i. FURNACE
a. Inspection of the following parts:1. front wall tubes including the area of the burners.
2. side wall tubes including peephole area.
3. rear wall tubes including the boiler nose area.
4. furnace floor area.
b. Waterwashing to remove deposits from all the walls.
c. Repair the burner cell refractory.
d. Repair the furnace floor area.
e. Scaffolding erection in the furnace.
-124f. Cut the water wall tube for mechanical and chemical inspection.
2 Screen tubes
3 Manhole area
4 Sootblower area
5 Economizer tubes
b. Removal of combustion products from the hopper
c. Water washing of HRA
d. Repair the expansion joint
e. Replace or repair the tubes
iv. FORCED DRAFT FAN DUCTING
a. Inspection of the following:1 FD fan suction screen
2. Steam air preheater area
3. Hot air ducting from air preheater to windbox
b. Cleaning of suction screen.
c. Cleanilng of steam air preheater steam tubes (externally) and tightening of leaking joints.
d. Strengthening of hot air ducting and burner wind box guide vanes.
v. STEAM DRUM
a. Inspectiion of the following:1. Drum internal surfaces
2. All pipe fittings/joints inside the drum
3. Feedpipe, girth plates, baffles, scrubbers, chevron driers, separator
4. Gauge glass
5. Isolating valves
b. Wipe cllean the drum internal surface.
c. Removal of deposits by vacuum cleaning.
d. Inspectiion by Inspector of Machinery before reassembly
e. Overhaul the gauge glass and isolating valve
vi. HEADER
a. Inspectlion of the following:1. Superheater inlet and outlet header
2. Reheater inlet and outlet header
3. \/Vaterwall header
4. Economizer inlet and outlet headers
b. Removal of hand hole or by cutting header cap for inspection and reweld.
vii. TUBES
a. Cutting of tubes for inspection and rewelding.
b. Replacing worn-out tubes. .