Desain 1 fungsi r =
MDL 80 Mu 144 fy2/(1.7fc') r2 - fy r + k=0
MLL 30 k=Mu/fbd2
b 250
d 500
fy 400
fc' 20 b1 0.85
Diameter tul 19
perhitungan
k 2.88 r 0.007942 0,75rb 0.016256
a 4705.882 rminimum 0.0035
b -400
c 2.88
As desain 992.7597
digunakan 4D19 a 106.7402
As aktual 1134.115 Mu beton 162.0895 Mu baja 162.0895
Desain 2 Rn=rfy(1-rfy/(1.7fc' ))
MDL 142.875 Mu 289.575 bd2=Mn/Rn
MLL 73.82813 d3=r Mn/Rn
fy 400
fc' 30 b1 0.85
Diameter tul 10
rasio d/b (r) 2
kelipatan dim. Blk 50
perhitungan
r perkiraan 0.016256 0,75rb 0.024384 rminimum 0.0035
As desain 2458.758 Rn 5.673431 bd^2 63.80068
d desain 503.4447
d aktual 550
b aktual 275
tulangan 32D10 a 143.3597
As aktual 2513.274 Mu beton 384.6879 Mu baja 384.6879
Balok beton tulangan ganda lihat Park and Pauley hal 81!
analisis
b 279
d 508
d' 51
As' 645 r' 0.004551
As 2581 r 0.01821 rb 0.02057582 under
Es 200000
fy 500
fc' 20.7 b1 0.85
a 197.18864
c 231.98663
WDL 8
WLL 6 Wu 19.2
L 8
Vu 76.8
bw 250
d 450
fy 400 D
fc' 20
diameter tul 10 kaki 4 luas Av 314.1593
perhitungan
Vc 83.85255 1
Abaikan penampang kritis ( y / t ) y
Vu pd jrk d 68.16
Syarat penampang struktur
Vu<0,5fVc 25.155765 ==> memerlukan tulangan geser
0,5fVc<Vu<fVc 25.155765 50.31153 ==> harus dihitung tulangan gesernya
(Vu-fVc)<0,67bwdfc'^1/2
17.848471 337.0872 ==> penampang memenuhi syarat
Vs 29.74745
s desain 1900.958 s max 225 s min 1507.964
s perlu 225 57.6 0 12.14745 4655.188 225
s aktual 200 38.4 1507.964474 -19.85255 1507.964 225
tulangan di tumpuan 2D10 - 200 19.2 1507.964474 -51.85255 1507.964 225
50 1507.964474 -0.519216 1507.964 225
segmen yang lain
pada jarak 1 meter tul 2D10 - 200
2 meter tul 2D10 - 200 tulangan minimum
3 meter tul 2D10 - 200 tulangan minimum
pd nilai Vu ttt 50 kN tul 2D10 - 200
an gesernya
200
200
200
200