Sie sind auf Seite 1von 2

ELEV.

DE ELEVACIÓN
DIST. ELEVACIÓN
CONEXIÓN ELEV. INTERSECCION
PT LONG. DE INTERSECCIÓN A LINEA PLANT. DE TUBERIA DE TUBERIA DE
DESCARGA A GAS GAS
PRINCIPAL REGISTRO GAS NATURAL Y
NATURAL NATURAL
DE DRENAJE DRENAJE

D0 7.06 6.52 54.2176 54.71 54.6677 54.088


D1 10.65 7.46 54.1447 55.00 54.7438 54.164
D2 10.03 6.75 54.1389 55.00 54.7184 54.138
D3 12.59 6.75 54.0968 55.00 54.5811 54.001
D4 12.87 6.75 54.0921 55.00 54.5683 53.988
D5 15.43 11.74 54.0500 55.00 54.7728 54.193
D6 15.70 11.74 54.0455 55.00 54.7593 54.179
D7 9.03 1.20 54.0957 55.20 54.2424 53.662
D8 8.44 1.07 54.1091 55.20 54.2474 53.667
D9 3.28 0.00 54.2291 55.20 54.2291 53.649
D10 2.69 0.00 54.2428 55.20 54.2428 53.663
D11 1.59 0.00 54.2500 55.20 54.2500 53.670
D12 12.76 6.75 54.0255 55.10 54.5939 54.014
D13 13.12 6.74 54.0209 54.90 54.4725 53.892
D14 16.26 11.75 53.9807 54.90 54.6450 54.065
D15 16.66 11.81 53.9757 54.90 54.6309 54.051
D16 19.81 11.75 53.9355 54.90 54.5076 53.928
D17 20.17 11.75 53.9309 54.90 54.4954 53.915
D18 15.26 11.75 53.8970 54.62 54.4537 53.874
TRAMO 10" 22.58 11.77 54.1447 55.53 54.8668 54.2868
DIFERENCIA
DE NIVEL
AL TURA ELEVACIÓN ENTRE
REGISTRO EN PISO CONEXIÓN A PROFUNDIDAD
PLATAFORMA TERMINADO LINEA
PRINCIPAL Y
REGISTRO
1.03 55.73 0.4874 1.82
1.20 56.20 0.8553 1.70
1.20 56.20 0.8611 1.59
1.20 56.20 0.9032 1.73
1.20 56.20 0.9079 1.74
1.20 56.20 0.9500 1.54
1.20 56.20 0.9545 1.55
1.00 56.20 1.1043 2.07
1.00 56.20 1.0909 2.06
1.00 56.20 0.9709 -
1.00 56.20 0.9572 -
1.00 56.20 0.9500 -
1.10 56.20 1.0745 1.68
1.10 56.00 0.8791 1.80
1.10 56.00 0.9193 1.68
1.10 56.00 0.9243 1.69
1.10 56.00 0.9645 1.77
1.10 56.00 0.9691 1.78
1.10 55.72 0.7230 1.83
55.53 1.3853 1.34

Das könnte Ihnen auch gefallen