Beruflich Dokumente
Kultur Dokumente
Emerson
Location Plymouth Av.
Near
Northside
Redevelopmen
Olson Hwy (TH 55)
t
4th Av. Area
Glenwood Av.
d
2nd Av.
a
Ro
ke
Master Planning Areav.
La
ar
d
Ce
nA
ek de
Cr e Li n
sett
Bas
RR
n
er
r th
No
o n
gt
r l in
Bu
Parade Area
K e n w o o d P a r k w a y
DCAUL
“Oh, I love my new home! It’s beautiful and it has more space
that we really need and it’s right around the corner from where I
work. It’s a dream come true for my family.”
UrbS 3500 Presentation 23
Development Plan
(Project E)
Before After
– Series of filtration
basins in median
islands
– Surface overflow
Rain storm becomes
an adventure
r Sediment
rm wate Pond or
Sto Flow Grit Filtration Storm
Trench Pond
Splitter Chamber Basin Pipes
Forebay
Level
Spreader Drain tile
UrbS 3500 Presentation 32
Amenity Ponds with
Cleansed Water
r Sediment
rm wate Pond or
Sto Flow Grit Filtration Storm
Trench Pond
Splitter Chamber Basin Pipes
Forebay
Level
Spreader Drain tile
UrbS 3500 Presentation 33
Architecturally
treated Culverts
and Walls
Railing Insert
Pattern book
Entrance—Old Unit
Entrance—New Unit
UrbS 3500 Presentation 40
Rental Housing
Planning
? Implementation