Overview Contents
ATP-check in SD Requirements and the Availability Check Types of Availability Check in SD Shipping and Transportation Scheduling Rescheduling
7/19/2011
Activities of the shipping department eg planning of freight forwarding, packing and loading Activities of the procurement departement eg production or purchasing
To determine the actual date the material has to be at the plant (material availability date = MBDAT) scheduling is used !
7/19/2011
About Requirements
7/19/2011
In the customizing of the requirements class its determined whether an availability check is to be carried out against the ATP quantity, against planning or against product allocation.
7/19/2011
The types of issues and receipts that are taken into account for ATP, the scope of check can be customized.
7/19/2011
7/19/2011
7/19/2011
7/19/2011
Product allocation facilitates period-based distribution of products for certain customers (or customer groups) or regions. This ensures, for example, that when production is low, the first customer does not get the full amount, resulting in following sales orders not being confirmed or being confirmed far too late. Avoid first-come first-serve situations
7/19/2011
7/19/2011
When an order is created, the system determines the required material availability date on the basis of the customers requested delivery date. On this date, picking, packing, labelling, and loading the goods are based. Therefore, this is the date of significance for requirements planning on which the availability should be checked
Times to be considered: Working Hours (or calendar) for Shipping Point Pick/pack time Loading time Transit time Lead time for transport planning (optional) Working Hours (or calendar) for Unloading Point
7/19/2011
shipping
7/19/2011
Incoming Order
Material Availability
Transport Planing
Loading
Goods issue
Delivery Date
Lead Time
7/19/2011
Lead Time
7/19/2011
Rescheduling
Rescheduling
Rescheduling allows the REDISTRIBUTION of already confirmed quantities to other documents Example:
Right now the order of customer 1 has got the only one
piece in stock left as his order was posted at 10am today. The order of customer 2 is a backorder as when his order was posted at 3pm today there was no piece left anymore to confirm.
Rescheduling
The program takes the selected documents and unconfirms them all. Then they are rechecked, one after the other, according to the following sorting criteria: Delivery priority (defined at customer level) Sales Document creation date. Sales Document Number Alternatively the flag in V_V2 can be set to consider the delivery date instead of the creation date In 46C the priorities of sorting can be customized to a much finer level! 1. 2. 3. 4.
7/19/2011
7/19/2011
40 pieces
Sales orders
Confirmation Is it possible to deliver the product in the required quantity, and on the required date?
7/19/2011
Integrated with PP/DS (CTP Capable to Promise) High performance (time series) Backorder Processing (BOP)
7/19/2011
7/19/2011
Capable-To-Promise (CTP)
R/3
Confirmation
APO
ATP
No ATP Make
SD
Planned orders
ATP request
Planned orders
7/19/2011
Delivery Group
7/19/2011