10,000 8,750 7,500 6,250 5,000 3,750 2,500 1,250 0 1980 1990 2000 2001 ADC-2005
1850-2470 kWh/acre-ft 5.6-7.5 kWh/kgal 1.5-2.0 kWh/m3
7.7
3.8
Note: 1. Numbers for energy consumption represent the RO process only. They do not include any allowance for supply or distribution. 2. Numbers are a general average for standard ASTM seawater locations.
Parking
Cargo Road
Storage
5
Main Test Building
ADC Water Treatment Process 1. Intake pier
7 N
1 2
iii
iv v
ii i Seawater Tank
vi
C B
vii
viii D
ix
G H Reject
Stream
Seawater Boat Channel GPM PSI TDS
A
93 35 34k
B
51 20 34k
C
43 20 34k
D
51 737 35k
E
93 763 35k 42 5
G
51 747 66k
H
51 10 65k
103
500
1.5 0.40
1000
3.1 0.82
1500
4.5 1.19
2000
6.1 1.61
2500
7.7 2.03
3500
10.7 2.83
4000
12.3 3.24
CRA and SWP figures are for West Basin Municipal Water District (WBMWD) and according to Water Sources Powering Southern California, by Robert C. Wilkinson Ph.D., January 2004. Seawater Reverse Osmosis (SWRO) Process power is from the ADCs demonstration facility at the most affordable point and for the SWRO process only. This includes the power of the main HP pump and PX booster pump only with no allowance for intake, pre-filtration, conveyance or distribution. WBMWD Total Power includes intake, pre-filtration, SWRO Process, conveyance and distribution power for their proposed 20 MGD ocean desalination facility.
Average So. Cal Home Water Consumption ~ 400 Gallons of Water Per Day
120 Watts
2.8 kWh/day
At 7.15 kWh/kgal seawater desalination requires only 120 watts of power to produce 400 gallons per day.
100 Watts avg. 140 Watts 75 Watts 100 Watts
2.4 kWh/day
3.4 kWh/day
1.8 kWh/day
2.4 kWh/day
$1M - 50% Non-State share funding Test and demonstrate latest technologies in optimal
configurations New membranes (Toray, Hydranautics and Koch) FilmTec hybrid membrane Next Generation Full scale Zenon Ultra filtration in natural seawater Hybrid PX flow schemes to push recoveries beyond 50% January 2007 - August 2008 Seeking new members to participate in and support ADC II and demonstrate new technologies