CONTRACTOR DAILY OVERTIME REPORT

DATE : 15-Oct-22 Arief Bayu Stefan A.


No : 15/11/10/SPKL/MEI/22
Photo
No NIK Full Name Dept Fajar PIC Clock In Clock Out Job Description
Before After

1. Daily cek AVS panel dan motor drive PM1/2 & finishing
1 91100308 Jana Tri P PM 1.2 Mr. Eko 1:00 2:00 2. Input data AVS
3. Pemadaman dan pengaktifan panel area finoshing

1. Daily Cek AVS panel Drive pm1,& Finising


2 91100346 Sukirno PM 1.2 Mr. Wisnu 18:00 19:00 2. Input data AVS pm1,& Finising
3. Lanjut over shift trouble di Maruishi

3 91100335 Dedi Dermawan SP 1.2 Mr. Kukuh 14:30 16:30

4 91100342 Reza Pahlevi SP 1.2 Mr. Kukuh 14:30 16:00

pulling & terminasi cable 300&240 untuk mdp incoming baru area
5 91100344 Wildan Septian SP 1.2 Mr. Kukuh 14:30 16:30
DP pm2

6 91100418 Ramdani SP 1.2 Mr. Kukuh 14:30 16:00

7 91100403 Nasrulloh SP 1.2 Mr. Kukuh 14:30 16:30


Photo
No NIK Full Name Dept Fajar PIC Clock In Clock Out Job Description
Before After

8 91100417 Dhiyauddin SP 1.2 Mr. Nanang 14:30 16:00 Cleaning & replace load protection motor, over load to
EOCR & Cable Power modul P046

1.Cek & Catat Energy Scada JB207 & JB302.


9 91100443 Aldino Eka PM 3.7 Mr. Sartika 18:00 19:00 2.Daily cek AVS & inspection PM3,7
3.Cek KWH PM3 & SP3

1.Permintaan mekanik, selesai pekerjaan mekanik. Konek motor


C-27, selesai konek test putaran dcs sesuai load 8,3 A / 15 A.
10 91100351 Sigit Priyanto PM 3.7 Mr. Arif 12:00 13:00
2.Permintaan mekanik, selesai pekerjaan mekanik. Konek motor
osc lead in roll, selesai konek aktifkan modul operasional.

1. M-B-1 trip over load, cleaning thickner


2. SR-36 amankan module starter guna cleaning screen oleh
11 91100438 Refli Hamdan PM 3.7 Mr. Sunari 1:00 2:00 produksi
3. Awal shift monitoring sheet break PM7, dari awal shift kertas
putus. Masih mengatasi semprot broke size press penuh