Jean-Louis TISON
ANDRA (Agence Nationale pour la Gestion des Dchets Radioactifs)
) Andra
AGENCE NATIONALE POUR LA GESTION DES DCHETS RADIOACTIFS INT.TR.ADAI.10-00NN
Andra
Safety.
Independence of the regulatory body. Safety objectives clearly identified and compatible with disposal options.(IAEA recommendations, National policies).
Andra
Effective.
Cost effectiveness. Look for an acceptable solution, not for the best technical solution. Optimization with other programs (Dismantling for example). Financing to be secure and reliable.
Andra
Andra
Design of a disposal.
Very critical for operational and short term monitoring periods. Includes the conditioning of waste (Relations with storage area), flexibility required. Compatibility between storage and disposal design. Depending on site Characteristics, Designmight be very critical (Engineered barriers).
6
AGENCE NATIONALE POUR LA GESTION DES DCHETS RADIOACTIFS
Andra
SITE.
Long term safety relies on Characteristics of the site. Importance of favorable technical characteristics Local acceptance to be key to the solution. Means Required for siting.
Andra
Andra
Acceptance Process
Implementation of National Independent Assessment organisations( technical and societal expertise) Call for international review by knowledgeable organisations (NEA, IAEA, etc). Acceptance of external review during the process. Implementation of local Independent Information Committees (financing included). Public Debate to be proposed. Show industrial references to the public as much as possible. Commitment from Waste producers required
9
AGENCE NATIONALE POUR LA GESTION DES DCHETS RADIOACTIFS
Andra
Producers need to be well identified in the local territory. ( Which activity has generated the waste?, which benefit was gained for the society?).
Producers to recognise that nuclear industry is at stake if failure in Waste disposal implementation.
10
Andra
Selection process in 1993 conducted by MP Christian BATAILLE resulted in four candidate districts: Vienne District Gard District Meuse District Haute-Marne District
district
and
regional
Andra
226 km
PARIS
CIGEO FACILITY
Andra
Andra
Conclusion
Interdependence of Site/Design/ Inventory components for a successful Disposal solution. Interface with Storage/sorting and preconditioning activities to be looked at. Compatibility of RWM Strategy with Nuclear Energy ,D&D ,and ER programs. General Planning consistency. RWM strategy requires support from the Institutions and from the Large Waste producers. The strategy might change with time, but it is important to have one! It takes a lot of time to implement a RWM strategy.
14