PETROCHEMICAL ENGINEERING Case Name: BHIT NETWORK-JUNE-19(1A II) FINALIZED BY BA.HSC


2 CONSULTANTS
3 C-2, BLK NO 17,GULSHAN E IQBAL, Unit Set: Field_Units
4 NEAR NATIONAL STADIUM,
KARACHI, PAKISTAN. Date/Time: Wed May 22 12:16:20 2019
5
6
7
NeotecPIPESYS v2.5.77.0: JUNE-19(1A II) FINALIZED BY BA.HSC
8
9
10
op-102-2
11
12
13 Pipeline Units Profile
14
15
Distance at Pipeline Origin: 0.00 m * Elevation at Pipeline Origin: 758.31 m *
16
17 Distance Elevation Run Rise Length Angle
Pipeline unit Label
18 (m) (m) (m) (m) (m) (deg)
19 Pipe * 9.75 * 757.09 * 9.75 -1.22 9.83 -7.125 Pipe #1 *
20 Pipe * 61.87 * 754.65 * 52.12 -2.44 52.18 -2.679 Pipe #2 *
21 Pipe * 140.51 * 750.99 * 78.63 -3.66 78.72 -2.663 Pipe #3 *
22 Pipe * 141.73 * 747.33 * 1.22 -3.66 3.86 -71.565 Pipe #4 *
23 Pipe * 213.35 * 744.29 * 71.62 -3.05 71.69 -2.437 Pipe #5 *
24 Pipe * 290.16 * 741.24 * 76.81 -3.05 76.87 -2.272 Pipe #6 *
25 Pipe * 365.74 * 738.49 * 75.59 -2.74 75.64 -2.078 Pipe #7 *
26 Pipe * 441.94 * 735.14 * 76.20 -3.35 76.27 -2.519 Pipe #8 *
27 Pipe * 518.13 * 731.18 * 76.20 -3.96 76.30 -2.977 Pipe #9 *
28 Pipe * 594.03 * 725.39 * 75.89 -5.79 76.11 -4.364 Pipe #10 *
29 Pipe * 669.61 * 719.90 * 75.59 -5.49 75.79 -4.151 Pipe #12 *
30 Pipe * 746.72 * 719.90 * 77.11 0.00 77.11 0.000 Pipe #11 *
31 Pipe * 766.88 * 759.26 * 20.15 39.35 44.21 62.883 Pipe #18 *
32 Pipe * 769.32 * 758.65 * 2.44 -0.61 2.51 -14.036 Pipe #17 *
33 Pipe * 852.95 * 758.04 * 83.64 -0.61 83.64 -0.418 Pipe #16 *
34 Pipe * 917.33 * 758.04 * 64.37 0.00 64.37 0.000 Pipe #15 *
35 Pipe * 949.51 * 758.34 * 32.19 0.30 32.19 0.543 Pipe #14 *
36 *
Erosion Velocity C 949.51 758.34 0.00 0.00 0.00 0.000 ErosionVelocityCheck #1 *
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69 Hyprotech Ltd. Aspen HYSYS Version 2006.5 (21.0.0.6924) Page 1 of 1
Licensed to: LEGENDS * Specified by user.

Das könnte Ihnen auch gefallen