Week 1 Week 23 Week 24 Week 25 Week 26 Week 27 Week 28 Week 29 Week 30 Week 31 Week 32 Week 33 Week 34 Week 35 Week 36 Week 37 Week 38 Week 39 Week 40 Week 41 Week 42 Week 43 Week 44 Week 45 Week 46 Week 47 Week 48 Week 49 Week 50 Week 51 Week 52 Week 53 Week 54 Week 55 Week 56 Week 57
NO. SCOPE OF WORK START END DAYS wt %
2 Aug 2021 - 2 Jan 2022 3 Jan 2022 10 Jan 2022 17 Jan 2022 24 Jan 2022 31 Jan 2022 7 Feb 2022 14 Feb 2022 21 Feb 2022 28 Feb 2022 7 Mar 2022 14 Mar 2022 21 Mar 2022 28 Mar 2022 4 Apr 2022 11 Apr 2022 18 Apr 2022 25 Apr 2022 2 May 2022 9 May 2022 16 May 2022 23 May 2022 30 May 2022 6 Jun 2022 13 Jun 2022 20 Jun 2022 27 Jun 2022 4 Jul 2022 11 Jul 2022 18 Jul 2022 25 Jul 2022 1 Aug 2022 8 Aug 2022 15 Aug 2022 22 Aug 2022 29 Aug 2022
1 GENERAL REQUIREMENT -
2 SUB-STRUCTURES -
3 SUPERSTRUCTURES -
WEEKLY TARGET ACCOMPLISHMENT 16.36% 1.34% 2.54% 2.86% 1.85% 2.19% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.56% 2.39% 2.16% 2.16% 2.16% 2.16% 0.36%
CUMMULATIVE PERCENTAGE 16.36% 17.70% 20.25% 23.11% 24.96% 27.15% 29.71% 32.27% 34.83% 37.39% 39.95% 42.51% 45.07% 47.63% 50.20% 52.76% 55.32% 57.88% 60.44% 63.00% 65.56% 68.12% 70.68% 73.24% 75.80% 78.36% 80.92% 83.48% 86.04% 88.60% 90.99% 93.16% 95.32% 97.48% 99.64% 100.00%
ACTUAL PERCENTAGE
MANPOWER UTILIZATION SCHEDULE
WEEK
NO. DESCRIPTION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1 PROJECT ENGINEER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 MATERIAL ENGINEER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 PROJECT INSPECTOR 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4 FOREMAN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5 LEADMAN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
6 SKILLED LABORER 0 0 0 0 0 10 15 15 15 15 15 15 15 15 15 15 15 15 15 10
7 UNSKILLED LABORER 10 15 15 15 15 15 20 20 20 20 20 20 20 20 20 20 15 15 10 10
8 ELECTRICIAN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
9 DRIVER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
10 HEAVY EQUIPMENT OPERATOR 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
11 WAREHOUSEMAN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
12 SAFETY OFFICER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
[Project Name] Project Schedule Gantt Chart Template © 2006-2018 by Vertex42.com.
[Company Name]
Project Start Date 8/1/2021 (Sunday) Display Week 1 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8
Project Lead 2 Aug 2021 9 Aug 2021 16 Aug 2021 23 Aug 2021 30 Aug 2021 6 Sep 2021 13 Sep 2021 20 Sep 2021
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
% WORK
WBS TASK LEAD START END DAYS M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
DONE DAYS
SCOPE OF WORKS
1 Site Works - -
1.1 Site Clearing and staking [Name] Sun 8/01/21 Fri 8/06/21 6 100% 5
3 Roofing Works - -
Installation of roofing
3.1 Wed 9/22/21 Thu 10/21/21 30 100% 22
anaccesories
4 Plumbing Works - -
Plumbing conduits rough-
4.1 Thu 8/26/21 Tue 9/14/21 20 100% 14
in
Installation of Plumbing
4.2 Tue 9/14/21 Tue 9/28/21 15 100% 11
fixtures
5 Electrical Works - -
Electrical conduits rough-
5.1 Thu 8/26/21 Tue 9/14/21 20 100% 14
in
5.2 Installation of Electrical fixtures Tue 9/14/21 Tue 9/28/21 15 100% 11
6 Tile Works - -
Installation of Floor and
6.1 Thu 9/09/21 Wed 9/29/21 21 100% 15
Wall tiles
7 Carpentry Works - -
Installation of hardilite
7.1 Wed 9/15/21 Tue 10/05/21 21 100% 15
and accessories
8 Container Van - -
-
Gantt Chart Template Pro
The following link is a blog post that talks specifically about the
Pro version for Excel Online.
Simple Color-Coding
The Pro version includes a column for specifying the color of bars in the chart. For example,
you could change the color based on urgency or task lead.
Be sure to read the Getting Started Tips below. Watching the video demos for Gantt Chart Template
Pro may also help you see how to use the spreadsheet.
Please read the license agreement in the TermsOfUse worksheet to learn how you may or may not
use and share this spreadsheet.
• [Bracketed Text] is meant to be edited, like the project title and task descriptions.
• Some of the labels include cell comments to provide extra information.
• To adjust the range of dates shown in the Gantt chart, change the Display Week number.
• The Project Start Date is used to define the first week shown in the gantt chart.
• Insert new tasks using one of the methods listed below.
• Define the task start date and duration (days) by editing the light green cells.
• If you see "#####" in a cell, widen the column to display the cell contents.
• Backup your file regularly to avoid losing data! Excel files get corrupted occasionally.
METHOD 1 (recommended)
• Insert a new blank row by right-clicking on the row number and selecting Insert.
• With the new blank row selected, press Ctrl+d to copy the formulas and formatting down from the row
above OR use the row drag handle to copy the formulas and formatting down.
METHOD 2
• Copy a row from the set of template rows at the bottom of the worksheet.
• Right-click on the row where you want to insert the new task and select Insert Copied Cells.
Method 2 will work, but Excel will split/fracture/duplicate conditional formatting rules rather than
merging the rules. This can cause inefficiencies in very large and heavily modified files.
Help improve Excel by voting on a suggestion to fix this problem.
Using the Template Rows and Choosing a WBS Level
The set of template rows at the bottom of the Gantt Chart worksheet provide examples of different
ways to format and define tasks for different WBS levels.
Each different WBS level uses a different formula in the WBS column.
You can either copy/paste/insert these template rows via Method 2 as explained above, OR you can
just copy/paste the desired WBS cell when you want to change the WBS level.
If you leave a blank cell above a WBS number, the numbering will reset to 1.x.x. The formulas are
meant for convenience, but you can manually enter the WBS numbers if you want to.
You can indent the task description for sub-tasks by entering leading spaces or using the Indent
feature in Excel.
FAQs
Q: How do I enter the Work Days instead of Calendar Days?
Entering work days instead of calendar days is a feature of the Pro version. There is nothing in the free
version preventing you from entering your own formulas, though.
Q: How do I calculate Calendar Days after entering the Start and End Dates?
You can calculate the duration in calendar days (including both start and end dates) using the formula
=enddate-startdate+1
Q: How do I create a summary row that shows the MIN and MAX dates for all sub-tasks?
In the Start column, use the formula =MIN(range_of_start_dates)
In the End column, use the formula =MAX(range_of_end_dates)
In the Days column, use the formula =end_date-start_date+1
Example: Let's say you have 3 sub tasks that are 10 days, 12 days, and 14 days long, respectively. If
the first subtask is 50% complete and the others are 25% complete, you could calculate the overall
percent complete for the group as: =(10*50%+12*25%+14*25%)/(10+12+14).
Input Cell
Terms of Use
Gantt Chart Template, by Vertex42.com
https://www.vertex42.com/ExcelTemplates/excel-gantt-chart.html
You may download the spreadsheet template, make archival copies, and customize
the template only for your personal use or use within your company or
organization and not for resale or public sharing.
You may not remove or alter any Vertex42 logo, trademark, copyright, disclaimer,
brand, terms of use, attribution, or other proprietary notices or marks within the
template.
The template and any file, document, or other work including or derived from the
template may NOT be sold, distributed, published to an online gallery, hosted on a
website, or placed on any server in a way that makes it available to the general
public.
Limited Private Sharing and Other Allowed Uses: See the complete license
agreement to learn more about how you may or may not use this template.