Sie sind auf Seite 1von 1

PT.

BANJAR HUTAMA KONSTRUKSI


Jl. A. Yani - Komplek Pangeran Antasari Blok C No. 01 - RT.02 / RW.05 - Martapura - Kabupaten Banjar
Telp : 0511 6750379 ·  Civil Engineering

Fax : 0511 6750379 ·  Transportation

e-mail : pt.bhk2018@gmail.com ·  Material Supply

DAFTAR HADIR KARYAWAN


BULAN JULI 2019

NIK : BHK - 006


NAMA : MOH.ASRUL ADIMAN, ST
JABATAN :

JAM KERJA HARI JAM LEMBUR JAM


NO. TANGGAL KEGIATAN PARAF
MASUK PULANG KERJA MASUK KELUAR LEMBUR
Stay Kantor siapkan backup data buat ketemu konsultan perencana
1 Monday, July 01, 2019 08.45 AM 19.31 PM
MAN 4 Banjar
Ke Banjarmasin ketemu Konsultan dan ke UIN dampingi Direktur
2 Tuesday, July 02, 2019 09.05 AM 19.24 PM
Cabang PT. PLN
3 Wednesday, July 03, 2019 09.10 AM 18.30 PM Stay Kantor backup Proyek MAN 4 Banjar

4 Thursday, July 04, 2019 08.21 AM 18.30 PM Stay MAN 4 Banjar dampingi Tim Surveyor
Stay Kantor print Gambar Perencanaan MAN dan Kembali ke MAN
5 Friday, July 05, 2019 08.01 AM 17.45 PM
dampingi Surveyor

Stay Kantor buat RMK dan RK3K serta data-data lain guna persiapan
6 Saturday, July 06, 2019 08.21 AM 19.33 PM
PCM Proyek MAN 4 Banjar

7 Sunday, July 07, 2019 Libur Hari Minggu

Stay MAN 4 Banjar kegiatan PCM + ke BANK MANDIRI SYARIAH urus


8 Monday, July 08, 2019 08.17 AM 22.11 PM rekening dan berkas-berkas Uang muka + Kembali ke MAN setor
berkas + Kembali ke kantor backup MAN + Gambar Rumah Bos.

Stay kantor buat Backup laporan MAN dan Backup lainnya + Gambar
9 Tuesday, July 09, 2019 08.19 AM 19.06 PM
Rumah Bos.
10 Wednesday, July 10, 2019 08.31 AM 18.31 PM Stay Proyek MAN 4 Banjar
11 Thursday, July 11, 2019 08.41 AM 18.01 PM Stay Proyek MAN 4 Banjar

12 Friday, July 12, 2019 08.54 AM 18.22 PM Stay Proyek MAN 4 Banjar

13 Saturday, July 13, 2019 08.44 AM 18.21 PM Stay Proyek MAN 4 Banjar

14 Sunday, July 14, 2019 09.00 AM 23. 34 PM Stay Proyek MAN 4 Banjar + Buat BACK UP MC 0 %

15 Monday, July 15, 2019 08.21 AM 02.41 PM Stay Proyek MAN 4 Banjar + Kawal Pihak KCE memasukkan Alat-alat Pancang

16 Tuesday, July 16, 2019 09.21 AM 22.21 PM Stay Proyek MAN 4 Banjar + Kembali Buat Back UP MC 0 %

17 Wednesday, July 17, 2019 08.33 AM 18.03 PM Stay Proyek MAN

18 Thursday, July 18, 2019 08.00 AM 18 20 PM Stay Proyek MAN


Stay Proyek MAN + Pengarahan ke pada Mandor segera
19 Friday, July 19, 2019 08.12 AM 20.22 PM menyelesaikan Progress Pek. Pabrikasi Begesting Poer Plat + Siapkan
Berkas MC 0
Stay Proyek MAN siapkan Acara Peletakan Batu Pertama + Rapat MC
20 Saturday, July 20, 2019 08.21 AM 21.04 PM
0% + Kemess Kerja Laporan Harian dan Minggu

Stay Proyek MAN + Lengkapi perlengkapan di Direksi Keed + Buat


21 Sunday, July 21, 2019 09.34 AM 21.54 PM
Surat" Kelanjutan dari Rapat MC 0

22 Monday, July 22, 2019 08. 21 AM 20. 12 PM Stay Proyek MAN + Buat Surat" MC 0 Kontrol Lapangan

23 Tuesday, July 23, 2019 08.51 AM 18.21 PM Stay Proyek MAN 4 Banjar

24 Wednesday, July 24, 2019 09.00 AM 18.11 PM Stay Proyek MAN 4 Banjar

25 Thursday, July 25, 2019 08.31 AM 19.00 PM Stay Proyek MAN 4 Banjar

26 Friday, July 26, 2019 08.33 AM 02.41 PM Stay proyek MAN + Back up Laporan Lapangan + Kawal Alat Pancang Keluar
Stay Proyek MAN + Pengarahan ke pada Mandor segera
27 Saturday, July 27, 2019 08.21 AM 19.00 PM menyelesaikan Progress Pek. Pabrikasi Pembesian Poer Asarama,
Neut dan Sloof + Back Up Volume
28 Sunday, July 28, 2019 09.00 AM 14.00 Stay Proyek MAN +
29 Monday, July 29, 2019

30 Tuesday, July 30, 2019

31 Wednesday, July 31, 2019 08.21 AM 18.33 PM Stay Proyek MAN + Ketemu KEPSEK MAN + Backup Lap. Mingguan

0 0

Jumlah Hari Kerja = 0 Hari 18,000 -


Jumlah Jam Lembur = 0 Jam 7,730 -
Dinas Luar Kota = Hari ### -

Di Buat oleh Di Periksa oleh

MOH. ASRUL ADIMAN, ST PAMUJI RESTUADI, ST

Das könnte Ihnen auch gefallen