Beruflich Dokumente
Kultur Dokumente
000
- 0.500
- 1.000
.R
R.1
.CW 49
BM
7 7 4
.
U
2
629 7
X = 0541.6
00
0.
00
5
52
Y= 12
=
. 6
+1
Y
64
=
X Z=
00 6
00 .
LAUT JAWA
N
NGI
LAUT JAWA
PIEL S
ARI
C ALE P
ASUT
X = 64 NIF.CS
196.66
IW
2 P .KK.0
Y = 52
B
106.87 0C
X = 64
56
K. C
8 151.10
Y = 52 8
1
Z = + 1 10.422
.554,5
00
0.
80
51
=
Y
00
0.
80
50
X
=
=
64
Y
00 0
.0
0 X
=
63
00
0.
00
- 1.0
00 - 1.0
00
- 0.
500
- 0.0
0
00
0
+ 0.0
0.
00
40
51
TAMBA PERBAIKAN DAN
=
K
Y
+ 0.5
00
=
X PENAMBAHAN
- 0.500
40
63
PANJANG JETTY
TAMBA 0.
K 00
SEPANJANG 150 M
00
PERBAIKAN DAN - 0.0
0.5
00
+
+ 0.
000
PENAMBAHAN JETTY
+ 0.50
00
SEPANJANG 180 M 0
0.
20
A
00
52
0.
56
80
=
500
51
Y
+ 0.
00
=
Y
0.
00
X
51
=
64
=
00 X
GROIN 1
Y
=
0. 63
00 60
0. X
00
X = 64007.55
=
62
80
0.
Y = 51952.52
00
Z = + 0.00 BM.KK.CW.02
GROIN 2
X = 63230.076 GROIN 4
X = 63655.13
00
GROIN 3 Y = 51421.502
0.
40
Y = 51731.52 X = 63033.61
51
=
X = 63357.18
Y
Z = + 0.00 Y = 51150.24
Y = 51468.36 =
X
00
63
Z = + 0.00
Z = + 0.00 00
0.
TITIK IKAT DAN KETINGGIAN DI AMBIL PEKERJAAN : DETAIL DESAIN PENGAMANAN PANTAI GEBANG DAN BUNGKO LOR PPK - 02
DARI BM.CWR.1.R KABUPATEN CIREBON PERENCANAAN DAN
0 50 100 150 200m PROGRAM
GAMBAR :
X : 62972.749 SITUASI DAN POSISI GROIN
SKALA H 1 : 2000 Y : 50541.674 Nomor kontrak :
KU.08.08/BBWS.02.08.A2/02/18
0 2 4 6 8 10m Z : + 1.612 LOKASI : BUNGKO LOR, KABUPATEN CIREBON
Tanggal 24 April 2009
Digambar Diperiksa Ketua Tim Teknis
No. Lembar : 01
SKALA V 1 : 100 PT. GANES ENGINEERING CONSULTANT Apriansyah ,ST. Ir. Syafrudin, Dipl. HE
Jml. Lembar : 43
G:\Cirebon\ADI CIREBON\logo.JPG
Kantor : Pondok Pinang Center A-14, Jl. Ciputat Raya Jakarta Selatan
Direncana Disetujui : PPK - 02
NO. TGL REVISI GAMBAR DIBUAT DIPERIKSA
Ir. Suranto ,MT. Ir. Triyono Tulus Setyawan M.Eng. Tanggal : 25 September 2009
DESAIN TYPICAL GROIN
6 6
alt 2b (elv.2.20) alt 2a (elv.2.50)
4 165.0 110.0
Tetrapod 0.75 Ton
2 layer dipasang random
4
+ 2.5
1.5
2 1
1.7
1.5
1 2
3.3
0 1.5
1
0
-2 Geotextile Non Woven
Sesek Bambu -2
-4 Cerucuk Dolken P=2.00 m, Tiap 1 m
-4
-6 -6
+2.20
+2.20
+2.20
+2.20
+2.20
+2.20
+2.50
+2.50
+2.50
+2.50
+2.50
-1.01
-0.37
-0.63
-0.84
-1.05
-1.10
-1.14
-1.19
0.71
0.01
0.97
0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175 0+200 0+225 0+250
0+100.00 0+200.00
Kubus Beton 0.38 Ton ℄ Kubus Beton 0.38 Ton ℄ Tetrapod 1 Ton
(0.55x0.55x0.55m) (0.55x0.55x0.55m) 6.0
+ 2.5 2 layer dipasang random
5.2
+ 2.2
dipasang random 1.5 1.5 dipasang random 1
1.5 1.5
1
1 1
12.0 12.0
6.0
1.5 1.5
12.0 12.0
1 1 1.5 1 1.5
1
-1.10
-1.10
0.40 -1.10
0.40 -1.10
2.50 -1.10
2.50 -1.10
0.40 -1.10
-1.10
-1.10
-5.00
-0.61
0.67 -0.62
-0.62
-0.64
-0.63
0.66 -0.63
0.66 -0.64
2.20 -0.63
2.20 -0.63
0.67 -0.63
0.40 -1.10
ELV.MTA ELV.MTA
ELV.RENCANA ELV.RENCANA
JARAK 8.40 7.79 12.00 9.01 5.60 8.98
12.00
7.73 8.49
JARAK 3.82 8.58 12.00 12.60 6.00 12.58 11.99 9.02 3.41
PEKERJAAN : DETAIL DESAIN PENGAMANAN PANTAI GEBANG DAN BUNGKO LOR PPK - 02
KABUPATEN CIREBON PERENCANAAN DAN
0 50 100 150 200m PROGRAM
GAMBAR :
SITUASI DAN POSISI GROIN
SKALA H 1 : 2000
G.40 - G.60 Nomor kontrak :
LOKASI : KABUPATEN CIREBON KU.08.08/BBWS.02.08.A2/02/18
0 2 4 6 8 10m Tanggal 24 April 2009
Digambar Diperiksa Ketua Tim Teknis
No. Lembar :
SKALA V 1 : 100 PT. GANES ENGINEERING CONSULTANT
G:\Cirebon\ADI CIREBON\logo.JPG
Apriansyah ,ST. Ir. Syafrudin, Dipl. HE
Kantor : Pondok Pinang Center A-14, Jl. Ciputat Raya Jakarta Selatan
Direncana Disetujui : PPK - 02 Jml. Lembar : 03 / 05
NO. TGL REVISI GAMBAR DIBUAT DIPERIKSA
Ir. Suranto ,MT. Ir. Triyono Tulus Setyawan M.Eng. Tanggal : 25 September 2009