Beruflich Dokumente
Kultur Dokumente
Walls:
Sides of the tunnel sections are
termed as tunnel walls.
Muck:
The material excavated during a
tunnel construction is called muck.
Ground:
It is a material through which the
tunnel has to be driven.
Roof Bolting:
Steel bolts are penetrated
through the roof material for the
protection of roof material by
steel sheets.
• Crown:
The top of the curve roof is called
crown.
Hiatus
Uses of Tunnel: