A PRESENTATION ON ERECTION PROTOCOLS

CONTENTS
PRELUDE QA PROGRAME FQP ERECTION PROTOCOLS

PRELUDE
Post Bid activities/discussions
Contractual issues Commercial issues Technical issues Quality issues

QA PROGRAME
QA Program To insure technical requirements To identify the responsibilities To look after the activities of

Shop manufacturing BOI Inspection Field activities

QA PROGRAME
BOI Inspection and Shop manufacturing

MQP compliance.

Model MQPMQP-Hoist.pdf
Issuance of MDCC.

FIELD QUALITY PLAN


Before starting of site activities, FQP is submitted by contractor and a suitable field quality organization with adequate manpower is set up to effectively implement the FQP requirements. Various checks/tests are performed and documents are prepared in different stages accordingly. Class of checks performed are A Class (Critical) B Class (Major) C Class (Minor)

ERECTION PROTOCOLS
Protocols/Records are prepared as per FQP in the following stages of the project execution Material receipt & storage Pre-erection activities Erection activities Pre-commissioning Commissioning and RIOC TO and TOC

MATERIAL RECEIPT AND STORAGE PROTOCOLS Check for transit damage Check for type, make, rating, quantity Checking of MDCC, Challan, MTC etc Storage as specified FQP- Storage.doc MRC

PRE-ERECTION PROTOCOLS
Civil works FQP-civil.xls Checking of inserts Clearance for civil foundation Protocols for handing over of foundations Structural work FQP-str.xls WPS Welder test format Tests for welded joints Shop assembly Sand blasting and painting Alignment checks Erection welding format Protocols.xls

ERECTION PROTOCOLS
Handing over of structures for flooring and casting of machine foundations Checking of layouts Leveling of foundations Erection of equipments Alignment of equipments & Grouting Sample FQP-ME.pdf

ERECTION PROTOCOLS
Electrical works cable tray power and control cables motors transformers HT and LT switchgears cable testing and termination earthing of equipments Sample FQP FQP-EE.pdf

PRE-COMMISSIONING
Equipment healthiness Safety clearance Checking of protection and interlocks Checks during initial running Sample IAC.pdf

Commissioning
Recoding the parameters in prescribed format for initial run RIOC Sample IAC.pdf List of defects observed during initial run

TRIAL OPERATION
After initial running of equipments individually, the total

system is put on the trial run for specified number of days.


Protocols are prepared for the start of TO During TO, performance of the system is observed and

any discrepancies found are recorded in log sheet.


After successful completion of TO, protocol for TO

completion is signed.

TAKING OVER BY O&M


Following successful completion of all facilities, for a particular unit, Projects Dept requests O&M Dept for issuing Unit-wise Taking Over Certificate (ITOC), enclosing the following documents for all the systems/ equipments pertaining to the specific unit
As-built Drawings, Manuals, Signed Quality Plans List of Equipments Copies of RIOC Copies of Factory & Site Test Reports

PG TEST
Submission of PG test procedure Pre-requisites to be ensured by Employer Pre-requisites to be ensured by Contractor Joint inspection protocol for PGT readiness Capacity tests and Power consumption measurement