LOG DESCRIPTION
PT. ELNARA CHRISTTO MINING
IUP PT. BOSOWA MINING
SITE: WIWIRANO, KABUPATEN KONAWE UTARA
CLIENT : PT. ELNARA CHBRISTO MINING LOGGER : MUSAIR COORDINATE
PROJECT LOC : IUP PT. BOSOWA DRILLING SPV : ADI YUSWANTO NORTHING 9646923
PROSPEK AREA : BLOK ECM RIG/DRILLER : MD.01 EASTING 414932
TOTAL DEPTH :19 METER DATE (From) : 10/07/2023 ELEVATION : 461 MDPL
DRILL HOLE ID : ECM.03_BSW(B) DATE (To)) : 12/07/2023 SHEET : 1 OF 1
Weathering
Boulder
Serpent
HOLE ID Run Length REMARK
FROM Recovery Colour
TO (m) Length Material Code Rock Code Grain Size Primary Secondary Tertiary (mm)
(m) (%) Code
(m)
Weathering
Boulder
Serpent
HOLE ID Run Length REMARK
FROM Recovery Colour
TO (m) Length Material Code Rock Code Grain Size Primary Secondary Tertiary (mm)
(m) (%) Code
(m)
Gambar 1. Core Box Meteran Ke 18-19 Gambar 2. Core Box Meteran Ke 1-5