Sie sind auf Seite 1von 8

R 33 kV line

A.I The BOQ and Cost estimate for 33 kV Sub-transmision Line

S.N

Three wire 33 kV line


Ruling span = 60 / 70 m (Approx)
Length = 1 KM
PARTICULARS

UNT

QTY

Supply, install including testing & commissioning of the following items as


per NEA standard and Engineer's instruction :

1 11m long steel Tubular pole (380 kg) 410 SP-52

nos.

17

2 100x50x50x6x300mm G.I Channel as Top Cross arm.

set

14

set

14

nos

20

4 100x50x50x6x2250mm G.I Channel Cross-arm with necessary holes for


clamps & bracing (for H-pole).
set

5 100x50x50x6x2000mm G.I Channel horizontal-Tie with necessary holes


for clamps & bracing (for H-pole).
set

5 75x75x6x2400mm Equal Angle cross Bracing with necessary holes (for


H-pole)

nos.

6 G.I.pole clamp for item 2,3, 4 & 5 with 16mm x 50mm Nuts & Bolts on
each holes.

nos.

44

7 33 kV Pin insulator with spindle

set

42

3 100x50x50x6x1350mm G.I Channel Lower Cross-arm with bracing.

3a

S.N

75x75x6x1600mm Equal Angle Bracing for item (3)

UNT

PARTICULARS

8.a 33 kV Disc insulator ( 3 nos of 11 kV Disc string)


nos
8.b Dead end set comprising of G.I. clamp suitable for DOG ACSR with balleye & clevis tong adopter back-straps Nut-bolts all complete.
set
9 Stay set with anchor plate (600x600x20 mm) and rod (2.5 m & 24 mm
dia).
nos
10 7/8 SWG ( overall diameter 12 mm) stay wire
kg
11 0.1 sq inch / 65 sq.mm ACSR (Dog) conductor
km

Page 1

QTY

12

12
6
72
3.3

R 33 kV line
12 PG clamp suitable for 65 sq. mm ACSR (Dog) conductor.
13 Earth electrode and continuity conductor
13.a 30 sq. mm ACSR conductor Earth wire (Rabbit)
14 Binding wire, Armour tape line hardwares etc.
15 Earth wire Joint of 'Dog" ACSR suitable for 65 sq. mm ACSR conductor.

nos
set
km
L.S.

12
6
1.1
1

Nos

KM

24

Material Cost of 1 KM = NRs


Case 1: For Connection to Lamanne S/S (2.6 km)
(a) Material Cost of 2.6 KM long 33 kV line
(b) Transportation cost 5% of (a) = NRs
(c) Installation cost 10% of (a) =NRs
(d) Testing and commissioning cost 10% of (a) = NRs
Total of (a)+(b)+( c)+(d) =NRs

Page 2

R 33 kV line

RATE
(Rs)

AMONUT
(Rs)

35,000.00

595,000.00

600.00

8,400.00

3,000.00

42,000.00

3,000.00

60,000.00

4,000.00

12,000.00

3,500.00

10,500.00

2,100.00

12,600.00

400.00

17,600.00

300.00

12,600.00

RATE
(Rs)

AMONUT
(Rs)

3,000.00

36,000.00

600.00

7,200.00

2,750.00
220.00
95,000.00

16,500.00
15,840.00
313,500.00

Page 3

R 33 kV line

110.00
11,000.00
46,000.00
1,320.00

1,320.00
66,000.00
50,600.00
1,320.00

1,600.00

3,200.00
1,282,180.00

1,282,180.00

30,772,320.00
1,538,616.00
3,077,232.00
3,077,232.00
38,465,400.00

Page 4

Other Items for Construction Power


B Transformers
B.1 250 kVA, 33/0.4 kV, 3P, 50 Hz
B.2 150 kVA, 33/0.4 kV, 3P, 50 Hz
B.3 500 kVA, 33/0.4 kV, 3P, 50 Hz
B.4 750 kVA, 33/0.4 kV, 3P, 50 Hz

Distribution
Distribution
Distribution
Distribution

Nos.
Nos.
Nos.
Nos.

1
2
1
1

250 kVA; 400/230 V; 3P, 0.8, 50 Hz Diesel Generator


C.1 (complete Package)

Set

150 kVA; 400/230 V; 3P, 0.8, 50 Hz Diesel Generator


C.2 (complete Package)

Set

500 kVA; 400/230 V; 3P, 0.8, 50 Hz Diesel Generator


C.3 (complete Package)

Set

750 kVA; 400/230 V; 3P, 0.8, 50 Hz Diesel Generator


C.4 (complete Package)

Set

B.

Cost of Transformers (in NRs)

Generators

C.

Transformer
Transformer
Transformer
Transformer

Cost of Generators (in NRs)

E. Sheet steel enclosed ACB / VCB Panel Board


E.1 415 V, 3P, 50 Hz. ACB Panel Board with Synchronising
facility and Trolly
E.2 Main Switch Board for the Disel Generator house
E.

Set

10

LS

Cost of Panel Boards

30 kV Lightning arrestor (3 nos per set)

set

33 kV,3 Pole centrally rotating type Isolator Switch.

Nos.

33 kV Neutral CT with support structure and enclosure.


650 V grade 3.5 core armoured Cu. Cable@ 30 M/
Transformer (1 x 30 M)

No

H
F.

Miscellaneous
(a) Total Material Cost = Rs (B + C + D + E + F)
(b) Transportation cost 5% of (a) = Rs
(c) Installation cost 15% of (a) = Rs
(d) Testing and commissioning cost 10% of (a) = Rs

Total of (a)+(b)+(c)+(d)+(e) = Rs
Total Construction Power Cost for Likhu-A = Rs (A+G)

Mtr

150

1,350,000.00
800,000.00
2,550,000.00
3,750,000.00

1,350,000.00
1,600,000.00
2,550,000.00
3,750,000.00
9,250,000.00

4,500,000.00

4,500,000.00

2,800,000.00

5,600,000.00

8,500,000.00

8,500,000.00

13,250,000.00

13,250,000.00
31,850,000.00

500,000.00

5,000,000.00

261,190.00

1,305,950.00

6,305,950.00
18,000.00

90,000.00

150,000.00

750,000.00

250,000.00

1,250,000.00

400.00

60,000.00
2,150,000.00
49,555,950.00
2,477,797.50
7,433,392.50
4,955,595.00
64,422,735.00
102,888,135.00