Sie sind auf Seite 1von 32

ENGINEERING PLUMBING AND

SANITATION

Application of Plumbing
System Of Clean Water
System of Clean Water
Purpose Of Common
Instructional :

1. After this Lesson solvent and


understands in explaining system
division of clean water .

Teknologi dan Rekayasa


Purpose Of Special Instructional
Student can mention :

1. Direct joint system


2. Indirect joint system
3. Advantage and disadvantage of
one of system

Teknologi dan Rekayasa


Installation of Clean Water Pipe
 To get safe installation there are some
thing that need to be paid attention :
1. Material is not corrosion easy to

2. Pipe through wall must be given


canopy

3. Applycation of pipe must be


diametrical

Teknologi dan Rekayasa


4.Utilizes fitting for transformation of
direction and transformation of
diameter
5.Exactly in determination of pipe
diameter
6.For vertical pipe labored straight to
the above of from basis
7.Every floor gives one crane stops
8.After meter water is attached [by]
crane which can prevent reverse flow

Teknologi dan Rekayasa


Example : Installation Scheme of Pipe in
building
1. Principal pipe
2. Housing joint
3. Meter water
4. Distributor pipe
5. Supply pipe of
clean water
6. Vertical pipe
7. Branch pipe for
equipments sanitary

Teknologi dan Rekayasa


Correct installation :

In important installation again was


all valves or crane attached at one
particular installation didn't cause
or can generate reverse flow and
exploitation to return if there are
transformation of water pressure in
installation.

Teknologi dan Rekayasa


1. Direct joint system
This system especially applied
for low and small housing
And Example :

a. Shut off valve in plot of land

b. Shut off valve below(under road


street)
physical plant.

Teknologi dan Rekayasa


a. Shut off valve in plot of land

Teknologi dan Rekayasa


b. Shut off valve below(under road street)
physical plant.

Teknologi dan Rekayasa


2. Indirect joint system :
 In this system, distribution pipe
within doors indirectly is attributed to
principal pipe of supply of cleanness
water.

 Water is accomodated in advance in


the tank then is flown / pumped to be
distributed in building for
requirement of cleanness water
would.

Teknologi dan Rekayasa


2.1. Roof tank system :
At this system, water is
accomodated in advance in the
tank under (attached to low floor
of building or below(under
ground face), then is pumped to
an usual upper tank is attached
above roof or above highest floor
of building.

Teknologi dan Rekayasa


Drawing :
System with roof tank

Teknologi dan Rekayasa


Compress tank system drawing

Teknologi dan Rekayasa


Application of Subterranean Pipe

Purpose Of Common
Instructional :

1. After this Lesson solvent


student and understands way of
applications of pipe in ground.

Teknologi dan Rekayasa


Purpose Of Special Instructional
Student can mention :

1. Dig aperture height


2. Way of putting down pipe in dig
3. Detention of pipe from at dividing
valve ( for big diameter )
4. Pipe test

Teknologi dan Rekayasa


Applications of subterranean
pipe
4 important factor of Applications
subterranean pipe :

1.Dig aperture height

Teknologi dan Rekayasa


Teknologi dan Rekayasa
2. Situation of Pipe

Teknologi dan Rekayasa


Explanation
A. Situation of Correct pipe
because :

 Pipe exactly ground anvil.

 Easy to checking of joint before


landfill with ground

Teknologi dan Rekayasa


 B. situation of Not accurate pipe
because.
 Ground anvil pipe only in each joint

 Cannot guarantee lineation of pipe

 If there are dividing valve from the


top (of), very possibly pipe earns
break

Teknologi dan Rekayasa


C. Situation of Pipe that is not
true because :
 Equiamplitude surface of
ground scraggly
 Pipe support above land not
regular
 Possibility to change / peripatetic
when landfill [by] ground or receives
payload from the top monstrous.

Teknologi dan Rekayasa


Joint that need to be given
retainer :
A.Turns pipe

Teknologi dan Rekayasa


B. Joint Knie 90

Teknologi dan Rekayasa


C. Tee Joint

Teknologi dan Rekayasa


D.Pipe connection final_

Teknologi dan Rekayasa


4 . Test pipe :
Step of putting down pipe :

a. Ground dug and in dig basis has


plane equiamplitude surface.

b. Equiamplitude surface of dig has


certain dip

Teknologi dan Rekayasa


c. Given sand as thick 10 cm

d. Pipe is put down, tied on


correctness

e. Put down as according to


above mentioned drawing.

Teknologi dan Rekayasa


Step of pipe test :

a. In check before hand every joint

b. By the end of pipe network is


closed

Teknologi dan Rekayasa


c. At the end of pipe network
attributed to pump

d. Depressed until pipe dividing


valve permitted

e. Emphasis within 15 second/


100 m. Pipe length.

Teknologi dan Rekayasa


Pipe test scheme

Teknologi dan Rekayasa


THE END