Sie sind auf Seite 1von 1

A B C D E F G H

A A' B C C B A' A A A' B C


C.I.S roofing
4*7cm wooden rafter
eucalyptus truss
4*5 wooden ceiling batten
+9.88 +9.88 chipboard ceiling
+9.88
1 1
Roof +9.00 Roof +9.00
Roof +9.00
level level level

Roof +6.00 Roof +6.00


Roof +6.00
level level level

2 2

First floor +3.00 First floor +3.00


First floor +3.00
level level level

Ground floor +0.00Ground floor +0.00


Ground floor +0.00

3 level level level 3


ceramic tile f.f
3cm thick Cement Screed

FRONT ELEVATION
15cm thick RC slab
SC-1:50 REAR ELEVATION SC-1:50 25cm thick Hard Core
Selected fll
Compacted Soil

4 3 2 1 1 2 3 SECTION
4 X-X SC-1:50

+9.88 +9.88

Roof +9.00 Roof +9.00


level level

4 4
Roof +6.00 Roof +6.00
level level
Fax:
Email.
Project Name: RESIDENCE (G+2)
Owner:

First floor +3.00 First floor +3.00 Location: DEBRE BIRHAN


level level
Architectural design
Team:
5 5

Drafts Person Team Date of Issue:

Ground floor +0.00 Ground floor +0.00


level level Drawing Title: Scale: Index
1:50, B
Drawing Stage: Drawing No:

RIGHT SIDE ELEVATION SC-1:50 LEFT SIDE ELEVATION SC-1:50


Final
AR-01/02
A B C D E F G H