Beruflich Dokumente
Kultur Dokumente
Ketan Tongare
Anjaneye Mohanty
Piyush Nandanwar
Chetna Popatkar
Aditya Bhonge
Abhijeet Tarar
Deepika Panth
Ankit Nakipuria
Assortment
Value Drivers
Financials
Display:
Selling space Sales volume/Sales per square foot = Selling space Type of goods: Convenience, Specialty and shopping goods Seen from main flow of traffic Sign be easily seen Better visibility, less advertising needed Structure has to be eye appeal
Office and Storage: Office and storage- 10 to 25% of total area Storage management systems and storage control systems SMS SCS
Straight floor plan (Ground floor) 1. Use of walls and fixtures 2. Most of the inventory on display 3. Economical store design
Mixed floor plan (1st floor) 1. Incorporates straight, diagonal and angular plan 2. Traffic towards the walls 3. Most functional store design
Store Layout
Ground Floor Plan
Store Layout
First Floor Plan
Decision factor:
1) 2) 3) 4) 5) 6) Size of the town The scale of its existing buildings, and Long-term goals with regard to retail development Social consideration Zoning laws Location cost
Logistics viewpoints:
1) Inbound logistics. Procurement logistics: Consists of activities such as 1)Market research 2) Requirements planning 3)Buy decisions 4)Supplier management 5) Ordering, and 6) Order controlling Minimization of procurement costs while maximizing the security within the supply process Disposal Logistics : 1. Reused or recycled 2. E.g.: packing material like plastic film and cardboard
Transport size
PMPML-TimeTable Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 Route ABC to Sanghavi Manapa to Sanghavi Manapa to Hinjevadi Manapa to Chinchvad Manapa to Pimple s. Manapa to Pimple G. Pune Station to Sanghavi Pune Station to Hinjevadi Pune Station to Chinchvad Pune Station to Pimple s. Pune Station to Pimple G. Swargate to Sanghavi Frequency Every ten min. Half hour Half hour One hour One hour Half hour Half hour One hour Every 15 min. Half hour One hour One hour
Transport Size
Auto Rickshaw Tariff
METER
1 1.1 1.2 1.3
CHARGE
11 12 12.5 13.5
METER
3.3 3.4 3.5 3.6
CHARGE
29.5 30 31 32
METER
5.6 5.7 5.8 5.9
CHARGE
48 48.5 49.5 50
METER
7.9 8 8.1 8.2
CHARGE
66 67 68 68.5
1.4
1.5 1.6 1.7 1.8
14
15 16 16.5 17.5
3.7
3.8 3.9 4 4.1
32.5
33.5 34 35 36
6
6.1 6.2 6.3 6.4
51
52 52.5 53.5 54
8.3
8.4 8.5 8.6 8.7
69.5
70 71 72 72.5
1.9
2 2.1 2.2 2.3
18
19 20 20.5 21.5
4.2
4.3 4.4 4.5 4.6
36.5
37.5 38 39 40
6.5
6.6 6.7 6.8 6.9
55
56 56.5 57.5 58
8.8
8.9 9 9.1 9.2
73.5
74 75 76 76.5
2.4
2.5 2.6 2.7 2.8 2.9 3 3.1 3.2
22
23 24 24.5 25.5 26 27 28 28.5
4.7
4.8 4.9 5 5.1 5.2 5.3 5.4 5.5
40.5
41.5 42 43 44 44.5 45.5 46 47
7
7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8
59
60 60.5 61.5 62 63 64 64.5 65.5
9.3
9.4 9.5 9.6 9.7 9.8 9.9 10 10.1
77.5
78 79 80 80.5 81.5 82 83 84