Bishwa Pokharel's Bio:
Bishwa Pokharel is the Engineer in Training (EIT), PEO, actively working towards obtaining Professional Engineering Designation (P. Eng.)...mehr sehenBishwa Pokharel's Bio:
Bishwa Pokharel is the Engineer in Training (EIT), PEO, actively working towards obtaining Professional Engineering Designation (P. Eng.), he possess Bachelor's Degree in Electrical Engineering, Specializing in Electric Power Systems, mainly in substations, and distribution lines, Tested 21 newly built 13.5 MVA, 132/33/11 kV step-down substations, 33 kV and 11 kV distribution lines including transformers, switchgears, circuit breakers, protection relays, cable schedules and other substations devices and accessories.
Participated in designing of 6/8 MVA, 33/11 kV substations and distribution lines,including equipment layout, control panel, AC/DC power distribution system, reviewing vendor drawings, protection and control system, single line diagrams, grounding systems, and wiring diagrams.
Supervised contractor's work, provided guidance to the technical staff, collected data, prepared datasheets, bill of materials, and cost-estimates.
Composed technical specifications for 5 MVA, 33/11 kV transformer, 100 and 50 sq. mm Dog ACSR conductor and cable trays.
Performed load flow studies, voltage drop and short circuit calculation of electrical system
Communicated engineering concepts graphically, in writing and verbally in English language.
Achieved exceptional problem solving, organizational and leadership ability, by working in a large semi-governmental organization.
Work collaboratively in a Canadian work environment with strong work ethics Strong computer skills and exposure to MS Word, Excel, PowerPoint, and email etiquette
Bishwa Pokharel's Experience:
Electrical Engineering Professional at Seeking a new career Opportunity In Electrical (Hydro) Industry
October 2014 - Present | Toronto, Ontario, Canada
Certificate in successfully passing the Professional Practice Exam(PPE) , University of Toronto, organized by Ontario Society of Professional Engineers.
Student at University of Toronto & Ontario Society of Professional Engineers at University of Toronto School of Continuing Studies
September 2013 - October 2014
Professional Practice Examination (PPE) Fundamentals of Electric Circuits (ECE 159H) Electrical Control System (ECE 410 H1) Digital and Computer System (ECE 253) Engineering Economics and Decision Making (CME 368H1)
Electrical Designer at S. A. Armstrong Limited
April 2007 - June 2007
Developed a work plan to complete work within identified constraints, time, resources, quality and budget One-line diagram, switching station, protection and metering system, protective relaying, variable frequency drives, distribution panels, transformers, disconnecting switches, battery chargers, selector switches, and other devices Electrical drawings, equipment layouts, instrumentation, electrical design with compliance of codes and standards Electrical distribution system with both mechanical and electrical interlocking arrangements, control circuit, AutoCAD and MS VISIO Circuit diagram for bulk power measurement ( 2-and 3-current transformer methods)
Electrical Tester at GE Electric/Multilin
February 2006 - April 2006
Measurement of input/output currents and voltages, wave forms, amplitudes, periods, pick-up and drop-off values, over-voltage and break-down events Functional and type testing of electrical and electronic equipment: withstanding to temperature-rise, impulse voltage, dielectric strength, and insulation resistance Input/output power, efficiency, frequencies, and over-and under-voltage margins of a prototype printed circuit board Testing of withstanding to surge immunity, electrical fast-oscillatory transience
Electrical Engineer at 7th Power Project, Nepal Electricity Authority (NEA)
November 1996 - June 2001 | Kathmandu, Nepal
Served as Power System Control and Operation Engineer, in the capacity of a shift in-charge Operated the integrated Power System of Nepal, analyzed breakdown events and failures and restored the system in the possible safest, cost-effective and quickest manner Prepared power system failure and analysis report, and remediation for restoration Recommended any changes, modification or corrective actions, prepared related documentation Monitored the loading of power system, frequency and node voltages Supervised technical crews assigned for operation and maintenance of electric distribution system Maintained and updated log-sheet and other planned and emergency records of operation Dispatched line crews and materials to site for maintenance and operation Led a team of staff assigned for on-site testing and commissioning of medium to low voltage substations and distribution systems Assisted in planning and designing of new substations and distribution lines Supervised construction/installation of medium to low voltage substations and power distribution line system Composed technical reports, specifications, engineering documentations, and other electrical diagrams and drawings Corresponded with internal and external authorities, management team and engineers ofweniger sehen