S.N
UNT
QTY
nos.
17
set
14
set
14
nos
20
nos.
6 G.I.pole clamp for item 2,3, 4 & 5 with 16mm x 50mm Nuts & Bolts on
each holes.
nos.
44
set
42
3a
S.N
UNT
PARTICULARS
Page 1
QTY
12
12
6
72
3.3
R 33 kV line
12 PG clamp suitable for 65 sq. mm ACSR (Dog) conductor.
13 Earth electrode and continuity conductor
13.a 30 sq. mm ACSR conductor Earth wire (Rabbit)
14 Binding wire, Armour tape line hardwares etc.
15 Earth wire Joint of 'Dog" ACSR suitable for 65 sq. mm ACSR conductor.
nos
set
km
L.S.
12
6
1.1
1
Nos
KM
24
Page 2
R 33 kV line
RATE
(Rs)
AMONUT
(Rs)
35,000.00
595,000.00
600.00
8,400.00
3,000.00
42,000.00
3,000.00
60,000.00
4,000.00
12,000.00
3,500.00
10,500.00
2,100.00
12,600.00
400.00
17,600.00
300.00
12,600.00
RATE
(Rs)
AMONUT
(Rs)
3,000.00
36,000.00
600.00
7,200.00
2,750.00
220.00
95,000.00
16,500.00
15,840.00
313,500.00
Page 3
R 33 kV line
110.00
11,000.00
46,000.00
1,320.00
1,320.00
66,000.00
50,600.00
1,320.00
1,600.00
3,200.00
1,282,180.00
1,282,180.00
30,772,320.00
1,538,616.00
3,077,232.00
3,077,232.00
38,465,400.00
Page 4
Distribution
Distribution
Distribution
Distribution
Nos.
Nos.
Nos.
Nos.
1
2
1
1
Set
Set
Set
Set
B.
Generators
C.
Transformer
Transformer
Transformer
Transformer
Set
10
LS
set
Nos.
No
H
F.
Miscellaneous
(a) Total Material Cost = Rs (B + C + D + E + F)
(b) Transportation cost 5% of (a) = Rs
(c) Installation cost 15% of (a) = Rs
(d) Testing and commissioning cost 10% of (a) = Rs
Total of (a)+(b)+(c)+(d)+(e) = Rs
Total Construction Power Cost for Likhu-A = Rs (A+G)
Mtr
150
1,350,000.00
800,000.00
2,550,000.00
3,750,000.00
1,350,000.00
1,600,000.00
2,550,000.00
3,750,000.00
9,250,000.00
4,500,000.00
4,500,000.00
2,800,000.00
5,600,000.00
8,500,000.00
8,500,000.00
13,250,000.00
13,250,000.00
31,850,000.00
500,000.00
5,000,000.00
261,190.00
1,305,950.00
6,305,950.00
18,000.00
90,000.00
150,000.00
750,000.00
250,000.00
1,250,000.00
400.00
60,000.00
2,150,000.00
49,555,950.00
2,477,797.50
7,433,392.50
4,955,595.00
64,422,735.00
102,888,135.00