DBInt Katar
DBInt Katar
Project Presentation
February 11th, 2013, BTU Cottbus
DB International GmbH
J. Marienhagen
International Projects
Cottbus, 11.02.2013
Qatar Integrated Railway Project (QIRP)
Content
Role of DB International
Time Schedule
Project Organisation
Management Approach
Technical Spotlights
1 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Content
2 DB International GmbH
Qatar Integrated Railway Project (QIRP)
World Map
Berlin
Doha
6 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Bauboom in Qatar – Middle East Economic Digest
8 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Metro and Long Distance Network scheme
9
Qatar Integrated Railway Project (QIRP)
Content
10 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Important QRDP Project Milestones
Main technical
solutions
Important, time- Inauguration Test Section
critical Tenders
Organisational Inauguration First Line Section
basis
11
Qatar Integrated Railway Project (QIRP)
Content
Role of DB International
12 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Role of DBI Branch Qatar
The Role of the DBI within this phase of the project is the
„Lead Consultant“.
14 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Typical Phasing of a Project
Concept Maintenance/
Operation
Definition Handover
Feasibility Study
Implementation
Time
15
Qatar Integrated Railway Project (QIRP)
Sidestep: FIDIC
Concept Maintenance/
Operation
Definition Handover
Feasibility Study
Tender
Tender
Construction and Installation
Implementation
Time
17
Qatar Integrated Railway Project (QIRP)
Content
18 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Scope of Work: DBI 2012
Scope of Work 2012: Tender Design / Tender Documents for different „Work Orders“
19 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Scope of Work: Work Order 8 „Railway Systems“
Interface Management
EMC Management
20 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Railway Systems: Subsystems Overview
Project Management
Interface Management
EMC Management
21
Qatar Integrated Railway Project (QIRP)
Content
Time Schedule
22 DB International GmbH
Qatar Integrated Railway Project (QIRP)
From Aquisition to Project Finalisation
23 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Milestones within the design project
Contract Award
24 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Milestones within the design project
25
Qatar Integrated Railway Project (QIRP)
Content
Project Organisation
26 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Organisational Chart
Lines of Communication:
Official project communication will be between Director Systems and PM
Technical communication will be initiated by PM
27 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Organisational Chart (detailled)
Q ATA R R A I L
Client: Chief Technical Officer Director Systems
D. Leckel M. Olschewski
contractual technical
Consultant:
Quality Management
Dr. K. Hofmann
U. Kohlenberger
TVS Signalling Telecom Energy EMC
A. Heneka O. Matthäi R. Geisendorf H. Neumann
Dr. P. Reinke◦
K. Tahmassebi A. Winter p.u. J. von Lingen R. Kadhim
Document Management
T. Germann
WP S1: Metro Infrastr. WP T1: Radio Systems WP E2: SPS WP C1: EMC Managmt.
A. Heneka , M. Franke N. Vu Dr. A. Frenzel + Dr. R. Hietzke*
P. Czerkewski* B. Klingenberg R. Zillmer+ R. Arlt +
Project Management
Assistance
J. Drescher
WP E3: DC TPS
WP S2: Req. On-board WP T2: Fixed Systems WP C2: EMC Design
F. Helms, F. König
A. Tahmassebi V. Vaxevanakis H. Neumann*
T. Scherrans*,
M. Marschollek* O. Matthäi J. Thiemig+
M. Gumprecht*
Technical Service
Support / CAD
U. Engelhardt WP T3: SCADA BACS WP C3: Proof of EMC
S. Helms WP E4: Sys Rq. 3rd Rail Dr. K.-H. Kuypers
M. Kuhne
A. Souradny F. Helms, F. König Dr. S. Röhlig +
F. Hein
N.N.*
N.N.+
WP E5: SCADA-PCSS
Administrative Services F. König
Legal Advice
N. Henckel
* … Subcontractor IfB
Contract Management + ... Subcontractor KEMA/ELBAS
P. Bethge 28 ◦ … Subcontractor HBI
DB International GmbH
D. Golz
Qatar Integrated Railway Project (QIRP)
Technical Counterparts – tailored project organisation
29 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Staffing Concept (Plan)
Germany
Average
Qatar
presence
25 rate
needed
in Doha
20
50%
Number of Personnel
15
10
0
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3
Calendar Week
30 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Content
Management Approach
31 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Management Approach (1): Thinking Ahead
Different design stages within a project require a different project management attention
Tender Documentation
Project Initiaon Phase
Conceptual Design
Inception Report
Project Closure
Rework Phase
Aquisition
Project Phase
Project Management Technical Workforce
32 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Management Approach (2): Leading Documents
33 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Management Approach (2): Leading Documents
After analysing the scope in very detail, the first ideas for
fulfilling the work has to compiled and discussed with the
Client.
Inception Report
34 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Management Approach (3): Conceptual Design as Presentation Event
36 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Content
Technical Spotlights
37 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Technical Spotlights: Grades of Automation
The performance of mass transit systems is largely dependent on the performance of the train control. With
increasing automation, the responsibility for operation management is passing from the driver to the system. A train
control system comprises functions for supervision, operation and control of the entire operational process. It can
feature different degrees of automation such as manual train operation, semi-automated train operation and
unattended operation.
These types of
operation are referred
to as Grade of
Automation
reference:
38
Qatar Integrated Railway Project (QIRP)
Technical Spotlights: Tunnel Ventilation System (TVS)
40 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Technical Spotlights: Tunnel Ventilation System (TVS)
Principle Illustration
Mode
Water drop/ Fog
curtain (wet
cooling)
Emergency
Congested
Maintenance
41
Qatar Integrated Railway Project (QIRP)
Assumptions Register – verification process
Hazard identification
This means hazards of the system itself
(track works) but also hazards in relation to
interfaces with other work orders will be
identified
43
Qatar Integrated Railway Project (QIRP)
Interface Management
44 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Interfaces to disciplines out of DBI scope
45 DB International GmbH
Qatar Integrated Railway Project (QIRP)
Quality Gate / EPLASS workflow
Levels of authorization
Prepared
by a competent Person who produces the design document, complying with
codes and standards governing that work.
Checked
by a competent person able to undertake a formal detailed check of design
methods, codes and standards used, deliverables, calculations, drawings,
and technical specifications produced by another member of the
Engineering Team. This role will be undertaken by a competent person of
the same discipline, not the Preparer, but can be a member of the same
team for a Category I check
Approved