Beruflich Dokumente
Kultur Dokumente
Pos B
Pos B
200
KM/WC
-0.10
100
650
KAMAR ISTIRAHAT
RUANG JAGA
400
MEJA JAGA
-0.05
400 350
750
200
KM/WC
-0.10
100
650
KAMAR ISTIRAHAT
RUANG JAGA
400
MEJA JAGA
-0.05
400 350
750
TAMPAK BELAKANG
Skala 1 : 100
TAMPAK SAMPING KANAN
Skala 1 : 100
Plafond PVC
+3.20
70
350
255
Ruang Jaga
400 100
POTONGAN MEMANJANG
Skala 1 : 100
33
135 0
95
Plafond PVC Plafond PVC
+3.20 +3.20
Listplank GRC 20 cm
350
350
200
Kamar Istirahat Ruang Jaga
55
400 350
750
POTONGAN MELINTANG
Skala 1 : 100
400 350
200
BV
P-3
100
J-2 P-1 J-2
650
P-1
400
J-3
P-2
J-2
400 350
750
40
40
255
255
205
205
73 73 80
155 90
45
45
200
200
140
140
50 50 50 50 60 60
225 135
45
55
205
200
60
70
DET. KUSEN BV
Skala 1 : 25
70
80
200
Plafond PVC
Rangka Hollow
+3.20
70
Plafond PVC
Plafond PVC
650
Plafond PVC
Rangka Hollow
+3.20
Plafond PVC
400
Plafond PVC
Rangka Hollow
+3.20
Plafond PVC
Rangka Hollow
+3.20
70
70
Plafond PVC
70 400 350 70
750
200
Talang Air
Listplank GRC 20 cm
80
80
650
400
KUDA-KUDA BAJA RINGAN
80
80 400 350 80
750
500
1000
80
25
500
500
300 300 300 300 300 300
1800
46
220
270
50
20
25 300 25 300 25 300 25 300 25 300 25 300 25
1800
TAMPAK DEPAN
Skala 1 : 100
479 69
479
45
65
Pas. GRC Finishing Cat
220
270
Cor Tiang Beton Uk. (25x80 t = 100 cm)
Finishing Batu Alam Andesit
Floor Rabat Carport
50
20
460 80 460
1000
TAMPAK SAMPING
Skala 1 : 100
80
25
1800
80
25
25
80
25
Pengecatan Ulang Pipa Galvanish Eksisting Pengecatan Ulang Pipa Galvanish Eksisting
Baseplate Double t = 5 mm Baseplate Double t = 5 mm
+0.70
Rabat Beton t = 5 cm
50
Kolom Beton Uk. 25x80 Kolom Beton Uk. 25x80
Rabat Beton +0.20
Rabat Beton t = 5 cm
Muka Tanah
-0.30
Pasir Urug 5 cm
28 25 28 20 80 20
80 120
Talang Air
1835
500
1000
80
500
500
300 300 300 300 300
1500
46
220
270
50
20
25 300 25 300 25 300 25 300 25 300 25
1500
TAMPAK DEPAN
Skala 1 : 100
479 69
479
45
65
Pas. GRC Finishing Cat
220
270
Cor Tiang Beton Uk. (25x80 t = 100 cm)
Finishing Batu Alam Andesit
Floor Rabat Carport
50
20
460 80 460
1000
TAMPAK SAMPING
Skala 1 : 100
80
25
1500
80
25
25
80
25
Pengecatan Ulang Pipa Galvanish Eksisting Pengecatan Ulang Pipa Galvanish Eksisting
Baseplate Double t = 5 mm Baseplate Double t = 5 mm
+0.70
Rabat Beton t = 5 cm
50
Kolom Beton Uk. 25x80 Kolom Beton Uk. 25x80
Rabat Beton +0.20
Rabat Beton t = 5 cm
Muka Tanah
-0.30
Pasir Urug 5 cm
28 25 28 20 80 20
80 120
Talang Air
1535