PEMBANGUNAN RUKO 3 UNIT

JALAN T. AMIR HAMZAH TANJUNG PURA


LAPORAN KEUANGAN

PENGELUARAN SALDO
TANGGAL URAIAN TRANSAKSI
NOMOR (Rp) (Rp)

01 - 04 - 2019 Saldo Kas pertanggal 30 Maret 2019 - 1,306,000.00


03 - 04 - 2019 Diterima Uang 101,306,000.00
03 - 04 - 2019 Kayu 1x2 10 Ikat 650,000.00 100,656,000.00
03 - 04 - 2019 Kayu 1,5 x 3 20 Btg 1,180,000.00 99,476,000.00
03 - 04 - 2019 Batu guli 6 Dum 7,200,000.00 92,276,000.00
03 - 04 - 2019 Kayu 1x2x16 12 btg 444,000.00 91,832,000.00
03 - 04 - 2019 Operasional (Minum Tukang) 100,000.00 91,732,000.00
04 - 04 - 2019 Kayu 2x3 x16 1 btg 76,000.00 91,656,000.00
04 - 04 - 2019 Kayu 1x2x16 6 btg 222,000.00 91,434,000.00
04 - 04 - 2019 Kayu 1x2 3 Ikat 195,000.00 91,239,000.00
04 - 04 - 2019 Kayu 2x3 x16 14 btg 1,064,000.00 90,175,000.00
04 - 04 - 2019 Kayu lat 2 Ikat 130,000.00 90,045,000.00
04 - 04 - 2019 Kapasitor SIC Air 100,000.00 89,945,000.00
04 - 04 - 2019 Pipa Air 3/4 10 Btg 27,000.00 89,918,000.00
04 - 04 - 2019 Transort Ke Binje 200,000.00 89,718,000.00
04 - 04 - 2019 Alat Listrik 8,330,000.00 81,388,000.00
04 - 04 - 2019 Bayar Uang Pinjaman 15,000,000.00 66,388,000.00
04 - 04 - 2019 Pasir Ikat 4 Dum 1,400,000.00 64,988,000.00
04 - 04 - 2019 Bor Air 750,000.00 64,238,000.00
05 - 04 - 2019 Langser Tanah 8 0h 800,000.00 63,438,000.00
06 - 04 - 2019 Pinjaman Gaji Tukang Listrik 500,000.00 62,938,000.00
06 - 04 - 2019 Gaji Mingguan Staff 4 0rg 1,200,000.00 61,738,000.00
06 - 04 - 2019 Gaji Tukang (B Darman) 12,500,000.00 49,238,000.00

Saldo sampai dengan ini :


Rp. 49238000,- (Empat puluh sembilan juta dua ratus tiga puluh delapan ribu rupiah)

Tanjung Pura, 4 April 2019


Disetujui Oleh Disusun Oleh