Sie sind auf Seite 1von 26
= wre ora Prepra siftepeur tor Mad Ware, wed ee ) farerer afte anny arearer fipin) (ot erenera National Water Dev elopment Agency Ministry of Jai Shakti, Government of India (Depariment of Water Resources. River Develapment and Ganga Rejuvenation Date: 67 /pa fz NWDA Teoh 152 12018 4.34 The Additional Chief Secretary Irrigation and WRD. The Additional Chief Secretary Water Resources Depart Government of Madhya Pradesh. Ministry of Jal Shakti Bhops Govt, of Unar Prades Lucknov Sub: Memorandum of Agreement (MoA) amongst Government of Madhya Pradesh, Government of Uttar Pradesh and) Union Government for implementation of Ken-Betwa Link Project (KBLP) ~ reg. Ref! (i) Govt. of Madhya Pradesh office Memo No. 22¢AV/192MPS/31 124} dated 07.11.2020 (ii) Govt. of Uttar Pradesh office letter received through e-mail dated 23.09.2020 May kindly recall the discussions held during the meeting taken hs Hon’ ble Minister. MoJS with Water Resources Jal Shakti Ministers of both the states on 22.09.2020 on the draft Memorandum of Agreement (MoA) amongst the Government of Madhya Pradesh, Government of Uttar Pradesh and Union Government for implementation of Ken-Betwa link project (KBLP). Ax requested, the observations/suggestions on the drafi MoA have been received trom both the states vide the levers cited above. The observations of both states have been examined thoroughly and the point wise replies to the observations of both the states on draft MoA are enclosed herewith Contd... - AVN ance ai Bea oF|pf V2 o_o f40_ M295, patika Bhawan. RK. Pum, Now Dethi-110066 205, wien wa, ame. a geH. a RReefl110006 RIT o11-24671661, 24074855, 24195751 sBerae 011-26871681 | S4RTET ; worwsnwda.govin Phone 011-2467 1681. 24674855, 2419573" Fax 011-28671681 | Website warw nwds gov Further, after incorporating the suggestions from Government of Madisa Pradesh and Government of Uttar Pradesh rationally. the dratt MoA uis been further modified. The modified draft MeA (duly approved by Hon'ble Minister, MoJS) is also. enclosed herewith for your kind perusal and acceptance please. It is requested to kindly convey the acceptance of the d draft MoA at the earliest so as to take up further necessary action for the Mo and initiate the implementation of KBLP. modit Yours faithfully. Enel: As above aie (RK. Jain) Chief Engineer (HQ) Copy to: 1. Additional Secretary, DoWR.RD&GR, Ministry of Jal Shakti 2. Enginecr-in-Chief. Water Resources Department. Madhya Pradesh 3. Engineer-in-Chief, lrrigation and Water Resources Department, Lucknow c D. 1k & ADDRESS Ui PARTIES Vailabh Bhawan, , 2. Goverment of Uttar Pradesh (GoUP), Ministry of Jal Shakti, Irrigation & Water Resources Department. Bapu Bhawan. Lucknow, Uttar Pradesh Union Government through Ministry of Jal Shakti, Department of WR. RD & GR, Shram Shakti Bhawan. Rafi Marg, New Delhi IL INTRODUCTION WHEREAS the Union Government considers the programme for interlinking of rivers (ILR) of national importance and will work out ways and means for implementation and funding including share of the States, ete, to enable completion of the projects within the stipulated time frame. AND WHEREAS the National Water Development Agency (NWDA). an autonomous body under the Ministry of Jal Shakti has prepared Detailed Project Report (DPR) of Ken-Betwa Link Project as per the Memorandum of Understanding (MoU) signed by Chief Ministers of Madhya Pradesh and Uttar Pradesh with Union Minister for Water Resources on 25" August. 2005 in the august presence of ihe Hon"ble Prime Minister AND WHEREAS the implementation of Ken-Betwa Link Project shall be carried out as per the Comprehensive DPR prepared by NWDA. The project is intended 10 develop and stabilize and-develop irrigation to the tune of 6.53 lakh ha in MP and 2.51 lakh ha in UP, besides providing drinking water 10 about 6.2 million people in the two States. AND WHEREAS, the Union Government, in consultation with the states, will ereate an appropriate institutional arrangement involving states for control mechanism. water accounting and regulation of water in Ken and Betwa basins in accordance with agreement reached. The composition, terms of reference and other related issues in respect of this institution shall be decided in due course. 2.00 3.0 Weir {PUW) shall be utilised by the states of MP and UP in Ken and Betwa basins. | smal year (annual gross yield in Ken basin upto Daudhan dam being 6188 MCM or more). the state of MP shall utilise total of 2350 MCM (83 TMC) while state of UP shall utilise total of 1700 MCM (60 TMC) annually from the Ken system upto Daudhan dam, Bariyarpur PEW, including Rangewan-dam. The dedicated committed releases to MP and UP from the storages in Daudhan reservoir during non monsoon period (November to May) shall be 1834 MCM and 750 MCM respectively. UP shall be free to create additional storages in its own territory downstream of Bariyarpur PUW to store monsoon water as per its requirement during non monsoon period. The rest of the water-shall-be-atilised-by MP in-Ken-and Betwe-basins. In case. MP utilises additional water in Bewa basin beyond its due share in Betwa basin as per existing ‘water sharing agreements for Betwa basin, the same shall be substituted by MP from its share in Ken basin to Betwa basin through Ken-Betwa Link Canal at its outfall at Barwa-Sagar in Betwa river, upstream of Parichha weir through Barwa Nallah In the years of scarcity (gross annual yield being below 6188 MCM in Ken basin upto Daudhan dam), the deficit shall be borne by both the states in the ratio of their respective utilisation from Ken system i.e, 27.5% by UP and 72.5% by MP. Also the any deficit in the storage of Daudhan reservoir as on Ist November shall be shared by both the states in the ratio of their share from Daudhan reservoir storage. COMPON| ENTS OF KEN-BETWA LINK PROJECT (KBLP) The components of KBLP including head works & their distribution system and canal pipeline & command networks are given at Annexure-I. PROVISION FOR DRE KING WATER SUPPLY The drinking water supply from project to region shall be given priority. The project wise provisions made for drinking water supply along with districts to be benefitted are given at Annexure-II. However, the provisions for drinking water supplies shall be within the overall share ofeach state." 7.0 TA SHARING OF COST (details enclosed he cost of KBLP shall inciude all the components listed in para at Annexure-l) of this MoA including the cost of land acquisition. R&R and diversion of forest land etc, The KBLP will be funded as National Project by: the Union Government with 90% (Centre) & 10% (States) finding pattern after the approval of the Union Cabinet. Alicr accounting for the Central share, the remaining cost of works shall be shared by the States of MP and UP as under: - 6.1.1 Headworks of Daudhan dam: between MP and UP in the ratio of 70 % MP. 30 % UP. 6.1.2. K-B Link Canal: in the ratio of water to be drawn by respective states. 6.1.3 For works exclusively serving either of the states, by the State concerned. ‘The Operation and Maintenance (O&M) cost of the project shall be borne by the States as per details below 6.2.1 Headworks of Daudhan dam and any compensatory works arising out of PTR submergence and R&R sites: between MP and UP in the ratio of 70 % MP 30 % UP. 6.2.2 K-B Link Canal in the ratio of water drawn by respective States 6.2.3 For works exclusively serving either of the states, by the concerned State: IMPLEMENTATION MECHANISM The execution of Ken-Betwa Link Project shall be ay under A Special Purpose Vehicle (SPV) shall be created with participation of Government of MP and UP for the execution of KBLP. The SPV will be responsible for execution ATATION AND RES EMENT (R & R) OF PROJECT AFFECTED FAMILIES (PAKS) R & R of project allected families and land acquisition for the project territorial jurisdiction would be carried out by respective State Goverr nisin time bound and transparent manner as per Land Acquisition, Rehabilitation and Resettlement Act. 2013 or as per the respective State Policy and as per approved [environmental Management Plan 9.0 MONITORING MECHNISM 9.1 A Steering Committee headed by Secretary (DoWR,RD&GR). Govt, of India with representations {fom state governments shall periodically review the overall implementation of project including policies, progress. funding and other related matiers, Any issue arising out at implementation stage shall be resolved by the Steering Committee. Dispute arising out at Steering Committee level, shall be referred to High Level Committee headed by Union Minister ( Jal Shakti) and represented by Water Resources/Jal Shakti Minister of both the states, Signed at New Delhi on this day 2020. (SHIVRA, SINGH CHOUHAN) (YOGI ADITYANATH) Chief Minister of Madhya Pradesh Chief Minister of Uttar Pradesh FOR THE STATE OF FOR THE STATE OF MADHYA PRADESH UTTAR PRADESH ( GAJENDRA SINGH SHEKHAWAT) Minister for Jal Shakti FOR UNION GOVERNMEMI 1.2 1.4 carrier of about 176 km. 1.3 A Lower Level Tunnel about {00 m from the left bank of Daudhan dam for conveying water to the Power House-Il and from there to the Lower Gana} Left Bank Canal of MP through a connecting channel of about 2.5 km 1.1.4 Power House-I (2x30 MW) to the right of spillway at the toc of Daudhan dam 1.1.5 Power House-II (3X6 MW) at the outlet of Lower Level Tunnel. Kotha Barrage Comprises 1.2.1 A barrage across Betwa river at village Kotha, Tehsil Ganj Basoda, na, Madhya Pradesh District Vidi 1.2.2 Pump Houses and Rising Mains Bina Complex Comprises 1.3.1 Four storage dams: Madia & Chakarpur on Bina river, Semra Ghat Diversion on Dhasan river and Dehra dam on Dehra Nalla. 1.3.2. Pump Houses. Rising Mains and Power Houses Lower Orr Project Comprises 1.4.1 An earthen embankment cum concrete dam across Orr river near village Didauni, in District Shivpuri, Madhya Pradesh 1.4.2. Pump Houses, Rising Mains and link water carrier Repair/strengthening/remodelling of Bariyarpur pick up weir. Parichha weir. Barwa Sagar dam along with appurtenant structure and 7.1 km long Barwa Nallah (© carry water from Barwa Sagar to Betwa river upstream of existing Parichha weir. 6 kim fong link water cartier from upper tunne Sagar/ aeress Barwa Nallah. in Betwa Basin 2.1.2 A bye pass channel from exit of Lower Level Tunnel to connect proposed Ken [eft Bank Canal of MP. 2.1.3, Pumping system arrangements for lifting of water to Upper level tunnel to ensure the water supply in the Ken-Betwa link canal whenever reservoir depletes below the crown level of Upper Level Tunnel 2.14 Developing pumping system. pipe distribution network and micro irrigation system by lifting water from Daudhan reservoir/initial reach of Link water carrier to serve a part of high level command (43.678 ha) of Chattarpur Distriet of MP. 2.1.5 Developing Pumping system, pipe distribution network and micro irrigation system for Ken Left Bank Canal to serve 1,39,848 ha, CCA in Chhattarpur District. 2.1.6 From existing Bariyarpur LBC 34.894 ha CCA will be covered by existing open canal network in Chhattarpur District of MP. 2.1.7 Developing pumping system, pipe distribution network and micro irrigation system for 90,101 ha. CCA by lifting water from Daudhan reservoir, out of which 70,000 ha. CCA will be in Panna District and 20,101 ha. CCA will be in Damoh District of MP. 1.8 Developing pumping system, pipe distribution network and micro link canal to serve remaining left out n system from Ken-Betw: area of 42,096 ha. of high level command & 96751 ha. enroute command of MP and 17,488 ha. of enroute command of UP MP Bina Compiey. « Pumping system. pipe distribution 1 irrigation system tor 96,000 ha. CCA of MP. eowork and Lower Orr Project Pumping system, pipe distributic micro irrigation system for 90000 ha. CCA of MP. 2.24 Development of existing command of 37.564 ha in Mahoba district in UP with pressurised pipe micro irrigation system. Lalitpur Uuar Pradesh Mahoba Uttar Pradesh Sub-Total Total of Daudhan Dam 2. | Lower Orr Dam Shivpi Total of Lower Orr Dam 3. | Kotha Barrage | Vidisha Madhya Pradesh | Total of Kotha Barrage af 4. | Bina Complex | Raisen ~ | Madhya Pradesh | | Multipurpose | | Project | Se DE nce saadaceeeaisiiae Total of Bina Complex Multipurpose Project lotal domestic requirement for MP: 126.73 MCM. Total domestic requirement for UP: 67.00 MCM Grand Total (MP + UP): 193.75 MCM Say 194 MCM. Say6MCM 3.15, | BAND WHERLAS the National Water Developmen 2 Agency (WDA), an autonomous body under the modified subsequently as per inistry of Ja! Shakti has prepared Detailed Project estions Report (DPR. april, 2010) of Ken-Betwe Link CWC, mention of | Project as per the Memorandum of Understanding 2010 in MOA may not be |{MoU) signed by Chief Ministers of Madhya appropriate Pradesh and Uttar Pradesh with Union Minister for Water Resources on 25® August, 2005 inthe august | presence of the Hon'ble Prime Minister Eel ct i @] AND WHEREAS the implementation of Ken- | Agreed | | Betwa Link Project shall be carried out as per the | | Comprehensive DPR prepared by NWDA. The | | project is intended t0 develop and stabilize and | develop irrigation to the tune of 6.53 lakh ha in MP , and 2.51 lakh ha in UP, besides providing drinking | | rations ‘water to about 6.2 million people in the two States. | D] AND WHEREAS. the Union Government. in| Agreed consultation with the states, will create anj appropriate institutional arrangement involving, states for conirol mechanism, water accounting and | regulation of water in Ken and Beowa basins in | accordance with agreement reached. ~The | | composition, terms of reference and other related issues in respect of this institution shall be decided | in due course | } al) No corre = | As per hydrological studies made in DPRUApr su | 2010), 73 % dependable yield of Ken river at per water sharing agreement | | Dauahan dam site is 6590 MCM232.70 TMC). | reached in year 2005 and Afier reserving 2266 MCM (80 TMC) for upstream _ reiterated again in year 2017 by uses in Madhya Pradesh (MP) in Ken basin upro | Hon'ble Chief Ministers of both Daudhan dam, and accounting for mandatory | the states. | releases for environment and reservoir losses at | The water sharing as decided in| Daudhar-dem upio Bariyarpur, the-rest-of-the-waier | tripartite MOU signed on 28" | ean _ | in-Ken-basin-upto-Bariyarpur Pick-Up Wele (PUW) | August | are not as nterim cuichmen! ¢ sven) and Barivu The dedieaied committed releases to UP from th storages in Daudhan reservoir dam, Rut iin and Barivarpur PU. during non monsoon period Comprehensive DPR. 2018. If (November 10 May) shall be 750 707 MCM (25 | more water is available in the FMC) for all purposes. However, if needed. UP shall | system, the same can be utilized be free to create additional storages in downstream | for environmental needs, of Barivarpur PUW its-owse-tertitory: within its | territorial boundary 10 store monsoon water as per | The sharing of water from | its enhanced requirement during non monsoon | Daudhan reservoir is proposed as | period. Hhe-rest-of-the-water shall-be utitised-by-MP | 750 MCM and 1834 MCM to | fn-Ken and Betwa-basins. Beyond dedicated share of | states UP and MP respectively. It 1700 MCM (60 TMC) allocated 10 UP, MP will be | will fulfill requirements of both | free 10 milise entire water of Ken spstem in Ken and | the states during non monsoon | Berwe basins. In case, MP ullises additional water } period. However, the figure 750 | in Betwa basin beyond its due share in Betwa basin | MCM or any other appropriate as per existing water sharing agreements for Betwa | figure to be allocated to UP basin, the same shall be substiuted_ by MP from its | during non monsoon period! may requirements of both the states 3 share in Ken basin to Betwa basin through Ken- | be decided at political level, Betwa Link Canal at its outfall at-Barwa-Sagar-in | Rangwan dam never came in | Berwa river, upstream of Parichha weir through | earlier discussions on water | Barwa Nath | sharing from Daudhan dam. It | won't be wise to bring Rangwan | at this stage ( Average utilisation by UP from Rangawan is about 39 MCM only in last 10 years Tin case of surplus vield. Madhya Pradesh shall have | The suggestions made are not as all rights t we the surplus yield. In the years of | per water sharing agreement | scarcity (wross annual yield being below 6188-6590 | reached in year 2005 and MCM in Ken basin upto Daudhan dam), affer | reiterated in year 2017 by reserving 2266 MCM (80 TMC) for upstream use in | Hon'ole Chief Ministers of both Madhya Pradesh and accounting for mandatory | the states. enviremnetal flows and reservoir losses, the deficit | Following line is also suggested shall be borne by both the states in the ratio of their | to added for share shortages in respective utilisation from Ken system i. 27-S%-by | Daudhan reservoir during non UP-and-22-5% by MP 25.34 % by UP and 74.66 % | monsoon period. by MP. Also the any deficit in the storage of Daudhan reservoir as ‘on 1" November shall be shared be borne hy Ait 6.1.1) Headworks of Daudiian dame between MP and UP in | The Headworks “east shall be the ratio of 38 73% MP: 30 279% UP | shared by both the states in the ratio of their share from Daudhan | reservoir ©.14 | The value of affected revenue and jorest land of Cost of land acquisition and | (new) | Madhva Pradesh will form part of the cost of the | diversion of forest land is already | | KBLP and adjusted against share of Madhva | mentioned in clause 6.1 i Pradesh | However, there is no issue in | {adding clause 6.1.4 as suggested. | GPT The cost of O&M of Headworks | Daudhan reservoir shall be [shared by both the sates inthe ratio of their share from Daudhan Nocomments ___ eee | The O&M cost of Rehabilitation & Resettlement | The suggestion is agreed and (ew) | (RAR) sites and other works related 10 | added with item in clause 6 Rehabilitation/Compensatory works arising out of | However, cost sharing ratio shall Panna’ Tigere Reserve submergence in equal | be in the ratio of their respective | _| proportion be, 30150 fe shore from Dauahan reservoir, | 7.1) No comments a | | 22 Nocommenis 1 | 7.3 | Water Resources Department, Govt of MP has | All the three projects mentioned initiated construction of three projects of Phase-Il | are part of KBLP and are clearly namely Lower Orr, Bina Complex and Kotha | mentioned in Clause 2.0] Barrage which are the part & parcel of KBLP in| (Annesureel) and need not to be anticipation of early implementation of KBLP. The | mentioned again in this clause. | cast of these projects being incurred by MP shall be | Moreover. all these projects are | reimbursed from the fund of KBLP. yet to be cleared hy the} | competent authorities and | mentioning of their ongoing construction in MoA is not, | " water 1 n (00 ny from the nh a 1.1 ower Leve ie} about bank of Daudhan dau ha ing fer conveying water 10 the Power House-Hi and irom there to the Lower-Canal Left Bunk Canal of M2 ohn sharnel of abou 2.5 han No comm No comments, No comments [No comments | Na comme Repair meetin and istrengtheningiremedelling Bariyarpur_ pick up weir, Parichha weir, Barwa | Sagar dam alongwith appurtenant structure, if needed and 7.1 kr Tong Barwa Nallaly to carry water from Barwa Sagar to Betwa river upstream of existing Parichha weir. eieaadne a vey ad an Area eae jor also. However. basic parameters | of remodeled structure shall he | Te 17 2 No comments No é. sp ‘A176 km long link water carrier trom upper tunnel to upsiream of Parichha weir in Berwa River through existing Barwa Sagar/ across Barwa Nallah. __| in Berner Basin: ‘A bye pass channel from exit of Lower Level Tunnel 10 connect proposed Ken Left Bank Canal of MP, No comments Developing pumping system, network and micro irrigation system by lifting water from Daudhan reservoir/initial reach of Link water carrier to serve a part of high level command 43,678 ha) of Chattarpur District of MP. | 1.5 | No comments pipe CCA_will_be covered distribution | Agreed From existing Bariyarpur LBC 34.894 38890 ha by existing open_canal | C¢ ‘Agreed | ‘AS per Comprehensive DPR. 894 ha | district in UP under existing Ken command by | be mentioned specities Zio (new) 22 222 223 224 Banda | {tis understood and need Stabilisation 9 repairisiengthening of existing system. Enhancing component command area of Bariyarpur Right Bank Canal | (Ken Canal) system by utilizing pressurised pipe | ‘micro irrigation system wish the UP Guns | Development of existing command of 37,564 ha] Covered in item 2 Mahoba district UP with pressurized pipe micro inrigation system within the share of UP Govt Bee No comments ‘No comments : 7 [ No comments fee Development-oF esisting-cormmhand-of 37.564-ha-in | It is appropriate to keep this item Mahoba—disiriet —with—pressurtsed—pipe—miero under Betwa Basin | | Jj MEMORANDUM OF AGREEMENT (MoA) © STATES OF MADHYA PRADESH, UTTAR PRADESH AND THE UNION 1 ON THE IMPLEMENTATION OF KEN-BETWA LINK PROJECT (KBLP) AMONGST ERNME “Commenn oF Gon No Comment jon and control of water in Ken and should be done by (ional arrangement f water in Ken and be decided at an apy No comment No comment Since 1 r oles para Ta therefore + amended as: | | | ee ‘water sharing agreements of | reement | iyarpur weir berween both the | the agreements on Ken river 25" Augus in d's of | ‘enroute ‘agreement of As the share of UP | increase from 1050 MCM 10 1700 MCM, the figure of discharge of 2500 cusee mentioned in 1977 agreement is bound to improve However, as sugges nol water 10 UP as well to MP has been Ken system upto inthe Moa Canal System sup | Banda District of UP + d discharge of UP in the right bank ken canal o ariyarpur weir as per 1977 agreemet between both the states. ‘The existing agreement of year 1972 for Rangwan dam will not be affected and inue 10 get water during soon period from Rangawan as agreement of year 1972. id be appropriate to sti 188 MCM water availability of Ken basin upto Daudhan dam at 75 % and allocate water 10 both) or developmen needs acca} Beiwa river. hydrology or availability of water he 1972 | upto Rajghat d he within their al Comprehensive Report of Ki 1972 at Rajghat dam, ff water uses in Betwa basi x dam by MP are also giver Table-3.16 of — Chaptar-3 MP are also given of Chapter-3 Table-3.16 Govt. of MP has proposed Kotha Barrage jon of $3 TMC as per | wer Om proj Wich joins in the | constructed at upst downstream oj affect Rajghat dam and upstream of Matatila | lability at Mi dam. Lower Orr dam project proposed | violate the exi near Didauni village at | dam between bot shok Nagar viel. lis catchment area is 1843 As per assessment made by NWDA, the construction of Lower Or ddam shall not impose any adverse impact on utilization from Matatila dam Bina Complex, Kotha Barrage are | proposed within allocated share of MP | ipstream of Rajghjat dam ie, 33 TMC (1301 Mem. | Complex and Lower beyond the scope of Ken Betwa usion should be Project. Hence their ink viewed. amended: Replacement 25 ‘Reconstruction! Bariyarpur pick up we Barua Sagar Dam along wi structure and 7.1 k appurtenant Barwa Nallah 10 Berwa haw id remodeling of Right Ken Cai System to satisfy the water requ UP and MP." Components shall Comprehensive remodeling i structure, ifre be kept as per DPR. The — wor s Feconsirution of any | ined Para 2.6 is amended as: its pump hoi rising mains ar Sprinkler dis syste — jae season and structures for Ke requirement transfer of water oh C Para 2.8 iy added as : “Construction of Pump House and its appurtenant. — wo: Channelization and remodelling of Drain to transfer 2. TMC water from Rajghat Dam (0 Govindsagar Dam in District Lalitpur.” Discharge capacity and the alignment of Ken Betwa link channel should be finalised in such a way so that there is substantial transfer of water from Ken basin to Betwa Basin so the nam and very purpose of the project itsel can be justified, No Comment Agreed. Item is modified suitably in the Moa No Comment No Comment | i | | a No Comment be covered by Weir therefore this clause need not be part of the proposed MoU, as area to be | Annexure has already been modified under para ll. | (modified Annexure giving details of works to be included in KBLP is enclosed) Introduction, part C. Jause should be deleted as area to be 1 ted is already covered under para ll. | pan C | No Comment fact that submergence of Daudhan Dam and R&R issue being in y will be bore by MP, the | RM of power house | er power of 78 MW has been proposed to MP. | No Comment | No Comment | ) LYLE MIEN T HONMECHANIS! T | Annexures have been made part of . MoA in Para 2 AND RESETTLEMENT 1 APFECTED FAMILIES | No Comment Act. 2013 | nd as per [Current MoA covers water sharing for Ke Para 9.1 read with Para 9.2 basin. The existing agreements between two) tates in Betwa basin shall be adhered to, joth the states are advised to enter a igreement for water sharing in Dhasan sub sin also. Any new storage strueture, proposed to be constructed during and after | construction of Ken Betwa Link, Project, on Inter State River ie. Kea, Dhasan, Betwa should seek the consen of Steering Committee headed by Secretary (DoWR, RD&GR), Gost. of India with representatives from state Government

Das könnte Ihnen auch gefallen