Sie sind auf Seite 1von 44

CAPITAL BUDGETING DECISIONS

Should we build this plant?

Sovraj Gautam

CAPITAL BUDGETING DECISIONS


The investment decisions of a firm are generally known as the capital budgeting, or capital expenditure decisions. The firm s investment decisions would generally include expansion, acquisition, modernisation and replacement of the long-term assets. Sale of a division or business (divestment) is also as an investment decision. Decisions like the change in the methods of sales distribution, or an advertisement campaign or a research and development programme have longterm implications for the firm s expenditures and benefits, and therefore, they should also be evaluated as investment decisions.

TYPES OF INVESTMENT DECISIONS


One classification is as follows:  Expansion of existing business  Expansion of new business  Replacement and modernisation Yet another useful way to classify investments is as follows:  Mutually exclusive investments  Independent investments  Contingent investments

AN EXAMPLE OF MUTUALLY EXCLUSIVE PROJECTS

BRIDGE vs. BOAT to get products across a river.

TYPES OF CASH FLOWS


Normal or Conventional Cash Flow :
 

One change of signs. Cost (negative CF) followed by a series of positive cash inflows.

Non-normal or unconventional Cash Flow:


  

Two or more changes of signs. Most common: Cost (negative CF), then string of positive CFs,then cost to close project. Example: Nuclear power plant, strip mine.

CAPITAL BUDGETING DECISIONS


These are generally: Long-term decisions; involving large expenditures. Have long term consequences. Difficult or expensive to reverse.

Capital Budgeting Methods

Discounting Criteria

Non Discounting Criteria

NPV

BCR

IRR

PBP

ARR

MIRR

DPBP

NET PRESENT VALUE


NPV of a project is the sum of the present values of all the cash flows positive as well as negative that are expected to occur over the life of the project. The formula for NPV is:

C1 C3 Cn C2     C0 NPV ! n 2 3 (1  k ) (1  k ) (1  k ) (1  k ) n Ct  C0 NPV ! t t !1 (1  k )

NET PRESENT VALUE


Where,  Ct = cash flow at the end of year t  n = Life of the project  k = discount rate (given by the projects opportunity cost of capital which is equal to the required rate of return expected by investors on investments of equivalent risk).  C0 = Initial investment  1 / (1 + k )t = known as discounting factor or PVIF i.e present value interest factor.

CALCULATING NET PRESENT VALUE


Assume that Project X costs Rs 2,500 now and is expected to generate year-end cash inflows of Rs 900, Rs 800, Rs 700, Rs 600 and Rs 500 in years 1 through 5. The opportunity cost of the capital may be assumed to be 10 per cent.
Rs 900 Rs 800 Rs 700 Rs 600 Rs 500      Rs 2,500 NPV ! 2 3 4 5 (1+0.10) (1+0.10) (1+0.10) (1+0.10) (1+0.10) NPV ! [Rs 900(PVF1, 0.10 ) + Rs 800(PVF2, 0.10 ) + Rs 700(PVF3, 0.10 ) + Rs 600(PVF4, 0.10 ) + Rs 500(PVF5, 0.10 )]  Rs 2,500 NPV ! [Rs 900 v 0.909 + Rs 800 v 0.826 + Rs 700 v 0.751 + Rs 600 v 0.683 + Rs 500 v 0.620]  Rs 2,500 NPV ! Rs 2,725  Rs 2,500 = + Rs 225

ACCEPTANCE RULE OF NPV


Accept the project when NPV is positive NPV > 0 Reject the project when NPV is negative NPV < 0 May accept or reject the project when NPV is zero NPV = 0 ( A project will have NPV = 0, only when the project generates
cash inflows at a rate just equal to the opportunity cost of capital)

The NPV method can be used to select between mutually exclusive projects; the one with the higher NPV should be selected.

ADVANTAGES OF NPV METHOD


It considers time value of money. It is a true measure of profitability as it uses the present values of all cash flows (both outflows & inflows) & opportunity cost as discount rate rather than any other arbitrary assumption or subjective consideration. The NPVs of individual projects can be simply added to calculate the value of the firm . This is known as Principle of value additivity . It is consistent with the shareholders wealth maximization principle as whenever a project with positive NPV is undertaken, it results in positive cash flows and hence the increase in the value of the firm.

DISADVANTAGES OF NPV METHOD


It is difficult to estimate the expected cash flows from a project. Discount rate to be used is very difficult to determine. Since this method does not consider the life of the projects, in case of mutually exclusive projects with different life, the NPV rule, tends to be biased in favour of the longer term project. Since NPV is expressed in absolute terms rather than relative terms it does not consider the scale of investment.

BENEFIT COST RATIO


It is calculated as: Benefit-cost ratio = PVB / I Where, PVB = present value of benefits I = Initial investments

ACCEPTANCE RULE FOR BCR


BCR > 1 = Accept BCR = 1 = Indifferent BCR < 1 = Reject

EVALUATION OF BCR METHOD


Advantages of BCR method:


Since it considers the investment in the project, it is considered to be preferable to NPV method. Disadvantages of BCR method:

It does not provide for a means through which a number of smaller projects can be combined to be compared to a bigger project.

Internal Rate of Return: IRR


0 1 2 3

CF0
Cost

CF1

CF2 Cash Inflow

CF3

IRR is the rate of return that equates PV of cash inflows with investment outlay of a project . This is the same as forcing NPV = 0.

INTERNAL RATE OF RETURN METHOD


The internal rate of return (IRR) is the rate that equates the investment outlay with the present value of cash inflow received after one period. This also implies that the rate of return is the discount rate which makes NPV = 0. The formula for calculating IRR is:
C1 C2 C3 Cn C0 !    2 3 (1  r ) (1  r ) (1  r ) (1  r ) n C0 !

t !1 n t !1

Ct (1  r )t Ct  C0 ! 0 t (1  r )

INTERNAL RATE OF RETURN METHOD


Where,
    

Ct = cash flow at the end of year t n = Life of the project r = discount rate C0 = Initial investment 1 / (1 + r )t = known as discounting factor or PVIF i.e present value interest factor.

CALCULATION OF IRR
Level or even Cash Flows:  Let us assume that an investment would cost Rs 20,000 and provide annual cash inflow of Rs 5,430 for 6 years.  The IRR of the investment can be found out as follows: NPV !  Rs 20,000 + Rs 5,430(PVAF6,r ) = 0
Rs 20,000 ! Rs 5,430(PVAF6, r ) Rs 20,000 PVAF6, r ! ! 3.683 Rs 5,430 IRR = 16% approx.( Refer to PVAF table @ 3.685 for 6 yrs

NPV Profile and IRR


A 1 N P V P r o f ile 2 C a s h F lo w 3 -2 0 0 0 0 4 5430 5 5430 6 5430 7 5430 8 5430 9 5430 B D is c o u n t r a te 0% 5% 10% 15% 16% 20% 25% C D E F G H

NPV 1 2 ,5 8 0 7 ,5 6 1 3 ,6 4 9 550 0 ( 1 ,9 4 2 ) ( 3 ,9 7 4 )

IR R

F ig u r e 8 .1 N P V P r o f ile

CALCULATION OF IRR
Uneven or non normal Cash Flows: Calculating IRR by Trial and Error  The approach is to select any discount rate to compute the present value of cash inflows. If the calculated present value of the expected cash inflow is lower than the present value of cash outflows, a lower rate should be tried. On the other hand, a higher value should be tried if the present value of inflows is higher than the present value of outflows. This process will be repeated unless the net present value becomes zero.

CALCULATION OF IRR
A project costs Rs.16000 and is expected to generate cash inflows of Rs. 8000, Rs.7000 & Rs.6000 at the end of each year for next 3 years.

ACCEPTANCE RULE FOR IRR


Accept the project when r (IRR) > k (WACC). Reject the project when r (IRR) < k (WACC). May accept the project when r = k. In case of independent projects, IRR and NPV rules will give the same results if the firm has no shortage of funds. In case of projects with equal IRR & different NPV, select project with higher NPV as it is consistent with firm s wealth maximisation objective.

ADVANTAGES OF IRR METHOD


It considers time value of money. It is a true measure of profitability as it uses the present values of all cash flows(both outflows & inflows) rather than any other arbitrary assumption or subjective consideration. In case of conventional independent projects NPV & IRR methods gives the same decision. Whenever a project with higher IRR than WACC is undertaken, it results in the increase in the shareholder s return. Hence, the value of the firm also increases.

PROBLEMS WITH IRR


Lending & Borrowing projects: Project with initial outflow followed by inflows is a lending type project whereas a project with initial inflow followed by outflows is a borrowing project. Since IRR does not differentiate between lending and borrowing projects, a higher IRR may not always be a desirable thing. Multiple IRR: In case of projects with non-normal or unconventional cash flows more than one IRR are generated which are misleading. Mutually Exclusive projects: In case of mutually exclusive projects the results of NPV & IRR methods may conflict each other. This is because the IRR method does consider the scale of investment.

PROBLEMS WITH IRR


Different short term & Long term interest rates: Since the cash flows are discounted at the opportunity cost of capital, there arises a confusion regarding what rate is to be used for discounting, if the short term and long term lending rates are different.

LENDING & BROWING PROJECTS


Lending projects: Project with initial outflow followed by inflows is a lending type project. Borrowing projects: Project with initial inflow followed by outflows is a borrowing project.
Cash Flows (Rs.) Project X Y Co -100 100 C1 110 -110 IRR 10% 10% NPV at 10% 0 0

LENDING &BORROWING PROJECTS


Cash Flows (Rs.) Project X Y Co -100 100 C1 110 -110 IRR 10% 10% NPV at 5% 4.72 -4.72

Cash Flows (Rs.) Project X Y Co -100 100 C1 110 -110 IRR 10% 10% NPV at 15% -4.3 4.3

PROBLEM OF MULTIPLE IRRS




A project may have both lending and borrowing features together. IRR method, when used to evaluate such non-conventional investment can yield multiple internal rates of return because of more than one change of signs in cash flows.

Case of Ranking Mutually Exclusive Projects


Investment projects are said to be mutually exclusive when only one investment could be accepted and others would have to be excluded. Two independent projects may also be mutually exclusive if a financial constraint is imposed. The NPV and IRR rules give conflicting ranking to the projects under the following conditions:  The cash flow pattern of the projects may differ. That is, the cash flows of one project may increase over time, while those of others may decrease or vice-versa.  The cash outlays of the projects may differ.  The projects may have different expected lives.

RANKING MUTUALLY EXCLUSIVE PROJECTS (Timing of Cash Flows)


Cash Flows (Rs) Project M N C0 1,680 1,680 C1 1,400 140 C2 700 840
Project M 0 5 10 15 20 25 30 560 409 276 159 54 -40 -125

NPV C3 140 1,510 at 9% 301 321


Project N 810 520 276 70 -106 -257 -388

IRR 23% 17%

Discount Rate

RANKING MUTUALLY EXCLUSIVE PROJECTS (Timing of Cash Flows)


NPV 1000 800 600 400 200 0 -200 -400 10% discount is k/as Fisher s intersection. 5% 10% 15% 20% 25% 30% NPV INR 276/___ Project M ---- Project N

Discount Rate

RANKING MUTUALLY EXCLUSIVE PROJECTS (Scale of Investment)


Cash Flow (Rs) Project A B C0 -1,000 -100,000 C1 1,500 120,000 NPV at 10% 364 9,080 IRR 50% 20%

RANKING MUTUALLY EXCLUSIVE PROJECTS (Project Life Span)


Cash Flows (Rs) Project X Y C0 10,000 10,000 C1 12,000 0 C2 0 C3 0 C4 0 C5 20,120 NPV at 10% 908 2,495 IRR 20% 15%

Modified Internal Rate of Return (MIRR)


The modified internal rate of return (MIRR) is the compound average annual rate that is calculated with a reinvestment rate different than the project s IRR. Both NPV & IRR methods assume that the entire cash flow generated during the life time of the project is reinvested at project cost of capital (i.e k) & internal rate of return (i.e r) respectively in each of the above two methods. But, in MIRR the cashflows are assumed to be reinvested at cost of capital ( k) instead of internal rate of return ( r )as in IRR method.

PAY BACK PERIOD


It is the number of years required to recover a project s cost, or how long does it take to get the business s money back?

PAY BACK PERIOD


0 CF -100 Cumulative -100 Payback = 2 + 1 10 -90 30/80 2

2.4

3 80 50

60 100 -30 0

= 2.375 years

PAY BACK PERIOD


Strengths of Payback: 1. 2. Provides an indication of a projects risk and liquidity. Easy to calculate and understand.

Weaknesses of Payback: 1. 2. 3. Ignores the time value of money. Ignores CFs occurring after the payback period. It is a measure of capital recovery & not profitability.

DISCOUNTED PAYBACK PERIOD (DPBP)


Discounted Payback: Uses discounted rather than raw CFs.
0 1 2 3

CFt PVCFt

-100 -100

10 9.09 -90.91

60 49.59 -41.32

80 60.11 18.79

Cumulative -100 Discounted payback

+ 41.32/60.11 = 2.7 yrs

ACCOUNTING RATE OF RETURN


The accounting rate of return is the ratio of the average after-tax profit divided by the average investment. A variation of the ARR method is to divide average earnings after taxes by the original cost of the project instead of the average cost.

ACCEPTANCE RULE OF ARR


This method will accept all those projects whose ARR is higher than the minimum rate established by the management and reject those projects which have ARR less than the minimum rate. This method would rank a project as number one if it has highest ARR and lowest rank would be assigned to the project with lowest ARR.

ACCOUNTING RATE OF RETURN


The ARR method has certain advantages as:
 

It is very simple to understand. Dependency on accounting data which is readily available. Shows the profitability of the project.

ACCOUNTING RATE OF RETURN


The disadvantages of ARR include:


It is based on accounting profit rather than cash flows. Time value of money is ignored. It is inconsistent in the sense that the numerator represents the profit belonging to equity and preference shareholders whereas the fixed assets used in denominator rarely if ever represents contribution equal to equity & preference shareholders.

 