Presentation outline Overview of Plant Controls Functions of ATRS Structure of ATRS Program Structure of ATRS and Turbine protection
PMI Revision 00
MAN-MACHINEINTERFACE
OPERATOR
PLANT
May 24, 2012 3
BOILER
TURBINE
GENERATOR
OPEN-LOOP CONTROL
ADVANTAGES OF AUTOMATION
OPERATING PERSONNEL FREED FROM ROUTINE TASKS. INCORRECT INTERVENTIONS IN THE PROCESS AVOIDED. STRESS ON EQUIPMENT REDUCED. PLANT OPERATIONS GEARED FOR MAXIMUM EFFICIENCY. INCIPIENT FAULTS RECOGNISED QUICKLY. ON FAULT OCCURRENCE, IMMEDIATE AND LOGICAL INTERVENTION POSSIBLE.
PMI Revision 00
A.
CONTROL SYSTEM:
ANALOG (CLOSE LOOP) - ELECTROHYDRAULIC CONTROLLER (EHC) - TURBINE STRESS EVALUATOR (TSE) - LOW PRESSURE BYPASS CONTROLLER (LPBPC) - GLAND STEAM PRESSURE CONTROLLER (GSPC) BINARY (OPEN LOOP) - AUTOMATIC TURBINE RUN UP SYSTEM (ATRS) - AUTOMATIC TURBINE TESTER (ATT)
B.
C.
PROTECTION SYSTEM
7
HIERARCHY OF CONTROL
SUB-GROUP CONTRL-1
SUB-GROUP CONTRL-2
CONTROL INTERFACE
FEATURES :
BASED ON FUNCTIONAL GROUP CONTROL PHILOSOPHY EACH FUNCTIONAL GROUP ORGANISED AND ARRANGED IN SUB-GROUP CONTROL, SUB-LOOP CONTROL, AND CONTROL INTERFACE OPERATING MODES AVAILABLE: - MANUAL MODE ( OPERATOR GUIDE) - AUTOMATIC MODE - STEP BY STEP MODE
PMI Revision 00
ATRS STRUCTURE
OIL SYSTEM, VACUUM SYSTEM, TURBINE etc.
GC
SGC SLC
May 24, 2012
SGC SLC
PMI Revision 00
SGC
SLC CI
CI
10
GROUP CONTROL: Decides WHEN, HOW MANY & WHICH SGC shall be operating and stopped. SUB GROUP CONTROL: Contains the sequential logics for switching drives ON and OFF. Perform sequence in STEPS, issue commands and get Checkbacks. SUB LOOP CONTROL: can be switched ON & OFF manually. Receive commands from GC, SGC and also Manual CONTROL INTERFACE: Standard Interface between the command transmitters and receivers in the plant, undertakes all necessary signal processing and monitoring. SYSTEM OPERATION MODES: AUTOMATIC,SEMI AUTOMATIC,OPERATOR GUIDE
May 24, 2012 PMI Revision 00 11
ADVANTAGES OF ATRS
ELIMINATES HUMAN ERROR PROVIDES MAXIMUM PROTECTION AGAINST MALFUNCTIONS OPERATORS TASK LESS ARDUOUS ENABLES SAFE, SMOOTH, STRESS CONSISTANT AND OPTIMUM WARM-UP, ROLLING AND SYNCHRONISATION OF TURBINE IN LEAST POSSIBLE TIME INCREASES PLANT AVAILABILITY REDUCES STARTING TIME WITHOUT IMPAIRING LIFE MEETS EMERGENCIES AUTOMATICALLY ALL PLANT OPERATING CONDITIONS CATERED TO BY CRITERIA DEPENDANT PROGRAMMING INCREASED OPERATING FLEXIBILITY, SAFETY AND RELIABILITY
PMI Revision 00
12
ATRS
PMI Revision 00
13
STEP 01
START DRIVE A
PMI Revision 00
14
SGC executes commands to bring the equipment upto a particular defined status. The commands are executed in a predefined sequence in the form of steps. Desired number of criteria act as preconditions before the SGC can take off or execute its defined sequence. The functional group continues to function automatically all the time demanding enabling criteria based on the process requirements and from other FGs, if required. In case the desired criteria is not available, the system would automatically act in such a manner as to ensure the safety of the main equipment. The sequence is programmed in the processor. The process signals are acquired through the input modules and are available on the bus.
PMI Revision 00 15
Waiting Time : It implies that the subsequent step will not be executed unless the specified time elapses. If no waiting time is specified, the next step gets executed as soon as the enabling criteria are fulfilled. Monitoring Time : It is the time required for executing the command of any step as well as the time required for appearance of criteria for the next step. Under healthy conditions it should happen within the specified time, otherwise an alarm is initiated. Whenever there is uncertainty regarding the time required for completing a particular task, such as warming-up, pulling vacuum etc., the monitoring time is blocked.
PMI Revision 00
16
&
BYPASS CRITERION
EXAMPLE
1 &
02 PROGRAM LOOP WAIT 50s MO TIME 20s
COMMAND
1 2
&
STEP 2 ( START UP PROGRAM) WITH 2 STEP CRITERIA, 2 COMMAND OUTPUTS AND A MONITORING & WAITING TIME . WITH ADDITIONAL PROGRAM LOOP CONTROL AND A BYPASS CRITERIA FOR STEP 1 WAITING OR MO TIME CAN BE PROGRAMMED FOR 0.1 SEC TO 999 MIN. NOS. 1-49 USED FORRevision 00 51 TO 99 FOR SHUTDOWN PROGRAM. 17 PMI START-UP,
ATRS can be switched on at any stage after completing certain tasks manually, if so desired. In such cases, the SGC program quickly scans through the steps and starts executing from the stage upto which the tasks have been completed manually. This is achieved by incorporating suitable overflow /bypass conditions in the logic.
PMI Revision 00
18
1. ATRS is organised in the following four Sub-Groups : Oil supply Evacuation Turbine HP CONTROL FLUID 2. SGC issues commands either to the SLC or directly to the drive through the Control Interface. 3. Each of these SGCs has its subordinate SLCs and CI modules. These SGCs in conjunction with the turbine governing system , TSE and the auto-synchroniser accomplish the function of start-up of the TG set.
PMI Revision 00
19
PMI Revision 00
20
PMI Revision 00
21
PMI Revision 00
22
1. SGC-TURBINE :
Sub-loop Control (SLC) Drains. Warm up Controller. Starting Device of turbine governing system. Speed & Load Setpoint devices of turbine governing system. Auto-synchroniser.
May 24, 2012 PMI Revision 00 23
Sub-loop control (SLC) turning gear. SLC auxiliary oil pump 1. SLC auxiliary oil pump 2. SLC emergency oil pump. SLC jacking oil pump.
PMI Revision 00
24
Sub-loop Control (SLC) condensate extraction pumps. Starting ejector, if provided. Main ejectors / vacuum pumps (as applicable). Vacuum breaker.
PMI Revision 00
25
Sub-loop Control (SLC) HPCF SLC HPCF pumps HPCF pumps HPCF re-circulation pumps LPCF temp control valve
PMI Revision 00
26
LP WATER INJECTION
MANUAL ON/OFF
AUTOMATIC SYNCHRONIZER
MANUAL OPEN/CLOSE
DRAIN VALVES
28
SGC-DISPLAY
4 6 8 7 5
1. PUSHBUTTON SHUTDOWN 2.PUSHBUTTON STARTUP OR OPERATION 3.PUSHBUTTON AUTOMATIC ON/OFF 4.LAMP SHUTDOWN PROGRAM 5.LAMP STARTUP OR OPERATION PROGRAM 6.LAMP AUTOMATIC OFF 7.LAMP AUTOMATIC ON 8.LAMP FAULT
May 24, 2012 PMI Revision 00 29
SLC-DISPLAY
2 3 4
1
1. PUSHBUTTON MANUAL ON/OFF 2.LAMP SLC OFF 3.LAMP FAULT 4.LAMP SLC ON
May 24, 2012 PMI Revision 00 30
DRIVE INTERFACE-DISPLAY
3 4 5
1. PUSHBUTTON OFF (CLOSE) 2. PUSHBUTTON ON (OPEN) 3. LAMP OFF (CLOSE) 4. LAMP FAULT 5. LAMP ON (OPEN)
May 24, 2012 PMI Revision 00 31
PMI Revision 00
33
PMI Revision 00
34
HYDRAULIC TRIP SYSTEM - OVER SPEED TRIP DEVICE 1/2 - VACUUM TRIP DEVICE - HAND TRIP LEVER(LOCAL) 1/2
ELECTRICAL TRIP SYSTEM - MANUAL REMOTE TRIP ( UCB) - LOW VACUUM TRIP - LOW LUBE OIL - FIRE PROT. TRIP -BRG METAL TEMP -AXIAL SHIFT -HP/IP TOP/BOT DIFF TEMP HI
PROT. CRITERIA FROM OTHER AREA -GENERATOR PROTECTION - MASTER FUEL TRIP RELAY ENERGISED - BOILER PROTECTION OPTD.
PMI Revision 00
35
PMI Revision 00
36
PMI Revision 00
37
PMI Revision 00
38
PMI Revision 00
39
PMI Revision 00
40
i)
or in machine hall, operated. ii) Level in main oil tank falls to a very low value, indicating substantial leakage of oil from the system.
The command signal under condition (ii) is initiated from three level transmitters in 2-out-of-3 logic cofiguration.
May 24, 2012 PMI Revision 00 41
PMI Revision 00
42
6. TRIP COMMAND INITIATED FROM ATRS : The protection acts when the trip command signal is initiated from the Automatic Turbine Run-up System .