PART1
PM 1 Im in charge of the construction of a retail development in the centre of a large town. There are 26 retail units and a super market in the complex. My main responsibilities are to co-ordinate the work of the various contractors to ensure that the project is completed to specification, within budget and on time. PM 2 I am directing a team of research scientists. We are running trials on a new analgesic drug on behalf of a pharmaceutical company. It is my responsibility to design the experiments and make sure that proper scientific and legal procedures are followed, so that our results can be subjected to independent statistical analysis. PM 3- The international aid agency which employs me is sending me to New Delhi to organize the introduction of multimedia resources at a teachers training college. My role is quite complex. I have to make sure that appropriate resources are purchased- and in some cases developed within the college. I also have to encourage the acceptance of these resources by lecturers and students within the college.
vikramthadeshvar@hotmai Project is not defined by the type4of outcome it is set up to achieve l.com
Project
A project is a temporary endeavour involving a connected sequence of activities and a range of resources, which is designed to achieve a specific and unique outcome and which operates within time, cost and quality constraints and which is often used to introduce change.
Characteristic of a project
1. A project has identifiable beginning and end point; it is an entity by itself. 2. It is not a permanent entity; it is usually a non-repetitive task. 3. It can be broken down into identifiable activities which require time and resources for their execution. 4. It is schedule to be completed by a target date. 5. The objectives are clear and output or end product definite. 6. It is usually large and complex with time horizon of 2 to 3 years. However some projects have taken more than 10 years while others have lasted for less than 6 months. 7. It usually involves heavy investment. 8. Execution of project activities and hence completion of the project is always subject to some uncertainties and risks 9.Need leadership
5
Examples
constructing houses, factories, shopping malls, athletic stadiums or arenas developing military weapons systems, aircrafts, new ships launching satellite systems constructing oil pipelines developing and implementing new computer systems planning concert, football games, or basketball tournaments introducing new products into market
vikramthadeshvar@hotmai l.com 6
What is project management The application of a collection of tools and techniques to direct the use of diverse resources towards the accomplishment of a unique, complex, one time task within time, cost and quality constraints. Its origins lie in World War II, when the military authorities used the techniques of operational research to plan the optimum use of resources. One of these techniques was the use of networks to represent a system of related activities
Each project, whether big or small has three basic requirements: It should be completed without any delay. It should use available man power and other resources as small as possible. It should involve as small investment as possible. The project management helps to fulfill the above requirements.
8
10
Project Planning
Resource Availability and/or Limits
Due date, late penalties, early completion incentives Budget
Activity Information
Identify all required activities Estimate the resources required (time) to complete each activity Immediate predecessor(s) to each activity needed to create interrelationships
vikramthadeshvar@hotmai l.com 12
vikramthadeshvar@hotmai l.com
13
History of CPM/PERT
Critical Path Method (CPM)
E I Du Pont de Nemours & Co. (1957) for construction of new chemical plant and maintenance shut-down Deterministic task times Activity-on-node network construction Repetitive nature of jobs
vikramthadeshvar@hotmai l.com
Network analysis is the general name given to certain specific techniques which can be used for the planning, management and control of projects
Use of nodes and arrows Arrows An arrow leads from tail to head directionally Indicate ACTIVITY, a time consuming effort that is required to perform a part of the work. Nodes A node is represented by a circle - Indicate EVENT, a point in time where one or more activities start and/or finish. Activity A task or a certain amount of work required in the project Requires time to complete Represented by an arrow Dummy Activity Indicates only precedence relationships vikramthadeshvar@hotmai Does not require any time of effort 15 l.com
Project Network
Event Signals the beginning or ending of an activity Designates a point in time Represented by a circle (node) Network Shows the sequential relationships among activities using nodes and arrows
Activity-on-node (AON) nodes represent activities, and arrows show precedence relationships Activity-on-arrow (AOA)
Project Network
arrows represent activities and nodes are events for points in time
vikramthadeshvar@hotmai l.com
16
PART2
PERT
One of the most challenging jobs that any manager can take on is the management of a large-scale project that requires coordinating numerous activities throughout the organization. A myriad of details must be considered in planning how to coordinate all these activities, in developing a realistic schedule, and then in monitoring the progress of the project.
PERT (program evaluation and review technique) CPM (critical path method)
In 1957 the Critical Path Method (CPM) was developed as a network model for project management. CPM is a deterministic method that uses a fixed time estimate for each activity. While CPM is easy to understand and use, it does not consider the time variations that can have a great impact on the completion time of a complex project. The Program Evaluation and Review Technique (PERT) is a network model that allows for randomness in activity completion times. PERT was developed in the late 1950's for the U.S. Navy's Polaris project having thousands of contractors. It has the potential to reduce both the time and cost required to complete a project.
PERT and CPM have been used for a variety of projects, including the following types:
Construction of a new plant Research and development of a new product NASA space exploration projects Movie productions Building a ship Government-sponsored projects for developing a new weapons system Relocation of a major facility Maintenance of a nuclear reactor Installation of a management information system Conducting an advertising campaign
BENEFITS OF PERT
PERT is useful because it provides the following information: Expected project completion time. Probability of completion before a specified date. The critical path activities that directly impact the completion time. The activities that have slack time and that can lend resources to critical path activities. Activity start and end dates.
LIMITATIONS
The activity time estimates are somewhat subjective and depend on judgment. Even if the activity times are well-estimated, PERT assumes a beta distribution for these time estimates, but the actual distribution may be different. Even if the beta distribution assumption holds, PERT assumes that the probability distribution of the project completion time is the same as the that of the critical path. Because other paths can become the critical path if their associated activities are delayed, PERT consistently underestimates the expected project completion time.
FORMULAS
PART3
In 1957, DuPont developed a project management method designed to address the challenge of shutting down chemical plants for maintenance and then restarting the plants once the maintenance had been completed. Given the complexity of the process, they developed the Critical Path Method (CPM) for managing such projects.
On July 20, 1969, just eight years after Kennedy's speech, Apollo 11 landed two men on the moon. This achievement was possible only with careful planning that included the critical path method. NASA used the critical path method to help determine an efficient schedule for the tasks that led to the moon landing.
Benefits
Provides a graphical view of the project. Predicts the time required to complete the project. Shows which activities are critical to maintaining the schedule and which are not
CPM Diagram
Events are depicted as nodes/circle on the network and activities that signify the beginning or ending of events are depicted as arcs or arrow lines between the activity. The following is an example of a CPM network diagram:
The CPM determines both the early start and the late start date for each activity in the schedule.
CPM calculation
Path A connected sequence of activities leading from the starting event to the ending event Critical Path The longest path (time); determines the project duration Critical Activities All of the activities that make up the critical path
CPM steps
Draw the CPM network Analyze the paths through the network Determine the float for each activity Float is the maximum amount of time in which activity can be delay in its completion before it becomes a critical activity, i.e., delays completion of the project Find the critical path i.e,the sequence of activities and events where there is no slack i.e.. Zero slack Longest path through a network
ACTIVITY
1-2 1-3 2-3 2-5 3-4 3-6 4-5 4-6 5-6 6-7
DURATION
15 15 3 5 8 12 1 14 3 14
5
2 5
15
1
3 15
3
14 12
14
Forward Pass:
Earliest Start Time-earliest time an activity can start Forward calculation from left to right. For any arrow max. value by addition should be taken.. Events are converging in.
E=15
2
5 E=27
5
15
E=0
1
3 E=26
4
14
12
3 E=40 14
6
E=54
7
15
3
8
E=18
Backward pass
Latest finish timelatest time an activity can be completed without delaying critical path time. Backward calculation from right to left. For any arrow minimum value by subtraction should be taken.. Events are diverging out.
E=15:L=15
2
E=27:L=37
5
15 E=0
1
1 3 E=26 L=26
4
3 14
14
14
7
L=0
15
3
12
E=18:L=18
TAIL EVENT START HEAD EVENT FINISH ACTIVI TY 1-2 1-3 2-3 2-5 3-4 DURATI EARLIE ON ST 15 15 3 5 8 LATEST EARLIE ST LATEST TOTAL
3-6
4-5 4-6 5-6
12
1 14 3
6-7
14
TAIL EVENT START HEAD EVENT FINISH ACTIVI TY 1-2 1-3 2-3 2-5 3-4 DURATI EARLIE ON ST 15 15 3 5 8 0 0 15 15 18 LATEST EARLIE ST LATEST TOTAL
3-6
4-5 4-6 5-6
12
1 14 3
18
26 26 27
6-7
14
40
TAIL EVENT START HEAD EVENT FINISH ACTIVI TY 1-2 1-3 2-3 2-5 3-4 DURATI EARLIE ON ST 15 15 3 5 8 0 0 15 15 18 LATEST EARLIE ST LATEST 15 18 18 37 26 TOTAL
3-6
4-5 4-6 5-6
12
1 14 3
18
26 26 27
40
37 40 40
6-7
14
40
54
TAIL EVENT START HEAD EVENT FINISH ACTIVI TY 1-2 1-3 2-3 2-5 3-4 DURATI EARLIE ON ST 15 15 3 5 8 0 0 15 15 18 LATEST EARLIE ST 15 15 18 20 26 LATEST 15 18 18 37 26 TOTAL
3-6
4-5 4-6 5-6
12
1 14 3
18
26 26 27
30
27 40 30
40
37 40 40
6-7
14
40
54
54
TAIL EVENT START HEAD EVENT FINISH ACTIVI TY 1-2 1-3 2-3 2-5 3-4 DURATI EARLIE ON ST 15 15 3 5 8 0 0 15 15 18 LATEST 0 3 15 32 18 EARLIE ST 15 15 18 20 26 LATEST 15 18 18 37 26 TOTAL
3-6
4-5 4-6 5-6
12
1 14 3
18
26 26 27
28
36 26 37
30
27 40 30
40
37 40 40
6-7
14
40
40
54
54
TAIL EVENT START HEAD EVENT FINISH ACTIVI TY 1-2 1-3 2-3 2-5 3-4 DURATI EARLIE ON ST 15 15 3 5 8 0 0 15 15 18 LATEST 0 3 15 32 18 EARLIE ST 15 15 18 20 26 LATEST 15 18 18 37 26 TOTAL
3-6
4-5 4-6 5-6
12
1 14 3
18
26 26 27
28
36 26 37
30
27 40 30
40
37 40 40
6-7
14
40
40
54
54
Float
Total float: Total float is an extra surplus time allocated to an activity. Total float can be: 1.Positive 2.Negative 3.Zero Mathematically, Total float=LFT-EST-Duration of activity
TAIL EVENT START HEAD EVENT FINISH ACTIVI TY 1-2 1-3 2-3 2-5 3-4 DURATI EARLIE ON ST 15 15 3 5 8 0 0 15 15 18 LATEST 0 3 15 32 18 EARLIE ST 15 15 18 20 26 LATEST 15 18 18 37 26 TOTAL 0 3 0 17 0
3-6
4-5 4-6 5-6
12
1 14 3
18
26 26 27
28
36 26 37
30
27 40 30
40
37 40 40
10
10 0 10
6-7
14
40
40
54
54
Free float: It is that fraction of total float which can be used for re-scheduling the activity without affecting the succeding activity. Mathematically, Free float=Total float - slack of head event
TAIL EVENT START HEAD EVENT FINISH ACTIVI TY 1-2 1-3 2-3 2-5 3-4 DURATI EARLIE ON ST 15 15 3 5 8 0 0 15 15 18 LATEST 0 3 15 32 18 EARLIE ST 15 15 18 20 26 LATEST 15 18 18 37 26 TOTAL 0 3 0 17 0
3-6
4-5 4-6 5-6
12
1 14 3
18
26 26 27
28
36 26 37
30
27 40 30
40
37 40 40
10
10 0 10
10
0 0 10
6-7
14
40
40
54
54
Independent float: It is that fraction of free float which can be used for rescheduling the activity without affecting the preceding and succeding activity. Mathematically, independent float=Free float slack of tail event
TAIL EVENT START HEAD EVENT FINISH ACTIVI TY 1-2 1-3 2-3 2-5 3-4 DURATI EARLIE ON ST 15 15 3 5 8 0 0 15 15 18 LATEST 0 3 15 32 18 EARLIE ST 15 15 18 20 26 LATEST 15 18 18 37 26 TOTAL 0 3 0 17 0
3-6
4-5 4-6 5-6
12
1 14 3
18
26 26 27
28
36 26 37
30
27 40 30
40
37 40 40
10
10 0 10
10
0 0 10
10
0 0 0
6-7
14
40
40
54
54
TAIL EVENT START HEAD EVENT FINISH ACTIVI TY 1-2 1-3 2-3 2-5 3-4 DURATI EARLIE ON ST 15 15 3 5 8 0 0 15 15 18 LATEST 0 3 15 32 18 EARLIE ST 15 15 18 20 26 LATEST 15 18 18 37 26 TOTAL 0 3 0 17 0
3-6
4-5 4-6 5-6
12
1 14 3
18
26 26 27
28
36 26 37
30
27 40 30
40
37 40 40
10
10 0 10
10
0 0 10
10
0 0 0
6-7
14
40
40
54
54
PART4
5. Determine the critical 5. Identify the critical path. path (longest path through the network) 6. Update the PERT chart as the project 6. Update the CPM progresses. diagram as the project progresses. 7. It has the potential to reduce both the time 7. usable for projects and cost required to with activities having complete a project. single time estimates
ADVANTAGES OF PERT/CPM
Simple to understand and use Show whether the project is on schedule; or behind/ ahead of the schedule Identify the activities that need closer attention (critical) Determine the flexibility available with activities
Show potential risk with activities (PERT) Provide good documentation of the project activities Help to set priorities among activities and resource allocation as per priority
LIMITATIONS OF PERT/CPM
Demand clearly defined and stable activities Precedence relationship should be known in advance Overemphasis on Critical path Activity time estimates are subjective Activity times in PERT may not follow Beta PD in reality
Cost of crashing an activity may not be linear Some Computer Software Available for Network Analysis Microsoft Project (Microsoft Corp.) Power Project (ASTA Development Inc.) Primavera Project Planner (Primavera)
PART5
Project cost
Each activity of the project consumes some resources and hence has cost associated with it. Almost in all the cases cost of an activity varies to some extent with the amount of time consumed by the activity. The cost of the project will also depend upon the duration time of project. Thus increasing the costs the project duration can be cut down to some extent. To obtain an optimum project schedule- Maintain a balance between the costs and time.
An optimum project schedule implies- lowest possible cost and minimum possible time. The total cost = consists of the direct and indirect costs
Direct cost
Cost of material, equipment and labor required to perform the activity. Cost is directly dependent upon- amount of resources involved in the individual activity. Direct cost-time relationship activity can varied by varying the cost i.e., if the duration of any activity is further increased that will decreases in cost.
Normal point- The cost of the activity decreases in significantly if the duration is further increased. Crash point- The minimum activity duration to which an activity can be compressed by increasing the resources and hence by increasing the direct cost.
Cost slope =
It is with assumption that the indirect cost increases linearly with time as shown in the figure give below:
MINIMUM COST
The sum of direct and indirect cost gives the total project cost. When the direct cost decrease with time and indirect cost increase with time, the total project cost curve will have a point where the total cost will be minimum.
Step 3: This step is to identify those activities along the critical path which can be crashed. Crash the least expensive activity, i.e., the activity with the least slope. Step 4: By crashing the critical activity of critical path if other paths also become critical, we obtain a situation of parallel critical paths which implies that the duration of project can further be reduced through simultaneous crashing of the activities in the parallel critical paths. Step 5: This step involves the computation of total cost. After following the step, 3rd and 4th point is obtained beyond which further crashing in project duration is not possible. Total cost is obtain by adding corresponding fixed cost to the direct cost and direct cost will refer to the sum of cumulative crashing cost and normal cost.
d) In the case of parallel critical path, each of the parallel must compressed. e) The minimum duration of the project with minimum cost network can be obtain.
THANK YOU