Importance of fire protection

Technological developments & establishment of sophisticated industries Have increased hazards of fire & explosion. Destruction of property, personal injury due to fire is a major concern.It is therefore necessary For proper identification of these hazards & quick protection of such Incidents when they occur. The risks & losses arising out of such accident cant be fully covered by insurance & therefore it is necessary to take all possible steps to reduce The extent of hazards & to minimize losses.An automatic fire protection system must be provided for total safety.
7/6/2011 KBL 4

Following purposes are served by using proper fire fighting systems. Safety of human life. Safety of buildings,plant,equipment,replacement of which is not costly But time consuming also. Insurance companies allow substantial rebate on insurance premium For installing fire fighting equipment's approved by TAC( Tariff Advisory committee) / NAPF 20 system approval is made compulsory by TAC.
7/6/2011 KBL 5

FIRE :
There are so many reasons of fire Careless match Short circuit Chemical explosion the fire can destroy property, profits and some times people too. All that remains is debris

7/6/2011

KBL

Fire insurance helps to get back some of the money invested. But insurance cannot bring back every thing like
loss of stock loss of production facilities delay while new machinery arrives loss of customers loss of immediate profits while business is being built

Fire insurance cant put out a fire, so that the only alternative would be to play safe and in the event of accidental fire and be prepared to stop fire within shortest possible time, before it can further damage.
7/6/2011 KBL 7

Fire Hazards

Normally fire hazards are classified in following major categories 1. Light Hazard Occupancies for e.g Cinema theaters, hotels, hospitals, offices and schools. 2. Ordinary Hazards Occupancies for e.g. Cigarette factories, Cotton mills and bakeries. 3. High Hazards A&C Alcohol distilleries, match factories, oil mills, storage yards for grass and bagasse. 4. High Hazards B Explosive factories, petrochemical plants, petroleum refineries etc. are covered.
7/6/2011 KBL 8

III FIRE PROTECTION METHODS & SYSTEMS

fire hazards can occur and increase only if following conditions are available Fuel availability Excessive Heat/ Temperature Oxygen content This is know as a fire triangle. To control & extinguish fire one or more of above to be controlled. To cut out fuel To reduce heat To cut off oxygen All fire protection systems work on one or combinations of above principles. Hydrant systems Sprinkler system Gas based protection systems Dry chemical powder protection systems and foam systems.
7/6/2011 KBL 9

Out of the above systems sprinkler and Hydrant systems are water based and are discussed below. Typical Fire water systems are as follows. 1. Main fire water pump with motor 2. Main fire water pump with engine 3. Jockey pump with motor 4. Piping, Hydrant valves hoses and other accessories.

7/6/2011

KBL

10

I. Sprinkler system:
This is water based system operated automatically through pressure sensing devices or through specially designed deluge valve. The water delivered is spread on desired object to extinguish fire. The temperature rise during fire activates sprinkle head which in turn sprays water in the fire area

7/6/2011

KBL

11

II . Hydrant system:
This is also water based system and can be operated either manually or automatically. In this system pressurized water can be used for extinguishing the fire. The operation of the system is governed by a pressure-switch mounted on hydrant line near the pump discharge. The delivery line is connected to a network of pipe lines and system is pressurized.

7/6/2011

KBL

12

In case of fire, when a hydrant valve is opened, a pressure drop is created in the system giving signal to control panel and thereby starting motor or diesel driven fire water pump. This pump can be stopped manually.

7/6/2011

KBL

13

Rules & Regulations:


TAC/NFPA 20 has recommended various parameters for selection of duty point for FW pump sets.

7/6/2011

KBL

14

7/6/2011

KBL

15

IFUG
. . 1) 2) 3) 4) 5) 6) 7) 8)

FI
T (

V
ITY

U I

( V. . )
.

TY B B B B B B B B 28 18 28 - 30 35 18 35 22.5 35 30 42 18 42 22.5 42 30

) 80-150 80-135 80-150 80-150 80-135

( I)

( 1500 1500 1500 1500 1500 1500 1500 1500

750 1000 1250 1500 2000 2500 3000 3500

100-150 125-150 125

7/6/2011

KBL

16

Specific Requirements for Pumps and Prime Movers TAC/NFPA 20


1. P MPS (MAIN FW) More reliable/Energy savings/Efficiency becomes secondary in consideration. Pump should start immediately. Pump should develop desired head with desired capacity immediately. The pump should be kept in primed condition. The pump should have flat characteristic curve.

7/6/2011

KBL

17

FW pump should develop 150% discharge and total head developed shall be at least 65% of the rated head. The MOC of impeller, casing ring, shaft sleeve, stuffing box, bush should be made in non-corrosive material preferable of bronze or brass. Pump coupling shall be directly coupled. Belts driven pumps are not acceptable. Shut off head shall not exceed 120% of rated head in case of horizontal pumps & 140% of rated head in case of vertical pumps. For pumps with negative suction, a foot valve with suitable priming arrangement is provided. TAC has approved our vertical turbine pumps, centrifugal pumps and end suction pumps with motor/engine.
7/6/2011 KBL 18

The most interesting point about fire fighting pumps is that its not supposed to use at all most of the times. Hence careful consideration is to be given to avoid corrosion of pump components and sticking of rotor unit to the stationary components in idle condition.

7/6/2011

KBL

19

Jockey pump:

To compensate water leakage in fire fighting loop a small jockey of adequate capacity is used. Its main function is to maintain pressure in the system and hence no special requirements are specified in TAC manual.

7/6/2011

KBL

20

EN INE :
Engine should accept load within 15 seconds from receipt of fire signal. Engine can be only naturally aspirated, turbo charged either air or water cooled type. Engine shall be capable of operating continuously of full load at desired site for a period of six hours. Engine shall be provided with adjustable governor to control the engine speed within 10% of its rated speed under any conditions of load, upto full loading rating.

7/6/2011

KBL

21

Engine rating after correction for altitude shall have BHP rating atleast 20% greater that max. bhp required to drive the pump at its duty point and in no case less that bhp required at 150% of its rated discharge. The coupling between pump and engine shall allow each unit to be allowed without disturbing to others. TAC recommend cooling system a. Heat exchanger cooling. b. Radiator cooling. c. Air cooling.
7/6/2011 KBL 22

Exhaust should be fitted with silencer, exhaust piping and total back pressure should not exceed 2 mercury column. Fuel tank with level gauge will be fitted & sufficient to run the engine at full load. Light hazard - 3 hrs Ordinary hazard - 4 hrs High hazard - 6 hrs

7/6/2011

KBL

23

Automatic starting by means of battery powered. Electric starter shall be provided. The battery capacity shall be adequate for 10 consecutive starts without recharging. Suitable battery charging device to charge batteries on trickle and boost to be provided. Engine shall be run for the period of at least 5 minutes of each day. Rotating components shall be covered with protective guards. Engine with air starting/Hydraulic staring shall be recommended as per TAC/NFPA 20 as and when required.
7/6/2011 KBL 24

KBL can offer the pump other than TAC approved duty point from wide range of Our products, also we can show string test of pump along with brought out instruments in our laboratory before dispatch.

7/6/2011

KBL

25

HEAT EXCHAN ER WATER FLOW / PRESS RE


MINIM M WATER FLOW AT 90 DE . TO HEAT EXCHAN ER LIT/MIN. ( PRESS RE : 100 PSI )

1500 RPM 1800 RPM N 495 114 143 NT/NTA/495 & NT 743 151 189 NT/NTA 743 & N 855 175 219 NT/A 855 240 300

ENGINE MODEL

7/6/2011

KBL

26

Deration of Engine
Performance engine especially those naturally aspiration, get seriously affected with change in altitudes, atmospheric temperature and presence of water vapor in air. This is because of all these factors collectively reduced quantity of 0xygen available for burning the fuel to drive the engine. Engine derating as per NFPA 20 a. Altitude For each 305 m altitude above standard condition (91.4 m) and deduction in 3% on engine HP b. Temperature Every 5.6 c rise above 25 c in ambient temperature a deduction of 1% c. Humidity deration not required as per TAC/NFPA20.
7/6/2011 KBL 27

MOTORS:
Electric supply to the pumping sets shall be entirely independent of all others electric equipment. Under volt release and no volt collect of the circuit breaker shall be removed so as to permit the motor to work under any condition. The motor shall be continuos rating type and shall have power rating equal to HP required to drive the pump at 150% of its rated discharge. Motor shall be totally enclosed type or drip proof type with class B insulation.

7/6/2011

KBL

28

Theory of operation:

Under normal conditions the entire system is under pressure. Under pressure there shall be always leakage. Due to this pressure will keep falling. This loss of water is compensated by jockey pump. The pressure switch for jockey pump is adjusted slightly below the system pressure so that pump starts when limit is reached and stops when system regains its desired pressure.

7/6/2011

KBL

29

During fires sprinkler/hydrant evacuated automatically and gets opened and starts spray the water. Due to this system pressure drop very fast. But since water demand is very high, at lower pressure motor operated fire pump will start. If it also fails to compensate and stand by diesel engine will start working. KBL can supply wide range of fire fighting sets. KBL pumps and accessories satisfies the requirements of TAC/ NFPA 20. Most of our models are approved by TAC/UL.

7/6/2011

KBL

30

The following major accessories are generally required in the fire fighting package 1. Right angle ear Box:

Gear box shall have a service (V.T pump only) factor 1.5 to provide power transmission of prime mover to vertical shaft of pump. Water cooler as well as, air cooled hollow shaft gear box are available in market. The cooler material can be steel or cuproNickel (Sea Water) to suit liquid conditions. Gear unit should have thrust bearing of adequate size to take downward thrust of pump. It should also have non reverse ratchet arrangement to avoid reverse rotation of pumps. The locking arrangement on the gear box with pump vertical shaft shall ensure proper locking.
7/6/2011 KBL 31

2. Propeller Shaft:

It couples and transmits torque to gear box shaft from engine flywheel. It shall have service factor of 1.75 for continuos duty operation. It will have axial slip and provision for angular and axial miss alignment. The diaphragm coupling/holset coupling shall be supplied between engine flywheel and propeller shaft/pump.

7/6/2011

KBL

32

3. Common Base/Separate base for engine and pump:

we can supply common base which can take complete weight of all systems and also provide space for mounting various instruments. Good design significantly contributes towards reduction of vibrations. Suitable anti-vibration mountings can be supplied to avoid transmission of vibration to the supporting supplied in case old vertical turbine pumps. structure. Alternatively separate base plate for engine and sole plate can be

7/6/2011

KBL

33

G.A DRAWING WITH COMMON BASE :

7/6/2011

KBL

34

GA DRAWING WITH DIFFERENT BASE

7/6/2011

KBL

35

GA DRAWING WITH SCT PUMP

7/6/2011

KBL

36

4. Diesel Fuel Tank:

Fuel Tank should be sized as per customers requirement, while deciding location of fuel tank it is to be noted that required flow of fuel shall come to the engine by gravity feed only to meet the NFPA 20 requirements. Fuel tank should be equipped with flame arrester in vent line, isolation valve for tank to drain and over flow pipe line, level switch to sense the level of fuel in fuel tank and give appropriate signals to control panel. A separate level indicator will be provided to give visual indication of fuel level in the tank.

7/6/2011

KBL

37

Capacity of fuel tank considering 8 hours continuos running of engine

Fuel tank size in liters 200 300 500

Engine type

N 495F NT 495F, N743F, N855 KT/A 1150F, V/VT, UTA - 1710F

7/6/2011

KBL

38

FUEL TANK CONNECTIONS :

7/6/2011

KBL

39

5. Circulation Relief alve:

It can be installed on delivery line and set below the shut off pressure (at min. flow app.. 40%). It shall provide flow of sufficient water to prevent the pump from overheating Circulation relief valve is not required for engine with heat exchanger, as secondary cooling flow is going though heat exchanger.

7/6/2011

KBL

40

6. Relief alve:

It can be installed after delivery line by pass loop. The set pressure will be in between shut off and min flow 40% to avoid excessive pressure on delivery line. The discharge of pump will be routed to sump.

7/6/2011

KBL

41

7. Automatic air release valve:

Air release valve can be installed in pump delivery pipe line to ensure the release of air trapped in column, it shall be sufficiently sized to allow maximum rate of air release. MOC depends on liquids handled.

7/6/2011

KBL

42

8. Pressure Switches:
Pressure switches are generally of Donfass or equivalent. They can set to any point within range of 0 to 10 kg/cm2.

9. Secondary engine cooling water piping:


Pumping water is used for engine cooling system. The connection for cooling water is taken from pump delivery. The cooling arrangement and its scope shall be generally as per NFPA 20 guidelines.

7/6/2011

KBL

43


T I


. V


I F W

SECONDARY COOLING ARRANGEMENT :

BY

SS B

U I

J I T

7/6/2011
Y TY ST UCI V

KBL
WH C CK T SC B B

44

10. Batteries & Battery Charger :

Normally 24V battery is used for starts (12 V two batteries are connected in series) also as per NFPA 20, one is taken in line after charging and standby is kept after charging. 3 m long cable with lugs, each for positive and negative terminal and 0.5 m interconnecting cable are standard scope of supply.00

7/6/2011

KBL

45

11. Instrument Panel:

This is incorporated to indicate overall conditions of the system at pump cooling water circuit and pressure indication in pump suction and delivery line.

7/6/2011

KBL

46

INSTRUMENT PANEL :

7/6/2011

KBL

47

12. Automatic Control Panel:

control panel is incorporated in fire fighting system for immediate start of the pump. It stars engine automatically when the hydrant pressure falls in the main hydrant line. Also control panel keeps constant watch on the engine conditions by giving audio visual indications for unhealthy conditions.

7/6/2011

KBL

48

Audio visuals signals for


Engine fails to start Lube oil low pressure High water temperature Fuel Level low Engine over speed

Visual indication
Engine running normal Battery charged Fuel level normal
7/6/2011 KBL 49

Selector switch for:

automatic starting Trickle/Boost battery charging Lube oil low pressure

7/6/2011

KBL

50

14. Exhaust Piping:

the engine exhaust is routed out side the pump house through exhaust piping.

7/6/2011

KBL

51

EXHA ST PIPIN

STANDARD SCOPE OF S PPLY

PIPE : 10M LONG, 2.77MM THICKNESS,BENDS 90DEG SHORD,


MS CONFIRM TO ANSI B16-9,FLANGES 4 NO.ALONGWITH FASTNERS.

I CI / / T/ T CI / T VT K / T K /6S T

XH UST SIZ

7/6/2011

KBL

52

Scope of supply of accessories:

Sr.No 1.

Pump Common base (P+M) (P + E) Separate base (P+E) Coupling guard (M&E) Foundation bolt (M&E) Fuel tank ( E) Battery (2 Sets) (E) ) (3m cable + 0.5 m) Sec cooling piping a. Heat exchanger only b. Radiator / air cooled (E)

Make

Split case   N/A      N/A

T. Pumps N/A        N/A

Remarks

KBL KBL KBL KBL KBL EXIDE

2. 3. 4 5. 6.

7.

KBL CIL/ KOEL


KBL

7/6/2011

53

Sr. o 8.

m uto control anel Instrument panel ( ptional) ressure itch ( ptional) ressure auge ( ptional) xhaust iping ( ptional) ight angle earbox.

ake chyut ( )

Split case

V .

mps

emarks

 

     / 

9. 10. 11 12. 13.

( (

) )

  

marillo

7/6/2011

KBL

54

Sr. o

mp

Make

Split case

V .

mps

emarks

14.

15. 16.

ropeller sha t ( ) ( nly spider/ olset coupling) irculation elie alve ( ) irculation elie ( ) elie alve ( alve

nique ) ( namar

  / 

  /  

17. 18.

) ) 

ir release valve (

NOTE : Insulation for Exhaust pimping can be made at site only

7/6/2011

KBL

55

CALCULATIONS FOR V.T. PUMP

7/6/2011

KBL

56

I ) RATED DISCHAR E ( NET FLOW ) = 450 M3/HR.

A) DISCHARGE REQUIRED FOR SECONDAR COOLING ( FROM GIL RECOMMENDATION FOR V 1710 ENG OF 1500RPM ) = 40 M3/HR. B) GEAR BOX COLLING ( AMARILLIO GEAR BOX ) = 1.8 M3/HR. TOTAL FLOW REQUIRED = (450 + 40.7 + 1.8 ) M3/HR = 492.5 M3/HR = 136.81 L/S.
7/6/2011 KBL 57

II) BOWL HEAD CALC LATION


A) SP. GRAVIT = 1.03 ( SEA WATER )

B) COLLAR DECK ELEVATION( FLOOR LEVEL ) = 17.458 M C) MINIMUM WATER LEVEL BELOW CHART DATUM = 7.0 M D) PUMP DISCHARGE C/L ABOVE COLLAR DECK = 0.565 M E) PRESSURE HEAD AT DELIVER C/L = (10.6 X 10)/1.03 = 1 02.91 M F) DIST.BETWEEN MIN.WATER LEVEL & DELIVER C/L = 17.458+7+0.565 = 25.03 M G) VELOCIT HEAD = Q/ A = 0.13631 / (A) = 2.787 M/ S. H) H = INTERNAL HEAD LOSS IN PUMP = 1.21 M
7/6/2011 KBL 58

TOTAL BOWL HEAD ={ DELIVER PRESSURE + STATIC LIFT + INTERNAL HEAD LOSS + (V2/2g)} = 102.913 + 25.023 + 1.21 + 0.396 = 129.541 M BOWL INPUT = ( Q X H ) / ( 102 X BOWL EFFICIENC ) = (136.81 X 129.541) / (102 X 0.75 ) = 231.666 X 1.03 = 238.62 KW MAX. BOWL INPUT FOR 150 % Q ( FROM CURVE ) = 255 KW SHUT OFF POWER ( APPROX.) = 200 KW SHUT OFF HEAD FROM CURVE = 182 M
7/6/2011 KBL 59

P MP : BHR 35 - 22.5 DE FIRE FI HTIN

THREE STA E P MP .

CONDITION

A) SHUT OFF SHOULD BE < 140 HDP < 1.40 X 129.541 M ACTUAL HEAD 174 M < 182 M B) FOR 150 % Q H > 0.65 HDP 150 X 136.8 = 205.21S > 0.65 X 129.541 M FOR 205 S HEAD > 84.55 M AS PER 92 M SO, BOTH NFPA20 CONDITION ARE SATISFIED.
7/6/2011 KBL 60

S SPENSION LEN TH CALC LATION :

A) COLLAR DECK ELEVATION : 17.458 M B) CHART DATUM TO MIN W.L. : 7.0 M C) POSITION OF E E OF LEVEL OF FIRST IMPELLER FROM MIN.WATER LEVEL :3600 MM D) IMPELLER E E TO BELL-MOUTH EDGE : 258 MM E) COLLAR DECK TO PUMP MOUNTING : 265 MM TOTAL SUSPENSION LENGTH (17458+7000+3600+258+265) = 28581 MM.

7/6/2011

KBL

61

GEAR BOX SELECTION :

MAX.BOWL INPUT = 255 KW X 1.36 = 346.8 HP + 2.1 HP ( SHAFT LOSSES ) = 348.567 HP. POWER REQUIRED AT GB SHAFT = 348.5676 / 0.96 ( 96 % GEAR EFF. ) = 363.09 HP. CONSIDERING 1.5 HP LOSS IN PULLE = 363.09 + 1.5 HP = 364.59 HP = 365 HP

7/6/2011

KBL

62

IN BUILT SERVICE FACTOR IN GEAR BOX : 1.5 SAFET FACTOR : 1.5 RATING OF GEAR BOX = (365 X 1.75) / 1.5 = 425.83 HP. GEAR BOX SELECTED HH 425 WITH 425 HP AT 1750 RPM.

7/6/2011

KBL

63

ENGINE SELECTION : (AS PER TAC 7.4.5.2.3) :

ENGINE H.P. RATING WILL BE


A) 20 % IN EXCESS OF THE MAXIMUM BHP REQUIRED TO DRIVE TO THE PUMP AT D.P. BPKW = 238.62 X 1.36 + 2.1 ( BEARING.& TRANSMISSION LOSSES ) = 326.6 X 1.20 = 391 HP

7/6/2011

KBL

64

B) THE BRAKE H.P. REQUIRED TO DRIVE THE PUMP AT 150 % OF ITS RATED DISCHARGE = 255 KW X 1.36 = 346.8 HP. SO, ENGINE SELECTION = 420 HP .

7/6/2011

KBL

65

ENGINE DERATING AS PER NFPA 20 : Altitude : 500 m Temperature : 40 C Humidity : 40 % at 40 C Application deration percentage for : a) Altitude : {(500 - 91.4 ) / (305)} x 3 b) Ambient temp. : {(40.25/5.6) x 1 % } c) Humidity : N.A.

7/6/2011

KBL

66

TOTAL = a + b + c = % Selected H.P. = 420 H.P. H.P.Avaliable after deration = 420 { 100-(_ _)/100 } = _ _ BHP.

7/6/2011

KBL

67

GUIDE LINES FOR GENERATION OF SPARE PARTS BUSINESS FOR V.T. PUMPS AND LARGE SPILT CASE PUMPS

Use of ISIturbid liquid.

6 strainer instead of

S galvanized in case of

Provision of bottom bearing arrangement in bell mouth for improvement of pump life. The bottom bearing provides supports to lower part of the impeller shaft which enhance the life of the pump.

7/6/2011

KBL

68

Study the site condition, sump layout, liquid details and recommend suitable material of construction to over come the problem, if any. Recommend impeller material CF PPM. Impeller guide piece material CF M or C 6 M instead of Cast Iron for BHM and BHQ type pumps.
7/6/2011 KBL 69

or C 6

if liquid

contains abrasive sand particles or chloride contents exceeds

Recommend improved design of discharge case having higher size [ ] bleed off connection and use of schedule instead MS IS: through tube tension nut. Use of Thordon type bearing and hardened shaft sleeve I of turbid liquid. Suggest provision of mechanical locking arrangement for Thordon type bearing to over come the problem of loosening and coming out from housing.
7/6/2011 KBL 70

pipes

pipes in order to avoid excessive leakage case

Recommend higher shell thickness or RW column pipes to over come water leakage problem through welding joint. Replacement of conical / Screwed coupling / old type coupling for higher size shaft diameters [ i.e. above 6 mm diameter] by muff coupling of improved design.

7/6/2011

KBL

71

Recommend cast iron discharge head which has better dampening properties in place of MS discharge head or suggest integral MS ischarge head [ ischarge head and

motor stool] to over come vibration problem or suggest to reduce bearing span after taking prior approval of PDE. Recommend improved design of stuffing box with throttle bush arrangement to avoid excessive leakage through stuffing box.

7/6/2011

KBL

72

Recommend hardened Stainless Steel material for shaft sleeve under stuffing box to avoid fast wearing of sleeve below gland packing to minimize stuffing box leakage. Replacement of Mitchell type bearing / lacier type thrust

bearing by antifriction bearing for reducing bearing loss. If at clients end antifriction bearing is giving trouble then suggest use of Mitchell type / lacier thrust bearing.

7/6/2011

KBL

73

Conversion of oil lubricated pumps into self/external water lubricated pumps with hardened Stainless Steel shaft sleeve and Thordon/ rcot/Finostos bearings. Replacement of old imported pumps with KB improved design. Replacement of competitors large size V.T. Pumps bowl assembly for old imported pumps or Indigenous pumps by KB pumps for improved performance. pumps of

7/6/2011

KBL

74

Pump operating parameters to be verified based on system head. If client requires higher discharge or system head is more then suggest use of higher impeller diameter by checking possibility of/margin on motor kW. If existing motor rating is not sufficient, then select new efficient pump type. If client requires both head and discharge more then check possibility of changing only pump unit.

S
7/6/2011 KBL 75

Suggest superior material to over come the problem of fast wearing of cast components considering water analysis. Recommend alternative material for pump component in case financial constraints of customer [e.g. CI impeller instead of Bronze, . % iCI instead of . to % iCI], keeping him informed about less life of component as compared to original supply.

7/6/2011

KBL

76

Conversion to separate thrust bearing in pump in arge V.T. Pumps instead of combined thrust-bearing design provided in motor. Suggest to replace all rings, fasteners, gaskets, keys during overhaul of V.T. Pumps. Recommend CF M impellers instead of BRONZE for spilt case pumps supplied in sugar industries to enhance the life.

7/6/2011

KBL

77

Recommend use of mechanical seal inplace of gland packed stuffing box arrangement for split case pumps for reducing leakage as well as friction loss. conversion of grease lubricated split case pump into oil lubricated pump to increase the bearing life of the pump.

7/6/2011

KBL

78

Suggest to replace metallic water deflectors inplace of rubber to avoid entry of water in bearing in case of oil lubricated spilt case pumps. Spare impeller of 6UPH and above pumps should be taken with impeller rings as standard supply. Impeller rings will be supplied fitted on impeller. For UPH/UPL pumps order for pump shaft should be taken with sleeve nuts and bearing nuts.

7/6/2011

KBL

79

Impress cust omer t hat f or last one year delivery of spare part s supply is improved. uide line f or supply of spares is as given below .

r. o.

DELI ERY RES ENTS. W ITHOUT INSPECTION 4 ks

ERI D. W ITH INSPECTION ks

1.

2. 3.

4.

fr r t P rt s t ri l f st r t ri l f c st r ct i . fr s ci l P rt s r t t ri l lik l, EN2 4 , :9 7 0 , 4 3 1 5 2 5 t c. ts f 2 Ni- st Ir / st Ir / r z t ri l. st c t s f s ci l t ls lik G Ni- r D2 , 2 1, 8 M , A NM , st t l , 13 t 17 Ni c st i s t c.

8 4

ks ks

10

ks ks

10

ks

12

ks

7/6/2011

KBL

80

1.

Gt l ti c l i ts Gt i t

list t L

L s s s

li ll s c

s tit rs P

t f s. N . s. A it

ck/

2.

t il r ss/Offic P c st ff r tt i r i A t t ir f l M i t ck.

N s/R si c r l f r c

3.

Disc ss r cli t

tr ct, E r

it

7/6/2011

KBL

81

Refurbishment & Retrofitting Of Existing Pumps.

A) Needs For Refurbishment & Retrofitting. 1) Upgrading Of Unit Capacity At Minimal Investment. 2) Adding Capacity To The Existing At Optimum Cost. 3) To Achieve Energy Saving.

7/6/2011

KBL

82

B) Basic Approach For Refurbishment 1) Review Of Operational History Of The Pumping Equipment & System 2) Analysis Of Data,records & Maintenance Of Overall Records. 3) Visual Examination Of Failed Pump Parts To Access Whether Cause Of Failure Is Due To Aging Or Due To External Cause Such As Corrosion,erosion Etc. C) Factors Responsible For Aging Of Pump 1) Prolonged Off Design Operations. 2) High & Low cyclo Fatigue. 3) Wear & Galvanic Corrosion Due To Improper Selection Of MOC.
7/6/2011 KBL 83

How KBLCan Participate In Refurbishing Of arious Pumps


This Involves Review Of Various Design Parameters Of Pumping Equipment In The System. 1) Variation In System Head Parameters Including The Variation In The Static Head,water Level Over The Day & ears. 2) Study Of The System Resistance Of Discharge Piping Network For Estimating Shifting Of Operating Point Of Pump. 3) Any Major Changes In The System, Such As Suction Intake Design Piping System,after Installation Of Pump That Were Not ConsiderRed In Design Change. 4) Post Operation & Failure History Of The Pump,overall Operation
7/6/2011

Vibration Behavior.

KBL

84

5)water Quality Monitoring & Its Record For Correlation Of Pump Operation. 6) Failure Pattern Of Worn Out Components. 7) Flow Condition In The Sump. 8) Transient Behavior Of The System . 9) Foundation Delivery Pipe & Driver Motor Details. 10) Influence Of Piping System & Foundation On The Vibration Performance Of The Pump. 11) Existing Pump Performance Curve. 12) Operation History Of The Pump At Different Flow Condition.
7/6/2011 KBL 85

The Above Study Will Help To :

Identify The Most Critical Parameters & Pump Element Responsible For Frequent Down Time Of The Pump Operation. A) Determination Of The Most Optimum Pump Parameters That Would Match With Existing System, Sump Design,motor,foundation & Piping Etc. B) Extent Of Modification Permitted In Existing System In Terms Of Flow , Efficiency Improvement ,Satisfactory Vibration PerformNCE & Over All Increase In Availability Of Pumps.

7/6/2011

KBL

86

RETRO-FITTING FOR VT PUMP :

7/6/2011

KBL

87

Energy Audit

Energy Conservation Now A Days Has Become A Prime Concern In Any Industry / Organization . Scarcity Of Energy & Day By Day Increasing Cost Of Forcing All The Profit Centers To Think Over Energy Saving In Each &Every Activity Carried Out. The Government Is Also Cautions About Energy Saving . The Example Of These Are Kerala & Gujarat ,Where State Governments Made Energy Audit Compulsory In Pump Replacement Project.

7/6/2011

KBL

88

Government Has Made Strict Company Laws For Energy conservation.KBL Has Conducted Energy Audits of pumps on Sites.Now A Days Many Parties Are Asking For Energy Audit. Hence It Is Very Much Essential To Start Energy Audit Of The Pumping System At Site & Suggest The Energy Efficient Alternatives/improvements To achieve Energy Efficient Performance. During Energy Audits at Site we have noticed the Consultant Has selected Pump for Higher head. The Small Size Energy Efficient Pump Be Sufficient. This Will Save ConSiderable Amount Of Energy.