wee set Prare arr
fore Ue ser aero ware as
NATIONAL WATER DEVELOPMENT AGENCY
rte (ney of Water Rescores, Rv Dereopmert and Senge Rejatn) =
eas,
wate aftatosy Rte
az ga ora,
24, 8 Floor ON),
Sota Bhawan,
RK. Puram, New Dethi-66
ve:— Comprehensive Report of Ker-Betwa Link Project-Regarding
Sool gta Satan Premera Otte oe srehr ag Reet B wate
1 470°2012/NP-t/Vol-T1824 Dated-07.06.2019
2. 492012/NPALNol-11953-8$ Dated-08.07.2018
As desired. comparative statement including changes between the
proposed components as envisaged in Comprehensive Report of Ken-Betwa
Link Project viz @ viz earlier submitted DPR of Phase-1 & Phase-II is enclosed
for kind information and necessary action please
This issues with the approval Chief Engineer (North) NWDA Lucknow
suet star
FRR ves Ee 7
+ ats Auf vita nates, was, af Red 3) et
2 Fe oft, frm, ORS ees |
3 Sere seen, see wa TAS A
Tat aes hin ST aa ae 3
‘GO°T / Phone C755 2880008 2340088 Ge, /ru cys ss4cNee
Ei enudapaeeinalic Webste am meanerComparative Statement including changes between the proposed
components as envisaged in Comprehensive Repor
Link Project vi
of Ken-Betwa
a viz earlier submitted DPR of Phase-I & Phase-1
SLNo) | Ken-teova link Project PhaseT and Phase-| ~ Comprehensive Report October
1 mos
___ Head Works _ ae z
@ | Dawdan Dam_was proposed under Air pammeies of Beata Dani
Kea-Beiwa link Project in the DPR Apel | ncluding oflake level of upper level
2010. This proposal of KBLD, Phase-1 was tunnel, lowes level tunnel div
|| ecepted by the Advisory Commitee of sluie ete Kept same as per Kents
‘MoWR. RD & GR in July, 2016, Further. the | link Phase-l April 2010. Only
project” proposal as ben eonsidared | operational suds of Daudhan dsm bs
| seceptabe for investment clearance in Juss, been changed in Comprehensive Report
| 2017, a the months water requizemen! of
MP. and UP changed dc to their
| modified inigstion planning. Irigaton
| lansing of the Davdhan dam is
eserbed in chapter VI of
Comprehensive Repor. Avene
annual evaporation loses fr
Daudhan reeroir was 91.90 MCM in
2010 port while 8064 MCM
| | considered in Comprehensive Report
Lower Om Saw and four barges te
Nocnitheda, Barr, Seni and Kota. Was | mR, borage ich
Jincluded in the DPR of Ker-Reiwa fink | Planning and operation study are wine
| phasecil and submitted. to Cental Water |S beta shir DPR bs Cover
f of Masaya Praiesh wo CWC, However
Commission for appraisal during. Janus" | Lowe Orr dam parameters are same as
2014, This DPR was under considered #9 per DPR of Loner Om Praise
J eWC, mean while, During the mesting Submited by CWC by NWDA dur
Jconvened by Hon'ble Minister | June 2017 except water planning a
(WRRDAGR held on 18h November, 2016 | iigstion ethology. The same are
SE NWDa sod Govemmentor MP ofits | incomorted in Comprehensive
ee iatnstery Report. Revised water planning and
imeation methodology of govt of MP
describe in chapter VI ol
| review the situs of KBLP, it was decided
‘that only Lower Orr Dam and Kotha Bax
wll be retained under Phisesl. On the | Compisaon ve Report
[request of Gow of MP sho as ated |Government of MP witl be inet
KBLP, Phase. (7) The DPR of Lower Orr
Project prepared by NWDA end subir
EWC. Gi) DPR of Koths Barnwe modi
by Government of MP (il) DPR of T
Complex Multipurpose Project prepared by
Govt of MP. and Sobmited «0 CWC by
Government of MP directly. These three DPR
are under techno-economic appraise! with |
ewe. |
wa | @) Om oF total Modified engi of |
| fink Cana is proposes as open chanel with | Ken-Betwa fink Canal (176 kin). RD |
| 76.226 cumec discharge enpecity and 287m _| 0.09 to 8$ km and 117 t0 176 km reach
| PSL at head. Branch canal. cstribataries and s proposed with open channet and RD
minor ete are also proposed for flow | 8S'km to. 176 km reach is proposed
irigation system, 46531 area in Madhys | with RCC. syphon duct.” Design |
| Pradesh and 13753 ha area was proposed in | discharge and FSL are 115,51 cumee
| Uirar Pradesh thorough flow wrigation. | and. 287 m respectively. Pumping
| sation, Rising main, breaking pressure
“ank, transmision line and pine Tne for
lstribution system ete are proposed fox
pressursedimicro iigation | system, |
-42096+96751 he area is proposed from |
Ken-Betwa link and 43678 ha area
| Sreely om reservoir by purine |
Fh pressinised fnicn ination on |
| | Madhya Pradesh utilizing 79.184 M1
| Power, 52052 ha area #8 proposed in
| Uttar Pradesh by Pressurised/micro,
t irigation wiizing 12.97 MW Power
| Gi) Ente Tengih of S730 Kes of Ken Tai Gi) Modified length of 9000 kor ob
| Bank Canal is proposed! as open channel with Ken Left Bank Canalis proposed
65.194 eumee discharge eapaity and 246.340 | Telescopic pipe ine with 57.34 cumee
nm FSE at head. Branch canal, disribwiaies | discharge capacity. Poraping stain.
| and minor ee are also proposed for flow | Rising main, breaking pressine ta
| gation system. 241306 and 213610 ha area |cransmission tine and. pipe
| wos proposed ftom Ken LBCY Bariyarpur disteibution system ete are propose fer
PUW by flow isgation in Madhya Pradesh pressrisedmnieto irigation stom,
| and Untar Pradesh espostively 139848 ha area is proposed trom Ken
EBC by pressurisod lino ie
Modiya Pradesh tly 102 M1
Posser 34894 a ates is proposed in
Madhya Pradesh by Dow eration.
Gi Panna & Teta UIS 5 proposed to
sigate 9010! ha_aree in Machbun reservoir near Parwatn Ful
wilizing 94,36 MW Power. As in
component which was not proposed i
DPR Apsil.2010,
[itastion™ and Domes Type arinigion
Waser supply
j |) Ditibation chamber
eat levelinn
Tow
ined asd ae
| Discharge Capachiy | 31.80 cumece a |
| | CCumnees ofthe {°° saw
| | Jeane” Skew | |
[SR ane |
| peoposse
| Basser in MW. re
are a 7 | Si Lento ary OT
rss often
| : | nein
i Fai Sippy Feel a ROO TiO Lave of waviy TTT
Head mains ofa fom |
| bile tats DCB) ink _|
Ful Spay dept | 36 Tid slncing reanor [A tie wirat
| | Mead | (UMCM capacity) | carrier RL
| i fs, si [33000 |
i Dedwihar Heed S00 {BH Tagih—oF gaa} 2900]
leat | nals fake om
| Delving enero Be
| i sink fr
Se Ske at Heal Leash of Bai | 320° Vs
| maim oftakeftom | respectively
tolacing scr
| eesti wilt y BARB ike
Te Kotha Barrage
r | |) Left bank piped canal having a lengih of | Canal system under Kotha
| 11-80 km outfall inte siver Kethan and whole | proposed us given in the DPR of Rothe
vommand is served by laying “Telescopic | Barrage which was submited io CWC
| | | Peamwtee Ioiguton Space x Ave Cea | erp abmaed 1 CWC
| | Level of 415.00 m. Length of Rising main | econon ic appraisal . No any change is
| has been
Kept 11.50 km whereas diameter of | proposed in Comprehensive Repent
| | Telescopic Pipe (mm) is 1.60 m. Single stage |
| BR of Bim has been proposed ta serve the
|| firigaion
Pradesh
Lena
in Vigishadisriet of Maya
The left bank pipe canal iss been
of designed for 3.50 cumee. The
3snd 10000 he
Right
8.50 Ein out
hank pipe cama h
jpecity of 3.50 cusmee. Length
main has been kept 8.50 km whereas
diameter of Telescopic Pipe Gn) is 1.60) m.
| Single sage lil of 26 m has been proposed 9
‘sere the inigation in Vidisha and Sagar
districts of MP. The GCA and CCA of right
tank canal is 15380 ha and 10000 ha
wer Bis,
been designed for
on t
)TTivigation system consists of pressurized pipe | Conml Sistem Under Bina comple
| nicra imigation in Kiurai, Malthone and | project is kept same as given in the
Bina Tehsils, Conveyance system of the Bina | DPR of Bina conyplex which vas
Main canal starting fom south moves | submitted to CWC hy MPWRD for
| towards various segments of the command | wechno-cconomic appraisal. No change
| area after crossing the railway lines at desired | s proposed in Comprehensive Report.
Jocations. Almost all the command area |
| served by the pressurized pipe micro
Iigation system. 90000 ha area is propossd |
oe pressursed/miero irrigation system |
1 usilizing 25.66 MW Power
3. | Command Ai
| Detail of Command area comparison is
Fe in UIP-38T062 ha
jilizaion i MP-DMOST
| and 591 MCM by substitution.
fee utilization in UP-1700,00 MCM Anhiial utilization in UP-1 700.08
| GiAnaual utlzaiion
ial utilization in MIPS TO
Bina Compl
Command areata MP-8OIH hi
iA uwilization in Mi.svicu
Power genration
Daueian Dam
station-78 MW (iit / (i) Hydro Power Gensraion:78 MW
(PH 60 MWPIL2 18 MW
“Ti Tsao Power Generation NT
{ilSolar Power Generation Ni
“GSolnr Power Gene
ate Cost (Details of east comparison I
___isenclned ss annevurett
Ta. | aan Da
I BE in kh RS TORESB7.20 Fee
it G 55 in ak
9285.79 inlakn
Lower Or Dam Pie
[WiCombined oF Ken Berwa Phas
and Phase-Il, Lower Orr Dam . Kothe
| | Barraye and Bina ProjestAnnexure
Districts Wise breakup of CCA of KBLP
Unit ia ha
SLNo | Name of bistets TAs perKBLP phase) As per Annual”
DPR 2010 /DPR of | Comprehensiv irrigation
KBLP phese-l e Report Oct
submitted toowe | 2018,
by MPWRD and
WDA
307155
z ae
2. [23306 oa
[3 lal 22184 ale
| 4 BamohiFattay |)
|Total ot kaLr————=387837
Phase-!
[Total of keLP 2 211500
| Phase-It
Total of MP
ue.
3. dhansi 9113
4. [Lalitpur ° 3533
Total of UP in KBLP | 227373 251064 251064
Phase!
“| Grand Total 676257 |= (904a32 1062038
6rict wise CCA of Ken-Betwa Link Phase-I
me rod we
Leo‘Annexure
‘Details of B - Land and X- Environmental and Ecology Annexure-A
Estimate approved by CWE | Cost as per comprehensive |
on 17/06/2016 = |
cost
st item
aoa
Tas