Sie sind auf Seite 1von 43

LP BY PASS

SYSTEM
December 8, 2021 PMI Revision 00 1
Presentation outline
• Introduction of LP Bypass system
• Overview of LP Bypass
• System details and lay out
• Control scheme of LP bypass system

December 8, 2021 PMI Revision 00 2


L.P. BYPASS SYSTEM

• LP bypass bypasses steam to IPT & LPT & maintain flow


through RH.
Function of LP bypass:-
1. To monitor the pressure in reheat system and to control it
under certain operating condition.
2. The volume of steam not utilized by the IPT & LPT during
start up & shut down must pass through condenser.

December 8, 2021 PMI Revision 00 3


LP BYPASS SYSTEM

LP Bypass system provide a very effective means of


controlling reheat –steam flow during

 Startup
 Low-load / part load operation
 Sudden load rejection

December 8, 2021 PMI Revision 00 4


LP BYPASS SYSTEM

It enhances fast starting capability of turbines from all


initial conditions e.g.

 Cold condition
 Warm condition
 Hot Condition

December 8, 2021 PMI Revision 00 5


LP BYPASS SYSTEM
LP steam-bypass system operates in parallel with the
turbine

Protects Condenser from excessive temperature and


pressure that could result from sudden injection of
superheated steam

December 8, 2021 6
LP BYPASS SYSTEM

• The controls for LP Bypass system are combination of electrical


and well proven hydraulic system

• Electro-hydraulic converter provides the necessary link


between hydraulic actuator and electrical system

December 8, 2021 PMI Revision 00 7


SEQUENCE OF EVENTS RESULTING FROM LOAD
REJECTION
Upon receiving load rejection signal from electrical
system:
 Turbine Speed Controller assumes control of
the TG set

 It initiates fast closure of HP & IP turbine


control valves through position controller

 Fast closure of turbine control valves cause an


immediate decrease in HP 1st. Stage pressure

December 8, 2021 PMI Revision 00 8


SEQUENCE OF EVENTS RESULTING FROM LOAD
REJECTION
 Pressure increases in main and reheat steam
systems

 These pressure changes are sensed by HP and LP


Bypass controllers

 Respective bypass valves are opened

December 8, 2021 PMI Revision 00 9


• If LP steam- bypass system fails or the
condenser cannot accept LP bypass
steam , Safety Valves open and dump
steam to atmosphere

December 8, 2021 PMI Revision 00 10


December 8, 2021 PMI Revision 00 11
December 8, 2021 PMI Revision 00 12
December 8, 2021 PMI Revision 00 13
System details and layout
• The controls for LP Bypass system are combination
of electrical and well proven hydraulic system

• Electro-hydraulic converter provides the necessary


link between hydraulic actuator and electrical
system

December 8, 2021 PMI Revision 00 14


Control scheme

• Set point formation


• Pressure control for LP bypass system
• LP bypass HYDRAULIC System
• Protection system

December 8, 2021 PMI Revision 00 15


Control scheme
• The LPBypass Controller acts as a maximum
pressure Controller

• It regulates the reheater pressure either to the


fixed set value or suitably derived variable set
value

• If the reheater pressure exceeds this set value,


the Controller causes the electro-hydraulic
converter to operate and initiate bypass
operation

December 8, 2021 PMI Revision 00 16


Set Value formation

The Two set values – fixed and variable are formed for the
LPBypass control system
set value to be used is determined by a maximum value
selector
For the formation of variable set point, a pressure
transducer is used to measure the steam pressure in HP
turbine

December 8, 2021 PMI Revision 00 17


Bypass Controller – Block Diagram

December 8, 2021 PMI Revision 00 18


LP Bypass System

December 8, 2021 PMI Revision 00 19


Features of LPBP Controller
• LPBP controller maintains pressure after reheater
by controlling LP bypass valves
• It acts on the coil of the LPBP E-H converter to
position the control valves.
• Two setpoints, fixed and variable are used in
maximum selection circuit
• Variable setpoint is derived from HP first stage
pressure
• Water spray is in two stages depending on steam
flow through LPBP stations.
• LPBP valves cannot open until adequate spray
water pressure and required vacuum is there and
condenser wall temp is not high.
• Valves can also be operated manually
December 8, 2021 PMI Revision 00 20
LP BYPASS SETPOINTS

December 8, 2021 PMI Revision 00 21


CONTROLLER
OUTPUT
CHARACTERI
STICS

December 8, 2021 PMI Revision 00 22


Hydraulic Mode of Operation

• The controller controls plunger coil of Electro Hydraulic


Converter
• With increase in voltage, the jet pipe is deflected towards
right
• Converter piston moves downwards leading to generation of
LPB signal oil through Follow-up pistons provided in the
hydraulic control system

December 8, 2021 PMI Revision 00 23


Hydraulic Mode of Operation

• Two Follow-up Pistons actuate and open first stage of


water injection valve
• Remaining two Follow-up Pistons generate signal oil for
opening LPBypass stop and control valve
December 8, 2021 PMI Revision 00 24
ADJUSTMENT
OF
LPBYPASS
CONVERTER

December 8, 2021 PMI Revision 00 25


Design of LPBypass Valves for 210 MW
Steam Turbine

• Controlled by 8
bar mineral oil

December 8, 2021 PMI Revision 00 26


Design of LPBypass Valve for 500
MW Steam Turbine

• Controlled by 36 bar FRF

December 8, 2021 PMI Revision 00 27


Protection Devices

 Low Vacuum Condensor Protection


 Spray Water Pressure Switch
 Condensor Temperature Protection
December 8, 2021 PMI Revision 00 28
Protection Devices cause closure of
bypass station in case of following
eventualities

a) Condensor vacuum is low ( > 0.6 bar absolute )


b) Spray water pressure is low (< 8.5 / 9.5 bar )
c) Temperature of condenser body is high (> 90° C )

December 8, 2021 PMI Revision 00 29


Water Injection Valves operate in two stages

• Second stage Water Injection Valves open


when steam flow through LPBypass Valves
increases more than 45 %
December 8, 2021 PMI Revision 00 30
CURVE FOR LPBYPASS
CONTROLLER

December 8, 2021 PMI Revision 00 31


Damping device

December 8, 2021 PMI Revision 00 32


December 8, 2021 PMI Revision 00 33
December 8, 2021 PMI Revision 00 34
Actuator Bypass
Stop Valve
December 8, 2021 PMI Revision 00 35
Actuator
LPBPCV
December 8, 2021
500 MW
PMI Revision 00 36
Pilot valve
for Water
Injection Valve

December 8, 2021 PMI Revision 00 37


Water
Injection
Valve

December 8, 2021 PMI Revision 00 38


Combined Bypass
Stop & Control
Valve 210 MW

December 8, 2021 PMI Revision 00 39


Feedback for Pilot valve of
Bypass Control Valve 210 MW

December 8, 2021 PMI Revision 00 40


December 8, 2021 PMI Revision 00 41
December 8, 2021 PMI Revision 00 42
THANK YOU

December 8, 2021 PMI Revision 00 43