Ground Processing
• Cargo Process
• Cargo Physical integration at S5C
• Cargo Late Access at BAF
NASA ESA
Container of CTB Container of CTB
Transport coordination
Transportation to Rochambeau Transportation to Rochambeau
from cargo packing facilities by ESA from cargo packing facilities
Ground processing team
ARIANESPACE responsible
Under launch contract
Arrival at
Rochambeau airport
S5
OFFICES S5
& OCOE ROOMS TRANSFER CORRIDORS
ESTEC 12 february 2004 ATV Ground Processing Team Slide Nr 4
D. SIRUGUET MSM-EAP
A - 3
EPCU 3 – S5
Dry cargo transport configuration
ATV Integration
AAC closure
Nominal Dry Cargo integration Possible Dry Cargo
• Duration: 2 days in 2 shifts (ie.
1 day = 2 x 8 hours)
integration
• Additional sequence:
– AAC door opening
– Internal floor set-up
– cargo introduction
Possible Dry Cargo integration before
AAC closure – internal floor removal &
Impact on Launch: max 3 days AAC door closure
depending on: – AAC leak test
• overall unloading / loading duration • Following ops :
• Possibility of same times operations
(bake out, prep. RFS & PM leak test, air
– ADB, ICC CoG,..
renewall, sampling,..)
Impact on Launch