Sie sind auf Seite 1von 3

JOB SAFETY ANALYSIS

DATE:

GENERIC JSA FOR SAFERAD (RADIOGRAPHY ACTIVITY)


JOB
DESCRIPTION:
BASIC JOB STEPS
POTENTIAL HAZARDS
1. Check all equipment in good & safe
1.1 Exposure to radiation source due to

CONTROLS & SAFETY PRECAUTIONS


1.1.1 TESTEX will perform daily check on their

working condition.

equipment using survey meter.

inadequate personal monitoring .

1.1.2 All radiographer to wearing a film badge as a


2. Obtain Work Permit to work from

2.1 Misunderstanding / Miscommunication

monitoring devices .
2.1.1 Proper coordination TestEx operator, OTS and BPC

BPC operation.

on work.

operation.
2.1.2 All permit and JSA and attachment sheet should
display at work area.
2.1.3 Daily toolbox talk will be conducted by prior to start

3. Site visit
4. Mobilize men and equipment to work

3.1 Expose to plant hazard


4.1 Falling object when working at height

site. (Manual lifting)

work activity.
3.1 Wearing basic PPE and additional PPE .
4.1.1 Use designated bag to contain equipment.
4.1.2 Use manila rope (min 12mm dia.) to lifting radiation
projector and accessories.

4.2 Expose to radiation source

4.2.1 To follow TestEx RT SOP.

5. Radiography activity

6.1 Exposure to radiation.

-Exposing radiography source.

6.1.1 All work procedure to be comply to TestEx SOP.


6.1.2 Temporary barricade consisting of warning signal
light to enclose the area for preventing unauthorized
entrant.
6.1.3 Sufficient shielding to protect radiographer and
others.
6.1.4 Radiographer should check the boundry for public
using survey meter.
6.1.5 Inform control room prior to start exposing
radiation.
6.1.6 BPC operation to announce via PA system prior to
start work.
6.1.7 Radiographer to ensure no radiation by using

6. Housekeeping

6.1 Tripping hazard

survey meter after complete shooting.


6.1.1 Store all radiation equipment at work area.
6.1.2 Ensure housekeeping is done upon work
completion.

8. Close work permit

8.1 Unknown work status

6.1.3 Operation to check the area before closing permit.


8.1.1 Contractor to ensure that the PTW is close after
completion of work.

Hard hat

Safety Shoes?

SAFETY EQUIPMENT REQUIRED FOR THE JOB


Work Vest?
Safety Harness?

Chemical Protective Suit?

Face Shield?

Safety Glasses?
Lock-Out/Tag-Out?

BumpCap?

Rain Boot

Goggle?

Film Badge?

Barricade?

Fire Extinguisher?

Respirators?

Ear Muff / Ear Plug


Trefoil Symbol?
Warning Signage?

Ladder?

Rain Coat?

LEL Detector?

Chemical Glove?

Survey meter?

Other Glove? (semi leather)


Continuous CO Monitor?

JSA Leader:

JSA Team Members:1. ___________________

2. _____________________

Approved by:

3.____________________

4. ______________________

5._______________________
Note: All JSA must be signed by the Team Members, JSA Team Leader and Approved by the Immediate Supervisor of the work group.