10.10.05 Page 1
TASK BASED RISK ASSESSMENT
The control measures contained within the risk assessment must be strictly adhered to throughout the operation Overall L
FINAL ASSESSMENT
Risk
10.10.05 Page 2
TASK BASED RISK ASSESSMENT
The control measures must be communicated to all personnel involved in the operation, in addition the control measures must be Overall L
FINAL ASSESSMENT
strictly applied at the work site in conjunction with the specific lifting plan. Risk
10.10.05 Page 3
TASK BASED RISK ASSESSMENT
The control measures contained within the risk assessment must be communicated to all relevant personnel and applied at the work Overall L
FINAL ASSESSMENT
site. Risk
ASSESSOR SIGNATURE RESIDUAL RISK ACCEPTED FINAL APPROVAL SIGNATURE:
10.10.05 Page 4
TASK BASED RISK ASSESSMENT
10.10.05 Page 5
TASK BASED RISK ASSESSMENT
10.10.05 Page 6
TASK BASED RISK ASSESSMENT
Compliance with the control measures of the risk assessments is mandatory for all personnel involved in the operation Overall L
FINAL ASSESSMENT
Risk
ASSESSOR SIGNATURE RESIDUAL RISK ACCEPTED FINAL APPROVAL SIGNATURE:
10.10.05 Page 7
TASK BASED RISK ASSESSMENT
10.10.05 Page 8
TASK BASED RISK ASSESSMENT
2. Slight
Minor injury requiring 2 4 6 8 10
first aid treatment
3. Moderate
Injury leading to lost 3 6 9 12 15
time accident
4. High
Single fatality or multiple 4 8 12 16 20
serious injury
5. Very high
Multiple fatality 5 10 15 20 25
Risk rating - interpretation of scores
1-6 May be acceptable; however, review task to see if risk can be reduced further
15 - 25
Task must not proceed. It should be redefined or further control measures put in
place to reduce risk. The controls should be re-assessed for adequacy prior to
task commencement
Hazard severity relative to property damage and environmental impact
10.10.05 Page 9