Beruflich Dokumente
Kultur Dokumente
Responses 2023-06-06
Responses 2023-06-06
IWAN ###
1 bh knie, URIS BAYA ###
pipa 1/2", URIS BAYA ###
1 bh tee 1/EDY GUNA ###
DEDET NU ###
1 bh elbowEDY GUNA ###
pipa 4, 2.bEDY GUNAW ###
DEDET NU ###
DEDET NU ###
1 bh knie , URIS BAYA ###
5.1 14.8 Pipa 1/2, ESRA SULI ### 3.510897 116.6459 5.1 14.8
6.6 32.7 Cek laporanESRA SULI ###
5.3 32.7 Sok drat luESRA SULI ###
JHON LING 7/1/2021
JHON LING 7/1/2021
JHON LING 7/2/2021
pipa1/2", URIS BAYA 7/3/2021
7.7 329.4 Elbo 1/2 pvESRA SULI 7/5/2021
Pipa 1/2", ESRA SULI 7/5/2021
5 41.5 Clam 3" ESRA SULI 7/5/2021 3.514952 116.6379 5 41.5
pipa1/2, 1 EDY GUNA 7/5/2021
39.07 67.7 EDY GUNA 7/6/2021
6.2 18.9 Elbo PVC 1/ESRA SULI 7/8/2021
JHON LING 7/9/2021
ESRA SULI ###
pipa1/2", 2URIS BAYA ###
3.9 12.5 Clam 3", DoESRA SULI ### 3.51489 116.6378 3.9 12.5
KENI ADI ###
pipa, lem URIS BAYA ###
HOIRIL AN ###
pipa 3", le URIS BAYA ###
HOIRIL AN ###
1 bh elbow,URIS BAYA ### 3.554959 116.6078 51.47
5.8 43.5 Pipa 1/2 p ESRA SULI ###
3.4 38.1 Clam 3" , ESRA SULI ###
4.9 3.5 Clam 3x2, PHOIRIL AN ###
1 bh clampHOIRIL AN ###
4.6 -2.8 Klan 3 in, , , ,
4.6 -2.4 Elbo HDPE 1/2 in, ,
6 bj baut 1URIS BAYA ###
Dobel nevel DEDET NU ###
5.3 2.4 Pipa 1/2 in PVC 1 meter
5 10.6 Pipa PE 4" EDY GUNA ### 3.550165 116.6113 5 10.6
EDY GUNA ###
98.4 68.6 1 bh clampURIS BAYA ###
4.9 -0.2 Pipa 1/2 p DEDET NU ###
1 bh elbow,URIS BAYA ###
3.6 10.7 Pipa 2" pv EDY GUNA ###
2 bh clampURIS BAYA ###
1 bh clam 4KENI ADI 8/2/2021
1 bh knie, KENI ADI 8/3/2021
4.8 2.2 Pipa 1/2 pvESRA SULI 8/8/2021 3.477333 116.655 4.8 2.2
17.057 62 Keni foset DEDET NU ###
pipa1/2", EDY GUNA ###
5 -19.5 Pipa1/2 pvcESRA SULI ### 3.489763 116.654 5 -19.5
4.2 -19.3 Clam 3" , DESRA SULI ###
32.486 68.6 Pipa1/2", URIS BAYA ###
1 bh clampHOIRIL AN ###
seltip EDY GUNA ###
pipa1/2", URIS BAYA ###
92.9 68.6 pipa 6, 1 b EDY GUNA ###
2 lonjor pi EDY GUNA ###
28.066 69.9 1 bh knie, URIS BAYA 9/6/2021
1 bh sok luURIS BAYA 9/9/2021
60 m pipa 2URIS BAYA ###
JHON LING ###
1 bh elbow,URIS BAYA ###
68.4 68.6 1 bh clampKENI ADI ###
2 bh elbow,KENI ADI ###
1 bh giwboURIS BAYA ###
39.205 68.6 2 bh elbow,URIS BAYA ###
pipa1/2", KENI ADI ###
6.4 -23.8 Perbaikan ESRA SULI ###
pipa 2", le URIS BAYA ###
1 lonjor pi URIS BAYA ###
pipa1/2", 2URIS BAYA ###
pipa1/2", URIS BAYA ###
URIS BAYA ###
1 bh clampURIS BAYA ###
URIS BAYA ### 3.555044 116.6078 30.466 68.5
1 bh sok luURIS BAYA ###
pipa1/2", URIS BAYA ###
seltip URIS BAYA ###
1 bh knie, URIS BAYA ###
pipa1/2", EDY GUNA ###
pipa 1/2", URIS BAYA ###
42.795 68.1 pipa 1/2", URIS BAYA ###
Clamp 6 x 2DEDET NURDIN, JHON LINGGI
5.538 85.55719 SIGIT AJI ###
6.068 72 PIpa 1/2 in 2 lonjor keni 4 elbo 4 perbaikan meteran kenna pagar RSUD
9 41.2 Sok lurus PHOIRIL AN ###
Elbo 1/2, KENI ADI 4/5/2022
7.585 76 PIpa HDPE 15 meter pipa pvc 1/2 in 1 lonjor keni 2, rlbo 2 lem silti
4.551 78 GEser wm malinau sebrang rt 1 pipa pvc 2 lonjor, keni 2 elbo 4 lem dan siltip
15.17 76 GEser wm rt 4 respen asesoris yg digunakan pipa pvc 5 lonjor keni 2 elbo 3 lem dan siltip secu
7.5 -48.6 Lem, Elbo 1EDY GUNA 4/5/2022
4.787 162.8 Kenie, lem, pipa
EDY GUNA 4/6/2022
1.Sok lurusMATIUS U 4/6/2022
5.061 72.9 1. Kopler. MATIUS U 4/6/2022
10.619 74 KEni 1/2, 2elbo 1/2, 2 pipa pvc 50 cm lem dan siltip secukupnya
2.kenie. 1. MATIUS U 4/6/2022
1.elbow. 1MATIUS U 4/6/2022
28.392 63.4 Elbo PE 1/2IWAN 4/6/2022
Elbo pe 1/2IWAN 4/6/2022
9.958 -8.6 Tdk ada, MATIUS U 4/7/2022
7.585 67 LAporan air tidak mrngalir
7.285 55.3 1.pipa. 1.l MATIUS U 4/7/2022
4.9 53.9 1.lem. 1.piMATIUS U 4/7/2022
4.7 53.7 1.pipa. 1.l MATIUS U 4/7/2022 3.530082 116.4986 4.9 53.7
7.128 65.2 Pipa 1/2 inIWAN 4/7/2022
Lem, Keni fDEDET NU 4/8/2022
9 -23.4 Laporan airESRA SULI 4/8/2022 3.506345 116.6485 9 -23.4
20 63.2 Pipa, Lem DEDET NU 4/8/2022
LAporan air tidak mengalir rt 5 respen
Lem, Pipa 1DEDET NU 4/9/2022
1. Lem. 1. MATIUS U 4/9/2022
LAporan air tidak mengalir rt 2 sembuak warot fit kran rusak kondisi air lancar
CEk laporan air kurang lancar rt 7 respen stop kran rusak
4.8 20.3 Pipa pE 3",DEDET NU ### 3.57397 116.6361 4.8 20.3
Lem, Pipa DEDET NU ###
Seltif. MATIUS U ### 3.530391 116.4967 4.943 8.1
Cek jlur s ESRA SULI ###
52.4 0 Cek laporan air tidak mengalir rt 5 pelita pipa dinas putus asesoris pipa 1/2 1m
4.783 9 1.lem. 1. PMATIUS U ###
2.seltif. 2 MATIUS U ###
1.lem. MATIUS U ###
Elbo 1/2 2 ESRA SULI ###
4.551 79 PErbaiken keni pecah sekalian naikan wmnya nomor WM 3157 rt 5 prlita asesoris keni 2 rlbo
4.675 27.7 1. Pipa. 1. MATIUS U ###
4.551 71 ASesoris loc cabel bocor
4.551 61 GAnti loc cabrl bocor asesoris yg digunakan keni poset HDPE 1/2 in loc cabel 1/2 in masing ma
5.2 16.4 1. Clam. 1. MATIUS U ### 3.523843 116.5293 4.466 17.4
Clam 3" ESRA SULI ###
Pipa, Lem, DEDET NU ###
15.17 58 ASesoris yg digunakan dobol nrvel elbo pipa 50 cm
5.36 70.50757 Camp 3 x 1/ JHON LING ### 3.614777 116.6162 5.36 70.50757
7 15.5 Dop darat 1ESRA SULI ### 3.489583 116.654 7 15.5
ebow1/2,shok lurus drat dalam 1/2
1.pipa. 1. MATIUS U ###
Pipa, Keni DEDET NU ###
Tiang meter patah asesoris elbo dan pipa 1/2 in 50 CM
4.97 62.4 Pipa lem sok keni darat luar
PErbaikan pipa persil setelah meteran bocor rt 1 respen asesoris elbo 1 dan pipa 1/2 in 30 cm
1 knie ,setivi,pipa
1 sok drat dalam ,1 DOF selubung,seltive
4.56 63.5 Pipa & lem
6.6 34.8 Kencang baESRA SULI ### 3.605777 116.6027 6.6 34.8
12.136 66 PErbaikan keni dan elbo pecah nomor sambungan 10.2412 rt 4 respen
15.17 82 Perbaikan keni pecah no.10.1457 rt 4 respen
PErbaikan pipa bocor rt 4 respen
GAnti stop kran no. 10.1457 rt 4 respen
6 -198.4 Elbo 1/2 1 ESRA SULI ### 3.475843 116.6526 6 -198.4
6.3 72.2 1. Lem. 1. MATIUS U ### 3.516943 116.514 6.441 72.1
3.5 -2.6 Pipa 3" pv HOIRIL AN ### 3.61877 116.6521 3.5 -2.6
7.495 21.3 1. Lem. 1. MATIUS U ###
4.551 75 CEk laporan air tidak mengalir rt 4 respen stop kran tertutup
72.9 0 PErbaikan pipa krosing jalan bocor asesoris yg digunakan pipa pvc 2 m
6.912 72.1 1. TEE. 1. MATIUS U ###
3.366 34.9 1. Pipa. 1. MATIUS U ###
PEmasangan WM 10 in tg 5
6.8 30.8 Pemasangan WM 10 inc . tg 5
8.3 -92.6 Lem, Ceni pESRA SULI ###
Dople nevel ESRA SULI ###
PErbaikan tiang wm bocor asesoris yg digunakan elbo pvc 1/2 in 1 krni pvc 1/2 in 1 lem dan sil
4.551 72 PErbaikan elbo pecah rt 3 respen sekalian ganti stop kran rt 3 resprn
PErbaikan pipa dinas bocor rt 5 respen
PErbaikan keni poset 1/2 in bocor no 3625 rr 4 respEn
ASesori pvc yg digunakan elbo 1/2 in T siltip dan lem
Pipa, Lem DEDET NU ###
1. Clam. 1. MATIUS U ###
Stop kran, DEDET NU ###
Pipa ,L BOW 3,LEM
5.937 35.8 1. Dobel nevMATIUS U ###
Pipa 3" pv HOIRIL AN ###
Cek laporaDEDET NU 5/3/2022
Dople nevel DEDET NU 5/3/2022
Elbo PE 1 bESRA SULI 5/9/2022
8.5 -48.7 Lem 1 biji, HOIRIL AN ###
Perbaikan laporan pipa bocor rt 6 pelita
32.956 63.2 Pipa, Keni DEDET NU ###
Pipa hdpe 3DEDET NU ###
22.638 66.8 Pipa 5 c,m DEDET NU ###
Pipa 5 cm, DEDET NU ###
5.9 56 Lem, Pipa EDY GUNA ### 3.551432 116.6252 5.9 56
Pipa 3" PE ESRA SULI ###
7.8 66 Pipa 2" pv IWAN ### 3.585783 116.6449 7.8 66
Pipa 5 cm, DEDET NU ###
Sealtape
PErbaikan sambungan reduser sembuak warot rt 1 asesoris reduser 4 ke 3
9.101999 77 PErbaikan pipa 2 in bocor rt 20
10.619 85 PEnyambungan pipa 3 in jalan gor
Sock lurus M Syawal ###
Knee posetM Syawal ###
Pipa , Sok DEDET NU ###
L BOW 5,kni IWAN , ESRA SULI TALLULEMBANG
7 33.7 Pipa PVC 2"KENI ADI ### 3.53495 116.6167 7 33.7
Pipa , Keni DEDET NU ###
Pipa2" pvcJHON LING ###
Pipa hdpe 4DEDET NU ###
Lem, Keni pESRA SULI ###
64.1 0 PErbaikan meteran pata alamat pelita rt 1 no. 3263
L bow 1,sok kni drat dalam 1,pipa,seal tape,lem
18.204 70 PErbaikan tiang fit kran patah rt 3 kelapis
7.585 69 PErbaikan pipa dinas bocor rt 3 krlapis
9.101999 57 PErbaikan pipa dinas yg kenna sandak asesori yg dibutukan 1 pic8s kopler dan 3 elbo
2200 Pipa PE 1/ ESRA SULI ###
PErbaikan pipa bocor rt 4 resprn asesoris pipa 1/2 in 1 meter
7.585 76 GaNti stop kran rt 1 resprn no4667
6.716 -0.3 L bow PVC IWAN ###
6.068 73 Pindah wmJHON LING ###
20 Elbo 1/2 pvKENI ADI 6/3/2022
Pipa, Lem, DEDET NU 6/6/2022
5.8 83 Knee FoucetM Syawal ###
7.333 72.5 Sock lurus M Syawal ###
7.1 63 Lem PVC, Pipa PVC 1 meter
Pipa PVC 1DEDET NU ###
3.9 72.5 L BOW PVCIWAN
2 ###
6 56 Sock lurus M Syawal ###
4.8 73.7 Pipa 1/2 inM Syawal ### 3.568403 116.6075 19.256
Pipa PVC 2IWAN ###
87.6 0 Pipa PVC 1JHON LING ###
5.56 69 Karet packM Syawal ###
5.86 75.9 Pipa pvc, M Syawal ###
Pipa, Lem, DEDET NU ###
Keni foset DEDET NU ###
5 71.2 Lem, Knee M Syawal ###
PErbaikan JHON LING ###
Cek laporanJHON LING ###
20 0 PErbaikan pJHON LING ###
Seal tive, ESRA SULI ###
Soklurus drDEDET NU ###
24.134 71.2 Elbo 1/2 inM Syawal ###
Pipa pvc 2 M Syawal ###
Lem, Pipa ESRA SULI ###
9.1 65 2 buah socM Syawal ###
Lem , dan M Syawal ###
5.1 -18.8 Pipa 3" pvcHOIRIL AN ### 3.618548 116.6486 5.1 -18.8
Sok Lurus HIWAN ###
26.238 70.5 Lem, pipa pM Syawal ###
7.8 70.5 Lem,pipa 3M Syawal ###
7 71.5 Clam sadleM Syawal ###
Coupler HDM Syawal ###
4.813 76 Sock lurus M Syawal ###
Saltape, K M Syawal ###
1000 Lem, Pipa 1ESRA SULI ###
24.095 71.6 Elbo 1/2 inM Syawal ###
Lem, knee Mp Syawal ###
Coupler/ s ESRA SULI ###
8.541 71.7 Elbo PVC 1M Syawal ### 3.525704 116.5182 8.541 71.7
5 62.6 Dof drat 1 pcs, lem , sealtipe
8.5 94 Sock lurus M Syawal ###
20 Clam sadleM Syawal ###
4.85 43.1 Knie 2 pcs,IWAN ### 3.568403 116.6075 19.256
Pipa 1 meteIWAN ###
Dop 1/2, CESRA SULI 7/4/2022
Sock lurus M Syawal 7/4/2022
12.59714 25.00168 Pipa pvc 3 M Syawal 7/4/2022 3.530488 116.4968 7.995991 25.15326
18.204 78 PErbaikan pJHON LING ###
6.068 129 PErbaikan pJHON LING ###
Coubler / sESRA SULI 7/5/2022
Lem pipa, M Syawal 7/6/2022
36.9 71.1 Sok Lurus dM Syawal 7/6/2022
Seltif 4 , IWAN , HOIRIL ANWAR, DEDET NURDIN, ESRA SULI TALLULEMBANG
Sealtape, M Syawal 7/7/2022
5.6 87.2 Lem 2 botoM Syawal ### 3.517037 116.5142 5.6 87.2
87.6 76.9 Lem,pipa pM Syawal ###
Elbo 1 buaM Syawal ###
8.3 78.5 Lem , DOF IWAN ###
Clam 3" , ESRA SULI ###
PErbaikan tJHON LING ###
4.1 59.1 Seltive , D IWAN ###
Sock lurus M Syawal ###
8 3 Knee posetM Syawal ###
8.5 70 1buah sockM Syawal ###
4.86 14 Lem, ,pipa IWAN ###
6.383 68.3 Lem pipa, PIWAN ###
15.17 67 PErbaikan pJHON LING ###
PErbaikan pJHON LING ###
48.9 0 PRrbaikan kopling meteran pata rt 2 kelapis no.10.6060
8.002 63.3 Pipa PVC 2IWAN ###
5.477 61.4 Lem, seltivIWAN ###
19.5 75 Knee posetM Syawal ###
7.183 70.1 Seltive,, IWAN ###
18 76.3 Knee posetM Syawal ###
5.863 16.2 Dof 1, Kne IWAN ###
4.3 16.1 Dof 1 IWAN ###
DOBEL NEVE DEDET NU ###
Lem , Pipa IWAN ###
Lem, Elbo 1ESRA SULI 8/2/2022
5.284 70.1 Kopler 1 IWAN ### 3.568403 116.6075 19.256
Pipa , Lem,DEDET NU 8/8/2022
Kopler 1 DEDET NURDIN, IWAN
4.333 62.5 Dof 1, lem IWAN 8/8/2022
5.066 62.5 Dof 1, lem IWAN 8/8/2022 3.583991 116.6463 5.3 62.5
7.842 69.8 Dof 1, lem IWAN 8/8/2022
8.66 -39.8 Dof 1, selt IWAN , JHON LINGGI
Elbo 2buahM Syawal ###
5.128 61.6 L bow 2 pcDEDET NURDIN, IWAN
4.66 61.4 Double nepl IWAN , JHON LINGGI
4.95 68.4 Pipa , selt IWAN , JHON LINGGI
lem 2 botoEDY GUNA ###
3.3 19.6 LEm, Pipa EDY GUNA ###
Elbow 2 pcM Syawal ###
4.6 -2.4 Pipa PVc 1 JHON LING ###
Knee foucet JHON LING ###
Elbow PVCM 2 Syawal ###
M Syawal ###
ah, Stop kran 2 inc 1 buah , Lem 4 botol, Seltip 3 buah, Pipa hdpe 2 inc 24 m, , ,
lem dan siltip
eni 2 elbo 3 lem dan siltip secukupnya
ndisi air lancar
dobol nevel
vr 2 in pvc 1
Sesori yg dibutukan sok drat dalam pvc 1, PIpa 1/2 50 cm, ELbo pvc 1/2 in 1
pvc 1 , ELbo pvc 1 , PIpa pvc 50 cm
a pvc 1/2 in 50 cm
or, ASesoris klam 2 in 1, elbo 1/2 in 1, sok drat luar 1/2 in 1 pipa 40cm
/2 in 1 lonjor
. Keni pvc1/2 in 2, 2. Pipa pvc 1/2 in 50 cm, lem 1, dan siltip 1