Introduction to Manthan

Wave XV August 12, 2005 H T Gangaramani

CONTENTS

Why do we need Manthan? What has Manthan achieved so far?

What is the plan for Wave XIII ?


Illustrations from earlier waves

TATA CHEMICALS OVERALL PERFORMANCE HAD BEEN DETERIORATING OVER THE LAST FEW YEARS
Sales Rs crore PAT Rs crore

1,648 1,464 1,521 1,493 1,433

1627

289 182 117 165 197 127

1998 1999

2000

2001

2002

2003

1998 1999

2000

2001

2002

2003

Pre-tax ROCE Per cent

Market capitalisation Rs crore

18 12 11 11 10 12 2,701 1,297 949 839 1190

687

1998

1999

2000

2001 2002

2003

1998

1999

2000 2001 2002

2003

THIS IS DUE TO THREE REASONS

Overcapacity in domestic industry

The production capacity of the soda ash industry has been


growing due to entry of new players like Nirma and expansion in capacities of existing players. This has not been accompanied by corresponding demand growth.

Threat from imports

Import duties on Soda ash are expected to go down further in


subsequent years. This will make the domestic market susceptible to an import threat.

Price-cost squeeze

A normal phenomenon in most chemical industries, it refers


to the increase in costs accompanied by a reduction in realizations or prices.

* Footnote Source: Source

THE OVERALL MARKET SCENARIO FOR SODA ASH IS WEAK

There is over 30 % overcapacity in the domestic market Production capacity in 000 tons p.a.

and realisations on exports are lower than that in the domestic market Realisation Rs / ton of SAL**

115
Demand for 01-02 1820 K tons* 420

96

2396

365

525 875

9001 5009

TCL

GHCL Nirma

SCL

TACFL DCW

Total

Domestic

Exports

* Includes internal consumption by producers including Nirma ** Price ex Mithapur, inclusive of excise and bagging costs Source: TCL Marketing department

FURTHER, THE DOMESTIC INDUSTRY FACES THREATS FROM CHEAPER IMPORTS IN THE NEAR FUTURE
Imports can come in cheaper US costs, 000 Rs./MT (natural soda ash) 8.2 1.5 Current landed price*

2.0
1.5 1.3 1.1 2.4 3.9

5.9

7.4
6.5

Landed price at full cost


Landed price at 10% duty

Variable Fixed Ex-works Local FOB Shipping, CIF cost costs cost freight handling Cost curve suggests price pressure Cash cost**, Rs./MT (2000-01 Indian cost curve) 8,200 Current landed price 6,500 Landed price at 10% duty 4,750 5,000+ 4,500 GHCL Nirma TCL

Duty

Landed cost

Past prices have shown a lower trough Ex-Mumbai Rs./MT 9500

5,900
SCL & others 10140 Imports 7760

10

15

20
Demand 19

25

Capacity (lakh tpa)

May 98

May 99

May 00

May 01

AND THE PRICE-COST SQUEEZE IN THE CHEMICAL INDUSTRY HAS LEAD TO CONTINUOUS REDUCTION IN MARGINS
Price-cost squeeze in chemical industry, Western Europe, 1986-1994 Index Costs increasing at 0.6% p.a.

Major drivers :

Labor (direct, services) Energy


Major drivers : Commodities Flattening of cost curves New/improved processes Operational excellence New entrants Specialities Customer sophistication New entrants Limited number of true innovations

100

Price cost squeeze -1.6% p.a.

Prices decreasing at -1.2% p.a. Time

Source: McKinsey

TATA CHEMICALS IS THEREFORE WORKING ON GROWTH OPPORTUNITIES WHILE STRENGTHENING POSITION IN CORE BUSINESS
Key Issues

Focus of current program

How can TCL achieve long term sustainable competitive advantage in core businesses?
Growth What should be the long term aspiration and strategy for soda ash, urea and salt?

What growth potential (e.g., exports) can cost reduction unlock for the core businesses? What should be the future growth engines for TCL? How far should TCL step out? Is M&A an attractive route? Should available options be pursued (e.g., Soda Ash
consolidation, fertiliser privatisations)?

Purchasing: Review sourcing strategy for key materials and services; improve purchasing
Profitability processes and organisation capabilities

Manufacturing: Optimise manufacturing processes and practices to reduce raw material


consumption and other fixed and variable costs

Supply chain: Optimise end-to-end supply chain to reduce working capital requirements,
logistics costs and improve customer service

Marketing: Optimise customer mix to increase profitability, increase emphasis on non-price


attributes, re-organise marketing and sales around key accounts, increase market share without deteriorating industry conduct

THE ROLE OF MANTHAN IS TO IMPROVE PERFORMANCE IN THE CORE BUSINESS


Total performance improvement Quantum leap and continuous improvement Performance

Throughput
Reduced losses at bottlenecked stations Current state Future state

Manthan

Cost Quality
Reduced accidents Reduced fines generated 40% reduction in compressible cost; 10-20% reduction in total cost

Time Past Manthan Future

MANTHAN aims at overall performance improvement that is both dramatic and continuous

MITHAPUR IS WORKING LIKE A HUB TO PROVIDE SUPPORT & KNOWLEDGE SHARING TO OTHER LOCATIONS TEAMS WORKING TOWARDS ACHIEVING ACCELERATED PERFORMANCE IMPROVEMENT
Other Group companies

API Centre Mithapur

Mumbai (Marketing) Haldia

Babrala

CONTENTS

Why do we need Manthan? What has Manthan achieved so far?

What is the plan for Wave XIII ?


Illustrations from earlier waves

MANTHAN UNITS AT MITHAPUR FOR CYCLE - I

Wave 1 Wave 2 Wave 5

Wave 3 Wave 4

Process flow

Soda ash plant

Plants or sections

Raw material inputs

10.TOP at salt works


Salt works

11.TOP at brine refinery


Brine Refinery 6. TOP at process house Process house 12. TOP at STD 7. TOP for soda ash handling Packaging

16 Stores & Services 17 Township & Over heads 18 Safety-I 19 MHY & Inbound Logistics 20 Port 21 ENCON 22 Replacement Ideas 23 Safety - II

STD

5. TOP at lime kiln 1. Coke purchasing 9. Limestone purchasing Lime kiln

Power plant MUW plant 8. TOP at MUW 14. TOP at Marine & WTP CC plant 14. TOP at CC plant Boiler 2. Fuel purchasing 4. TOP at boiler Rest of power plant 15.TOP at Rest of power plant 3. Packaging Purchasing

Gypsum, Limestone

13. TOP at Cement plant

Cement plant

MANTHAN UNITS AT MITHAPUR FOR CYCLE - II

Wave 8 Wave 7 Wave 6

Wave 9

Soda ash plant

28 TOP at Bicarb & Dense Ash

26.TOP at Finished Product handling

Units repeated in cycle - II Process flow Plants or sections Raw material inputs 33 Soda Ash Quality 34 Plant Safety 35 Fire Safety 36 Solar Salt Quality 37 OEE in Soda Ash

Salt works

Brine Refinery

31.TOP at Pr House & STD

Packaging

25.TOP at lime kiln

Process house

STD

Lime kiln

38 Cement Marketing 39 Sea Water System 40 Corporate & Mktg O/Hs 41 Stores Inventory 42 Administration

Power plant

29.Packaging Purchase

Gypsum, Limestone

MUW plant

CC plant
32. TOP CC & Marine

27. TOP at MUW

Boiler
24.TOP at Power Plant

Rest of power plant

30.TOP at Cement

Cement plant

Wave 10

Wave 12

MANTHAN UNITS AT MITHAPUR FOR CYCLE - III

Wave 11

Wave 13

Units repeated in cycle -III Process flow Plants or sections

Soda ash plant

Salt works

Brine Refinery

Packaging

Process house

STD

Lime kiln

Power plant

MUW plant

CC plant
56 Caustic Throughput & Marketing 57 ESF Cake Utilisation

Raw material inputs 43 Salt Logistics 44 Supply Chain - I 45 Soda Ash Maintenance 46 Corporate Overheads 47 Supply Chain - II 48 Delayed Ideas 49 Lime Path -I 50 Brine Path 51 Lime Path-II 52 Raw Material - Cement 53 Soda Ash Throughput 54 Energy conservation Cement 55 Salt Throughput 56 Caustic Throughput & Marketing 57 ESF Cake Utilisation 58 Water Conservation Gypsum, Limestone Cement plant

55 Salt Throughput

Boiler

Rest of power plant

58 Water Conservation

WE HAVE TAKEN ENERGY CONSERVATION, WATER MANAGEMENT, MUW PLANT EVAPORATORS AND SIX SIGMA OEE IN CYCLE - IV
64 Water Management

Wave 15 Wave 14

Wave 12 Wave 13

66 Six Sigma and OEE

Units repeated in cycle -III Process flow Plants or sections Raw material inputs 51 Lime Path-II 52 Raw Material - Cement 53 Soda Ash Throughput 54 Energy conservation Cement 55 Salt Throughput 56 Caustic Throughput & Marketing 57 ESF Cake Utilisation 58 Water Conservation 59 Maintenance Excellence 60 Waste Reduction 61 Business Process Innovation 62 Replacement Ideas 63 Energy Conservation 64 Water Management 65 MUW Plant Evaporators 66 Six Sigma and OEE Gypsum, Limestone Cement plant

Soda ash plant

Salt works

Brine Refinery

Packaging

Process house
63 Energy Conservation

STD

Lime kiln

Power plant

MUW plant

CC plant

65 MUW Plant Evaporators

Boiler

Rest of power plant

AFTER COMPLETING THE CYCLE-1 WE HAVE NOW STARTED WITH CYCLE-2, IN CYCLE-2 WE SHALL REVISIT ALL THE UNITS OF CYCLE -1 IN 4 MORE WAVES AND CONTINUE TO IMPROVE SAFETY & PRODUCT QUALITY
Wave 8 Wave 7 Wave 6 Q1, 2003 Q2, 2003 Q3, 2003 Q4, 2003 Wave9

Units

Lime Kiln Finished Product Handling Soda Ash Quality Power Plant Plant Safety (MUW, Marine & CC)

Fire Safety Bicarb- Dense Ash Quality Solar Salt MUW Plant OEE - Soda Ash

Cement Marketing Cement Plant Cooling Water System Packaging Purchase Corporate O/Hs

Process House & STD Administration CC and Marine Stores Inventory and usage

Num.of units

CYCLE - III HAS BEEN COMPLETED AFTER COMPLETION OF WAVE- XIII IN APRIL 2005

Wave 12 Wave 11 Wave 10 Q1, 04-05 Q2, 04-05 Q3, 04-05

Wave 13

Q4, 04-05

Units

Supply Chain Soda Ash Maintenance Corporate Overheads Salt Logistics & Distribution

Lime Path Lime Path Brine Path Soda Ash Delayed Idea Throughput Implementation Cement Plant Supply Chain Energy Raw Materials for cement plant

Salt Throughput Caustic Throughput & Marketing ESF Cake Utilization Water Conservation

No.of units

WE STARTED CYCLE 4 BY LAUNCHING WAVE XIV AND WILL START WAVE XV ON 12 AUG 05

Wave 16 Wave 15 Wave 14 Q1, 05-06 Q2, 05-06 Q3, 05-06

Wave 17

Q4, 05-06

Units

Maintenance Excellence Waste Reduction Replacement Ideas Forecast to stock (Business Process Innovation)

MUW Evaporator bodies Water Balance Six Sigma and OEE Energy Conservation 4

Indigenous Purchase Coal and coke purchase Coke Consumption soda ash plant Salt Marketing 4

No.of units

Gypsum and Solar Salt Throughput Cement Plant Throughput Customer profitability improvement Fixed Cost reduction 4

TOTAL COST SAVING IDEAS FROM CYCLE - I, II & III WAVES UNDER IMPLEMENTATION ARE WORTH ~ Rs 135 CRORES
Throughput

Syndicated Savings Rs crore


Cycle - I (Rs 111.66 Cr) Cycle - II (Rs 33.47 Cr)
8.30 0.29 4.90 6.72 4.50 1.38 18.36 13.31 45.78 18.45 0.69 2.47 1.12 13.05 4.64 3.13 3.96 2.67

Cost based Cycle - III (Rs 26.83 Cr)


171.96
2.39 5.47 3.26 6.82 0.30 37.39

134.57

Mktg & Logistics

Dropped Idea Repl

Wave - V

Wave - IV

Wave - IX

Wave - III

Wave - VI

Wave - X

Wave - II

Wave - I

Wave - VII

Wave - XI

Wave - XII

Wave - VIII

Wave - XIII

Total

29.53

Fuel Purchase& Fuel Mix

Wave-1

7.14

Power plant

2.53

Packaging purchase

6.57

Coke purchase

1.53

L/s purchase

5.54

Lime Kiln

Wave-2

7.58

Process House MUW plant Prod Hand. Solar Salt SABR STD Cement Usage&Services Marketing&Logistic

Cost Based Savings Rs crore

1.96 2.02 2.62 1.06 4.10 2.63 8.06

Wave-3

Rest of Power plant CC&MC

Wave-4

Town &O/H
TOP at MHY

TOP At Port ENCON


Replacement Ideas Total savings

Wave-5

4.50 1.09 0.61 0.92 0.79 0.80 1.99 4.01 97.58

TOTAL COST SAVING IDEAS FROM CYCLE - I WAVES UNDER IMMEDIATE IMPLEMENTATION ARE WORTH ~ Rs 97 CRORES

0.54

Cancellation Value of ideas under implementation

97.04

97.58

Cycle - I Savings

1.34

Power plant

Wave-6

3.23

Lime Kiln

0.16

Soda Ash Quality

1.01

Cost Based Savings Rs crore

Finished Product Handling Bicarb Dense ash Solar Salt Quality

0.11 0.66

Wave-7

2.10

MUW

OEE in Soda Ash plant

0.79

5.56

Packaging Purchase Cement Marketing

4.90

Wave-8

1.20

TOP at Cement Sea Water System Corporate & Mktg O/Hs Process House & STD CCG & Marine

0.49 2.84 1.62 0.94

Wave-9

0.24

Stores Inventory

TOTAL COST SAVING IDEAS UPTO CYCLE - II (INCLUDING CYCLE -I) UNDER IMPLEMENTATION WILL BE WORTH ~ Rs.124 CRORES

124.77

Total Savings

UPTO WAVE - XIII, UNITS HAVE SYNDICATED ~ Rs.175 CRORE IN COST AND THROUGHPUT RELATED SAVINGS
Rs Cr

Cost Based Savings

Throughput Savings
37.39 13.09 134.82 171.96

20.80 93.48 7.45

No Investment

Investment <10 Lacs, ROI>50%

Investment > 10 Lacs, <100 Lacs, ROI > 50% 82 27.06 77

InvestTotal ment > Savings 100 Lacs, ROI >50%

Through put Investment >100 Lacs, ROI>50% 46 36.54 110

Total Savings Syndicated

No. of Ideas 697 Investment 0 -

207 6.84 109

10 24.03 54

996 57.93 233

1042 94.47 185

ROI%

IMPLEMENTATION OF CYCLE - II IDEAS WILL BE FULLY COMPLETED BY JAN 2011


Number of ideas to be implemented by the end of month/year
* 151 Ideas of Marketing & 9 Ideas of OEE, which are ongoing in nature, not considered

Wave - VI Wave - VII Wave - VIII Wave - IX

280 260 240 220 200 180 160 140 120 100 80 60 40 20 0

225 240244 232 218


208 195 160 51 43 143 98 76 62
27 31 58 53 54

248* 247 247

59 59 59 59 59

62 62 62 62 62 60 60 50 58 46

26 11 22

32

40

2 1 14 8 3 2 4 20 22 23 24 3 11

42 5 35 71 75 78 78 79 28 60 60 60 63 66 15 44 48 5 8 33 25 27 30 46 47 47 48 48 48 48 48 48 48 27 27 31 32 37 39

57

Aug-03

Mar-04

Jul-03

Year 06-07

Year 07-08

Year 08-09

Year 09-10

Year 10-11

Sep-03

Nov-03

Dec-03

Oct-03

Jan-04

1 2004-05

2 2004-05

3 2004-05

4 2004-05

1 2005-06

2 2005-06

3 2005-06

4 2005-06

Jun-03

Feb-04

IMPLEMENTATION OF CYCLE - III (till Wave - XII) IDEAS WILL BE FULLY COMPLETED BY MAR 2007 Wave - XII
Wave - XI

Number of ideas to be implemented by the end of month/year


* 41 Ideas of Marketing, 3 Ideas of Delayed Idea Unit and 6 SOP ideas, which are ongoing in nature, not considered

Wave - X

75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Q3 04-05 Q4 04-05 Q1 05-06 Q2 05-06 Q3 05-06 Q4 05-06 Year 0607

Dropped Idea Repl

60

60 *
9 13 2

50
44 42 38 34 22
1 5 2 1 7 2 2 8 2 3 9 2 4

9 13

10 2 2

21

26

28

30

30

34

36

36

Year 0708

ON IDEA IMPLEMENTATION FRONT THERE IS A GAP BETWEEN TARGET & ACTUAL


Cumulative Idea nos.

Target Actual 600 574 575 516 ** 522 550 514 525 499 486 500 473 462 475 448 426 450 476 413 464 403 383 425 389 441 448 375 * 400 423 369 358 405 411 375 401 331 382 350 375 314 301 325 351 291 338 342 276 300 326 260 275 299 244 229 277 286 250 267 211 225 225 192 212 244 253 236 198 200 177 175 155 150 125 100
Ye ar 02 Ap 03 r' M 03 ay ' Ju 03 n' 03 Ju l'0 Au 3 g' 0 Se 3 p' 0 O 3 ct '0 No 3 v' 0 De 3 c' Ja 03 n '0 Fe 4 b' 0 M 4 ar Ap '04 ril M '04 ay Ju '04 ne Ju '04 ly '0 Au 4 g Se '04 pt '0 O 4 ct ' No 04 v ' De 04 c '0 Ja 4 n ' Fe 05 b ' M 05 ar '0 Ap 5 Ye r ar '05 05 -0 6

* Impact of rescheduled ideas ** Impact of dropped ideas Note: In above status, Marketing ideas are not included

THE VALUE OF ACTUAL IDEAS IMPLEMENTED IS BELOW THE TARGETED IDEA VALUE
Rs Crores

Target
130 120 110 100 90 80

Actual
127.80 117.09 113.67 **

110.22 106.31 107.32 104.32 105 101.14 103.02 97.6 102.42 100.43 96.96 98.08 96.16 97.76 102.64 96.59 91.92 93.96 * 94.81 88.94 91.63 87.43 95.78 96.84 90.07 89.66 90.71 88.12 84.49 94.05 85.94 88.65 89.85 90.21 90.76 82.8 82.78 83.21 80.49 83.6 83.8 77.35 76.66 83.11 81.61

70 69.59 60 50
Ju l '0 3 Se p' 03 No v' 03 Ja n '0 4 M ar '0 4 M ay '0 4 Ju ly '0 4 Se pt '0 4 No v '0 4 Ja n '0 5 M ar '0 5 Ye ar 05 -0 6 02 -0 3 Ye ar ay '0 3 M

* Impact of rescheduled ideas ** Impact of dropped ideas

IMPLEMENTATION OF CYCLE - I IDEAS WILL BE FULLY COMPLETED BY SEPT 2005


Number of ideas to be implemented by the end of month/year
* 127 Ideas of Marketing , which are on going in nature, not considered

Wave-V Wave-IV Wave-III Wave-II Wave-I

340 320 300 280 260 240 220 200 180 160 140 120 100 80 60 40 20 0

299 270 254 236 187 28 129


35
39 56 72

275

301*

52 52 38 42
42 43 49 50

139
9 31 54

148
10 34 58

159
15 40 58

4
20 46 67

33 53 71

65

65

70

70

99
78 62 45 20 28
3 17 30 1 41 4 8 45

5 28 51

73

73

76

77

11 1 46 46 50 51 52 52 52 52 52 28 32 36 42 45 45 11 19 25
ay -0 2 Ju n02 Ju l-0 Au 2 g0 Se 2 p02 O ct -0 No 2 v0 De 2 c02 Ja n0 Fe 3 b0 M 3 Q a r-0 1 20 3 Q 032 0 20 4 Q 03-0 3 20 4 Q 034 0 20 4 0 Ye 3-0 4 ar 04 Ye a r 05 05 -0 6

Ap r

-0 2

IMPLEMENTATION OF CYCLE - II IDEAS WILL BE FULLY COMPLETED BY JAN 2011


Number of ideas to be implemented by the end of month/year
* 155 Ideas of Marketing & 9 Ideas of OEE, which are ongoing in nature, not considered

Wave - VI Wave - VII Wave - VIII Wave - IX

280 260 240 220 200 180 160 140 120 100 80 60 40 20 0

252 267271 259 245

274 275* 274

234 219
176 46 55 158

63 58 59

64 64 64 64 64

70 70 70 70 68 70 32 68 58 66 53 107 28

79 63

58
26

47 51 5 8 31 35 22 27 2 25 11 1 14 3 55 56 56 57 57 57 57 57 57 57 8 2 4 33 36 42 45 20 22 23 25 28 28 3 11

32

41

5 41 31 15

48 76 80 83 83 84 65 65 65 68 71

Aug-03

Sep-03

Mar-04

Nov-03

Dec-03

Feb-04

Jun-03

Oct-03

Jan-04

Jul-03

1 2004-05

2 2004-05

3 2004-05

4 2004-05

1 2005-06

2 2005-06

3 2005-06

4 2005-06

Year 06-07

Year 07-08

Year 08-09

Year 09-10

Year 10-11

SAVINGS OF ~ Rs 135 CRORES HAVE BEEN IDENTIFIED UPTO WAVE - XI


Rs. Crores
Cycle I
Wave- V

Cycle II
Wave- VI Wave- VII Wave- VIII Wave- IX

Cycle III
Wave- X Dropped Idea Repl Wave XI

140 130 120 110 100 90 80 70 60 50 40 30 20 10


26.8 30.48 31.01

Wave- IV Marketing & Logistics Wave III Wave II Wave I

135.50 134.75 135.49 130.50 121.10 94.49


11.32 12.23 14.9 14.9 14.9

5.73 5.73 5.73 5.45 5.73 7.6 7.6 7.6 7.6 3.09 7.6 0.91 0.1 2.61 2.61 2.61 0.76 5.6 2.57 2.61 3.152.25 4.5 4.5 4.5 4.5 4.5 2.25 66.50 71.35 2.61 1.2 4.5 4.5 1.08 4.5 0.4 0.38 4 4 53.99 18.46 18.46 18.46 18.46 18.46 0.37 0.36 3.84 0.36 3.67 15.29 15.29 3.5 0.36 52.08 13.07 13.49 13.69 3.34 11.98 12.77 12.99 42.64 16.94 11.94 18.32 18.63 18.63 18.63 18.63 15.13 2.6 3.17 0.36 13.32 14.5 38.84 0.25 0.05 0.73 12.35 12.54 12.54 16.94 30.48 6.68 6.99 7.69 31.07 5.88 26.80 2.5

81.38 72.91 83.88 76.86 0.55 72.51 3.02

88.83

0.06 42.75 42.75 43.17 36.34 36.51 45.7 43.17 43.17 43.17 45.7 45.78 45.7845.78 45.78 45.78 45.78 45.78 45.78

0 Apr- May- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Q1 02 02 02 02 02 02 02 02 02 03 03 03 0304

Q2 0304

Q3 0304

Q4 Year Year Year Year Year 03- 04- 05- 06- 07- 0804 05 06 07 08 11

Number of 11 20 ideas

28

45

62

78

99

129 139 148 159 187

236

276 311 354 550 608 621 625 629

INVESTMENT REQUIREMENTS ARE PHASED OUT OVER TIME


Rs. Crores
Cycle - I Wave- V Wave- IV
60 55 50 45 40 35 30 25 20 15 10

Cycle - II Wave- VI Wave- VII Wave- VIII

Cycle - III Wave- X Dropped Idea Repl Wave XI

Wave- III Wave-II Wave-I

59.31 59.77 57.01 54.19

Wave- IX

37.85 21.86 14.95 9.44


3.24

7.29 7.29 6.62 6.91 7.29 9.62 9.79

7.32 3.82

5.39 3.34 3.82 3.82 3.82

8.59
5.46 7.27 5.50

0.1 0.42 0.34

6.8

6.8

6.8

6.8 6.8

2.78 2.78

6.16 1.38 1.45 1.45 1.45 1.45 0.11 0.2 0.88 1.18 4.61 4.61 4.61 4.614.61

0.06 0.1 0.21 0.08 0.51 10.57 0.01 0.15 0.08 0.24 8.58 8.58 10.0510.5710.5710.57 0.60 1.14 0.01 0.06 5.97 6.27 5 0.52 5.03 4.28 4.37 4.37 2.29 2.29 2.29 2.29 2.292.29 2.15 2.15 2.29 2.29 0.34 0.38 0.03 0.06 0 0.2 0.21 0.21 0.21 0.26 0.26 0.26 0.76 0.38 1.08 1.08

4.66

Ap r-0 M 2 ay -0 Ju 2 n02 Ju l-0 Au 2 g0 Se 2 p02 O ct -0 No 2 v0 De 2 c02 Ja n03 Fe b03 M ar Q 1 20 03 Q 032 20 04 Q 033 20 04 03 Q -0 4 20 4 0 Ye 3-0 4 ar 04 Ye -0 5 ar 05 Ye ar 06 0 Ye 6-0 7 ar 07 Ye -0 8 ar 08 -1 1

TARGETED SAVING ACCRUAL FOR FY 2005-06 WILL BE ~ Rs 128 CRORE

Rs Crores

128.10

33.03
94.90 94.76

Q4

25.97
45.47
Q4

15.06 33.86 28.45


Q3

24.31 23.51 21.11


2003-04

18.20 17.20 7.86 2.21


2002-03

27.15 24.10
2004-05

32.58

Q2

Q3 Q2 Q1

28.63
2005-06

Q1

OVERALL IMPLEMENTATION STATUS

Year 02-03 Wrt. Baseline Target Actual 44.53 248 69.59 %

Year 03-04 Target Actual 69.69 265 19.06 %

Year 04-05 Target Actual %

Savings 45.47 Accrued (Rs Cr) No. of Ideas Implemented Value of Imp. Ideas (Rs Cr) Wrt. Budget Savings Accrued (Rs Cr) Savings Inbuilt (Rs Cr) --301 77.35

99% 94.90 82% 305 90% 26.97

73% 94.76 87% 71% 212 9.35

80.50 85% 200 13.77 94% 147%

30.85 9.20

---

---

(1.35) 67.15

---

1.21 81.10

(36.12) 101.15

---

SAVINGS ACCRUED (TARGETED VS ACTUAL)


Monthly Savings Accrual (wrt baseline) Rs. In lacs
1400 1300 1200 1100 1000 900 800 700

Target

Actual

1037 976 918 821 773 653 910 946

1025

1052

1033

1068

1079

1072

917

600

551*
500 400 300

Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06

* Savings is lower due to higher LS & fuel consumption at Kilns, higher fuel TCO & higher maintenance cost in Cement

SAVINGS ACCRUED (TARGETED VS ACTUAL)


Cumulative Savings Accrual (wrt baseline) Rs. In lacs
Target
15,000 14,000 13,000 12,000 11,000 9,812 10,000 9,000 8,000 7,000 6,000 5,000 4,000 3,000 Mar' 03 Apr'03 May'03 Jun'03 Jul'03 Aug'03 Sep'03 Oct'03 Nov'03 Dec'03 Jan'04 Feb'04 Mar'04 4,547 5,163 4,453 5,203 6,658 5,918 6,619 5,977 7,105 7,404 7,758 8,208 8,995 8,415 9,009 9,381 9,829 10,384 10,612 10,897 11,440 12,327 11,421 13,163

Actual
14,037

SAVINGS ACCRUED (TARGETED VS ACTUAL)


Year Target 4,547 9,490 9,476 Actual 4,453 6,969 8,050

Cumulative Savings Accrual (wrt baseline) Rs. In lacs


Target
27,000 24,000

2002-03 2003-04
Actual

2004-05

22,962 22,007 21,067 20,105 19,162 18,148 16,447 17,257 17,971 15,819 14,366 15,032 13,682 11,421 11,885 12,399 16,515 17,158

23,792 23,513

21,000 18,000 15,000 12,000 9,000 6,000 14,037 14,810 15,634

** 19,470
18,981 19,876

Mar' 04 Apr-04 May-04 Jun-04 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05 Feb-05 Mar-05

* Cumulative saving target adjusted for all dropped & rescheduled ideas * * Actual cumulative saving adjusted for anthracite coal usage in lime kilns

SAVINGS ACCRUED (TARGETED VS ACTUAL)


Year Target 4,547 9,490 9,476 Actual 4,453 6,969 8,050

Cumulative Savings Accrual (wrt baseline) Rs. In lacs


Target
40,000 37,000 34,000

2002-03 2003-04
Actual

2004-05 YTD 05-06

3,626
34,349

2,923
35,421

33,432 32,353 31,285 30,253 29,200 28,175 26,163 27,139

31,000 28,000 25,000 22,000 19,000 16,000 19,470 21,446 20,243 20,793 23,513 24,431 25,253

22,392

Mar' 05 Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06

ACTUAL IDEA IMPLEMENTATION AGAINST THE TARGET

Cumulative Idea nos.


550 525 499 500 473 475 448 450 426 425 403 400 375 * 375 350 325 300
'0 4 Au g' 04 '0 5 Ju ne '0 4 Ju ly '0 4 '0 5 '0 5 '0 4 Se pt '0 4 Ap ril '0 4 '0 4 M ay Ap r Ja n M ay M ar Ju n No v De c Fe b O ct Ju l '0 5 '0 4 '0 5 '0 5 '0 5

Target

Actual
516 486 514

536

** 522

529

531

462 476 464 413 423 383 375 351 382 401 405 411 441 448

480

488

493

338

342

* Impact of rescheduled ideas ** Impact of dropped ideas Note: In above status, Marketing ideas are not included

THE VALUE OF ACTUAL IMPLEMENTED IDEAS AGAINST THE TARGET

Rs Crores

Target
130 120 110
103.02 104.53 105 96.16 93.96 98.08 101.14 97.6 90.76 90.71 91.63 94.05

Actual
117.09 113.67 107.32 110.22 106.31 102.42 96.59 96.84 95.78 102.64 103.48 103.70 94.81 106.88 119.35 117.68 118.25

**

100 90 80 70 60 50
'0 4
89.66

90.21 89.85

Ju ne '0 4 Ju ly '0 4 Au g '0 4 Se pt '0 4 O ct '0 4 No v '0 4 De c '0 4 Ja n '0 5 Fe b '0 5 M ar '0 5 Ap r' 05 M ay '0 5 Ju n' 05

'0 4

Ap r

* Impact of rescheduled ideas ** Impact of dropped ideas

Ju l'

ay

05

GAP ANALYSIS ON SAVINGS INDICATES THAT LOSS IN SAVINGS IS DUE TO HIGHER


LIMESTONE, FUEL CONSUMPTION & MAINTENANCE IN LIME KILN, HIGHER MAINTENANCE COST AT STD, LOWER DA-1 & BICARB THROUGHPUT, HIGHER SALT POUCH COST & SECONDARY PACKAGING COST, HIGHER CAPTIVE LIMESTONE TCO, HIGHER 20# & 120# STEAM CONSUMPTION AT MUW AND HIGHER SP. FUEL CONSUMPTION AT CEHP 1& 2
Rs. Lacs
59 31

Above Target
20 7 27 27 3 2 1 0 1 1 1 2

Below Target
4 5 9 9 13 16 26 36 41 63 218 4 10 10 1,415 2 1 946

107 154 976

TOP at S Ash Quality

TOP at Bicarb & D Ash

S Ash Throughput

TOP at OEE in SA Plant

Corp & Mktg. OHs

Salt Logistics & Distribution

Packaging purchase

TOP at Town & OHs

Cement Raw Materials

Marketing & Logistics

Actual savings for these units are being tracked under other earlier units, so only targets are considered here

TOP at Sea water system

TOP at Solar Salt

TOP at Cement Mrktg

Limestone Purchase

TOP at CC, Marine

Stores & Inventory

TOP at Process House

TOP at Replacement

Usage & Services

TOP at FP Handling

SA Maintenance

TOP at ENCON

Coke Purchase

TOP at Cement

Actual Savings

TOP at SABR

TOP at MUW

Sub Total

Fuel Purchase

TOP at MHY

TOP at Port

TOP at Boiler

TOP at STD

TOP at Kiln

Target

SAVINGS OF Rs. 223.92 CRORES HAVE BEEN ACCRUED TO THE BOTTOMLINE UPTO JULY 05 FROM IMPLEMENTED IDEAS
Upto Jul..2005

01/06
Cumulative

Idea status
Planned No. Of Actual No. Value of Ideas to be Implemd Rs Cr Implemd Actual Value of Implemd Ideas Rs Cr % of planned

Saving status
Savings Targeted accrued Savings Rs Cr Accrued due to Idea Implmd

Sr. No. Unit

No.of Ideas

Ideas to be of Ideas Implemd

% of planned

Rs Cr

1 2 3 4 5 6

Fuel purchase & Fuel Mix Coke Packaging TOP at Boilers Marketing & Logistics 1 L/S Purchase

16 03 16 17 361 4

16 3 16 17 292 4

16 3 16 17 259 3

29.53 6.57 2.53 7.14 4.50 1.53

29.53 6.57 2.53 7.14 4.50 0.43

100 100 100 100 100 28

76.53 8.29

89.52 (8.35)

117

93 112 37 51

11.22
25.29 10.69 7.29

10.41
28.37 391 (3.75)

7
8 9

TOP at Kiln
TOP at Pr House TOP at F P H

11
17

9
17

9
14

3.09
7.58

3.09
7.12

100
94 100 100

16.38
24.90

4.32
20.50

26
82 170 16

25
19

25
19

25
19

2.02
1.96

2.02
1.96

5.89 4.96

9.99 0.79

10 TOP at MUW Sub Total

489

418

381

66.45

64.89

98

191.44

155.71

81

1. Marketing and Logistics includes wave I to wave XIII ideas

Continued

SAVINGS OF Rs. 223.92 CRORES HAVE BEEN ACCRUED TO THE BOTTOMLINE UPTO JULY 05 FROM IMPLEMENTED IDEAS
Upto Jul..2005

02/06
Cumulative

Idea status
Planned No. Of Actual No. Value of Ideas to be Implemd Rs Cr Implemd Actual Value of Implemd Ideas Rs Cr % of

Saving status
Savings Targeted accrued Savings Rs Cr Accrued due to

Sr. No. Unit

No.of

Ideas to be of Ideas Implemd

% of

Ideas

planned

Idea Implmd Rs Cr

planned

Sub Total upto Wave II 11 TOP at Salt 12 TOP at SABR 13 TOP at STD 14 TOP at Cement 15 Usage & Services 16 Supply Chain 17 TOP at ROP 18 TOP at CC Marine 19 TOP at Town 20 Safety - I Sub Total

489 14 10 22

418 14 10 21

381 11 10 20

66.45 2.62 0.95 3.75

64.89 1.73 0.95 4.10

98 66

191.44 6.33 2.85 5.91 5.64 20.80

155.71 6.17 2.16 0.50 8.28 11.18 7.70 4.92 3.88 NA

81
97

100
109

76
8

11
5

11
5

11
5

2.63
8.06

2.63
8.06

100
100

147 54
1222 284

6
7 19 7 14

6
7 18 7 14

4
7 19 7 14

1.09 0.49 0.85 -

1.09 0.53 0.85 -

100 108
100 -

0.63 1.73 2.44 NA

159

84

604

531

489

86.89

84.83

98

237.77

200.50

Continued

SAVINGS OF Rs. 223.92 CRORES HAVE BEEN ACCRUED TO THE BOTTOMLINE UPTO JULY 05 FROM IMPLEMENTED IDEAS
Upto Jul..2005

03/06
Cumulative
% of planned

Idea status
No.of Planned No. Of Implemd Actual No. Value of of Ideas Ideas to be Implemd Rs Cr Actual Value of Implemd Ideas Rs Cr % of planned Ideas

Saving status
Targeted
accrued Savings Rs Cr

Savings Accrued due to Idea Implmd Rs Cr

Sr. No. Unit

Ideas to be Implemd

Sub Total upto Wave IV 21 TOP at MHY 22 TOP at Port 23 ENCON* 24 Safety - II Replacement Ideas* 25 TOP at Power Plant* 26 TOP at Lime Kiln* 27 TOP at SA Quality 28 TOP at FPH* 29 Safety -III

604 10

531 10

489 9

86.89 0.79

84.83 0.38

98 48 100 96 -

237.77
0.79 1.41 2.13 NA 6.96 0.49 1.20 0.21

200.50
(0.76) 1.58 NA 0.38 0.60 0.08

84
112

4
24 4 7 15

4 24
4 7 15 5 9 10 8

4
22 4 6 10 4 7 10 8

0.80
1.21 3.92 0.52

0.80
1.16 1.60 0.19 3.07 0.10 0.75 -

5 122 7 -

41
37 95 56 100 -

5
9 11 8

3.23
0.16 0.75 -

(0.33)
NA

1.42
NA

Total

701

627

573

98.27

92.88

95

252.38

202.05

80

* Actual savings for these units are being tracked under other earlier units

Continued

SAVINGS OF Rs. 223.92 CRORES HAVE BEEN ACCRUED TO THE BOTTOMLINE UPTO JULY 05 FROM IMPLEMENTED IDEAS
Upto Jul..2005

04/06
Cumulative
% of planned

Idea status
No.of Planned No. Of Implemd Actual No. Value of of Ideas Ideas to be Implemd Rs Cr Actual Value of Implemd Ideas Rs Cr % of planned Ideas

Saving status
Targeted
accrued Savings Rs Cr

Savings Accrued due to Idea Implmd Rs Cr

Sr. No. Unit

Ideas to be Implemd

Sub Total upto Wave VI 30 Fire - Safety 31 TOP at Bicarb Dense ash 32 TOP at Solar salt quality* 33 TOP at MUW* 34 OEE in Soda Ash* 35 Packaging* 36 Cement Marketing 37 TOP at Cement*

701 19 5 25 17 22 14 7 14

627 19 5 11 16 9 14 6 9

573 17 3 7 13 14 13 5 11

98.27 0.11 0.59 1.12 0.05 4.52 1.72 0.72 0.49 2.80

92.88 0.05 0.06 0.97 0.03 2.78 2.68 0.59 0.14 1.92

95
45 10 87

252.38
NA 2.61 0.34 0.87 0.09 2.57 4.32 1.33 0.33 1.93

202.05
NA 2.15 1.18 (0.10) 3.08 0.22 (0.01) 9.79

80
82

136 71

60
62 156

82
29 69

17
507

38 Sea Water System*


39 Corp & Mktg O/H

15
12

11
12

6
11

Total

851

739

673

110.39

102.10

91

266.77

218.36

82

* Actual savings for these units are being tracked under other earlier units

Continued

SAVINGS OF Rs. 223.92 CRORES HAVE BEEN ACCRUED TO THE BOTTOMLINE UPTO JULY 05 FROM IMPLEMENTED IDEAS
Upto Jul..2005
No.of Sr. No. Unit Ideas

05/06
Cumulative
% of planned

Idea status
Planned No. Of Implemd Actual No. Value of of Ideas Ideas to be Implemd Rs Cr Actual Value of Implemd Ideas Rs Cr % of planned

Saving status
Targeted
accrued Savings Rs Cr

Savings Accrued due to Idea Implmd Rs Cr

Ideas to be Implemd

Sub Total upto Wave VIII 40 TOP at Process House & STD*

851 13 8 25 13 7 10 2 17 2

739 9 6 22 13 5 3 2 17 2

673 5 3 22 11 4 3 2 14 1

110.39 0.77 0.68 0.23 0.00 3.20 0.09 0.00 3.54 0.29

102.10 0.68 0.08 0.23 0.00 0.27 0.09 0.00 3.01 0.23

91 88 12

266.77
0.28 0.18 0.23 NA

218.36
0. 32 3.19 0.32 NA

82
114

41 TOP at CCG & Marine*


42 Stores Inventory 43 Administration 44 Salt Logi. & Dist. 45 SAMG * 46 SCM - I 47 Corp & Mktg O/Hs 48 Dropped Idea Repl

1772
114 188 42 -

100
8 100

0.16 0.00
NA 3.17

0.30 NA 1.34

85
88

NA

NA

Total

948

818

738

119.19

106.69

270.79

223.74

83

* Actual savings for these units are being tracked under other earlier units

SAVINGS OF Rs. 223.92 CRORES HAVE BEEN ACCRUED TO THE BOTTOMLINE UPTO JULY 05 FROM IMPLEMENTED IDEAS
Upto Jul..2005
No.of Sr. No. Unit Ideas

06/06
Cumulative
% of planned

Idea status
Planned No. Of Implemd Actual No. Value of of Ideas Ideas to be Implemd Rs Cr Actual Value of Implemd Ideas Rs Cr % of planned

Saving status
Targeted
accrued Savings Rs Cr

Savings Accrued due to Idea Implmd Rs Cr

Ideas to be Implemd

Sub Total upto Wave X 49 Brine Path * 50 Lime Path - 1 * 51 SCM - 2 52 Delayed Ideas 53 Lime Path - 2* 54 Raw Mat. Cement 55 Cement ENCON* 56 Water conservation

948 2 3 7 4 8 2 5 13

818 1 0 6 2 0 1 0 0

738 1 0 5 2 2 1 2 1

119.19 0.09 0.00 0.00 0.00 0.00 0.07 0.00 0.00

106.69 0.09 0.00 0.00 0.00 0.00 0.07 0.02 0.01

88 100 100

270.79
0.01 -

223.74
-

83
-

31

0.58 -

0.18 -

Total

992

828

752

119.35 106.88

88

271.38

223.92

83

* Saving tracking for these units will be started after implementation of the cost based ideas

SUMMARY OF MANTHAN (FOR THE MONTH OF JULY 05)


Month :July .2005

01/06

Idea status
Planned No. Of Actual No. Value of Ideas to be Implemd Rs Cr Implemd Actual Value of Implemd Ideas Rs Cr % of planned

Saving status
Savings Targeted accrued Savings Rs Cr Accrued due to Idea Implmd Rs Cr % of planned

Sr. No.

No.of Unit Ideas

Ideas to be of Ideas
Implemd

1 2 3 4 5 6 7 8 9

Fuel purchase & Fuel mix Coke Packaging Top at Boilers Marketing & Logistics1 L/S Purchase TOP at KILN TOP at Pr House TOP at F P H

16 03 16 17 361 4 11

0 0 0 0 0 0 0

0 0 0 0 0 0 0

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0 -

2.43
0.06 0.27 0.71 0.16 0.09 0.77

3.98
1.13 0.15 0.41 0.07 (0.16) (1.18) 1.36

164 1883 56 58 44 --

-132 162

17 25
19 489

1 0
0 1

0 0
0 0

0.17 0.00
0.00 0.17

0.00 0.00
0.00 0.00

1.03 0.18
0.14 5.85
Continued..

0.30
0.04 6.10

10 TOP at MUW Sub Total

28 104

1. Marketing and Logistics includes wave I to wave XIII ideas

SUMMARY OF MANTHAN (FOR THE MONTH OF JULY 05)


Month : July.2005

02/06

Idea status
Planned No. Of Actual No. Value of Ideas to be Implemd Rs Cr Implemd Actual Value of Implemd Ideas Rs Cr % of planned

Saving status
Savings Targeted accrued Savings Rs Cr Accrued due to Idea Implmd Rs Cr % of planned

Sr. No.

No.of Unit Ideas

Ideas to be of Ideas Implemd

Sub Total upto Wave II 11 TOP at Salt 12 TOP at SABR 13 TOP at STD 14 TOP at Cement 15 Usage & Services 16 Supply Chain 17 TOP at ROP 18 TOP at CC Marine 19 TOP at Town 20 Safety - I

489
14 10 22 11 5 6 7 19

0
0 0 0 0 0 0 0 0

0
0 0 0 0 0 0 0 0

0.17
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.85
0.20 0.07 0.30 0.18 0.47 0.04 0.08

6.10
0.21 0. 07 (0.32) 0.44 1.06 0.25 0.25 0.09 NA

104 105 101 -244 226 -

625

313
129

7
14

0
0

0
0

0.00
-

0.00
-

0.07
NA

112

Sub Total

604

0.17

0.00

7.26

8.15

Continued

SUMMARY OF MANTHAN (FOR THE MONTH OF JULY 05)


Month : July.2005
Sr. No.

03/06

Idea status
No.of Ideas Planned No. Of Implemd Actual No. Value of of Ideas Ideas to be Implemd Rs Cr Actual Value of Implemd Ideas Rs Cr % of planned

Saving status
Targeted
accrued Savings Rs Cr Savings Accrued due to Idea Implmd Rs Cr % of planned

Unit

Ideas to be Implemd

Sub Total upto Wave IV 21 TOP at MHY 22 TOP at Port 23 ENCON * 24 Safety - II Replacement Ideas*

604 10 4 24 4 7

0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0

0.17 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

7.26
0.03 0.06 0.10 NA 0.21 0.05 0.24 0.02

8.15
(0.05)

112
67

0 --

0.04
NA 0.11

52 20 4 -

25 TOP at Power Plant* 15 26 TOP at Lime Kiln* 27 TOP at SA Quality

0.00
0.00 0.00

0.00
0.00

0.01
0.01 0.00 NA

5 9

0.00 0.00
-

28 TOP at FPH *
29 Safety -III

11
8

0.00
-

0.08
NA

Total

701

0.17

0.00

8.06
Continued

8.27

103

* Actual savings for these units are being tracked under other earlier units

SUMMARY OF MANTHAN (FOR THE MONTH OF JULY 05)


Month : July 2005
No.of Sr. No. Ideas Unit

04/06

Idea status
Planned No. Of Implemd Actual No. Value of of Ideas Ideas to be Implemd Rs Cr Actual Value of Implemd Ideas Rs Cr % of planned

Saving status
Targeted
accrued Savings Rs Cr Savings Accrued due to Idea Implmd Rs Cr % of planned

Ideas to be Implemd

Sub Total upto Wave VI 30 Fire - Safety 31 TOP at Bicarb Dense ash 32 TOP at Solar salt quality * 33 TOP at MUW *

701 19 5 25

1 0 0 0

0 1 0 0

0.17 0.00 0.00 0.00

0.00 0.00 0.00 0.00

-0 0 0 0 513

8.06
NA 0.41 0.06 0.12 0.02 0.22 0.30 0.12 0.04 0.00

8.27
NA 0.00 0.06 (0.01) 0.31 0.05 0.01 --

103
-

50 -103
42

17

0
0 0 1 0 1 0

0
0 0 1 0 0 0

0.00
0.00 0.00 0.52 0.00 0.00 0.00

0.00
0.00 0.00 2.68 0.00 0.00 0.00

34 OEE in Soda Ash * 22 35 Packaging * 36 Cement Marketing 37 TOP at Cement*

14 7 14

38 Sea water System* 15 39 Corp & Mktg O/H

25

12

93

Total

851

0.69

2.68

388

9.34
Continued

8.69

* Actual savings for these units are being tracked under other earlier units

SUMMARY OF MANTHAN (FOR THE MONTH OF JULY 05)


Month : July.2005
No.of Sr. No. Ideas Unit

05/06

Idea status
Planned No. Of Implemd Actual No. Value of of Ideas Ideas to be Implemd Rs Cr Actual Value of Implemd Ideas Rs Cr % of planned

Saving status
Targeted
accrued Savings Rs Cr Savings Accrued due to Idea Implmd Rs Cr % of planned

Ideas to be Implemd

Sub Total upto Wave VIII 40 TOP at Process House & STD *

851 13 8 25 13 7 10 2 17 02

3 0 0 0 0 0 0 0 0 0

2 1 0 0 0 0 0 0 0 0

0.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2.68 0.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

388
-

9.34
0.07 0.09 0.02 NA 0.02 0.01 NA 0.04 NA

8.69
0.00

93
256

41 TOP at CCG & Marine *


42 Stores Inventory 43 Administration 44 Salt Logi. & Dist. 45 SAMG * 46 SCM - I 47 Corp & Mktg O/Hs 48 Dropped Idea Repl

0.23
0.01 NA 0.29 0.00 NA -NA

0
0 -

50
-

1450
-

--

444

Total

948

0.69

3.07

9.59

9.22

96

* Actual savings for these units are being tracked under other earlier units

SUMMARY OF MANTHAN (FOR THE MONTH OF JULY 05)


Month : July.2005
No.of Sr. No. Ideas Unit

06/06

Idea status
Planned No. Of Implemd Actual No. Value of of Ideas Ideas to be Implemd Rs Cr Actual Value of Implemd Ideas Rs Cr % of planned

Saving status
Targeted
accrued Savings Rs Cr Savings Accrued due to Idea Implmd Rs Cr % of planned

Ideas to be Implemd

Sub Total upto Wave X 49 Brine Path *

948 2 3 7 4 8 2 5 13

3 1 0 0 0 0 0 0 0

3 1 0 0 0 0 0 0 1

0.69 0.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3.07 0.09 0.00 0.00 0.00 0.00 0.00 0.00 0.01

444
100 -

9.59
0.01 -

9.22
-

96
-

50 Lime Path - 1 *
51 SCM - 2 52 Delayed Ideas 53 Lime Path - 2 * 54 Raw Mat. Cement* 55 Cement ENCON * 56 Water Conservation

406

150 -

0.16 -

0.24 -

Total

992

0.78

3.17

9.76

9.46

97

* Saving tracking for these units will be started after implementation of the cost based ideas

SAVING ANALYSIS
Categories of Savings 1 Operational Performance For the Month Jul 05 243.12 For YTD Jul 05 1,007.27

Rs. In lacs Cumulative Upto Jul 05 8,594.01

2 Procurement
3 Fixed Cost

422.21
281.06

814.28
1,101.22

4,800.38
8,998.45

a)

Idea Base

90.28

368.48

3,174.15

b)

Top Down

190.78

732.73

5,824.29

TOTAL

946.38

2,922.76

22,392.83

TEAM CONFIGURATION FOR WAVE XIV- MITHAPUR (From 05.05.2005 to 11.08.2005)


CIG/Suggestion Avdhesh Chaudhary Manish Shah Sreejith Manish M Vakil Manthan Admn Deepak D Karelia Business Process Innovation Mentors S Kilambi Z N Langarana M Vivekanand Rao Replacement Ideas T Radhakrishnan R V Chaudhary M Ravindranath K B Makadia A K Savani Tushar Padia M J Lakhani Hitesh Patel Waste Reduction T Radhakrishnan R V Chaudhary M Ravindranath K B Makadia Ashok Thakur P P Chaudhary Ajay Trivedi Raj Lingam A A Patel Maintenance Excellence G J Adroja T Radhakrishnan B P Joshi B B K/ R C S R R Koyani Vijay Trivedi M Bharmal Manish Aghera Sunil Sadhu

Mithapur Operations

Unit Leader Facilitator

Supervisor TAS Sr Facilitator

K Panchmatia Vijay Pashupati

J Bhardava

Co-ordinator

H T Gangaramani

CONTENTS

Why do we need Manthan? What has Manthan achieved so far?

What is the plan for Wave XV?


Illustrations from earlier waves

TEAM CONFIGURATION FOR WAVE XV- MITHAPUR (From 12.08.2005 to 20.11.2005)


CIG/Suggestion Avdhesh Chaudhary Manish Shah Sreejith Manish M Vakil Manthan Admn Deepak D Karelia

Mithapur Operations

Six Sigma and OEE


Mentors T Radhakrishnan V P Chandarana M Ravindranath K B Makadia

MUW PlantEvaporator
V P Chandarana G J Adroja

Water Management
T Radhakrishnan V P Chandarana M Ravindranath K B Makadia

Energy Conservation
T Radhakrishnan V P Chandarana M Ravindranath K B Makadia

Unit Leader Hitesh Patel


Facilitator M K Nayak Mohmadi Bharmal

Rajlingam R. M V Bhatt Rashmin Shah Tushar Padia K M Pillai

Alpesh Merja
A J Takodara Jayesh Bhatt

S J Shah
A L Sah A K Savani

Supervisor

Kamlesh Thakur Suresh Ghedia Vijay Pashupathi

Sandeep Shah

M P Mashroo

TAS
Sr Facilitator Co-ordinator

H T Gangaramani

LIKE IN EARLIER WAVE A SYSTEMATIC PROCESS WILL BE FOLLOWED WHICH WILL TARGET COMPLETION OF WAVE XIV BY 20 NOV 2005
Phase 1
Set aspirational targets (1-2 weeks)

Phase 2

Phase 3

Phase 4
Plan implementation (1 weeks) Nov 20

Review meetings

Generate & Take evaluate ideas decisions for improvement (8 weeks) (1 week) Communication Sep 26
Plant SC

Implement & track progress

Aug 12

Aug 22
Plant SC

Oct 28
Plant SC

Develop cost
database

Create exhaustive Preparation


idea list (2A) New ideas
Experts Brainstorming

Develop
detailed implementation plans

Develop detailed KPI


trees and TCO models

Existing ideas

for steering committee meeting

Understand
organisation and process flows

Formal
steering committee meeting for finalisation of all ideas

Understand impact of
existing ideas

sessions
Suppliers Competitors

Set baseline and


targets on key KPIs

Evaluate and
prioritise ideas

Prepare for Phase 2

Syndicate ideas

RECENTLY WE HAVE INITIATED THE SIX SIGMA PROJECTS TO REDUCE THE PROCESS VARIATION

No. of Projects Identified

No. of Projects Completed

No. of People trained as Green Belts

12

40

The 12 Step DMAIC Strategy


Formulating the Practical Problem

DMAIC DMAIC DMAIC


DMAIC DMAIC DMAIC

Step A : Collect VOC & identify CTQ Step B : Project & Team Charter development Step C : High Level process Map (SIPOC) Step 1 : Drill-down Y, characterise CTQ Step 2 : Define Performance Standards

How do my customers look at me? Team Dynamics & Biz. Need How my output links with processes& suppliers? Detailed Y analysis Whats the best way to measure? Can I trust the output data?

Step 3 : Validate the Measurement System

Changing to a Statistical Problem


DMAIC DMAIC DMAIC Step 4 : Establish Process Capability & Set Target Step 5 : Identify Variation Sources Step 6 : Validate Variation Sources
Where am I today & where do I want to go? What factors possibly make a difference? What factors actually make a difference?

Developing a Statistical Solution


DMAIC DMAIC DMAIC Step 7 : Discover Variable Relationships
How do the factors affect the Output? What are the options to improve Output? What option to select and how to implement?

Step 8 : Generate Possible Solutions


Step 9 : Select Best Solution, Plan & Implement

Implementing the Practical Solution


DMAIC Step 10 : Validate X Measurement Systems DMAIC DMAIC Step 11 : Determine Process Capability Step 12 : Implement Process Control
Can I trust the in-process data? Have I reached my goal? How can I sustain the improvement?

FURTHER, WE ARE PLANNING FOR FULL SCALE DEPLOYMENT OF SIX SIGMA FOR VARIOUS PLANTS THROUGH A SYSTEMATIC APPROACH

Understand various plant operations

Step I:

Understand the plant operations in detail, in the context of its function, existence in the organization & outputs produced.

Identify key input, process & output variables

Step II:

Identify various input & process variables with regards to various plants, that are critical to measure the performance of the plant, consumption of inputs, productivity/efficiency of processes, quality & quantity of outputs.

Review existing measures & measurement systems at various plants

Step III:

Evaluate the measurement systems for the identified input, process & output variables with regards to their ability to reflect the actual performance of various processes.

Evaluate & Plan Six Sigma Deployment Roadmap

Step IV:

Analyze the information gathered and plan way forward towards a full scale deployment of Six Sigma for various plants.

CONTENTS

Why do we need Manthan? What has Manthan achieved so far?

What is the plan for Wave XIII?


Illustrations from earlier waves

SODA ASH PLANT: LIMESTONE CONSUMPTION (T/TSA)


1.5

TRAINING EXAMPLE

Star ideas

1.45

Use of kiln top level


controller, air flow controller, discharge temperature indicator and oxygen analyser at the kilns
1.4
1.40 1.40 1.40 1.40 1.40 1.39 1.38 1.38 1.37 1.36 1.36 1.36 1.36 1.35 1.36 1.36

Tighter control of
MOL in still effluent using an online lime analyser

1.3

To provide for auto


lubrication to prevent stopping of one kiln everyday and to provide for continuous discharge for improving efficiency
1.2

Base Sep-02 line

Dec-02

Mar -03 Jun-03

Sep-03

Dec-03

Mar-04

SODA ASH PLANT: COKE CONSUMPTION (T/TSA)

TRAINING EXAMPLE

109

109

Star Ideas
107

Use of kiln top level


controller, air flow controller, discharge temperature indicator and oxygen analyser at the kilns
105
105

104

103

102 101

Tighter control of MOL in


still effluent using an online lime analyser

101

100

Enrichment of lime at the


MOL plant by stopping the overflow from tank 2

99

97

95

Base Sep-02 line

Dec-02

Mar -03 Jun-03

Sep-03

Dec-03

Mar-04

SODA ASH DENSE: HANDLING COST (Rs/TON)


Star Ideas

TRAINING EXAMPLE

Presently Jumbo bags (1000


Ton) loading rate is paid as per tonne basis similar to 50 kg loading though companys crane is used for loading. Loading rate can be reduced to reduce the handling cost.

45.0

25.0

23.3 23.3

21.8

21.8 15.6 15.6 15.6 12.9

Soda Ash Dense 50 Kg after


packing is loaded into trucks after one stacking. Direct truck loading after getting the excise permission will reduce stacking cost

5.0
Base Jun 02 line Aug

Soda Ash Dense - 50 Kg are


stacked and loaded from Dense Ash plant. After installation of truck loader loading, internal transportation rates and losses / damages will reduce.

Oct

Dec

Feb 03

Apr

THE END