Beruflich Dokumente
Kultur Dokumente
Operating Instructions
Notice technique
und / and / et
PLUS
Abb. 0.2
EMP IV E 60PLUS
(mit / with / avec Dongle-Platine,
Art.-Nr. 249629)
Abb. 0.1
EMP IV E 60
Deutsch
417101799_EMP_IV_E60.docx
English
Francaise
Rev. 9-06.11
Inhaltsverzeichnis
1
Allgemeines ............................................................................................................... 5
1.1
1.2
Gewhrleistungsumfang ...................................................................................................................................5
Kontaktadresse / Hersteller ..............................................................................................................................5
Sicherheit .................................................................................................................. 6
2.1
2.2
2.3
2.4
Sicherheitshinweise ..........................................................................................................................................6
Hervorhebungen ...............................................................................................................................................6
Aufzhlungen ....................................................................................................................................................6
Spezielle Sicherheitshinweise bei Wartungs- und Reparaturarbeiten...............................................................6
Lieferumfang ............................................................................................................. 7
3.1
Funktionsbeschreibung ............................................................................................ 8
4.1
4.2
4.3
4.4
Aufbau ....................................................................................................................... 9
5.1
5.2
5.2.1
Einbau ...................................................................................................................... 10
6.1
Einbauschema ................................................................................................................................................ 10
Gerteinstallation ..................................................................................................... 11
7.1
7.1.1
7.1.2
7.1.2.1
7.1.2.2
7.1.2.3
7.2
7.2.1
7.2.2
7.2.2
7.2.3
7.2.3.1
7.2.3.1.1
7.2.3.2
7.2.3.3
7.2.3.4
7.2.3.5
7.2.3.6
7.2.4
7.2.4.1
7.2.4.2
7.2.5
7.2.5.1
7.2.6
7.2.7
7.2.7.1
7.2.7.2
8.1
8.1.1
8.1.2
Inbetriebnahme ........................................................................................................ 23
9.1
9.2
9.3
9.4
9.5
9.5.1
9.5.2
9.5.3
PLUS
...................................................................................................7
PLUS
PLUS
417101799_EMP_IV_E60.docx
PLUS
...................................................... 22
Rev. 9-06.11
10
Menbeschreibung ................................................................................................... 26
10.1
10.1.1
10.2
10.2.1
10.2.2
10.2.2.1
10.2.2.2
10.2.3
10.2.3.1
10.2.3.2
10.2.4
10.2.4.1
Hauptmen ..................................................................................................................................................... 26
bersicht ........................................................................................................................................................ 26
Betriebsart ...................................................................................................................................................... 27
Auswhlen ...................................................................................................................................................... 27
Betriebsart / Intern .......................................................................................................................................... 27
Auswhlen ...................................................................................................................................................... 27
Displayanzeige in der Betriebsebene / Einstellen ........................................................................................... 28
Betriebsart / Impuls ......................................................................................................................................... 28
Auswhlen ...................................................................................................................................................... 29
Displayanzeige in der Betriebsebene/ Einstellen ............................................................................................ 29
Betriebsart / Strom (Extern-Normsignal) ......................................................................................................... 30
Auswhlen ...................................................................................................................................................... 30
10.2.4.1.1
10.2.4.2
10.3
10.3.1
10.3.2
10.3.3
10.3.3.1
10.3.4
10.3.4.1
10.3.5
10.3.5.1
10.3.5.2
10.3.6
10.3.6.1
10.3.7
10.3.7.1
10.3.8
10.3.8.1
10.3.9
10.3.9.1
10.3.10
10.3.10.1
10.3.10.2
10.3.11
10.3.11.1
10.3.12
10.3.12.1
10.3.12.2
10.3.13
10.3.13.1
10.3.13.2
10.3.13.3
10.3.13.4
10.3.13.5
10.3.14
10.3.14.1
10.3.14.2
10.3.14.3
10.4
10.4.1
10.4.2
10.4.2.1
10.4.2.2
10.4.3
10.4.3.1
10.4.3.2
10.4.4
10.4.4.1
10.5
10.5.1
10.5.2
10.5.2.1
10.5.3
10.5.3.1
10.5.4
10.5.4.1
417101799_EMP_IV_E60.docx
-3-
Rev. 9-06.11
11
Wartung .................................................................................................................... 46
11.1
11.2
11.3
11.3.1
11.3.2
11.4
11.4.1
11.4.2
12
Betriebsstrungen ................................................................................................... 50
12.1
12.2
12.2.1
13
13.1.1
13.1.2
13.1.2.1
14
14.1
14.1.1
14.2
14.3
14.3.1
14.3.2
14.3.3
14.3.4
14.3.4.1
14.3.4.2
14.4
14.5
14.5.1
14.6
14.7
14.7.1
14.7.2
14.7.3
14.7.4
14.7.5
14.7.6
14.7.7
Pumpenschlssel............................................................................................................................................ 54
Pumpenschlsseldefinition E60 ...................................................................................................................... 56
Abmessungen ................................................................................................................................................. 57
Technische Daten bersichtstabellen .......................................................................................................... 57
Elektrische Daten............................................................................................................................................ 57
Allgemeine Daten Standardpumpen ............................................................................................................... 58
Abweichende allgemeine Daten Pumpen der Version Hhere Drcke (HP) ................................................ 58
Ein- / Ausgangsbeschaltung (siehe auch Kapitel 7.2.3).................................................................................. 58
Steuereingnge .............................................................................................................................................. 58
Steuerausgnge ............................................................................................................................................. 59
Werkstoffe....................................................................................................................................................... 59
Steckerbelegungen ......................................................................................................................................... 59
Steckerbelegung: Leermeldung (3-polig) ........................................................................................................ 59
Dosierleistungen ............................................................................................................................................. 60
Frderleistungen in Abhngigkeit von Gegendruck und Hubeinstellung......................................................... 60
Frderleistung Typ 01400 / 10 bar .................................................................................................................. 60
Frderleistung Typ 01400 / 12 bar (Sonderversion: hhere Drcke) .............................................................. 61
Frderleistung Typ 02100 / 8 bar .................................................................................................................... 61
Frderleistung Typ 02100 / 10 bar (Sonderversion: hhere Drcke) .............................................................. 62
Frderleistung Typ 04500 / 6 bar .................................................................................................................... 62
Frderleistung Typ 06300 / 4 bar .................................................................................................................... 63
Frderleistung Typ 07500 / 3 bar .................................................................................................................... 63
15
Konformittserklrung ............................................................................................. 64
417101799_EMP_IV_E60.docx
-4-
Rev. 9-06.11
Allgemeines
Dieses Technische Handbuch enthlt alle Anweisungen zur Installation, Inbetriebnahme,
Wartung und Reparatur der Membran-Dosierpumpe der Baureihe ELADOS EMP IV E60
und ELADOS EMP IV E60PLUS mit Softwareversion 3.5 oder 3.6.
WICHTIG
Achten Sie bei der Verwendung dieser Bedienungsanleitung unbedingt auf die
Softwareversion Ihrer Pumpe (siehe Kapitel 9.5.1).
HINWEIS
1.1
Gewhrleistungsumfang
Gewhrleistung in Bezug auf Betriebssicherheit, Zuverlssigkeit und Leistung dieser
Ausfhrung wird vom Hersteller nur unter folgenden Bedingungen bernommen:
Montage, Anschluss, Einstellung, Wartung und Reparatur werden von autorisiertem und
geschultem Fachpersonal durchgefhrt.
Die Membran-Dosierpumpe wird entsprechend den Ausfhrungen der im Lieferumfang
enthaltenen Bedienungsanleitung verwendet.
Bei Reparaturen werden nur Original-Ersatzteile verwendet.
Durch ffnen des Pumpengehuses geht der Gewhrleistungsanspruch verloren.
Im brigen gelten die allgemeinen Garantie- und Leistungsbedingungen der Firma
ECOLAB Engineering GmbH.
1.2
Kontaktadresse / Hersteller
417101799_EMP_IV_E60.docx
-5-
Rev. 9-06.11
Sicherheit
2.1
Sicherheitshinweise
Die Anschluss- und Reparaturarbeiten an der Membran-Dosierpumpe drfen nur von
autorisiertem Fachpersonal ausgefhrt werden.
Vor allen Arbeiten an elektrischen Teilen unbedingt den Netzstecker ziehen.
Bei Wartungs- und Reparaturarbeiten ist geeignete Schutzkleidung zu tragen.
Die Sicherheitsbestimmungen im Umgang mit Chemikalien sind stets zu beachten.
2.2
Hervorhebungen
In dieser Wartungsanleitung haben die hier dargestellten Hervorhebungen folgende
Bedeutung:
2.3
VORSICHT
ACHTUNG
WICHTIG
wird benutzt, wenn auf eine besondere Aufmerksamkeit im Umgang mit dem Gert
geachtet werden muss.
HINWEIS
wird benutzt, wenn auf eine Besonderheit aufmerksam gemacht werden soll.
Aufzhlungen
Aufzhlungen, die mit diesem Vorzeichen () markiert sind, beschreiben eine Ttigkeit,
die durch den Monteur /Anwender durchgefhrt werden muss.
2.4
VORSICHT
WICHTIG
Vor Reparatur- und Wartungsarbeiten und Dosierung von gefhrlichen Medien immer den
Dosierkopf splen, die Druckleitung entlasten und Schutzkleidung (Schutzbrille,
Schutzhandschuhe und Schrze) tragen.
Elektroreparaturen drfen nur durch Elektrofachkrfte ausgefhrt werden.
Sicherheitsregeln der Berufsgenossenschaft VB G 4 & ZH 1/11)!
Beim ffnen von Abdeckungen oder Entfernen von Teilen knnen spannungsfhrende
Teile freigelegt werden.
Auch knnen Anschlussstellen spannungsfhrend sein.
Bei Reparaturen drfen nur Original-Ersatzteile verwendet werden.
417101799_EMP_IV_E60.docx
-6-
Rev. 9-06.11
Lieferumfang
Der Lieferumfang besteht aus:
Abb. 3.1
Abb. 3.2
Kurzanleitung
(Art.-Nr. 417101795)
CD Bedienungsanleitung
(Art.-Nr. 417101793)
HINWEIS
3.1
417101799_EMP_IV_E60.docx
-7-
Dongle-Platine
(Art. Nr. 249629)
Rev. 9-06.11
Funktionsbeschreibung
4.1
Mechanische Funktionen
Die Dosierpumpe ELADOS EMP IV E60 und E60PLUS ist eine elektromotorisch betriebene
Membran-Verdrnger-Pumpe.
Die Dosierpumpe ist fr den Einsatz von sauberen, nicht abrasiven Dosiermedien bis zu
einer Viskositt von 100 mPas (Messmethode: Brookfield) geeignet.
Ein Exzenter-Schneckengetriebe (Pos. 4) bewegt die Membrane (Pos. 2) und frdert dabei
ber das Druckventil (Pos. 1) das Dosiermedium. Das Saugventil ist geschlossen.
Die Membrane wird durch eine Rckholfeder (Pos. 3) zurckgestellt.
Abb. 4.1
Dadurch wird das Dosiermedium ber
das Saugventil (Pos. 6) in den
Pumpenkopf angesaugt. Das Druckventil
ist geschlossen.
Die Frdermenge lsst sich nur whrend
des Betriebes ber die Hubverstellung
(Pos. 5) regulieren. Es wird hierbei die
Rckstellbewegung der Membrane
begrenzt.
Pos.
1
2
3
4
5
6
ACHTUNG
4.2
Bezeichnung
Druckventil
Frdermembrane
Rckholfeder
Exzenter-Schneckengetriebe
Hubverstellung
Saugventil
Zum Schutz der Dosieranlage wird die Verwendung einer Sauglanze mit
Leermeldeeinrichtung und Schmutzfnger aus unserem Zubehrprogramm dringend
empfohlen! Die Leermeldeeinrichtung schaltet bei Unterschreitung eines bestimmten
Niveaus (im Behlter) die Pumpe ab.
Elektronische Funktionen
Die Bedienung der Pumpe erfolgt ber vier Tasten (Abb 5.3, Pos. 3, 4, 5 und 6)
(siehe Kapitel 9.3 Tastenfunktionen).
Die Betriebsanzeige wird ber ein Grafikdisplay (Abb 5.3, Pos. 2) dargestellt.
4.3
4.4
Betriebsarten
Die Pumpe kann in drei verschiedenen Betriebsarten genutzt werden:
INTERN
EXTERN
EXTERN
Zustzlich kann ber den Menpunkt Konfiguration eine Chargendosierung (pro Startimpuls
wird eine festgelegte Menge dosiert) eingestellt werden.
417101799_EMP_IV_E60.docx
-8-
Rev. 9-06.11
Aufbau
HINWEIS
5.1
Abb. 5.1
Der uere Aufbau sowie die Anzeigen, Bedienelemente und Anschlussbuchsen an der
PLUS
EMP IV E60 und EMP IV E60
sind identisch. Der Unterschied liegt in der
PLUS
Platinenkonfiguration, die zur Version E60
aufgerstet werden kann. (siehe Kapitel 8)
Pos.
1
2
3
4
5
6
7
8
9
10
5.2
5.2.1
Abb. 5.3
Pos.
1
2
3
4
5
6
7
8
9
10
11
417101799_EMP_IV_E60.docx
-9-
Bezeichnung
Elektrischer Motoranschluss
Motor
l-Einfllffnung mit
berdruckkappe
Drehknopf fr
Hublngeneinstellung
lstandsschauglas
Pumpenkopf
Druckventil
Saugventil
lablassschraube
Anschluss
Membranbruchsensor /
Membranbruchablauf
Flierichtung des
Dosiermediums
Bezeichnung
Strungs-LED
Grafik Display
Menu/Exit, Pfeil nach oben Taste
Menu/Exit, Pfeil nach unten Taste
Start/Stop Taste (Enter Funktion)
Test - Taste
Kabeldurchfhrungen
zur beliebigen Verwendung
Ein-Aus Schalter
Kabeldurchfhrung
fr Niveau- Strmeldeausgang
Kabeldurchfhrung
fr Impuls-, Stromeingang, Dosiersperre
Eingang fr Niveauvorwarnung, und Leermeldung
(siehe Kapitel 7.2.4.1 & 14.5.1)
Rev. 9-06.11
Einbau
Die Dosierpumpe sollte an gut zugnglicher, frostgeschtzter Stelle montiert werden.
Die Umgebungstemperatur darf +40 C nicht bersteigen.
Die Einbaulage des Gertes muss waagrecht sein.
Die Pumpe ist an den dafr vorgesehenen Bohrungen fest mit der Konsole bzw. dem
Behlter zu verschrauben (Bohrungsabstand siehe Kapitel 14.2 Abmessungen).
ACHTUNG
6.1
Gem DIN EN 809 5.2.1.4 weisen wir darauf hin, dass die Pumpe, wenn nicht fest mit der
Unterlage verschraubt (z.B. bei Transport, Einbau oder Demontage), bei einer Neigung von
10 oder mehr in jede Richtung ihre Standfestigkeit verlieren kann.
Solange die Pumpe nicht fest mit ihrem Untergrund verschraubt ist sind daher geignete
Sicherungsmanahmen zum Schutz gegen Umkippen zu ergreifen.
Einbauschema
Abb. 6.1
Pos
1
2
3
4
HINWEIS
Bezeichnung
berstrmventil
Dosierventil / Impfventil
Ersatzweise:
Mehrfunktionsventil (MFV)
Sauglanze bzw. Bodensaugventil
417101799_EMP_IV_E60.docx
- 10 -
Rev. 9-06.11
Gerteinstallation
7.1
Hydraulische Installation
7.1.1
Installationsbeispiele
ACHTUNG
HINWEIS
Die Installation darf nur durch zugelassene Fachkrfte durchgefhrt werden. Allgemeine
Richtlinien und rtliche Installationsvorschriften sind hierbei zu beachten!
Besondere Manahmen und Schutzeinrichtungen fr die Dosierung gefhrlicher bzw.
aggressiver Chemikalien sind hier nicht aufgefhrt.
Beachten Sie bei deren Verwendung unbedingt die gesetzlichen Vorschriften und das
entsprechende Produktdatenblatt.
Die hier aufgefhrten Installationsbeispiele und Anwendungen haben funktionalen
Charakter. Sie geben einen berblick ber korrekte oder zu vermeidende Installationsarten
fr die richtige Funktion der Pumpe.
HINWEIS
Abb. 7.1
ACHTUNG Die berstrmleitung darf nicht in die Saugleitung der Dosierpumpe zurckgefhrt werden!
HINWEIS
Anstelle von Druckhalteventil und berstrmventil kann auch ein Mehrfunktionsventil aus
unserem Lieferprogramm verwendet werden.
D) An der Impfstelle sollte grundstzlich ein federbelastetes Impf- oder Dosierventil (1)
eingebaut sein (auch bei Eindosierung in druckfreie Systeme).
Bei ausgasenden Medien oder bei Produkten mit einer Viskositt
> 100 mPas empfiehlt sich die Anordnung im Zulaufbetrieb.
Hierbei ist aber darauf zu achten, dass die Impfstelle oberhalb des
Entnahmebehlters angeordnet ist und/oder ein entsprechendes
Druckhalteventil (2) eingebaut wird. Durch diese Manahmen wird
ein Leerhebern des Entnahmebehlters vermieden.
Pos.
Abb. 7.2
Bezeichnung
1
2
Impfventil / Dosierventil
Druckhalteventil
berstrmventil
417101799_EMP_IV_E60.docx
- 11 -
Rev. 9-06.11
Abb. 7.3
HINWEIS
Bezeichnung
Impfventil / Dosierventil
Externe Freigabe
Magnetventil
Druckhalteventil
Abb. 7.4
Abb. 7.5
Bezeichnung
berstrmventil
Impfventil / Dosierventil
Druckhaltenventil
Abb. 7.6
Abb. 7.7
Bezeichnung
Hebergef
Magnetventil
417101799_EMP_IV_E60.docx
- 12 -
Rev. 9-06.11
Abb. 7.10
7.1.2
VORSICHT
Achten Sie darauf, dass beim Anschluss der Saug- und Druckleitung die O-Ringe auf den
Anschlssen montiert sind, um die notwendige Abdichtung zu erreichen.
HINWEIS
Wir empfehlen die Verwendung einer passenden Sauglanze aus unserem Lieferprogramm.
Pos.
1
2
3
4
5
Bezeichnung
Schlauch
Schlauchklemme
berwurfmutter
Schlauchtlle mit Einlegeteil (verschweit)
O-Ring
7.1.2.2 Anschluss der Saug- und Dosierleitung bei Festverrohrung mit Einlegeteil
HINWEIS
Abb. 7.12
Bei starrer Verrohrung der Dosierleitung muss ein Pulsationsdmpfer zur Vermeidung von
Druckschlgen installiert werden.
Pos.
Bezeichnung
1
2
3
4
Rohr
berwurfmutter
Einlegeteil
O-Ring
417101799_EMP_IV_E60.docx
- 13 -
Rev. 9-06.11
HINWEIS
Abb. 7.13
Pos.
Bezeichnung
1
2
3
4
5
Schlauch
berwurfmutter
Spannteil
Kegelteil
O-Ring
7.2
Elektrische Anschlsse
7.2.1
Netzanschluss
Abb. 7.14
ACHTUNG
HINWEIS
Bezeichnung
Netzleitung
Leitung zum Pumpengehuse
Anschluss Anlaufelektronik*
(im Klemmenkastendeckel)
Der Netzspannungswert muss mit dem angegebenen Wert auf dem Typenschild
bereinstimmen.
Die Dosierpumpe ist mit einem eingebauten thermischen Wicklungsschutz ausgestattet,
der den Motor bei berhitzung abschaltet.
417101799_EMP_IV_E60.docx
- 14 -
Rev. 9-06.11
7.2.2
bersicht Steuerplatine
Abb. 7.15
Pos.
1
2
3
4
5
6
7
8
9
10
11
Bezeichnung
Schalter (ohne Funktion!)
Anschlussklemmleiste (X2)
Anschlussklemmleiste (X1)
Sauglanzenanschluss
Abdeckkappe
Frontplatte
Anschluss fr Ein/Aus-Schalter
Anschlussklemmleiste (X3)
Platine
Wahlschalter Leermeldekontakt
Auswahl der Kontaktfunktion (Schlieer/ffner)
des Leer- bzw. Strmelderelais
Montierte Dongle-Platine E60
Nach Abnehmen der Frontplatte (Pos. 6) ist der Klemmraum fr die Ansteuer- und
Ausgangssignale zugnglich. Die Platine (Pos. 9) mit den Anschlussklemmleisten
(Pos. 2, 3, 7 & 8) kann etwas aus dem Pumpengehuse gezogen und die Klemmen
abgesteckt werden.
Fr den Anschluss einer Sauglanze, ist der Stecker (Pos. 4) an der Front vorgesehen, der
bereits mit der internen Klemmleiste verbunden ist. Wird keine Sauglanze verwendet, so
muss die mitgelieferte Abdeckkappe (Pos. 5) mit den integrierten Brcken aufgesteckt
werden.
Mit dem Wahlschalter (Pos. 10) kann der Kontakt des Str- bzw. Leermelderelais von
Schlieer-Funktion auf ffner-Funktion umgeschaltet werden (siehe Aufdruck auf der
Platine).
417101799_EMP_IV_E60.docx
- 15 -
Rev. 9-06.11
7.2.3
Klemmleistenbersicht
Abb. 7.16
7.2.4
Pos. Bezeichnung
Siehe
Kapitel
X1
Klemmleiste X1
7.2.4
X2
Klemmleiste X2
7.2.5
X3
Klemmleiste X3
7.2.6
X4
Klemmleiste X4
7.2.7
S1
Schalter S1
7.2.8
Anschlussbelegung Klemmleiste X1
Abb. 7.17
Klemme
Aderfarbe
(Anschlusskabel)
braun
Eingang Niveauvorwarnung
blau
Eingang Niveauleermeldung
schwarz
GND (Bezugspotential)
Eingang Chargendosierung
Ausgang 5 V,DC
(Belastung max. 100 mA)
Eingang Impulsansteuerung
GND (Bezugspotential)
Eingang Dosiersperre
9
10
11
12
Ausgang Hubsignal ()
417101799_EMP_IV_E60.docx
Belegung
- 16 -
Rev. 9-06.11
PINKlemmenBelegung
belegung
AnschlussX1
stecker
Aderfarbe
(Anschlusskabel)
braun
blau
schwarz
Belegung
Eingang
Niveauvorwarnung
Eingang
Niveauleermeldung
GND ()
HINWEIS
Steckplatz I muss immer belegt sein, entweder durch die montierten Brckenstecker
(Schutzkappe mit entsprechendem Symbol, siehe Kapitel 5.2.1, Abb. 5.3, Pos. 11) oder
durch Anschluss der Leermeldeeinrichtung.
Abb. 7.19
PIN
1
4
Belegung
Schalteingang Niveauvorwarnung
GND ()
PIN
3
4
417101799_EMP_IV_E60.docx
- 17 -
Belegung
Schalteingang Niveau-Leermeldung
GND ()
Rev. 9-06.11
6+7=
Klemme Belegung
6
Schalteingang Impuls
GND ()
7
5 + 6 + 7 = Impulseingang mit elektronischem
Schalter (NPN)
Klemme Belegung
5
6
7
5 V, DC
Schalteingang Impuls
GND ()
9 + 10 = Normsignaleingang 0/4 20 mA
Klemme Belegung
9
10
0/420 mA +
0/420 mA -
HINWEIS
Der Dosiersperre-Eingang muss im Men (siehe Kapitel 10.3.7) aktiviert werden und steht
in allen Betriebsarten zur Verfgung.
Abb. 7.22
8+7
= Eingang Dosiersperre
mit potentialfreiem Kontakt
Klemme
8
7
Belegung
Schalteingang Dosiersperre
GND ()
5 + 8 + 7 = Eingang Dosiersperre
mit elektronischem Schalter (NPN)
Klemme
5
8
7
417101799_EMP_IV_E60.docx
- 18 -
Belegung
5 V, DC
Schalteingang Dosiersperre
GND ()
Rev. 9-06.11
4+7=
Eingang Chargendosierung
mit potentialfreiem Kontakt
Klemme
Belegung
4
7
Schalteingang Chargendosierung
GND ()
5 + 4 + 7 = Eingang Chargendosierung
mit elektronischem Schalter (NPN)
Klemme
5
4
7
Belegung
5 V, DC
Schalteingang Chargendosierung
GND ()
11 + 12 = Ausgang Hubsignal
Klemme Belegung
11
12
7.2.5
Anschlussbelegung Klemmleiste X2
Abb. 7.25
Aderfarbe
Klemme (Anschluss- Belegung
kabel)
braun
13
wei
14
blau
15
16
schwarz
(fr Sensoren
mit
Anodenanschl.)
Ausgang 5V
DC
Eingang
Membranbru
ch-signal
GND
17
nicht belegt
18
nicht belegt
Ausgang 5V
DC
Eingang
Dosierberwachung
GND
DongleSendeleitung
DongleEmpfangsleit.
Nicht belegt
19
20
21
22
23
24
417101799_EMP_IV_E60.docx
Anode
- 19 -
Anschluss
MembranbruchSensor
(optional)
Dosierberwachung
Anschluss
Dongle-Platine
E60PLUS (siehe
Kapitel: 8.1)
Abb. 7.26
Rev. 9-06.11
Klemme
Aderfarbe
Belegung
(Anschlusskabel)
braun
13
14
15
16
wei
blau
schwarz
HINWEIS
Abb. 7.28
Klemme
20
21
Belegung
Schalteingang
GND ()
Klemme
19
20
21
7.2.6
Belegung
Ausgang 5V DC
Schalteingang
Dosierberwachung
GND ()
Anschlussbelegung Klemmleiste X3
Abb. 7.29
Klemme
Bezeichnung
1
Ausgang Niveauvorwarnung, Leermeldung, Strmeldung
2
1+2 =
Ausgang fr Niveauvorwarnung,
Niveau- Leermeldung und Strung
417101799_EMP_IV_E60.docx
- 20 -
Rev. 9-06.11
7.2.7
Anschlussbelegung Klemmleiste X4
Abb. 7.31
Klemme Bezeichnung
1
2
7.2.8
Anschluss fr Hauptschalter
Wenn Alarm
Power Off
Kontakt offen
Kontakt geschlossen
Kontakt offen
Kontakt geschlossen
Kontakt offen
Kontakt geschlossen
Wenn Alarm
Power Off
Kontakt geschlossen
Kontakt offen
Kontakt offen*
Kontakt offen
Kontakt geschlossen
Kontakt geschlossen
417101799_EMP_IV_E60.docx
- 21 -
Rev. 9-06.11
8.1
Pos.
Bezeichnung
X2
1
Klemmleiste X2
Dongle-Platine
Aderfarbe
Belegung
(Anschlusskabel)
8.1.2
25
braun
Ausgang 5 V DC
26
wei
Busleitung
27
schwarz
Impulseingang
28
29
30
blau
GND
Abb. 8.2
PLUS
Anschluss OGM
HINWEIS
Die Funktion Ovalradzhler muss zuerst im Men aktiviert werden. Ist ein OGM
angeschlossen so wird die Funktion Ovalradzhler automatisch aktiviert
(siehe Kapitel 10.3.11).
Abb. 8.3
25 + 26 + 27 + 28 Anschluss OGM
Plus
PLUS
Klemme Belegung
25
26
27
28
417101799_EMP_IV_E60.docx
- 22 -
Ausgang 5 V DC
Busleitung
Schalteingang Impuls
GND ()
Rev. 9-06.11
Inbetriebnahme
HINWEIS
9.1
Abb. 9.2
9.2
Bei einem anstehenden Dosiergegendruck von > 0,5 bar, empfehlen wir die Verwendung
eines Mehrfunktionsventils aus unserem Zubehrprogramm.
Ansonsten muss der montierte Kugelhahn (Empfehlung siehe Kapitel 7.1.1, Abb. 7.1)
geffnet oder die Dosierleitung anderweitig entlastet werden.
ACHTUNG
HINWEIS
ACHTUNG Eine nderung der Hublngeneinstellung ist nur bei laufender Pumpe mglich.
Bei Verwendung eines Mehrfunktionsventils (siehe Zubehrprogramm) zur Entlftung,
benutzen Sie bitte die zugehrige Bedienungsanleitung.
Bei Verwendung eines Kugelhahnes (oder anderer Entlftungsvorrichtung) stellen Sie
ein geeignetes Auffanggef unter die Entlftungsleitung.
Kugelhahn ffnen.
TEST-Taste drcken, bis das Dosiermedium aus der Entlftungsleitung austritt.
Weitere 60 sek. gedrckt halten, um den Pumpenkopf vollstndig mit Produkt zu fllen.
Kugelhahn (falls vorhanden/verwendet) schlieen.
Die TEST-Taste erneut drcken, bis das Dosiermedium sichtbar durch die
Dosierleitung, bis ca. 2 cm vor das Impfventil gelangt ist.
Klarsichtdeckel zum Schutz der Funktionstasten vor Vernderung der Einstellwerte
schlieen und ggf. verplomben.
HINWEIS
9.3
Tasten- / Schalterfunktionen
Taste
Beschreibung
Abb. 9.3
Abb. 9.5
Abb. 9.6
Testfunktion (Dauerlauf)
417101799_EMP_IV_E60.docx
- 23 -
Rev. 9-06.11
9.4
Displayanzeigen
Display Beschreibung
Laufmeldung der Pumpe, mit jedem Hub der Pumpe rotiert die Anzeige
oben rechts im Display um
1 Umdrehung.
Niveaumeldung liegt an (blinkende Anzeige = Niveauvorwarnung, Anzeige stndig sichtbar =
Leermeldung), siehe Kapitel 7.2.4.1.1 Installation Sauglanze bzw. Kapitel 10.3.8 Konfiguration
Niveaukontakt
Dosiersperre aktiv, siehe Kapitel 7.2.4.4 Installation Dosiersperre bzw. Kapitel 10.3.7 Konfiguration /
Dosiersprerre.
Strung liegt an, siehe Kapitel 12.2 Strmeldungen.
Intern
MUL
DIV
x..xx mA
Charge
xxx /min
xx %
x.xx l/h
n= x
xx.x mA
f = xx.x %
OFF
E60+
E60++
Alarm
9.5
Erstinbetriebnahme / Auslieferungszustand
Abb. 9.7
ACHTUNG
Vor Inbetriebnahme:
Verschlussschraube an der leinfllffnung durch die beiliegende
Entlftungsschraube ersetzen.
HINWEIS
417101799_EMP_IV_E60.docx
- 24 -
Rev. 9-06.11
9.5.1
9.5.2
HINWEIS
9.5.3
Betriebsart:
Intern
Dosierfrequenz / - menge in: Hbe/min (122 Hbe/min bei 50 Hz,
146 Hbe/min bei 60 Hz)
Betriebszustand:
OFF (bei V 3.6, Stand by bei V 3.5)
(zum Starten START / STOP Taste drcken)
Mit jedem Hub der Pumpe rotiert die Anzeige
Konfiguration
In der Konfiguration sind werksseitig folgende Einstellungen festgelegt:
Abb. 9.11
417101799_EMP_IV_E60.docx
Konfiguration von
Sprache:
Einheit:
Code:
Autostart:
Dosiersperre:
Niveaukontakt:
Alarmausgang:
Impulsspeicher:
Ovalradzhler:
Dosierregler:
Dosierberwachung:
Charge:
- 25 -
Standard
Deutsch
Liter
nicht aktiv (-)
nicht aktiv (-)
nicht aktiv (-)
offen ()
aus ()
nicht aktiv (-)
nicht aktiv (-)
nicht aktiv (-)
nicht aktiv (-)
nicht aktiv (-)
siehe Kapitel
10.3.3
10.3.4
10.3.5
10.3.6
10.3.7
10.3.8
10.3.9
10.3.10
10.3.11
10.3.12
10.3.13
10.3.14
Rev. 9-06.11
10
Menbeschreibung
10.1
Hauptmen
Das Hauptmen kann whrend des laufenden Betriebes der Pumpe aufgerufen werden.
Der Einstieg erfolgt durch gleichzeitiges Drcken der und Tasten.
Durch nochmaliges gleichzeitiges Drcken der und Tasten erfolgt die Rckkehr in die
Betriebsebene.
10.1.1
bersicht
Abb. 10.1
417101799_EMP_IV_E60.docx
Betriebsart
Konfiguration
Kalibrierung
Betriebsdaten
- 26 -
Rev. 9-06.11
10.2
Betriebsart
10.2.1
Auswhlen
Abb. 10.2
Einstellungen
Intern
Impuls
Strom
10.2.2
siehe Kapitel:
10.2.2
10.2.3
10.2.4
Betriebsart / Intern
Mit der Betriebsart intern kann die Dosierpumpe ohne externe Signale betrieben werden.
Es stehen folgende Anzeigevarianten zur Auswahl:
Hbe/min
Die eingestellte Dosiergeschwindigkeit (und somit Dosiermenge)
wird in Hbe/min angezeigt. (Standardeinstellung)
Prozent
Die eingestellte Dosiergeschwindigkeit (und somit Dosiermenge)
wird in Prozent angezeigt.
Liter*
Die eingestellte Dosiermenge wird in Liter / h
(wahlweise auch in Gallon / day bzw. Gallon / h) angezeigt.
* Umstellung von Liter auf Gallon, siehe 10.3.4
10.2.2.1 Auswhlen
Abb. 10.3
417101799_EMP_IV_E60.docx
- 27 -
Rev. 9-06.11
HINWEIS
Wenn der neu eingestellte Wert nicht innerhalb von 10 Sekunden durch Drcken der
START/STOP-Taste besttigt wird, bleibt der ursprngliche Wert erhalten.
Hbe/min
Abb. 10.4
Prozent (%)
Abb. 10.5
Liter
Gallon
Abb. 10.6
10.2.3
Abb. 10.7
Betriebsart / Impuls
Bei Betriebsart Impuls arbeitet die Dosierpumpe nur in Verbindung mit eingehenden
Impulsen (z. B. von einem Kontaktwasserzhler).
Folgende Impulsverarbeitungvarianten stehen zur Auswahl:
Multiplikation
Division
417101799_EMP_IV_E60.docx
- 28 -
Rev. 9-06.11
10.2.3.1 Auswhlen
Abb. 10.8
HINWEIS
Division
Abb. 10.10
417101799_EMP_IV_E60.docx
- 29 -
Rev. 9-06.11
10.2.4
0 20 mA
4 20mA
20 0 mA
20 4 mA
beliebig
10.2.4.1 Auswhlen
Abb. 10.11
417101799_EMP_IV_E60.docx
- 30 -
Rev. 9-06.11
HINWEIS
Die Differenz der eingestellten Werte muss grer oder gleich 5 sein (z.B. min 10 max 15).
Abb. 10.12
Pos.
1
2
3
10.3
Konfiguration
10.3.1
bersicht
Bezeichnung
Im Men voreingestellter Arbeitsbereich
Aktuell anliegender Stromwert
Hubfrequenz in %
Abb. 10.14
Konfiguration von:
Mensprache
Einheiten
Codeeingabe
Starteinstellungen
Dosiersperre
Niveaukontakt
Alarmausgang
Impulsspeicher
Ovalradzhler
Dosierregler
Dosierberwachung
Charge
10.3.2
siehe Kapitel:
10.3.3
10.3.4
10.3.5
10.3.6
10.3.7
10.3.8
10.3.9
10.3.10
10.3.11
10.3.12
10.3.13
10.3.14
Display Rollen
Abb. 10.15
417101799_EMP_IV_E60.docx
Rev. 9-06.11
10.3.3
Konfiguration / Sprache
Hier wird die Sprache fr die Menfhrung ausgewhlt.
10.3.3.1 Auswhlen
Abb. 10.16
Standardeinstellung = Deutsch
10.3.4
Konfiguration / Einheit
Ist bei Betriebsart / Intern die Anzeigevariante Liter gewhlt (siehe Kapitel 10.2.2) kann hier
die Anzeige von Liter / h auf Gallon / day (1 Gallone = 3.785 Liter) umgestellt werden.
10.3.4.1 Auswhlen
Abb. 10.17
Standardeinstellung = Liter
10.3.5
Konfiguration / Code
In dieser Einstellung kann eine Zahlenkombination zur Sicherung der Einstellwerte
gegenber unerlaubtem Verstellen vergeben werden.
Ist Code aktiviert muss vor jeder Vernderung eines Einstellwertes bzw. vor Wechsel in
das Hauptmen der entsprechende vierstellige Code eingegeben werden.
417101799_EMP_IV_E60.docx
- 32 -
Rev. 9-06.11
10.3.5.1 Auswhlen
Abb. 10.18
- Codeabfrage inaktiv.
(Standardeinstellung)
Codeabfrage aktiv.
10.3.5.2 Einstellen
Abb. 10.19
10.3.6
Konfiguration / Autostart
Diese Funktion bestimmt ob die Pumpe bei Wiederanlegen der Netzspannung nach
Spannungsausfall in den Betriebszustand OFF (Standby bei V 3.5) geht, oder ob die
Pumpe sofort in der eingestellten Betriebsart weiterlaufen soll.
10.3.6.1 Auswhlen
Abb. 10.20
10.3.7
Konfiguration / Dosiersperre
Bei aktivierter Dosiersperre luft die Pumpe nur wenn an Stecker II zwischen PIN 3+4
(siehe Kapitel 7.2.4.4) ein externer Freigabekontakt geschlossen ist (unabhngig davon
welche Betriebsart eingestellt ist)
417101799_EMP_IV_E60.docx
- 33 -
Rev. 9-06.11
10.3.7.1 Auswhlen
Abb. 10.21
10.3.8
Konfiguration / Niveaukontakt
Hiermit wird festgelegt ob am Niveaueingang (Stecker I siehe Kapitel 7.2.4.1) ein offener
oder ein geschlossener Kontakt als Niveau i. O. angesehen wird.
10.3.8.1 Auswhlen
Abb. 10.22
= Kontakt offen:
Niveau n.i.O. (leer)
Kontakt geschlossen:
Niveau i.O. (voll)
(Standardeinstellung)
= Kontakt geschlossen:
Niveau n.i.O. (leer)
Kontakt offen:
Niveau i.O. (voll)
10.3.9
Konfiguration / Alarmausgang
Diese Option ermglicht die Invertierung des Alarmausganges (Alarmausgangs - Relais hat
bei Alarm angezogen oder nicht angezogen).
10.3.9.1 Auswhlen
Abb. 10.23
417101799_EMP_IV_E60.docx
- 34 -
Rev. 9-06.11
ACHTUNG
Die gespeicherten Impulse werden abgearbeitet nachdem keine externen Impulse mehr
eingehen. D.h. die Pumpe luft weiter obwohl keine externe Laufbedingung vorliegt.
Im ungnstigsten Fall kann das dazu fhren, dass in ein geschlossenes System dosiert
wird und somit ein unzulssig hoher Druck im System entsteht.
Das muss durch entsprechende Sicherungsmanahmen verhindert werden.
Der Speicherinhalt kann durch Aktivieren der Dosiersperre oder Ausschalten der Pumpe
gelscht werden.
10.3.10.1 Auswhlen
Abb. 10.24
Bedeutung
Impulsmultiplikation
(Beispiel: aus 10 externen
Impulsen werden 20 Hbe)
Abb. 10.26
Pos
1
2
3
Bezeichnung
Impulsspeicher aktiv
Anzahl der eingegangenen
Impulse
Eingestellter Faktor
Impulsdivision
(Beispiel: aus 10 externen
Impulsen werden 5 Hbe)
10.3.11 Konfiguration / Ovalradzhler (nur E60PLUS & OGM bzw. OGM PLUS)
Die Funktion Ovalradzhler ermglicht eine echte Mengenerfassung bei Menpunkt
Betriebsdaten / Liter (siehe Kapitel 10.5.3).
HINWEIS
Der Ovalradzhler kann nur aktiviert werden, wenn die Pumpe durch eine Dongle-Platine
PLUS
zur E60
erweitert und ein Ovalradzhler (siehe Zubehr) angeschlossen wurde.
Zur Aktivierung der Dongle-Platine in Verbindung mit dem Ovalradzhler, muss die
Netzspannung getrennt und neu hergestellt werden. (Netzstecker ziehen oder die Pumpe
aus- und wieder einschalten!)
PLUS
Bei Anschluss eines OGM
wird die Funktion Ovalradzhler automatisch aktiviert.
417101799_EMP_IV_E60.docx
- 35 -
Rev. 9-06.11
10.3.11.1 Auswhlen
Abb. 10.27
Ist ein OGM Plus angeschlossen, so wird mit Aktivierung der Dosierregler-Funktion die
durch den OGM gemessene Dosiermenge mit einem eingestellten Dosiermengen-Sollwert
verglichen. Ergibt sich hierbei eine Abweichung wird die Dosierfrequenz der Pumpe
automatisch erhht bzw. vermindert.
Da die Nachregelung der Dosierfrequenz nur innerhalb der Leistungsgrenzen der Pumpe
mglich ist, empfiehlt es sich die Dosiermengen-Vorgabe auf hchstens 80 - 90 % der
maximal mglichen Dosierfrequenz einzustellen. Dadurch hat der Dosierregler nach oben
hin Reserven um auf negative Regelabweichungen zu reagieren.
Die Dosierregler-Funktion kann nur in den Betriebsarten Intern und Strom genutzt
werden. Ist die Betriebsart Impuls eingestellt, so ist die Dosierregler-Funktion ausser
Betrieb.
HINWEIS
Die Dosierreglerfunktion kann nur aktiviert werden, wenn die Pumpe durch eine DonglePLUS
PLUS
Platine zur E60
erweitert und ein Ovalradzhler, Typ OGM
(siehe Zubehr)
angeschlossen wurde.
Zur Aktivierung der Dongle-Platine in Verbindung mit dem Ovalradzhler, muss die Pumpe
aus- und wieder eingeschaltet werden!
10.3.12.1 Auswhlen
Abb. 10.29
417101799_EMP_IV_E60.docx
- 36 -
Rev. 9-06.11
Abb. 10.30
Abb. 10.31
- = Keine Dosierabweichung
Die Pumpe frdert exakt die Menge, die voreingestellt (hier
beispielsweise 100/min) ist.
Eine Nachregelung zur Korrektur ist nicht erforderlich.
= Dosierabweichung nach oben
Die Pumpe frdert aktuell mehr, als die voreingestellte Hubfrequenz
(hier beispielsweise 100/min) verlangt.
Die Dosierfrequenz wird automatisch abgesenkt, bis der Wert
angeglichen ist.
Abb. 10.32
Abb. 10.33
HINWEIS
Dongle-Platine montiert.
PLUS
Ovalradzhler OGM
montiert.
HINWEIS
10.3.13.1 Auswhlen
Abb. 10.34
Dosierberwachung inaktiv.
(Standardeinstellung)
Dosierberwachung aktiv.
417101799_EMP_IV_E60.docx
- 37 -
Rev. 9-06.11
Standardeinstellung = 10
10.3.13.4 Dosierberwachung / Abweichung (nur bei E60PLUS & OGM bzw. OGMPLUS)
Bei Abweichung wird eine Toleranz in % eingestellt.
Die vom Ovalradzhler eingehende tatschliche Impulsrate innerhalb des zu
berwachenden Pumpenintervalls (siehe 10.3.13.3 Konfiguration / Hbe) wird mit einer bei
der Kalibrierung ermittelten Soll- Impulsrate verglichen.
Sollte bei diesem Vergleich eine Abweichung grer dem unter Abweichung eingestellten
%- Wert herauskommen, so wird Alarm Dosierberwachung ausgegeben.
HINWEIS
Diese Funktion kann nur ausgewhlt werden wenn eine Dongle-Platine angeschlossen ist
und wenn Konfiguration / Ovalradzhler (siehe Kapitel 10.3.11) aktiviert wurde.
Abb. 10.37
Einstellbereich: 0-100%
Standardeinstellung = 20 %
417101799_EMP_IV_E60.docx
- 38 -
Rev. 9-06.11
HINWEIS
417101799_EMP_IV_E60.docx
- 39 -
Rev. 9-06.11
417101799_EMP_IV_E60.docx
Pos
1
2
3
Bezeichnung
Betriebsart
Noch zu dosierende Menge
Verbleibende, noch zu ttigende Hbe
- 40 -
Rev. 9-06.11
10.4
Kalibrierung
10.4.1
bersicht
Abhngig davon ob ein Ovalradzhler angeschlossen ist oder nicht, unterscheiden sich
Vorgehensweise und Displayanzeige bei der Kalibrierung.
Abb. 10.42
Kalibrierung Pumpe:
siehe Kapitel 10.4.2
Kalibrierung Pumpe mit
Ovalradzhler:
siehe Kapitel 10.4.3
10.4.2
Kalibrierung / Pumpe
10.4.2.1 Vorbereitung
Pumpe druckseitig betriebsfertig anschlieen.
(siehe Kapitel 7 Gerteinstallation).
Geeigneten Messzylinder befllen und
Saugleitung einfhren.
HINWEIS
Abb. 10.43
Zu
HINWEIS
Zu
Nach Ablaufende muss die aus dem Messzylinder (siehe Kapitel 10.4.2.1
Vorbereitung) entnommene Menge abgelesen werden.
Diese Menge wird dann als Kalibrierwert (in ml bzw. l) eingegeben.
417101799_EMP_IV_E60.docx
- 41 -
Rev. 9-06.11
10.4.3
10.4.3.1 Vorbereitung
Abb. 10.45
HINWEIS
Zu
HINWEIS
Zu
Nach Ablaufende muss die aus dem Messzylinder (siehe Kapitel 10.4.3.1
Vorbereitung) entnommene Menge abgelesen werden.
Diese Menge wird dann als Kalibrierwert (in ml bzw. l) eingegeben.
Abb. 10.47
417101799_EMP_IV_E60.docx
- 42 -
Rev. 9-06.11
10.4.4
Kalibrierung / Manuell
Wenn der einzugebende Kalibrierwert bekannt ist kann hier eine Trockenkalibrierung
(sofortige Eingabe des Wertes ohne vorherigen Kalibrierlauf) vorgenommen werden.
Diese Methode ist allerdings nicht sehr genau, da die Vor- Ort- Verhltnisse (Gegendruck,
Viskositt; Leitungsquerschnitte und lngen usw.) nicht bercksichtigt werden.
Abb. 10.48
HINWEIS
Pumpe
EMP IV
Abb. 10.49
10.5
Pumpenleistung [l/h]
bei 50 (60) Hz
140 (168)
2,33 (2,80)
210 (252)
3,50 (4,20)
450 (540)
7,50 (9,00)
630 (756)
10,5 (12,6)
750 (900)
12,5 (15,0)
Betriebsdaten
Unter diesem Menpunkt werden folgende Betreibsdaten erfasst und angezeigt:
Betriebsstunden
Liter
Impulsanzahl
417101799_EMP_IV_E60.docx
- 43 -
Rev. 9-06.11
10.5.1
bersicht
Abb. 10.50
10.5.2
Siehe Kapitel
10.5.2
Siehe Kapitel
10.5.3
Siehe Kapitel
10.5.4
Betriebsdaten / Betriebsstunden
Hier werden die Laufzeit der Pumpe (entspricht Anzahl der Hbe 480 ms) seit
Erstinbetriebnahme bzw. seit der letzten Rcksetzung angezeigt.
10.5.3
Betriebsdaten / Liter
Hier wird die dosierte Menge in Liter seit Erstinbetriebnahme bzw. seit der letzten
Rcksetzung angezeigt. Bei Betrieb der Pumpe ohne Ovalradzhler wird dieser Wert
errechnet (ml / Hub Anzahl der dosierten Hbe). Mit Anschluss eines Ovalradzhlers wird
die gemessene Menge angezeigt (ermittelt aus der Anzahl der Ovalradzhler-Impulse).
417101799_EMP_IV_E60.docx
- 44 -
Rev. 9-06.11
10.5.4
Betriebsdaten / Impulsanzahl
Hier wird die ber den Impulseingang der Pumpe (siehe Kapitel 7.2.4.2 Installation
Impulsansteuerung) eingegangene Anzahl an Impulsen seit Erstinbetriebnahme bzw. seit
der letzten Rcksetzung angezeigt.
417101799_EMP_IV_E60.docx
- 45 -
Rev. 9-06.11
11
Wartung
VORSICHT
HINWEIS
Dosierpumpen drfen nur von sachkundigen und autorisierten Personen gewartet werden.
Wartungsintervall halbjhrlich, krzere Intervalle bei starker Beanspruchung
(z. B. Dauerlauf).
HINWEIS
HINWEIS LWECHSEL:
Das Getriebel sollte nach max. 10.000 Betriebsstunden oder
alle 2 Jahre gewechselt werden (siehe Kapitel 11.3 "Getriebe
lwechsel"). lspezifikation nach ISO 6743 L-CKT 320.
11.1
Abb. 11.3
Saug-/Druckventil
Saug-/Druckventil
417101799_EMP_IV_E60.docx
- 46 -
Rev. 9-06.11
11.2
Pos.
HINWEIS
Bezeichnung
1
2
3
4
5
Dosierkopfschraube
Andrckplatte
Dosierkopf
Frdermembrane
Zwischenring
Schutzmembrane
Bei geplanter Wiederverwendung der Ventile zunchst die Ventile ausbauen wie unter
Kapitel 11.1 beschrieben.
Vor dem Austausch der Membrane die Hublngeneinstellung auf unter 50 % einstellen!
HINWEIS
ACHTUNG
417101799_EMP_IV_E60.docx
- 47 -
Rev. 9-06.11
11.3
Getriebelwechsel
VORSICHT
HINWEIS
Die Schutzmanahmen gem WHG sowie die Anweisungen gem Produktdatenblatt des
Getriebels sind zu beachten. Geeignete Schutzkleidung tragen.
Vor dem lwechsel muss die Pumpe durch Betrieb auf eine Mindesttemperatur von
ca. 30C gebracht werden.
Abb. 11.5
Pos.
1
2
3
11.3.1
Bezeichnung
Getriebeentlftungsschraube
lstandschauglas
Verschlussschraube
Getriebel ablassen
Getriebeentlftungsschraube (Pos. 1) von Hand herausschrauben.
Geeigneten Auffangbehlter (min. 0,9 l) unter Verschlussschraube (Pos. 3) halten.
Verschlussschraube mit Steckschlsseleinsatz (SW19) lsen und vorsichtig
herausschrauben.
Auslaufendes l in Auffangbehlter flieen lassen.
Verschlussschraube mit neuem O-Ring (NBR 9 x 2 mm) einschrauben und festziehen.
11.3.2
Getriebel auffllen
Frisches Getriebel ber geeigneten Trichter in ffnung fr Getriebeentlftungsschraube
(Pos. 1) einfllen (Fllmenge ca.0,8 l).
lstand an lstandschauglas (Pos. 2) kontrollieren; (min./max. lstand siehe Abb. 11.5
und gegebenenfalls korrigieren.
HINWEIS
11.4
Es darf nur Getriebel nach ISO 6743 vom Typ L-CKT 320 verwendet werden.
Altes Getriebel fachgerecht entsorgen!
Motor wechseln
ACHTUNG
Pos.
1
2
3
4
5
417101799_EMP_IV_E60.docx
Beschreibung
Motor
Klemmenkastendeckel
Kabelverschraubung
Motorbefestigungsschrauben
Wasserablaufschlitz
- 48 -
Rev. 9-06.11
11.4.1
Ausbau
11.4.2
Einbau
Nutwelle & Gehuseflansch reinigen, Motorwelle & Nutwelle mit Teflonfett benetzen.
Motorwelle gerade auf die Nutwelle aufsetzen und mit sanftem Druck bis auf Flansch
aufschieben. Motor nicht verkanten.
Motor so drehen, dass Klemmenkasten nach vorn, in Richtung Hubverstellknopf zeigt.
Befestigungsschrauben (Pos. 4) ansetzen und ber Kreuz festziehen
(Anzugsmoment 12 Nm).
Netzanschlusskabel und ggf. Anschlusskabel zum Pumpengehuse wieder anschlieen.
Netzspannungsversorgung wiederherstellen.
VORSICHT
417101799_EMP_IV_E60.docx
- 49 -
Rev. 9-06.11
12
Betriebsstrungen
12.1
Bedeutung
Auswirkung
Ursache
Behebung
Abb. 12.1
Reservemeldung
(blinkend)
Pumpe luft
weiter
Niveauvorwarnung
aktiv
Dosiermedium bevorraten
Leermeldung
Pumpe wird
gestoppt
Leermeldung aktiv
Dosiermedium wechseln,
ersetzen
Pumpe wird
gestoppt
Externe Freigabe
aktivieren oder im
Konfigurationsmen die
Dosiersperre inaktiv
setzen.
Pumpe wird
gestoppt
Pumpe luft im
Dauerlauf
Normsignal
berschreitet
Anzeigeumfang
Normsignal verringern
+ Strungs-LED
Abb. 12.2
+ Strungs-LED
Abb. 12.3
Dosiersperre
(nur mglich wenn
diese konfiguriert
wurde.)
Anzeige im
Betriebsmodus
4..20mA blinkt
+ Strungs-LED Normsignalberwac
hung spricht an
Abb. 12.4
Abb. 12.5
--.-
12.2
Normsignal liegt
ber 23;0 mA
Bedeutung
Auswirkung
Ursache
Behebung
Motor luft
unkontrolliert im
Dauerlauf.
berdosierung
Leistungselektronik
defekt
Platine austauschen
Abb. 12.6
Gegendruck zu hoch
Ventil auf Druckseite
geschlossen
Abb. 12.7
keine
Dosierung
Motor berhitzt/defekt
Leistungselektronik
defekt
Steckverbindung von
Getriebe zur Platine
unterbrochen
Abb. 12.8
Motor in
Dauerlauf ohne
Anforderung
Abb. 12.9
Dauerdosierung
Fehler in der
Auswertung der
Dosierberwachung
oder des
Ovalradzhlers
Pumpe dosiert
zu wenig oder
zu viel.
Dosierkopf ist
undicht,
Medium tritt
aus dem
Membranbruch
ablauf
Abb. 12.10
417101799_EMP_IV_E60.docx
- 50 -
Druck verringern
Ventil ffnen
Motor abkhlen lassen,
bzw. austauschen
Platine austauschen
Anschluss berprfen
Platine defekt
Pumpe einschicken
Optischer Sensor
verschmutzt
Optischen Sensor
berprfen
Schluche kontrollieren
Membrane kontrollieren
Schlauch Defekt
Membran defekt
Gegendruck zu hoch
oder zu niedrig
Gegendruck kontrollieren.
Dosierkopf locker
(undicht)
DosierkopfBefestigungsschrauben
diagonal festziehen
Membrane gerissen
Membrane austauschen
Rev. 9-06.11
12.2.1
Strungssuche
Strung
Dosierpumpe arbeitet nicht,
keine Displayanzeige
mgliche Ursache
Behebung
Netzkabel beschdigt
Falsche Spannung
Netzkabel wechseln
Netzspannung berprfen
Anschluss nach Klemmenplan
berprfen
ber Saugleitung den Dosierkopf
durchsplen, evtl. Ventile ausbauen und
reinigen bzw. austauschen
Falsch angeschlossen
Ablagerungen, Verkleben,
Austrocknen der Ventile
Niveauanzeige
erscheint
im Display trotz vollem
Behlter
VORSICHT
Vor Reparatur- und Wartungsarbeiten und Dosierung von gefhrlichen Medien immer den
Dosierkopf splen, die Druckleitung entlasten und Schutzkleidung (Schutzbrille,
Schutzhandschuhe und Schrze) tragen.
VORSICHT
Beim ffnen von Abdeckungen oder Entfernen von Teilen, auer wenn dies ohne
Werkzeug mglich ist, knnen spannungsfhrende Teile freigelegt werden. Auch knnen
Anschlussstellen spannungsfhrend sein.
Vor einem Abgleich, einer Wartung, einer Instandsetzung oder einem Austausch von Teilen
muss das Gert von allen Spannungsquellen getrennt sein, wenn ein ffnen des Gertes
erforderlich ist.
417101799_EMP_IV_E60.docx
- 51 -
Rev. 9-06.11
13
Abb. 13.1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Beschreibung
01400
Saug- Druckventil
Pos
417101799_EMP_IV_E60.docx
- 52 -
02100
249075
-249055
Typ
04500
06300
07500
-249503
249504
249074
249505
249041
413031066
-34950144
34950135
34950137
34950101
34950150
34950184
34950163
34950177
34950147
249506
-413031067
34950160
34950145
34950134
34950136
34950138
34950139
34950153
34950105
34950149
34950151
--34950164
34950165
--413031055
34950152
34950146
34950148
34950124
417002063
415204603
413119274
34950123
417002137
415204601
413071033
34950125
418461544
249690
418244171
418244180
34950119
417401005
413119236
34950131
418441042
34950209
248186
418441010
34950120
418441041
418244179
418441009
Rev. 9-06.11
13.1.1
Pos.
5
Beschreibung
Frdermembrane
13.1.2
Pumpenkopf Service-Satz
01400
02100
34950261
04500
06300
--
07500
Saugventil (Pos. 1)
Druckventil (Pos. 1)
Membrane (Pos. 5)
Schutzmembrane (Pos. 7)
Artikel. Nr.
250160
250161
250162
250163
250164
250165
250166
250167
250168
250169
250170
250171
Saugventil (Pos. 1)
Druckventil (Pos. 1)
Membrane (Pos. 5)
Schutzmembrane (Pos. 7)
417101799_EMP_IV_E60.docx
Artikel. Nr.
auf Anfrage
auf Anfrage
- 53 -
Rev. 9-06.11
14
Technische Daten
14.1
Pumpenschlssel
1. Elektrische Version
...
E 60 = (Erklrung siehe Kapitel 14.1.1)
...
2. Pumpenleistung 50 Hz
01400 = 140 l/h
02100 = 210 l/h
04500 = 450 l/h
06300 = 630 l/h
07500 = 750 l/h
Sonderversionen hhere Drcke:
01400 = 12 bar = 135 l/h
02100 = 10 bar = 202 l/h
(60 Hz)
(168 l/h)
(252 l/h)
(540 l/h)
(756 l/h)
(900 l/h)
(162 l/h)
(242 l/h)
3. Pumpenkopfwerkstoff
PP
PV
VA
VC
=
=
=
=
PP
PVDF
V4A
PVC
(Standard)
(2,5 bar)
(3,3 bar)
(5 bar)
(6 bar)
(8 bar)
(9,6 bar)
5. Werkstoff Dichtung
FP =
EP =
K
=
Viton B
EPDM
Kalrez
(Standard)
6. Werkstoff Kugel
KE =
VA =
PT =
Keramik
V4A
Teflon
(Standard)
7. Werkstoff Ventil
PP
PV
VA
VC
=
=
=
=
PP
PVDF
V4A
PVC
(Standard)
8. Ventilfeder
01
10
99
=
=
=
9. Netzanschluss
01
99
Netzkabel 2 m Schukostecker
Nur bei 230 V/50 oder 60 Hz
ohne Netzkabel
(Standard)
10. Spannung/Frequenz
E60
04500 PP
06 FP
KE
PP 99
99
03
01
02
03
04
05
=
=
=
=
=
115V / 50 Hz
115V / 60 Hz
230V / 50 Hz
230V / 60 Hz
3N 230V / 400V
(Standard)
417101799_EMP_IV_E60.docx
- 54 -
Rev. 9-06.11
Pumpenschlssel 2
11. Anschluss Saugseite
11
14
15
18
19
20
99
=
=
=
=
=
=
=
(Standard)
12.Anschluss Druckseite
11
14
15
18
19
20
99
=
=
=
=
=
=
=
(Standard)
=
=
=
=
PP
PVDF
V4A
kein Anschluss
(Standard)
15. Membranbrucherkennung
01
99
=
=
mit Membranbrucherkennung
ohne Membranbrucherkennung
(Standard)
16. Gehuseversion
01
99
99
99
99
99
01
Standardgehuse
04500
PP
06
FP
KE
PP
99
99
03
(Pumpenschlssel 1)
417101799_EMP_IV_E60.docx
99
99
99
99
99
01
(Pumpenschlssel 2)
- 55 -
Rev. 9-06.11
14.1.1
Pumpenschlsseldefinition E60
1. Elektrische Version
Hauptschalter zum Ein- Ausschalten der Pumpe
E60
mechanische Hubverstellung
hinterleuchtetes Graphikdisplay, 4 Bedientasten
Einzelhubsteuerung (jeder Hub wird vollstndig ausgefhrt)
Dosierkontrolle ber Hubsignalausgang (rechnerisch)
oder ber externes Dosierberwachungssystem mglich
E60PLUS
PLUS
wie E60, jedoch zustzlich mit Dongle-Platine zum Anschluss eines Ovalradzhlers OGM
(Erweiterungseinheit fr Betriebsdatenerfassung)
417101799_EMP_IV_E60.docx
- 56 -
Rev. 9-06.11
14.2
Abmessungen
Abb. 14.1
Leistung
Typ
C1
00140
00210
00450
00630
00750
133,5
133,5
142,5
142,5
142,5
170
170
190
220
220
174
174
194
225
225
14.3
14.3.1
Elektrische Daten
Mae [mm]
L
392
392
412
412
412
H1
H2
280
280
303,5
318,5
318,5
216
216
263
293
293
1"
1"
2"
2"
2"
Bezeichnung
Versorgungsspannung
max. Stromaufnahme IN
115V 50/60 Hz
230V 50/60 Hz
3PE 400V 50/60 Hz
max. Anlaufstrom IA ( IN 3,3) 115V 50/60 Hz
230V 50/60 Hz
3PE 400V 50 / 60 Hz
Motorleistung
115V 50/60 Hz
230V 50/60 Hz
3PE 400V 50 / 60 Hz
Sicherungswert
115 V
230 V
Schutzart
Schaltleistung bei Beschaltung mit 24 V Leermeldeausgang
Hubsignalausgang
Schaltleistung bei Beschaltung mit 230 V Leermeldeausgang
Hubsignalausgang
417101799_EMP_IV_E60.docx
- 57 -
5,1 / 7,6 A
2,5 / 3,8 A
1,2 / 1,05 A
16,8 / 25,1 A
8,25 / 12,5 A
4,0 / 3,5 A
0,3 kW
0,3 kW
0,37 kW
12,5 A
6,3 A
IP 55
24 V 3 A AC/DC
24 V 0,3 A DC
230 V / 3 A AC/DC
Anschluss nach VDE nicht zulssig
Rev. 9-06.11
14.3.2
01400 02100
Pumpenleistung [l/h]*/**
max. Dosiergegendruck [bar] **
Hubzahl [1/min] bei 50 Hz
Dosiermenge/Hub [ml] 50 Hz/60 Hz
Reproduziergenauigkeit (siehe Kapitel 14.6)
max. frderbare Viskositt [mPas]
zulssige Umgebungstemperatur
Saughhe [mWS] bei 100 % Hubeinstellung***
max. Vordruck saugseitig [bar]
empfohlene Mindestdurchmesser:
Sauganschluss [ID mm]
Druckanschluss [ID mm]
Gewicht [kg]
14.3.3
140
10
210
8
19,4
29,2
Pumpentyp
04500 06300 07500
450
6
630
4
750
3
144
87,5
120
62,5
87,5
< 3%
200 mPas
5-40C
2
0,5
DN 20 DN 20
DN 25
DN 30 DN 30
DN 12 DN 12
DN 20
DN 25 DN 25
ca. 23,5
ca. 25,5
ca. 27,2
Bezeichnung
Pumpenleistung [l/h]*
max. Dosiergegendruck [bar]
Frderleistung [cm]/Hub
135
12
18,1
02100
202
10
28
*
Werte ermittelt mit Dosiermedium Wasser mit einer Temperatur von 20C.
** Bei Netzfrequenz 60 Hz erhht sich die Frderleistung um 20 %, der Dosiergegendruck vermindert sich um 20 %.
*** Ansaughhen ermittelt mit sauberen, angefeuchteten Ventilen bei 100% Dosierhub und max. Hubfrequenz.
14.3.4
14.3.4.1 Steuereingnge
Eingnge
Belegung
Niveauvorwarnung
Klemme X1
Pin 1 + 3
Klemme X1
Pin 2 + 3
Klemme X1
Pin 4 + 3
Klemme X1
Pin 6 + 7
Klemme X1
Pin 8 + 7
Leermeldung
Charge
Impuls
Dosiersperre
Normsignal
Klemme X1
Pin 9 + 10
Membranbruch
berwachung
Klemme X2
Pin: 13 + 14
+ 15 + 16
Dosierberwachung
Klemme X2
Pin 20 + 21
417101799_EMP_IV_E60.docx
Externe Beschaltung
potentialfreier Kontakt
Achtung: Keine externe Spannung
anschlieen!
Externer Strom
Eingang ist nicht potentialfrei!
Achtung:
Polaritt von angeschlossenem
Signal beachten!
Elektronischer Schalter
Spannungsversorgung durch 5 V
Ausgang/Pumpe
(Klemme X2, Pin 15 + 16)
potentialfreier Kontakt
Achtung: Keine externe Spannung
anschlieen!
- 58 -
Werte
0/4-20 mA,
Brde ca. 50 Ohm
Rev. 9-06.11
14.3.4.2 Steuerausgnge
14.4
Ausgnge
Belegung
Externe
Beschaltung
externe
Versorgung
Klemme X1
Pin 5 + 3
Hubsignal
Klemme X1
Pin 11 + 12
Leer-/Reserve/Strmeldung
Klemme X3
Pin 1 + 2
Werte
potentialfreier Kontakt
Achtung: Keine externe
Spannung anschlieen!
Externe Spannung
Achtung:
Polaritt von
angeschlossenem
Signal beachten!
Externe Spannung
Werkstoffe
Dosierkopf:
Membrane:
Dichtungen:
Ventilkugeln:
Ventilfedern:
Gehuse:
Farbe:
14.5
Steckerbelegungen
14.5.1
Pos
1
3
4
Aderfarbe
(Anschlusskabel)
braun
blau
schwarz
Bezeichnung
Niveauvorwarnung
Niveau- Leermeldung
GND
ACHTUNG
Falls die Leermeldung nicht benutzt wird, muss Kontakt 3/4 immer gebrckt werden! Die
hierfr vorgesehene Schutzkappe stellt die Brcke zwischen den Kontakten her und muss
in diesem Fall aufgesteckt sein.
HINWEIS
417101799_EMP_IV_E60.docx
- 59 -
Rev. 9-06.11
14.6
Dosierleistungen
Die reproduzierbare Dosiergenauigkeit betrgt ca. 3 % bei minimal 30 % Hublnge und
gleich bleibenden Verhltnissen.
Durch die Charakteristik der Pumpe kann es bis zum Erreichen der Betriebstemperatur zu
hheren Leistungen kommen.
Unter Beachtung folgender Punkte kann eine genaue Dosierung erreicht werden:
a) Alle Dosierleistungsangaben sind bezogen auf Messungen mit Wasser bei 20 C sowie
konstanter Versorgungsspannung und betriebswarmen Zustand der Dosierpumpe.
b Liegt auf der Saugseite ein Vordruck (max. 1 bar zulssig) an, muss der Differenzdruck
zwischen Saug- und Druckseite mindestens 1 bar betragen. Die anstehende
Wassersule auf die Dosierpumpe muss durch eine entsprechende Ventilanordnung
abgesichert werden.
HINWEIS
Ein Druckhalteventil oder ein Dosierventil ist kein absolut schlieendes Absperrorgan.
ACHTUNG
14.7
Dosierhubverstellung nur bei laufender Pumpe, wenn die Hubeinstellschraube entlastet ist.
14.7.1
Dosiervolumen (l/h)
120
110
100
90
80
70
60
1 bar
2 bar
4 bar
6 bar
8 bar
10 bar
50
40
30
20
10
0
10
20
30
40
50
60
70
80
90
100
Hublngeneinstellung (%)
417101799_EMP_IV_E60.docx
- 60 -
Rev. 9-06.11
14.7.2
Dosiervolumen (l/h)
130
120
110
100
90
80
70
60
1 bar
2 bar
4 bar
6 bar
8 bar
10 bar
12 bar
50
40
30
20
10
0
10
20
30
40
50
60
70
80
90
100
70
80
90
100
Hublngeneinstellung (%)
14.7.3
Dosiervolumen (l/h)
190
180
170
160
150
140
130
120
110
100
90
80
70
1 bar
2 bar
4 bar
6 bar
8 bar
60
50
40
30
20
10
0
10
20
30
40
50
60
Hublngeneinstellung (%)
417101799_EMP_IV_E60.docx
- 61 -
Rev. 9-06.11
14.7.4
Dosiervolumen (l/h)
190
180
170
160
150
140
130
120
110
100
90
80
70
1 bar
2 bar
4 bar
6 bar
8 bar
10 bar
60
50
40
30
20
10
0
10
20
30
40
50
60
70
80
90
100
70
80
90
100
Hublngeneinstellung (%)
14.7.5
Dosiervolumen (l/h)
Abb. 14.7
520
500
480
460
440
420
400
380
360
340
320
300
280
260
240
220
200
180
160
140
120
100
80
60
40
20
0
1 bar
2 bar
3 bar
4 bar
5 bar
6 bar
10
20
30
40
50
60
Hublngeneinstellung (%)
417101799_EMP_IV_E60.docx
- 62 -
Rev. 9-06.11
14.7.6
Dosiervolumen (l/h)
550
500
450
400
350
300
1 bar
2 bar
3 bar
4 bar
250
200
150
100
50
0
10
20
30
40
50
60
70
80
90
100
70
80
90
100
Hublngeneinstellung (%)
14.7.7
Dosiervolumen (l/h)
600
550
500
450
400
350
1 bar
2 bar
3 bar
300
250
200
150
100
50
0
10
20
30
40
50
60
Hublngeneinstellung (%)
417101799_EMP_IV_E60.docx
- 63 -
Rev. 9-06.11
15
Konformittserklrung
417101799_EMP_IV_E60.docx
- 64 -
Rev. 9-06.11
Contents
1
General ..................................................................................................................... 67
1.1
1.2
Safety ....................................................................................................................... 68
2.1
2.2
2.3
2.4
3.1
4.1
4.2
4.3
4.4
Setup ........................................................................................................................ 71
5.1
5.2
5.2.1
Mounting .................................................................................................................. 72
6.1
Device installation.................................................................................................... 73
7.1
7.1.1
7.1.2
7.2
7.2.1
7.2.2
7.2.3
7.2.4
7.2.5
7.2.6
7.2.7
7.2.8
8.1
8.1.1
8.1.2
Startup ...................................................................................................................... 85
9.1
9.2
9.3
9.4
9.5
9.5.1
9.5.2
9.5.3
10
Menu description...................................................................................................... 88
10.1
10.1.1
10.2
10.2.1
10.2.2
10.2.3
10.2.4
10.3
10.3.1
10.3.2
10.3.3
10.3.4
10.3.5
10.3.6
10.3.7
PLUS
................................................................................................ 69
PLUS
PLUS
417101799_EMP_IV_E60.docx
- 65 -
PLUS
...................................................... 84
Rev. 9-06.11
10.3.8
10.3.9
10.3.10
10.3.11
10.3.12
10.3.13
10.3.14
10.4
10.4.1
10.4.2
10.4.3
10.4.4
10.5
10.5.1
10.5.2
10.5.3
10.5.4
11
11.1
11.1.1
11.2
11.3
11.3.1
11.3.2
11.4
11.4.1
11.4.2
12
12.1
12.2
12.2.1
13
13.1.1
13.1.2
14
14.1
14.1.1
14.2
14.3
14.3.1
14.3.2
14.3.3
14.3.4
14.4
14.5
14.5.1
14.6
14.7
14.7.1
14.7.2
14.7.3
14.7.4
14.7.5
14.7.6
14.7.7
15
417101799_EMP_IV_E60.docx
- 66 -
Rev. 9-06.11
General
This Technical Manual contains all of the instructions for installing, starting up, maintaining and
repairing diaphragm metering pumps of the ELADOS EMP IV E60 and
ELADOS EMP IV E60PLUS with software version 3.5 or 3.6.
IMPORTANT
NOTE
Please note your pumps software version when using these operating instructions
(see chapter 9.5.1).
The German sections of this manual constitute the ORIGINAL OPERATING MANUAL and
take legal precedence.
All other languages are translations of the ORIGINAL OPERATING MANUAL.
1.1
Warranty coverage
Operational safety, reliability and performance of this model are only guaranteed by the
manufacturer if the following conditions are met:
Mounting, connections, adjustment, service and repair are performed by authorized and
trained personnel.
The diaphragm metering pump must be used according to the specifications in the
operating instructions contained in the delivery scope.
Only original spare parts must be used for repairs.
The warranty claim is invalidated if the pump housing is opened.
In addition, the general warranty and service conditions of the company
ECOLAB Engineering are applicable.
1.2
417101799_EMP_IV_E60.docx
- 67 -
Rev. 9-06.11
Safety
2.1
Safety notes
Connection and repair work on the diaphragm metering pump must only be performed by
authorized technical personnel.
The power supply plug must always be disconnected before starting any work on electrical
components.
Appropriate protective clothing must be worn for any maintenance and repair work.
The safety regulations for handling chemicals must always be observed.
2.2
Emphases
The emphases indicated in this maintenance guide have the following meanings:
CAUTION
WARNING
IMPORTANT
NOTE
2.3
Numberings
Numberings marked with this sign () describe an activity which must only be performed
by the installer / user.
2.4
CAUTION
Electronics repairs must only be performed by trained electricians, following the safety
regulations of the professional association VB G 4 & ZH 1/11)!
When opening covers or removing parts, components carrying live voltages may be
exposed.
Connection points may also be under live voltages.
IMPORTANT
417101799_EMP_IV_E60.docx
- 68 -
Rev. 9-06.11
Delivery scope
The delivery scope consists of:
Fig 3.1
Fig 3.2
Short instruction
(Part No. 417101795)
Operating Instruction
CD-Version
(Part No. 417101793)
NOTE
3.1
Connection parts for the hydraulic connection of the pump (hose or pipe connection) are
not included in delivery.
These parts must be ordered separately.
417101799_EMP_IV_E60.docx
- 69 -
Dongle-Plate
(Part No. 249629)
Rev. 9-06.11
Functional description
4.1
Mechanical functions
The metering pumps ELADOS EMP IV-E60 and E60PLUS are diaphragm metering pumps
driven by an electrical motor.
The metering pumps are suitable for use with clean, non-abrasive metering media with a
viscosity of up to 100 mPas (measuring manner: Brookfield).
An eccentric screw gear (pos. 4) moves the delivery diaphragm (pos. 2) and delivers the
metering medium via the pressure valve (pos. 1). The suction valve is closed.
Fig. 4.1
WARNING
4.2
Description
Pressure valve
Delivery diaphragm
Return spring
Eccentric screw gear
Stroke setting
Suction valve
To protect the metering device, the use of a suction pipe with an empty reporting device
and dirt arrestor (available from our range of accessories) is highly recommended!
The empty reporting device switches off the pump if it falls below a certain level (in the
container).
Electronic functions
The pump is operated using four keys (Fig. 5.3, Pos. 3, 4, 5 and 6)
(see "Chapter 9.3 Key functions").
The operating indicator is shown on a graphical display (Fig. 5.3, Pos 2).
4.3
4.4
Operation mode
The pump may be used in three different operation modes:
INTERNAL
EXTERNAL
EXTERNAL
The Configuration menu item can also be used to set batch metering (a specific quantity is
metered on each start pulse).
417101799_EMP_IV_E60.docx
- 70 -
Rev. 9-06.11
Setup
NOTE
5.1
Fig. 5.1
The external structure and the displays, control elements and connecting sockets on the
PLUS
EMP IV E60 and the EMP IV E60
are identical. The difference between the two models
PLUS
can be found in the PCB configuration, which can be upgraded to achieve the "E60
model. (see chapter 8)
Pos.
1
2
3
4
5
6
7
8
9
10
5.2
5.2.1
Fig. 5.3
Pos.
1
2
3
4
5
6
7
8
9
10
11
417101799_EMP_IV_E60.docx
- 71 -
Description
Electrical motor connection
Motor
Oil filler opening with
overpressure cap
Control knob for setting the
stroke length
Oil-level gauge glass
Pump head
Pressure valve
Suction valve
Waste oil screw
Connection for diaphragm
sensor / diaphragm
breakage drain
Flow direction of the
metering medium
Description
Fault-LED
Graphical display
Menu/Exit, up arrow key
Menu/Exit, down arrow key
Start/Stop key (Enter function)
Test key
Cable entry point
for any desired connection
On-Off switch
Cable entry point for Level alarm output
Cable entry point for Pulse / current input,
metering disable system
Input for low-level advance warning and empty
report (see 7.2.4.1 & 14.5.1)
Rev. 9-06.11
Mounting
WARNING
6.1
In accordance with DIN EN 809 5.2.1.4, we inform you that the pump can lose its stableness
and fall in every direction as a result of an inclination angle of 10 or more degrees, if it is
not tightly screwed to the ground (e. g. during transport, mounting or demounting).
Hence, as long as the pump is not tightly screwed to the ground, appropriate safety
measures have to be taken for preventing the pump from overturning.
Mounting diagram
Fig. 6.1
Pos
1
2
3
4
NOTE
Description
Overflow valve
Pressure control valve
Replacement method:
Multifunction valve
Suction pipe /
bottom admission valve
The metering valve, pressure control valve and pressure relief valve can be replaced by a
multifunction valve (MFV) from our product range, which combines all of these
functionalities.
417101799_EMP_IV_E60.docx
- 72 -
Rev. 9-06.11
Device installation
7.1
Hydraulic installation
7.1.1
Installation examples
WARNING
The installation must only be performed by authorized personnel and the general
guidelines and local installation regulations must be observed!
Specific measures and protection devices for the metering of dangerous or aggressive
chemicals are not provided here.
When using such chemicals, always observe the legal regulations and the relevant
product datasheet.
The installation examples and applications provided here are of a functional nature. They
give an overview of installation types which are correct or to be avoided for the correct
functioning of the pump.
NOTE
NOTE
Fig. 7.1
WARNING
WARNING
NOTE
The overflow line never be fed back into the suction line of the metering pump.
In place of a pressure valve and an overflow valve also a multifunction valve (MFV) from our
delivery program can be used.
D) A spring-loaded injection or metering valve (1) should be installed at the injection point
(including with supplying metered amounts into depressurised systems).
Fig. 7.2
For outgassing media and products with a viscosity of > 100
mPas, flooded suction is recommended.
In using this method, however, ensure that the injection point is
positioned over the discharge container and/or an appropriate
pressure control valve is installed.
These measures prevent the discharge container from being
siphoned empty.
Pos.
1
2
3
Description
Injection valve / metering valve
Pressure control valve
Overflow valve
417101799_EMP_IV_E60.docx
- 73 -
Rev. 9-06.11
NOTE
Fig. 7.3
To prevent the running out of the metering medium when the pump is
stopped, we also recommend the fitting of a solenoid valve which is
approved for use with the pump.
Pos.
1
2
3
4
Description
Injection valve / metering valve
External release
Solenoid valve
Pressure control valve
Figb. 7.4
Fig. 7.5
Description
Overflow valve
Injection valve / metering valve
Pressure control valve
Fig. 7.6
When using long metering lines or in the case of an inflexible pipe work, a
pulsation attenuator (1) should be installed in the pressure line (directly
behind the pressure valve of the metering pump) in order to avoid pressure
strokes.
Fig. 7.7
The suction pipes must be kept as short as possible. Long and twisted
suction pipes may lead to air buildup in the system. The max. suction
height is 2 m and the max. flow velocity is 0.3 m/s!
(see also chapter 14.3 Technical Specifications)
Fig. 7.8
Always lay the suction pipe so that it ascends to the suction valve of
the metering pump.
Fig. 7.9
For system designs with a suction tube length of more than about 3 m
and/or that must reach a suction height of > 2 m, an appropriate lifting
vessel must be installed to support the suction process. The lifting
vessel must be positioned above the pump.
Pos.
Description
1
2
Lifting vessel
Solenoid valve
417101799_EMP_IV_E60.docx
- 74 -
Rev. 9-06.11
Fig. 7.10
7.1.2
CAUTION
NOTE
When connecting the suction and pressure pipes, ensure that the O-rings are fixed to the
connectors so as to achieve the required seal.
The use of an appropriate suction pipe from our product range is recommended.
Pos.
1
2
3
4
5
Description
Hose
Hose clamp
Union nut
Hose nipple with insertion part (welded)
O-ring
7.1.2.2 Suction and metering line connection with insertion part in case of permanent tubing
NOTE
Fig. 7.12
If the metering line is laid in an inflexible manner, a pulsation attenuator has to be installed
in order to avoid pressure strokes
Pos.
1
2
3
4
417101799_EMP_IV_E60.docx
Description
Tube
Union nut
Insertion part
O-ring
- 75 -
Rev. 9-06.11
NOTE
Fig 7.13
Pos.
1
2
3
4
5
Description
Hose
Union nut
Clamping piece
Tapered part
O-ring
7.2
Electrical connection
7.2.1
Power supply
Fig 7.14
WARNING
NOTE
Description
Powerline
Main to pump housing
Connection start-up electronics*
(in terminal box cover)
The mains voltage has to correspond with the value indicated on the nameplate.
The metering pump is provided with an installed thermic winding protector, which stops
the motor when overheated.
417101799_EMP_IV_E60.docx
- 76 -
Rev. 9-06.11
7.2.2
Pos.
1
2
3
4
5
6
7
8
9
10
11
Description
Switch (without function!)
Connection terminals (X2)
Connection terminals (X1)
Suction pipe connection
Cover cap
Front panel
Connection for "On/Off" switch
Connection terminals (X3)
PCB
Selector switch for empty signal contact
(normaly open/normaly closed) of empty or fault
report relay.
Installed Dongle-Plate E60
After the lower part of the front has been removed (pos. 6), the terminal box becomes
accessible for drive and output signals. The PCB (pos. 9) may be slightly pulled out from the
pump housing together with the connection terminals (pos. 2, 3, 7 & 8). The terminals can
be detached.
The plug (pos. 4) at the front, which is already connected to the internal terminal, is used for
the connection of a suction pipe. If no suction pipe is used, the cover cap (pos. 5) enclosed
with delivery has to be attached together with the integrated bridges.
Use the selector switch (pos. 10) to change the function of the error or empty signal relay
contact from normally closed contact to normally open contact (see imprint on PCB).
417101799_EMP_IV_E60.docx
- 77 -
Rev. 9-06.11
7.2.3
7.2.4
Pos.
X1
X2
X3
X4
S1
Description
Terminal X1
Terminal X2
Terminal X3
Terminal X4
Switch S1
see chapter
7.2.4
7.2.5
7.2.6
7.2.7
7.2.8
Conductor
coloring
brown
Fig. 7.17
Assignment
Input low-level advance warning
blue
black
417101799_EMP_IV_E60.docx
(cable
connection)
10
11
12
- 78 -
Rev. 9-06.11
PIN
Conductor
terminal
assignment
coloring Assignment
configuof connector
(cable
ration X1
plug
connection)
1
brown
2
3
3
4
blue
black
7.2.4.1.1 Installing the suction pipe with low-level advance warning and empty report
NOTE
Slot I must always be assigned, either through the mounted strapping plug (protective cap
with corresponding symbol; see Chapter 5.2.1, Fig.5.3, Pos. 11) or through connection to
the empty report device.
Fig. 7.19
PIN
1
4
Assignment
Relay input low-level advance warning
GND ()
PIN
3
4
417101799_EMP_IV_E60.docx
- 79 -
Assignment
Relay input empty report
GND ()
Rev. 9-06.11
6+7=
Terminal Assignment
6
Relay input pulse
GND ()
7
5 + 6 + 7 = Pulse input with electronic switch (NPN)
Terminal Assignment
5
6
7
5 V, DC
Relay input pulse
GND ()
Terminal Assignment
9
10
0/420 mA +
0/420 mA -
NOTE
The metering disable system must have been activated in the menu (see section 10.3.7)
and is available in all modes of operation.
Fig. 7.22
8+7
Terminal Assignment
8
Relay input metering lock
GND ()
7
5 + 8 + 7 = Input metering lock with electronic
switch (NPN)
Terminal Assignment
5
8
7
417101799_EMP_IV_E60.docx
- 80 -
5 V, DC
Relay input metering lock
GND ()
Rev. 9-06.11
4+7=
Terminal
4
7
Assignment
Relay input batch function
GND ()
Terminal
5
4
7
Assignment
5 V, DC
Relay input batch function
GND ()
Terminal Assignment
11
12
7.2.5
Fig. 7.25
Term.
Cond.
color.
(cable
connec.)
brown
13
14
white
blue
15
16
black
Anode
(for sensors
with anode
terminal)
Output 5V DC
Input,
diaphragm
burst detector
GND
17
not assigned
18
not assigned
19
Output 5V DC
Input for
metering
monitoring
GND
Dongle
transmission
cable
Dongle
reception
cable
Not assigned
20
21
22
23
24
417101799_EMP_IV_E60.docx
Assignment
- 81 -
Connection
diaphragm
burst
detector
(optional)
Connection for
Dongle-Plate
PLUS
Metering
E60
monitoring (see also
chapter: 8.1
fig. 7.26
Rev. 9-06.11
Terminal Conductor
coloring
Assignment
(cable
connection)
13
14
15
16
brown
white
blue
black
NOTE
Fig. 7.28
20 + 21 =
Input metering
monitoring with potential-free
contact
Terminal Assignment
20
21
19 + 20 + 21 = Input metering
monitoring function with electronic
switch
Terminal Assignment
19
20
21
7.2.6
Output 5V DC
Relay input metering
monitoring
GND ()
Terminal
Description
1
Out put low-level advance warning, empty report, fault report
2
1+2 =
417101799_EMP_IV_E60.docx
- 82 -
Rev. 9-06.11
7.2.7
Terminal Description
1
2
7.2.8
Fig. 7.32
If Alarm
Power Off
Closing function:
(Default setting)
contact open
contact closed
contact open
Opening function:
contact closed
contact open
contact closed
Switch setting S1
If Alarm
Power Off
Closing function:
(Default setting)
contact closed
contact open
contact open *
Opening function:
contact open
contact closed
contact closed
Switch setting S1
417101799_EMP_IV_E60.docx
- 83 -
Rev. 9-06.11
8.1
Pos
Description
X2
1
Terminal X2
Dongle-plate
8.1.2
Conductor
coloring Description
(cable
connection)
25
26
brown
white
Output 5 V
Bus line
27
black
Pulse input
28
blue
GND
29
30
Fig 8.2
PLUS
Connection OGM
NOTE
The oval gear meter function must be activated in menu first. If a OGM
function oval gear meter is activated automatically.
(see chapter 10.3.11).
Abb. 8.3
Plus
is attached, the
25 + 26 + 27 + 28 Anschluss OGM
PLUS
Terminal Assignment
25
26
27
28
417101799_EMP_IV_E60.docx
- 84 -
Output 5 V DC
Bus line
Relay input pulse
GND ()
Rev. 9-06.11
Startup
NOTE
9.1
Fig. 9.2
9.2
With an applied metering backpressure of > 0.5 bar, the use of a multifunction valve from
our product range is recommended.
Otherwise the fitted ball cock (for recommendation, see chapter 7.1.1, Fig. 7.1) must be
opened or the metering output must be released elsewhere.
WARNING
NOTE
To ensure an optimal suction performance, the stroke length should be set to 100% and the
maximum stroke frequency.
In the event that pump has no suction or insufficient suction, the correct connection must
be checked.
WARNING
It is only possible to modify the stroke length setting when the pump is running.
When using a multifunction valve (see accessory range) for the venting, use the appropriate
operating instructions.
When using a ball cock (or another venting device), place a suitable collection vessel below the
venting pipe.
Open the ball cock.
Press the TEST key until the metering medium escapes from the venting outlet.
Hold down the Test key for a further 60 seconds to fill the pump head fully with the product.
Close the ball cock (if available/used).
Press the TEST Key again until the metering medium is visible through the metering pipe, until it
reaches approximately 2 cm in front of the injector valve.
Close the clear cover which protects the function keys, and seal it if necessary.
NOTE
9.3
Description
Abb. 9.3
Abb. 9.5
Abb. 9.6
417101799_EMP_IV_E60.docx
- 85 -
Rev. 9-06.11
9.4
Description
Pumps operation mode: the top right indicator in the display
makes a full rotation with each
stroke.
Level report is active (flashing display = low level advance warning, display is permanently
visible = empty report), see 7.2.4.1.1 Installing the suction pipe with low-level ad advance
warning and empty report or 10.3.8 Configuration / Low-level contact
Metering lock active, see 7.2.4.4 Installing the control via the metering lock or 10.3.7
Configuration / Metering lock
Fault report, see 12.2 Alarm messages
Intern
MUL
DIV
x..xx mA
Charge
xxx /min
xx %
x.xx l/h
n= x
xx.x mA
f = xx.x %
OFF
E60+
E60++
Alarm
9.5
Plus
Dongle box is connected, see 8 Upgrading to Version Chem-Ad Serie B E60
PLUS
Dongle box and OGM
are connected, see 8.1.2 Installing the oval gear meter or 10.3.11
Configuration / Oval gear meter
Alarm operation mode, see 12.2 Alarm messages
WARNING
NOTE
To change the preconfigured factory settings, observe the corresponding menu items in
Chapter 10.3 "Configuration".
417101799_EMP_IV_E60.docx
- 86 -
Rev. 9-06.11
9.5.1
9.5.2
NOTE
9.5.3
Operating mode:
internal
Metering frequency / - quantity: strokes/min
(122 strokes/min at 50 Hz,
146 strokes/min at 60 Hz)
Operating state:
OFF (in V 3.6, Standby in V 3.5
(to start the pump
press START / STOP key)
With each stroke of the pump, the indicator in the upper right of the display
1 turn.
rotates
Configuration
The following factory settings are defined in the configuration.
Fig. 9.11
417101799_EMP_IV_E60.docx
Configuration of
language:
unit:
code:
auto start:
metering lock:
low level contact:
alarm output:
pulse memory:
oval gear meter:
metering controler:
meter monitor:
batch:
- 87 -
Standard
German
liter
not active (-)
not active (-)
not active (-)
open ()
off ()
not active (-)
not active (-)
not active (-)
not active (-)
not active (-)
see Chapter
10.3.3
10.3.4
10.3.5
10.3.6
10.3.7
10.3.8
10.3.9
10.3.10
10.3.11
10.3.12
10.3.13
10.3.14
Rev. 9-06.11
10
Menu description
10.1
Main menu
The main menu can be accessed while the pump is operating.
It is started by simultaneously pressing the and keys.
Simultaneously press the and keys again to return to the operating display.
10.1.1
Overview
Fig. 10.1
417101799_EMP_IV_E60.docx
Operation mode
Configuration
Calibration
Operating data
- 88 -
Rev. 9-06.11
10.2
Operation mode
10.2.1
Selecting
Fig. 10.2
Adjustments
internal
pulse
current
10.2.2
see chapter:
10.2.2
10.2.3
10.2.4
10.2.2.1 Selecting
Fig. 10.3
417101799_EMP_IV_E60.docx
- 89 -
Rev. 9-06.11
NOTE
If the newly set value is not confirmed within 10 seconds by pressing the START/STOP
key, the system reverts to the primarily value.
Strokes/min
Fig. 10.4
Percent (%)
Fig. 10.5
Liter/min
Gallons/day
Fig. 10.6
10.2.3
Fig. 10.7
417101799_EMP_IV_E60.docx
- 90 -
Rev. 9-06.11
10.2.3.1 Selecting
Fig. 10.8
NOTE
Division
Fig. 10.10
417101799_EMP_IV_E60.docx
- 91 -
Rev. 9-06.11
10.2.4
10.2.4.1 Selecting
Fig. 10.11
417101799_EMP_IV_E60.docx
- 92 -
Rev. 9-06.11
NOTE
The difference in the set values must be greater than or equal to 5. (e.g. min 10 max 15).
Fig. 10.12
Pos
1
Fig. 10.13
10.3
Configuration
10.3.1
Overview
Description
Range of input signal, preset in the menu
Stroke frequency in %
Fig. 10.14
Configuration of:
Menu language
Units
Code entry
Startup settings
Metering lock
Low-level contact
Alarm output
Pulse memory
Oval gear meter
Metering controller
Metering monitoring
Batch
10.3.2
see chapter:
10.3.3
10.3.4
10.3.5
10.3.6
10.3.7
10.3.8
10.3.9
10.3.10
10.3.11
10.3.12
10.3.13
10.3.14
417101799_EMP_IV_E60.docx
The display possesses a "scroll function", i.e. some menu items are only
shown on the display when the end of the menu is reached on the
display. Using the symbols (1) or (2) on the display, you can see
which direction you can scroll in.
1 = ()scroll the display upwards
2 = ()scroll the display downwards
- 93 -
Rev. 9-06.11
10.3.3
Configuration / Language
This is used to select the menu language.
10.3.3.1 Selecting
Fig. 10.16
10.3.4
Configuration / Unit
If litre is selected for the internal operation mode (see chapter 10.2.2) , this can be used to
change the display from litres/h to gallons/day (1 gallon = 3,785 litres).
10.3.4.1 Selecting
Fig. 10.17
10.3.5
Configuration / Code
With this setting, a four-digit number combination can be assigned to secure the setting
against unauthorized adjustment.
If code has been activated, the four-digit code must be entered before configured values
can be amended or the main menu can be accessed.
417101799_EMP_IV_E60.docx
- 94 -
Rev. 9-06.11
10.3.5.1 Selecting
Fig. 10.18
10.3.5.2 Setting
Fig. 10.19
10.3.6
Configuration / Autostart
This function determines whether the pump is set to OFF (Standby in V 3.5) when the
mains connection is re-established following a power cut or if the pump should immediately
recommence functioning in the configured operation mode.
10.3.6.1 Selecting
Fig. 10.20
10.3.7
417101799_EMP_IV_E60.docx
- 95 -
Rev. 9-06.11
10.3.7.1 Selecting
Fig. 10.21
10.3.8
10.3.8.1 Selecting
Fig. 10.22
= contact open:
level not OK (empty)
contact closed:
level OK (full)
(Default setting)
= contact closed:
level not OK (empty)
contact open:
level OK (full)
10.3.9
10.3.9.1 Selecting
Fig. 10.23
417101799_EMP_IV_E60.docx
- 96 -
Rev. 9-06.11
WARNING
The stored pulses are processed once no further external pulses are received. This means
that the pump continues to function even though there is no external running condition.
In the worst case, this can lead to metering taking place into a closed system and resulting
in impermissibly high pressure in the system.
This must be prevented through appropriate safety measures.
The memory content is erased by activating the metering lock or switching off the pump.
10.3.10.1 Selecting
Fig. 10.24
Meaning
Fig. 10.25
Pulse multiplication
(Example: 10 external
pulses become 20 strokes)
Fig. 10.26
Pos
1
Description
Pulse memory active
Set factor
Pulse division
(Example: 10 external
pulses become 20 strokes)
10.3.11 Configuration / Oval gear meter (only E60PLUS & OGM or OGM PLUS)
The oval gear meter function makes it possible to record a real value in the operating
data/litre menu item (see chapter 10.5.3).
NOTE
The oval gear meter can only be activated if the pump is upgraded with a dongle plate to
PLUS
the E60
and a standard oval gear meter (see Accessories) is connected.
To activate the Dongle-Plate in connection with the oval gear meter, the power supply has
to be switched off and on again! (Unplug power plug or switch the pump off and back on
again!)
PLUS
The oval gear meter function is automatically activated when an OGM
is connected.
417101799_EMP_IV_E60.docx
- 97 -
Rev. 9-06.11
10.3.11.1 Selecting
Fig. 10.27
If an OGM Plus is connected, when the metering controller function is activated, the dosage
quantity measured by the OGM is compared with a pre-defined dosage quantity target
value. If there is a discrepancy between the values, the metering frequency of the pump is
automatically increased or decreased.
Since metering frequency can only be adjusted within the performance limitations of the
pump, setting the dosage quantities higher than 80 or 90% of the maximum possible
metering frequency is not recommended. This will ensure that the metering controller retains
sufficient reserves to react to negative control deviations.
The metering controller function can only be used in the 'internal' and 'current' operating
modes. If the operating mode 'pulse' is selected, the metering controller function will not
work.
NOTE
The metering controller function can only be activated if the pump is upgraded with a
PLUS
PLUS
dongle plate to the E60
and oval gear meter , type OGM
(see Accessories) is
connected.
To activate the dongle plate in connection with the oval gear meter, the power supply has
to be switched off and on again!
10.3.12.1 Selecting
Fig. 10.29
417101799_EMP_IV_E60.docx
- 98 -
Rev. 9-06.11
Fig. 10.30
Fig. 10.31
- = No metering divergence
The pump delivers exactly the preset flow (here 100/min for
example).
No correction is necessary.
= Upward metering divergence
The pump is currently delivering more than the preset stroke
frequency (here 100/min for example) requires.
Metering frequency is reduced automatically until the actual
value matches the target value.
Fig. 10.32
Fig. 10.33
NOTE
NOTE
10.3.13.1 Selecting
Fig. 10.34
417101799_EMP_IV_E60.docx
- 99 -
Rev. 9-06.11
Default setting = 10
NOTE
This function can only be selected if a dongle plate is connected and configuration/oval gear
meter (see chapter 10.3.11) has been activated.
Fig. 10.37
417101799_EMP_IV_E60.docx
- 100 -
Rev. 9-06.11
NOTE
The pump must be calibrated before using batch metering (see chapter 10.4).
When activating batch mode with a signal to the metering lock/pulse input (plug II), a
previously defined quantity is metered with 100 % stroke frequency.
The batch metering can be interrupted by deactivating the release (metering lock) or
switching off the pump.
10.3.14.1 Selecting
Fig. 10.39
Batch is inactive
(Default setting)
Batch is active
417101799_EMP_IV_E60.docx
- 101 -
Rev. 9-06.11
417101799_EMP_IV_E60.docx
Pos
1
Description
Operation mode
- 102 -
Rev. 9-06.11
10.4
Calibration
10.4.1
Overview
The procedure and display during the calibration process differ depending on whether or not
an oval gear meter is connected.
Fig. 10.42
Calibration pump:
see chapter
10.4.2
Calibration pump with
oval gear meter:
10.4.3
see chapter
10.4.2
Calibration pump
10.4.2.1 Preparation
Fig. 10.43
NOTE
to
NOTE
to
After the running process, the amount removed from the measuring cylinder
(see chapter 10.4.2.1 Preparation) must be read off.
This quantity is then entered as the calibration value (in ml or l).
417101799_EMP_IV_E60.docx
- 103 -
Rev. 9-06.11
10.4.3
10.4.3.1 Preparation
Fig. 10.45
NOTE
to
NOTE
to
After the running process, the amount removed from the measuring cylinder
(see chapter 10.4.3.1 Preparation) must be read off.
This quantity is then entered as the calibration value (in ml or l).
Fig. 10.47
417101799_EMP_IV_E60.docx
- 104 -
Rev. 9-06.11
10.4.4
Calibration / Manual
If the calibration value to be entered is known, a dry calibration (immediate entry of the
value without a previous calibration process) can be conducted.
However, this method is not very accurate as no consideration is given to the on-site
conditions (back-pressure, viscosity, cable cross-chapters and lengths etc).
Fig. 10.48
NOTE
Pumpe
EMP IV
Fig. 10.49
10.5
140 (168)
2,33 (2,80)
210 (252)
3,50 (4,20)
450 (540)
7,50 (9,00)
630 (756)
10,5 (12,6)
750 (900)
12,5 (15,0)
Operating data
The following operating data is recorded and displayed under this menu item:
Operating hours
Liter
Amount of plulses
417101799_EMP_IV_E60.docx
- 105 -
Rev. 9-06.11
10.5.1
Overview
Fig. 10.50
10.5.2
see chapter
10.5.2
see chapter
10.5.3
see chapter
10.5.4
10.5.3
417101799_EMP_IV_E60.docx
- 106 -
Rev. 9-06.11
10.5.4
417101799_EMP_IV_E60.docx
- 107 -
Rev. 9-06.11
11
Maintenance
CAUTION
NOTE
NOTE
Fig. 11.1
11.1
11.1.1
Fig. 11.3
SUCTION-/PRESSURE
VALVE
1 O-Ring, 28 x 3,5
2 Suction-/Pressure valve
SUCTION-/PRESSURE
VALVE
1 O-Ring, 40,87 x 3,53
2 Suction-/Pressure valve
417101799_EMP_IV_E60.docx
- 108 -
Rev. 9-06.11
11.2
Pos.
1
2
3
4
5
6
NOTE
Description
Metering head screws
Pressing plate
Metering head
Delivery diaphragm
Intermediate ring
Protective diaphragm
If you plan to reuse valves, they should be initially dismantled as described in Chapter
11.1.
Before replacing the diaphragm, set stroke length adjustment to less than 50 %!
NOTE
WARNING
417101799_EMP_IV_E60.docx
- 109 -
Rev. 9-06.11
11.3
The safety regulations of the German Water Resources Law (WHG), as well as all
instructions given in the product specification sheet of the gear oil have to be observed.
Wear appropriate protective clothing.
Before changing the oil, the pump has to be put into operation in order to achieve a
minimum temperature of approx. 30C.
Fig. 11.5
11.3.1
1
2
3
Description
Gear vent screw
Oil-level gauge glass
Locking nut
11.3.2
Pos.
NOTE
11.4
Only use gear oil of type L-CKT 320 that meets the ISO 6743 requirements.
Dispose correctly of waste oil!
Motor replacement
WARNING
Before replacing the motor the plug has to be disconnected from the mains. The device
has to be prevented from reclosing.
Fig. 11.6
Pos.
1
2
3
4
5
417101799_EMP_IV_E60.docx
Description
Motor
Terminal box cover
Cable connections
Motor attaching screws
water drip groove
- 110 -
Rev. 9-06.11
11.4.1
Disassembly
11.4.2
Installation
Clean splined shaft and housing flange, and moisten motor and splined shaft with
Teflon fat.
Place motor shaft right onto splined shaft and pull softly until flange is reached. Do not
set motor on its edges.
Turn the motor in a way that the terminal box points straight forward into the direction of
the stroke adjustment knob.
Place attachment screws (pos. 4) and tighten them crosswise (tightening torque 12 Nm).
Mains connection cable and (if necessary) connection cable to the pump housing may
then be reconnected
Re-establish mains voltage supply.
CAUTION
417101799_EMP_IV_E60.docx
- 111 -
Rev. 9-06.11
12
Operating faults
12.1
Meaning
Effect
Cause
Remedy
Fig. 12.1
reserve report
(flashing)
pump continues
running
low-level advance
warning active
empty report
pump is stopped
pump is stopped
+ fault-LED
Fig. 12.2
+ fault-LED
Fig. 12.3
metering lock
(only possible if this
is configured)
Indicator in
operation mode
pump is stopped
4..20 mA flashes
standard signal
monitoring responds
pump runs in
standard signal is
continuous
above 23.0 mA
operation
Fig. 12.4
+ fault-LED
Fig. 12.5
--.-
12.2
Meaning
Effect
Cause
Remedy
Motor is running
out of control
over dosage
replace PC-Board
no metering
Fig. 12.6
alarm
failure 1
permanent stroke
Fig 12.7
alarm
failure 2
no stroke
Fig. 12.8
alarm
failure 3
motor control
Fig. 12.9
alarm
failure 4
oval gear meter
Abb. 12.10
Motor is not
running despite
of rotating
dosing symbol.
motor in
continuous
operation
without request
error in
evaluating the
metering
monitoring or
oval gear meter
Diaphragm burst
sensor has
detected a
leckage
417101799_EMP_IV_E60.docx
- 112 -
PC-board fault
Plug connection from
gear to PC-Board
interrupted
tube fault
diaphragm fault
Diaphragm wrenched
Change diaphragm
Rev. 9-06.11
12.2.1
Trouble shooting
Fault
Possible cause
Remedy
CAUTION
Prior to repair and maintenance work and metering of dangerous media, always rinse the
metering head, relieve the pressure pipe and wear protective clothing (protective goggles,
gloves and apron).
Electronics repairs must only be performed by trained electricians, following the safety
regulations of the professional association VB G 4 and ZH 1/11)!
CAUTION
When opening the covers or removing parts, except when this is possible without tools,
voltage-carrying parts may be exposed. Connection points may also be under live
voltages.
417101799_EMP_IV_E60.docx
- 113 -
Rev. 9-06.11
13
Fig. 13.1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Description
01400
Suction-/pressure
valvel
Pos
417101799_EMP_IV_E60.docx
- 114 -
02100
249075
-249055
type
04500
06300
07500
-249503
249504
249074
249505
249041
413031066
-34950144
34950135
34950137
34950101
34950150
34950184
34950163
34950177
34950147
249506
-413031067
34950160
34950145
34950134
34950136
34950138
34950139
34950153
34950105
34950149
34950151
--34950164
34950165
--413031055
34950152
34950146
34950148
34950124
417002063
415204603
413119274
34950123
417002137
415204601
413071033
34950125
418461544
249690
418244171
418244180
34950119
417401005
413119236
34950131
418441042
34950209
248186
418441010
34950120
418441041
418244179
418441009
Rev. 9-06.11
13.1.1
Pos
5
Description
Delivery diaphragm
13.1.2
01400
02100
34950261
04500
06300
--
07500
Article no.
250160
250161
250162
250163
250164
250165
250166
250167
250168
250169
250170
250171
417101799_EMP_IV_E60.docx
Article no.
On request
On request
- 115 -
Rev. 9-06.11
14
Technical Specifications
14.1
Pump key
1. Electrical version
...
E 60 = (for explanation, see Chapter 14.1.1)
...
2. Pump output 50 Hz
01400 = 140 l/h
02100 = 210 l/h
04500 = 450 l/h
06300 = 630 l/h
07500 = 750 l/h
special version: high pressure
01400 = 12 bar = 135 l/h
02100 = 10 bar = 202 l/h
(60 Hz)
(168 l/h)
(252 l/h)
(540 l/h)
(756 l/h)
(900 l/h)
(162 l/h)
(242 l/h)
=
=
=
=
PP
PVDF
V4A (stainlesssteel)
PVC
(standard)
(2,5 bar)
(3,3 bar)
(5 bar)
(6 bar)
(8 bar)
(9,6 bar)
5. Gasket material
FP =
EP =
K
=
Viton B
EPDM
Kalrez
(standard)
6. Ball material
KE =
VA =
PT =
Ceramic
V4A stainless steel
Teflon
(standard)
7. Valve material
PP
PV
VA
VC
=
=
=
=
PP
PVDF
V4A stainless steel
PVC
(standard)
8. Valve spring
01
10
99
=
=
=
99
10. Voltage/frequency
E60
04500 PP
06 FP
KE
PP 99
99
03
01
02
03
04
05
=
=
=
=
=
115V / 50 Hz
115V / 60 Hz
230V / 50 Hz
230V / 60 Hz
3N 230V / 400V
(standard)
417101799_EMP_IV_E60.docx
- 116 -
Rev. 9-06.11
Pump key 2
11. Suction-side connection
11
14
15
18
19
20
99
=
=
=
=
=
=
=
(standard)
=
=
=
=
=
=
=
(standard)
=
=
=
=
PP
PVDF
V4A stainless steel
without connection
(standard)
=
=
(standard)
99
99
99
99
01
standard housing
04500
PP
06
FP
KE
PP
99
99
03
99
(Pump key 1)
417101799_EMP_IV_E60.docx
99
99
99
99
01
(Pump key 2)
- 117 -
Rev. 9-06.11
14.1.1
E60PLUS
417101799_EMP_IV_E60.docx
- 118 -
Rev. 9-06.11
14.2
Dimensions
Fig. 14.1
capacity
type
C1
00140
00210
00450
00630
00750
133,5
133,5
142,5
142,5
142,5
170
170
190
220
220
174
174
194
225
225
Dimensions [mm]
L
H1
14.3
14.3.1
Electrical data
392
392
412
412
412
280
280
303,5
318,5
318,5
H2
216
216
263
293
293
1"
1"
2"
2"
2"
Description
supply voltage
115V 50/60 Hz
230V 50/60 Hz
3PE 400V 50/60 Hz
115V 50/60 Hz
230V 50/60 Hz
3PE 400V 50/60 Hz
motor power
115V 50/60 Hz
230V 50/60 Hz
3PE 400V 50/60 Hz
fuse rating
115 V
230 V
type of protection
breaking capacity at circuit with 24 V
417101799_EMP_IV_E60.docx
- 119 -
5,1 / 7,6 A
2,5 / 3,8 A
1,2 / 1,05 A
16,8 / 25,1 A
8,25 / 12,5 A
4,0 / 3,5 A
0,3 kW
0,3 kW
0,37 kW
12,5 A
6,3 A
IP 55
24 V 3 A AC/DC
24 V 0,3 A DC
230 V / 3 A AC/DC
connection according to VDE is not permitted
Rev. 9-06.11
14.3.2
14.3.3
01400
02100
140
10
210
8
19,4
29,2
Pump type
04500
06300
450
6
630
4
120
DN 20
DN 20
DN 12
DN 12
approx 23,5
62,5
< 3%
200 mPas
5-40C
2
0,5
DN 25
DN 20
app. 25,5
87,5
07500
750
3
144
87,5
DN 30
DN 30
DN 25
DN 25
approx 27,2
Description
pump capacity [l/h]*
max. metering backpressure [bar]
delivery capacity [cm]/stroke
01400
02100
135
12
18,1
202
10
28
*
**
14.3.4
allocation
external circuit
Low-level advance
warning
Empty report
terminal X1
Pin 1 + 3
terminal X1
Pin 2 + 3
terminal X1
Pin 4 + 3
terminal X1
Pin 6 + 7
terminal X1
Pin 8 + 7
voltage-free contact
Note: do not connect any
external voltages!
Batch
Pulse
Metering lock
Standard signal
Metering monitoring
417101799_EMP_IV_E60.docx
terminal X1
Pin 9 + 10
terminal X2
Pin: 13 + 14 +
15 + 16
terminal X2
Pin 20 + 21
external current
Note: Observe the polarity of
the connected signal!
Electronic switch
Power supply 5 V output / Pump
(clamp X2, Pin 15 + 16)
voltage-free contact
Note: do not connect any
external voltages!
- 120 -
declaration of value
Rev. 9-06.11
14.4
Output
Assignment
external circuit
declaration of value
External
power supply
terminal X1
Pin 5 + 3
Stroke signal
terminal X1
Pin 11 + 12
voltage-free contact
Note: do not connect any
external voltages!
external current
Note: Observe the
polarity of the connected
signal!
Empty/reserve/fault report
terminal X3
Pin 1 + 2
External current
Materials
Pump head:
Diaphragm:
Gaskets:
Valve ball:
Valve spring:
Housing:
Colour:
14.5
Connector assignments
14.5.1
Pos.
Conductor coloring
1
3
4
brown
blue
black
(cable connection)
Description
Low-level advance warning
Empty report
GND
WARNING
NOTE
In the event that the empty report is not used, contact 3/4 must always be bridged! The
protective cap provided for this creates the bridge between he contacts and must be
attached in this case.
The empty and reserve report input can be inverted in the "Configuration / Low-level
contact" menu. (see chapter 10.3.8)
417101799_EMP_IV_E60.docx
- 121 -
Rev. 9-06.11
14.6
Metering rates
The reproducible metering accuracy is approx. 3 % at a minimum 30% stroke length under
invariable conditions.
Due to the characteristics of the pump, higher output can be produced until the operating
temperature is reached.
Accurate metering can be achieved by observing the following points:
a) All metering output data refer to measurements with water at 20 C as well as a constant
supply voltage and a warmed-up operating condition of the metering pump.
b) If there is pre-pressure on the suction side, the pressure difference between the suction
and the pressure sides must be at least 1 bar. The water column on the metering pump
must be protected by an appropriate valve arrangement.
A pressure maintaining valve or a metering value is not an absolutely hermetically sealing
shutoff device.
NOTE
WARNING
14.7
Metering stroke adjustment may only be performed with the pump running if the stroke
adjusting screw is enabled.
14.7.1
120
110
100
90
80
70
60
1 bar
2 bar
4 bar
6 bar
8 bar
10 bar
50
40
30
20
10
0
10
20
30
40
50
60
70
80
90
100
417101799_EMP_IV_E60.docx
- 122 -
Rev. 9-06.11
14.7.2
130
120
110
100
90
80
70
60
1 bar
2 bar
4 bar
6 bar
8 bar
10 bar
12 bar
50
40
30
20
10
0
10
20
30
40
50
60
70
80
90
100
70
80
90
100
14.7.3
190
180
170
160
150
140
130
120
110
100
90
80
70
1 bar
2 bar
4 bar
6 bar
8 bar
60
50
40
30
20
10
0
10
20
30
40
50
60
417101799_EMP_IV_E60.docx
- 123 -
Rev. 9-06.11
14.7.4
190
180
170
160
150
140
130
120
110
100
90
80
70
1 bar
2 bar
4 bar
6 bar
8 bar
10 bar
60
50
40
30
20
10
0
10
20
30
40
50
60
70
80
90
100
70
80
90
100
14.7.5
Fig 14.7
520
500
480
460
440
420
400
380
360
340
320
300
280
260
240
220
200
180
160
140
120
100
80
60
40
20
0
1 bar
2 bar
3 bar
4 bar
5 bar
6 bar
10
20
30
40
50
60
417101799_EMP_IV_E60.docx
- 124 -
Rev. 9-06.11
14.7.6
550
500
450
400
350
300
1 bar
2 bar
3 bar
4 bar
250
200
150
100
50
0
10
20
30
40
50
60
70
80
90
100
70
80
90
100
14.7.7
600
550
500
450
400
350
1 bar
2 bar
3 bar
300
250
200
150
100
50
0
10
20
30
40
50
60
417101799_EMP_IV_E60.docx
- 125 -
Rev. 9-06.11
15
Declaration of Conformity
417101799_EMP_IV_E60.docx
- 126 -
Rev. 9-06.11
Sommaire
1
1.1
1.2
2.1
2.2
2.3
2.4
3.1
4.1
4.2
4.3
4.4
5.1
5.2
5.2.1
6.1
7.1
7.1.1
7.1.2
7.2
7.2.1
7.2.2
7.2.3
7.2.4
7.2.5
7.2.6
7.2.7
7.2.8
8.1
8.1.1
8.1.2
9.1
9.2
9.3
9.4
9.5
9.5.1
9.5.2
9.5.3
10
10.1
10.1.1
10.2
10.2.1
10.2.2
10.2.3
10.2.4
10.3
10.3.1
10.3.2
10.3.3
10.3.4
10.3.5
10.3.6
10.3.7
10.3.8
PLUS
.................................................................. 131
PLUS
PLUS
PLUS
417101799_EMP_IV_E60.docx
- 127 -
................................................. 146
Rev. 9-06.11
10.3.9
10.3.10
10.3.11
10.3.12
10.3.13
10.3.14
10.4
10.4.1
10.4.2
10.4.3
10.4.4
10.5
10.5.1
10.5.2
10.5.3
10.5.4
11
11.1
11.2
11.3
11.3.1
11.3.2
11.4
11.4.1
11.4.2
12
12.1
12.2
12.2.1
Messages davertissement et de dfaut mis pendant les oprations de service (afficheur) ....................... 174
Messages de dfaut (afficheur et LED de dfaut)......................................................................................... 174
Recherche des dfauts ................................................................................................................................. 175
13
13.1.1
13.1.2
14
14.1
14.1.1
14.2
14.3
14.3.1
14.3.2
14.3.3
14.3.4
14.4
14.5
14.5.1
14.6
14.7
14.7.1
14.7.2
14.7.3
14.7.4
14.7.5
14.7.6
14.7.7
15
417101799_EMP_IV_E60.docx
- 128 -
Rev. 9-06.11
Gnralits
Ce manuel technique contient toutes les instructions concernant linstallation et la mise en
service ainsi que les travaux de maintenance et de rparation sur la pompe doseuse
membrane de la srie ELADOS EMP IV E60 et ELADOS EMP IV E60PLUS avec la version
du logiciel 3.5 ou 3.6.
IMPORTANT
REMARQUE
Il est impratif dobserver dans tous les cas les avis de scurit et les remarques mises
en vidence !
1.1
Etendue de la garantie
Le fabricant reconnatra un cas de garantie comme tel, en ce qui concerne la scurit de
service, la fiabilit et la performance de ces appareils, uniquement dans les conditions
suivantes :
le montage, le raccordement, le rglage, la maintenance et les rparations sont excuts
par un personnel spcialis, form et agr,
la pompe doseuse membrane est utilise conformment aux instructions figurant dans
le mode demploi appartenant la livraison,
seules des pices dtaches originales sont utilises lors des rparations,
louverture du carter de pompe entrane lannulation de toute revendication de garantie.
Par ailleurs, seront valables les conditions gnrales de garantie et de prestations de
la socit ECOLAB Engineering GmbH.
1.2
417101799_EMP_IV_E60.docx
- 129 -
Rev. 9-06.11
Scurit
2.1
Instructions de scurit
Les travaux de raccordement et de rparation sur la pompe doseuse membrane doivent
tre excuts uniquement par un personnel spcialis et agr.
Dbrancher absolument la fiche secteur avant deffectuer des travaux sur les pices
lectriques.
Il faut porter des vtements de protection appropris pendant les travaux de maintenance
et de rparation.
Il est impratif de toujours observer les consignes de scurit concernant la manipulation
des produits chimiques.
2.2
PRECAUTION
2.3
ATTENTION
IMPORTANT
Ce pictogramme IMPORTANT est utilis sil faut prter une attention particulire
lors de la manipulation de lappareil.
REMARQUE
Ce pictogramme REMARQUE est utilis sil faut prter attention une particularit.
Enumrations
Les numrations mises en vidence par ce symbole () dcrivent une activit qui doit
tre ralise par le monteur ou par lutilisateur.
2.4
PRECAUTION
IMPORTANT
417101799_EMP_IV_E60.docx
- 130 -
Rev. 9-06.11
Contenu de la livraison
La livraison comprend les lments suivants :
Fig. 3.1
Fig. 3.2
CD Notice technique
(art. n 417101793)
REMARQUE
3.1
417101799_EMP_IV_E60.docx
- 131 -
Rev. 9-06.11
Description du fonctionnement
4.1
Fonctions mcaniques
Les pompes doseuses ELADOS EMP IV E60 et E60PLUS sont des pompes doseuses de
refoulement membrane qui fonctionnent par lectromoteur.
Lapompe doseuse convient lutilisation de substances doses propres et non abrasives
dont la viscosit ne dpasse pas 100 mPas (mthode de mesure : Brookfield).
Une transmission vis excentrique (pos. 4) dplace la membrane (pos. 2) et convoie alors
la matire de dosage par lintermdiaire de la soupape de pression (pos. 1). La soupape
daspiration est ferme.
La membrane est remise en position via un ressort de rappel (pos. 3).
Fig. 4.1
ATTENTION
4.2
Dsignation
Soupape de pression
Membrane de convoyage
Ressort de rappel
Transmission vis excentrique
Dispositif de rglage de course
Soupape daspiration
Il est vivement recommand dutiliser une lance daspiration munie dun dispositif de
signalisation de ltat vide et dun collecteur de salets appartenant notre programme
daccessoires afin de protger linstallation de dosage !
Le dispositif de signalisation de ltat vide met la pompe hors service ds que le niveau
natteint plus une certaine valeur (dans le rservoir).
Fonctions lectroniques
La pompe est manie au moyen de quatre touches (fig. 5.3, Pos 3, 4, 5 et 6)
(voir au chapitre 9.3 Fonctions des touches ).
Laffichage de service est reprsent via un afficheur graphique (fig. 5.3, Pos 2).
4.3
4.4
Modes de service
La pompe peut tre utilise dans trois modes de service :
INTERNE
fonction de dosage manuelle (rglage dusine)
EXTERNE
commande dimpulsion
EXTERNE
commande de signal normalis (mA)
Il est en outre possible, dans la rubrique Configuration, de programmer un dosage par
charges (pour chaque impulsion de dmarrage, une quantit dtermine est dose).
417101799_EMP_IV_E60.docx
- 132 -
Rev. 9-06.11
Structure
REMARQUE
5.1
La structure extrieure ainsi que les affichages, les lments de commande et les prises
PLUS
de connexion sur lEMP IV E60 et lEMP IV E60
sont identiques. La diffrence se
trouve dans la configuration de la carte mre qui peut tre quipe sur la version
PLUS
E60
(voir au chapitre 8)
Fig. 5.1
Fig. 5.2
Pos.
1
2
3
4
5
6
7
8
9
10
Dsignation
Raccord du moteur lectrique
Moteur
Ouverture de remplissage
dhuile avec clapet de
surpression
Bouton tournant pour le
rglage de la longueur de
course
Verre indicateur de niveau
dhuile de niveau dhuile
Tte de pompe
Soupape de pression
Soupape daspiration
Vis dvacuation dhuile
Raccord du capteur de rupture
de membrane / de lopration
de rupture de membrane
Direction dcoulement de la
matire de dosages
5.2
5.2.1
Pos.
1
2
3
4
5
6
7
8
9
10
11
417101799_EMP_IV_E60.docx
- 133 -
Dsignation
LED de dfaut
Afficheur graphique
Menu/Exit, touche flche vers le haut
Menu/Exit, touche flche vers le bas
Touche Start/Stop (marche/arrt)
(fonction Enter)
Touche de test
Traverses de cbles pour une utilisation
quelconque
Commutateur de marche/arrt
Traverse de cble pour la sortie de la
signalisation du niveau et du message de
dfaut
Traverse de cbles pour lentre du
signal dimpulsion et du courant, et pour
le blocage du dosage
Entre pour le pr-avertissement de
niveau, et signalisation de ltat vide
(voir aux paragraphes 7.2.4.1 et 14.5.1)
Rev. 9-06.11
Montage
- La pompe doseuse doit tre monte un endroit bien accessible et tre protge du gel.
- La temprature ambiante ne doit pas dpasser +40 C.
- Lappareil doit tre mont lhorizontale.
- La pompe doit tre fixe au niveau des perages prvus cet effet sur la console ou sur
le rservoir respectivement (pour lentraxe des perages, voir chapitre 14.2 Dimensions).
ATTENTION
6.1
Conformment la norme DIN EN 809 5.2.1.4, si la pompe nest pas visse au support (par
ex., en cas de transport, de montage ou de dmontage), elle peut perdre sa stabilit une
inclinaison de 10 ou plus et glisser dans une direction quelconque.
Il convient par consquent de prendre les mesures de scurit adaptes pour viter un
basculement, tant que la pompe nest pas visse son support.
Schma de montage
Fig. 6.1
Pos
1
2
3
4
REMARQUE
Dsignation
Soupape de surpression
Soupape de dosage / soupape
dinoculation
A titre de remplacement :
soupape multifonctions
Lance daspiration ou
soupape daspiration du fond
417101799_EMP_IV_E60.docx
- 134 -
Rev. 9-06.11
Installation de lappareil
7.1
Installation hydraulique
7.1.1
Exemples dinstallation
ATTENTION
REMARQUE
Linstallation doit tre excute uniquement par des ouvriers spcialiss et agrs ; de
plus, il est impratif dobserver les directives gnrales et les prescriptions dinstallation
locales !
Des mesures spciales et des dispositifs de protection particuliers pour le dosage de
produits chimiques dangereux ou agressifs ne sont pas mentionns ici.
Il est absolument impratif dobserver les prescriptions lgales et la fiche de donnes de
produits correspondantes pendant leur utilisation.
Les applications et les exemples dinstallation mentionns ici ont un caractre
fonctionnel. Ils fournissent une vue densemble sur les modes dinstallation corrects ou
sur ceux qui doivent tre vits, pour le bon fonctionnement de la pompe.
A) La pompe doseuse doit tre implante en priorit sur ou audessus du rservoir de dosage.
REMARQUE
Fig. 7.1
ATTENTION
ATTENTION
REMARQUE
Fig. 7.2
Dsignation
Soupape dinoculation / soupape de dosage
Soupape de maintien de la pression
Soupape de surpression
417101799_EMP_IV_E60.docx
- 135 -
Rev. 9-06.11
Fig. 7.3
REMARQUE
Dsignation
soupape dinoculation / soupape de dosage
Libration externe
Soupape magntique
Soupape de maintien de la pression
Fig. 7.4
Fig. 7.5
Dsignation
Soupape de surpression
soupape dinoculation / soupape de dosage
Soupape de maintien de la pression
Fig. 7.6
Fig. 7.7
417101799_EMP_IV_E60.docx
- 136 -
Rev. 9-06.11
Fig. 7.9
Dsignation
Rservoir siphon
Soupape magntique
Fig. 7.10
7.1.2
PRECAUTION
REMARQUE
embout olive
Fig. 7.11
Pos.
1
2
3
4
5
417101799_EMP_IV_E60.docx
Dsignation
Tuyau flexible
Collier de tuyau flexible
Ecrou-raccord
Embout olive avec pice dinsertion (soude)
Joint torique
- 137 -
Rev. 9-06.11
Pos.
1
2
3
4
Dsignation
Tuyau
Ecrou-raccord
Pice dinsertion
Joint torique
Pos.
1
2
3
4
5
Dsignation
Tuyau flexible
Ecrou-raccord
Pice de serrage
Pice conique
Joint torique
7.2
Connexions lectriques
7.2.1
Connexion au rseau
Fig. 7.14
Conducteur de rseau
Conducteur vers le carter de pompe
Connexion de lunit lectronique de
dmarrage* (dans le couvercle du coffret des
bornes)
ATTENTION
REMARQUE
La pompe doseuse est quipe dun systme de protection thermique de bobine qui
stoppe le moteur en cas de surchauffe.
417101799_EMP_IV_E60.docx
- 138 -
Rev. 9-06.11
7.2.2
Pos.
1
2
3
4
5
6
7
8
9
10
11
Dsignation
Commutateur (sans fonction !)
Bornier de raccordement (X2)
Bornier de raccordement (X1)
Prise de la lance daspiration
Capuchon de recouvrement
Plaque frontale
Prise du commutateur de marche/arrt
Bornier de raccordement (X3)
Carte mre
Commutateur de slection - contact de
signalisation de ltat vide. Slection de la fonction
de contact (travail/repos) du relais de signalisation
de ltat vide ou du relais de signalisation des
dfauts
Carte mre du module de protection E60 ltat
mont
La plaque frontale (pos. 6) doit tre retire afin daccder au compartiment des bornes pour
les signaux de commande et de sortie. Il est possible dextraire la carte mre (pos. 9) avec
les borniers de raccordement (pos. 2, 3, 7 et 8) quelque peu du carter de pompe et de
dbrancher les bornes.
On a prvu pour le raccordement dune lance daspiration le connecteur (pos. 4) sur la face
frontale qui est dj reli au bornier interne. Si aucune lance daspiration nest utilise, le
capuchon de recouvrement (pos. 5) comportant des pontages intgrs et contenu dans la
livraison doit tre embot.
Le commutateur de slection (pos. 10) permet de commuter le contact du relais de
signalisation des dfauts ou du relais de signalisation de ltat vide entre la fonction de
travail et la fonction de repos (voir linscription sur la carte mre).
417101799_EMP_IV_E60.docx
- 139 -
Rev. 9-06.11
7.2.3
Pos. Dsignation
voir
Chapitre
X1
X2
X3
X4
S1
7.2.4
Bornier X1
Bornier X2
Bornier X3
Bornier X4
Commutateur S1
7.2.4
7.2.5
7.2.6
7.2.7
7.2.8
Fig. 7.17
Couleur de
brin
Borne
(Cble de
raccordement)
brun
bleu
noir
9
10
11
12
417101799_EMP_IV_E60.docx
- 140 -
Rev. 9-06.11
Fontion
Couleur de
Configura
Mise en tat
PIN du
brin
tion des
connecteur
d'occupation
(Cble
de
bornes X1
raccordement)
brun
bleu
noir
Entre de pravertissement de
niveau
Entre de signalisation
dtat vide
Terre GND ()
REMARQUE
Lemplacement enfichable I doit toujours tre occup - soit par les connecteurs de
pontage monts (capuchon de protection avec symbole correspondant, voir au
chapitre 5.2.1, fig. 5.3, pos. 11), soit par la connexion du dispositif de signalisation de
ltat vide (connecteur de la lance daspiration).
Fig. 7.19
PIN
1
4
PIN
3
4
417101799_EMP_IV_E60.docx
- 141 -
Rev. 9-06.11
6+7
Borne
6
l' entre du signal
Terre GND ()
7
5 + 6 + 7 = Entre dimpulsion avec interrupteur
lectronique (NPN)
Borne
5
6
7
Borne
9
10
REMARQUE
Lentre du blocage de dosage doit tre active dans le menu (voir chapitre: 10.3.7 ) et
est disponible dans tous les modes de service.
Fig. 7.22
Borne
8
l' entre du signal
Terre GND ()
7
5 + 8 + 7 = Entre de blocage de dosage avec
interrupteur lectronique (NPN)
Borne
5
8
7
417101799_EMP_IV_E60.docx
- 142 -
Rev. 9-06.11
4+7
Borne
4
7
Borne
5
4
7
5 V, DC
l' entre du signal
Terre GND ()
Borne
11
12
7.2.5
Fig. 7.25
Borne
Couleur
de brin
(Cble de
raccordem.)
brun
Anode
blanc
Sortie 5V DC
Entre du
signal de
rupture de
membrane
Terre GND
13
14
bleu
15
16
noir
(pour capteurs
avec borne
danode)
17
non occup
18
non occup
19
Sortie 5V DC
Entre pour la
surveillance
du dosage
Terre GND
Gnrateurs
de dongle
Charges de
dongle
non occup
20
21
22
23
24
417101799_EMP_IV_E60.docx
- 143 -
Prise du
capteur de
rupture de
membrane
(en option)
contrle
du
dosage
Prise de la carte
mre du module
de protection
PLUS
E60
(voir aussi
chapitre : 8.1)
Fig.7.26
Rev. 9-06.11
Borne
Couleur de
brin
(Cble de
raccordement)
13
brun
14
15
blanc
bleu
REMARQUE
Fig. 7.28
20 + 21 = Entre de la contrle du
dosage avec contact sans potentiel
Borne
20
21
Mise en tat
doccupation
l' entre du signal
Terre GND ()
19 + 20 + 21 = Entre de la
contrle du dosage avec
interrupteur lectronique
Borne
19
20
21
7.2.6
Mise en tat
doccupation
Sortie 5V DC
l' entre du signal
Terre GND ()
Borne
1
2
Designation
Sortie du pr-avertissement de niveau, signalisation de ltat vide,
message de dfaut
1+2 =
417101799_EMP_IV_E60.docx
- 144 -
Rev. 9-06.11
7.2.7
Borne
1
2
7.2.8
Designation
Prise pour linterrupteur principal
7.2.8.1.1
Fig. 7.32
Si Alarme
Power Off
le relais dalarme
nest pas activ)
Fonction de fermeture :
(Par dfaut)
Contact ouvert
Contact ferm
Contact ouvert
Fonction douverture :
Contact ferm
Contact ouvert
Contact ferm
Position de linterrupteur S1
7.2.8.1.2
Si Alarme
Power Off
le relais dalarme
nest pas activ)
Fonction de fermeture :
(Par dfaut)
Contact ferm
Contact ouvert
Contact ouvert *
Fonction douverture :
Contact ouvert
Contact ferm
Contact ferm
Position de linterrupteur S1
417101799_EMP_IV_E60.docx
- 145 -
Rev. 9-06.11
8.1
Pos
X2
1
Dsignation
Bornier X2
Carte mre du module de protection
Monter la carte mre du module de protection (fig. 8.1, pos. 1) sur les
bornes 19 24 du bornier X2 (fig. 8.1, pos. 2).
8.1.1
Couleur de
brin
(Cble de
raccordement)
8.1.2
25
26
brun
blanc
Sortie 5 V DC
ligne de bus
27
noir
entre dimpulsios
28
bleu
Terre (GND)
29
30
Fig. 8.2
Connexion dun
PLUS
OGM
REMARQUE
La fonction Compteur roues ovales doit d'abord tre active dans le menu. Si un
Plus
OGM
est raccord, alors la fonction Compteur roues ovales est automatiquement
active (voir chapitre 10.3.14).
Fig. 8.3
25 + 26 + 27 + 28 Anschluss OGM
PLUS
417101799_EMP_IV_E60.docx
- 146 -
sortie 5 V DC
ligne de bus
l' entre du signal
Terre GND ()
Rev. 9-06.11
Mise en service
REMARQUE
9.1
Lors de la mise en service, il convient de purger le systme comme dcrit au chapitre 9.2!
Fig. 9.2
Commuter interrupteur
principal I.
9.2
ATTENTION
Il faut absolument oprer avec une prudence particulire en manipulant des matires de
dosage chimiques !
De la matire de dosage schappe ; selon ses proprits, elle est susceptible
doccasionner des irritations de la peau ; cest pourquoi il est absolument impratif
dobserver avant la purge la fiche de donnes de produit de la matire de dosage afin
dviter des blessures quelque soit leur nature!
REMARQUE
ATTENTION
Si une soupape multifonctions (voir la gamme daccessoires) est utilise pour la purge, il
convient de consulter le mode demploi correspondant.
Si un robinet boisseau sphrique (ou un autre dispositif de purge) est utilis, il faut placer un
rcipient collecteur appropri sous la conduite de purge.
Ouvrir le robinet boisseau sphrique.
Appuyer sur la touche de TEST jusqu ce que de la matire de dosage schappe de la
conduite de purge. Maintenir la touche enfonce pendant encore 60 secondes pour que la tte
de pompe se remplisse entirement de produit.
Fermer le robinet boisseau sphrique (sil est prsent/utilis).
Appuyer nouveau sur la touche de TEST jusqu ce que larrive de la matire de dosage via
la conduite de dosage soit visible, jusqu environ 2 cm avant la soupape dinoculation.
Fermer le couvercle transparent destin protger les touches de fonction et, le cas chant, le
sceller par des plombages.
REMARQUE
9.3
Arrt de la pompe
Designation
Fig. 9.3
ig. 9.6
417101799_EMP_IV_E60.docx
- 147 -
Rev. 9-06.11
9.4
Symboles Affichs
Display
Designation
Signal de fonctionnement de la pompe: chaque course de la pompe, le pictogramme
en
haut droite de l'cran effectue 1 rotation.
Signal de niveau (pictogramme clignotant = pralarme de niveau, pictogramme constamment
visible = signal vide), voir 7.2.4.1.1 Installation de la lance daspiration avec pr-avertissement
de niveau et signalisation de ltat vide ou bien 10.3.8 Configuration / Commutateur dniveau
Blocage du dosage actif, voir 7.2.4.4 Installation de la commande via le blocage du dosage ou
bien 10.3.7 Configuration / Blocage du dosage.
Perturbation prsente, voir 12.2 Messages derreur
Intern
MUL
DIV
x..xx mA
Charge
xxx /min
xx %
x.xx l/h
n=
xx.x mA
f = xx.x %
OFF
E60+
E60++
Alarm
9.5
Plus
Donglebox raccord, voir 8 Arnement dans Version Chem-Ad Srie A E60
PLUS
Donglebox et OGM
raccords, voir 8.1.2 Installation du compteur roues ovales ou bien
10.3.11 Configuration / Compteur roues ovales
tat de fonctionnement alarme, voir 12.2 Messages derreur
ATTENTION
REMARQUE
417101799_EMP_IV_E60.docx
- 148 -
Rev. 9-06.11
9.5.1
9.5.2
REMARQUE
9.5.3
Mode opration:
Interne
frquence de dosage /
quantit de dosage:
courses/min (122 courses/min chez 50 Hz,
146 courses/min chez 60 Hz)
tat de service:
OFF (pour V 3.6, Standby pour V 3.5)
(Pour le dmarrage appuyer sur la touche START/STOP)
A chaque course de la pompe, le symbole
tourne de 1 tour.
Configuration
Dans la configuration, les rglages suivants sont effectus lusine.
Fig. 9.11
417101799_EMP_IV_E60.docx
Configuration
Standard
voir Chapitre
langue:
Francais
10.3.3
10.3.4
units:
litre
10.3.5
code:
pas activement (-)
demerrage auto:
pas activement (-)
10.3.6
10.3.7
blocage de dosage:
pas activement (-)
10.3.8
commutateur d niveu:
offen ()
alarme:
aus ()
10.3.9
mmoire impulsions:
pas activement (-)
10.3.10
10.3.11
compteur roues ovales:pas activement (-)
10.3.12
rglage du dosage:
pas activement (-)
10.3.13
contrle du dosage:
pas activement (-)
charge:
pas activement (-)
10.3.14
- 149 -
Rev. 9-06.11
10
10.1
Menu principal
Le menu principal peut tre appel pendant le fonctionnement de la pompe.
L'entre s'effectue par un appui simultan sur les touches et .
Un appui simultan supplmentaire sur les touches et permet de retourner
lindicateur de progression de lappel
10.1.1
Vue densemble
Fig. 10.1
417101799_EMP_IV_E60.docx
Mode opration
Configuration
talonnage
Dones dopration
- 150 -
Rev. 9-06.11
10.2
Mode opration
10.2.1
Slectionner
Fig. 10.2
10.2.2
Des rglages
voir chapitre:
Interne
Impulsions
Courant
10.2.2
10.2.3
10.2.4
10.2.2.1 Slectionner
Fig. 10.3
417101799_EMP_IV_E60.docx
- 151 -
Rev. 9-06.11
REMARQUE
Courses/min
Fig. 10.4
Pourcentage (%)
Fig. 10.5
Litres/heure
Fig. 10.6
10.2.3
Gallons/jour
Fig. 10.7
417101799_EMP_IV_E60.docx
- 152 -
Rev. 9-06.11
10.2.3.1 Slectionner
Fig. 10.8
REMARQUE
Si la valeur nouvellement ajuste nest pas
confirme dans les 10 prochaines secondes par
une pression de la touche START/STOP ,
cest la valeur en cours, ajuste au pralable, qui
reste conserve.
Division
Fig. 10.10
417101799_EMP_IV_E60.docx
- 153 -
Rev. 9-06.11
10.2.4
0 20 mA
4 20mA
20 0 mA
20 4 mA
Choix par oprateur
10.2.4.1 Slectionner
Fig. 10.11
417101799_EMP_IV_E60.docx
- 154 -
Rev. 9-06.11
REMARQUE
Fig. 10.12
10.3
Configuration
10.3.1
Vue densemble
Pos
1
Designation
Zone de travail pr-ajuste dans le menu
Frquence de course en %
Fig. 10.14
Configuration:
Langue de menu
Units
Entre du code
Rglages de dmarrage
Blocage du dosage
Commutateur dniveu
Sortie dalarme
Mmoire dimpulsions
Compteur roues ovales
Rgulateur de dosage
Contrle du dosage
Charge
10.3.2
voir chapitre:
10.3.3
10.3.4
10.3.5
10.3.6
10.3.7
10.3.8
10.3.9
10.3.10
10.3.11
10.3.12
10.3.13
10.3.14
Dfilement de lafficheur
Fig. 10.15
417101799_EMP_IV_E60.docx
Rev. 9-06.11
10.3.3
Configuration / Langue
La langue du menu peut tre slectionne ici.
10.3.3.1 Slectionner
Fig. 10.16
10.3.4
Configuration / Unite
Si, en mode opration Intern, la variante daffichage Litres est slectionne (voir chapitre
10.2.2), laffichage peut ici tre converti de litres/heure en gallons/jour (1 gallon = 3.785 litres).
10.3.4.1 Slectionner
Fig. 10.17
10.3.5
Configuration / Code
Lors de ce rglage, une combinaison de chiffres peut tre indique pour scuriser les
valeurs rgles contre une modification non autorise.
Si code" est activ, ce code quatre chiffres doit tre entr avant toute modification ou
tout changement dans le menu principal.
417101799_EMP_IV_E60.docx
- 156 -
Rev. 9-06.11
10.3.5.1 Slectionner
Fig. 10.18
10.3.5.2 Rglage
Fig. 10.19
10.3.6
10.3.6.1 Slectionner
Fig. 10.20
10.3.7
417101799_EMP_IV_E60.docx
- 157 -
Rev. 9-06.11
10.3.7.1 Slectionner
Fig. 10.21
10.3.8
10.3.8.1 Slectionner
Fig. 10.22
= Contact ouvert :
Niveau incorrect (vide)
Contact ferm :
Niveau correct (plein)
(Par dfaut)
= Contact ferm :
Niveau incorrect (vide)
Contact ouvert :
Niveau correct (plein)
10.3.9
Configuration / Alarme
Cette option permet l'inversion de la sortie d'alarme (le relais de sortie d'alarme est activ ou
non en cas d'alarme).
10.3.9.1 Slectionner
= En cas dalarme le relais
de la sortie dalarme est activ
(Par dfaut)
Fig. 10.23
- 158 -
Rev. 9-06.11
ATTENTION
Les impulsions enregistres sont traites aprs la fin des impulsions. Cela signifie que
la pompe continue de fonctionner bien quil nexiste aucune condition externe.
Dans un cas dfavorable, cela peut provoquer le dosage dans un systme ferm et donc
une pression excessive dans le systme.
Cela doit tre empch par des mesures de scurit appropries.
Le contenu de la mmoire est effac ds que le blocage du dosage est activ ou ds que la
pompe est mise hors tension.
10.3.10.1 Slectionner
Fig. 10.24
Pos
1
Fig. 10.25
Multiplication dimpulsion
(Exemple : 10 impulsions
externes gnrent 20 courses)
Fig. 10.26
2
3
Designation
Mmoire dimpulsions active
Nombre des impulsions
appliques
Facteur ajust
Division dimpulsion
(Exemple : 10 impulsions
externes gnrent 5 courses)
10.3.11 Configuration / Compteur roues ovales (justement E60PLUS & OGM or OGM PLUS)
Le fonctionnement du compteur roue ovale permet une mesure "relle" des quantits
dans la rubrique du menu donnes dopration / Litres (voir chapitre 10.5.3).
REMARQUE
Le compteur roue ovale ne peut tre activ que si la pompe est munie dune carte mre
PLUS
du module de protection pour E60
et si un compteur roue ovale (voir Accessoires) a
t branch.
Pour lactivation de la carte mre du module de protection en combinaison avec le
compteur roue ovale, la tension du rseau doit tre dbranche et rebranche. (Retirer
la prise ou bien arrter et redmarre la pompe)
PLUS
En cas de branchement dun OGM
, le compteur roue ovale est automatiquement
activ.
417101799_EMP_IV_E60.docx
- 159 -
Rev. 9-06.11
10.3.11.1 Slectionner
Fig. 10.27
Lorsquun OGM Plus est raccord, la quantit de dosage mesure par lOGM est compare
avec une valeur de consigne rgle de quantit de dosage lors de lactivation du rgulateur
de dosage. En cas dcart, la frquence de dosage de la pompe est automatiquement
augmente ou, le cas chant, rduite.
Dans la mesure o le rglage ultrieur de la frquence de dosage est uniquement possible
dans les limites de puissance de la pompe, il est recommand de rgler le point de
consigne de la quantit de dosage sur 80-90 % de la frquence de dosage max. possible.
Ainsi, le rgulateur de dosage a des rserves vers le haut pour ragir aux carts de rglage
ngatifs.
La fonction du rgulateur de dosage peut uniquement tre utilise dans les modes de
fonctionnement Intern et Strom . En mode Impuls , le rgulateur de dosage est
hors service.
REMARQUE
10.3.12.1 Slectionner
Fig. 10.28
417101799_EMP_IV_E60.docx
- 160 -
Rev. 9-06.11
Fig. 10.30
Fig. 10.31
- = cart de dosage
La pompe dbite exactement la quantit qui est pr-ajuste
(ici par exemple 100/min.).
Il nest pas ncessaire deffectuer une rgulation pour corriger.
= cart de dosage vers le haut
La pompe dbite actuellement plus que ce qui est exig par la
frquence de course pr-ajuste (ici par exemple 100/min.).
La frquence de dosage est diminue automatiquement jusqu ce
que la valeur de lcart soit compense.
Fig. 10.32
Fig. 10.33
REMARQUE
REMARQUE
Lorsquun compteur roue ovale est branch pour le contrle du dosage et doit tre
ananlys de manire correspondante, la fonction Configuration / Compteur Roue Ovale
doit galement tre active en plus de Configuration / contrle du dosage (voir chapitre
10.3.11).
10.3.13.1 Slectionner
Fig. 10.34
417101799_EMP_IV_E60.docx
- 161 -
Rev. 9-06.11
REMARQUE
Cette fonction ne peut tre slectionne que si carte mre du module de protection est
branche et si Configuration / Compteur Roue Ovale a t activ (voir chapitre 10.3.11).
Fig. 10.37
417101799_EMP_IV_E60.docx
- 162 -
Rev. 9-06.11
10.3.13.5 Affichage des impulsions du compteur roue ovale (seulement pour E60PLUS)
Fig. 10.38
REMARQUE
La pompe doit tre calibre avant dutiliser le dosage de charge (voir au chapitre: 10.4).
417101799_EMP_IV_E60.docx
- 163 -
Rev. 9-06.11
417101799_EMP_IV_E60.docx
Pos
1
Designation
Mode opration
- 164 -
Rev. 9-06.11
10.4
talonnage
10.4.1
Vue densemble
Le procd et laffichage de ltalonnage dpendent du fait quun compteur roue ovale est
branch ou non.
Fig. 10.42
talonnage pompe:
Voir au chapitre 10.4.2
talonnage pompe avec
compteur du dosage:
Voir au chapitre 10.4.3
10.4.2
talonnage / pompe
10.4.2.1 Prparation
Fig. 10.43
REMARQUE
concernant
REMARQUE
concernant
417101799_EMP_IV_E60.docx
- 165 -
Rev. 9-06.11
10.4.3
10.4.3.1 Prparation
Fig. 10.45
REMARQUE
concernant
REMARQUE
concernant
417101799_EMP_IV_E60.docx
- 166 -
Rev. 9-06.11
Fig. 10.47
10.4.4
talonnage / Manuell
Si la valeur dtalonnage saisir est connue, il est possible d'effectuer un talonnage
sec (saisie immdiate de la valeur sans calibrage pralable).
Cette mthode n'est cependant pas trs prcise car les conditions sur le site (contrepression, viscosit, section et longueur des conduites etc.) ne sont pas prises en compte.
Fig. 10.48
REMARQUE
Ces valeurs sont valables pour de l'eau 20C comme milieu de dosage.
Pompe
EMP IV
Fig. 10.49
10.5
140 (168)
2,33 (2,80)
210 (252)
3,50 (4,20)
450 (540)
7,50 (9,00)
630 (756)
10,5 (12,6)
750 (900)
12,5 (15,0)
Dones dopration
Cette option permet la sortie et la remise zro des donnes de service :
heures dopration
litres
nombre dimpulsions
417101799_EMP_IV_E60.docx
- 167 -
Rev. 9-06.11
10.5.1
Vue densemble
Fig. 10.50
10.5.2
Voir au chapitre
10.5.2
Voir au chapitre
10.5.3
Voir au chapitre
10.5.4
10.5.3
417101799_EMP_IV_E60.docx
- 168 -
Rev. 9-06.11
10.5.4
417101799_EMP_IV_E60.docx
- 169 -
Rev. 9-06.11
11
Maintenance
PRECAUTION
REMARQUE
Seules les personnes expertes et agres sont autorises excuter des travaux de
maintenance sur les pompes doseuses.
Intervalle de maintenance : tous les six mois; choisir des intervalles plus rduits lors de
conditions dutilisation plus extrmes (par exemple, course permanente).
REMARQUE
11.1
Fig. 11.3
Pour le type :
01400 - 02100
Pos. Dsignation
Pour le type :
04500 - 07500
Pos. Dsignation
SOUPAPE DASPIRATION/
DE PRESSION
1 Joint torique,
28 x 3,5
2 Soupape daspiration/
de pression
SOUPAPE DASPIRATION/
DE PRESSION
1 Joint torique,
40,87 x 3,53
2 Soupape daspiration/
de pression
Dmonter la soupape par rotation dans le sens inverse des aiguilles dune montre avec
une cl fourche correspondante (soupape 1" : ouverture de cl 41 ; soupape 2"
ouverture de cl 56) et les retirer.
Remplacer les joints toriques.
Visser la soupape dans la tte de dosage ; respecter le sens de la flche ! (la flche
montre vers le haut !)
417101799_EMP_IV_E60.docx
- 170 -
Rev. 9-06.11
11.2
Pos.
1
2
3
4
5
6
REMARQUE
Dsignation
Vis de la tte de dosage
Plaque de pression
Tte de pompe
Membrane de convoyage
Rondelle intermdiaire
Membrane de protection
sil est prvu de rutiliser les soupapes, ces dernires doivent tre tout dabord
dmontes comme dcrit au chapitre 11.1.
La longueur de course doit tre ajuste sur une valeur infrieure 50% avant de
remplacer la membrane !
REMARQUE
ATTENTION
417101799_EMP_IV_E60.docx
- 171 -
Rev. 9-06.11
11.3
Pos.
1
2
3
11.3.1
Dsignation
Vis de purge de la transmission
Vis de fermeture
Verre indicateur de niveau
dhuile
11.3.2
REMARQUE
11.4
Seule de lhuile dengrenage selon la norme ISO 6743 et du type L-CKT 320 doit tre
utilise. Eliminer lhuile dengrenage use conformment aux prescriptions !
Remplacement du moteur
ATTENTION
Pos.
1
2
3
4
5
417101799_EMP_IV_E60.docx
Dsignation
Moteur
Couvercle du coffret des bornes
Passe-cble vis
Vis de fixation du moteur
Fente dcoulement de leau
- 172 -
Rev. 9-06.11
11.4.1
Dmontage
11.4.2
Montage
Mettoyer larbre rainur et la bride de carter ; enduire larbre de moteur et larbre rainur
de graisse au tflon.
Placer larbre de moteur en ligne droite sur larbre rainur et le pousser jusqu la bride
en faisant douce pression. Veiller ne pas coincer le moteur.
Tourner le moteur de sorte que le coffret des bornes montre vers lavant en direction du
bouton de rglage de course.
Mettre les vis de fixation (pos. 4) en place et les visser bloc en diagonale
(couple de serrage : 12 Nm).
Brancher le cble de connexion au rseau secteur et le cas chant, brancher
nouveau le cble de connexion vers le de pompe.
Rtablir lalimentation en tension.
PRECAUTION
417101799_EMP_IV_E60.docx
- 173 -
Rev. 9-06.11
12
Dfauts de service
12.1
Afficheur
Signification
Rpercussion
Origine
Elimination
Fig. 12.1
+ LED de dfaut
Fig. 12.2
+ LED de dfaut
Fig. 12.3
Message de rserve
(clignotant)
La pompe continue
de tourner.
Le pr-avertissement de niveau
est actif.
Signalisation de ltat
vide
La pompe est
arrte.
matire de dosage
Blocage du dosage
(possible seulement si
celui-ci a t configur)
La pompe est
arrte.
La pompe est
arrte.
La pompe tourne en
mode permanent.
Fig. 12.4
12.2
Afficheur
Signification
Rpercussion
Origine
Elimination
Le moteur tourne en
permanence de manire
incontrle.
Dosage excessif
Lunit lectronique de
puissance est dfectueuse.
Fig. 12.6
Fig. 12.7
Le moteur est larrt
bien que le symbole de
dosage tourne.
Aucun dosage.
Fig. 12.8
Fig. 12.9
Le moteur tourne en
permanence sans
demande.
Dosage permanent
Le capteur de rupture de
membrane a dtect
une fuite.
La tte de dosage
est intanche ; de la
matire schappe
de lcoulement de
rupture de
membrane.
Fig. 12.10
417101799_EMP_IV_E60.docx
Diminuer la pression.
Ouvrir la soupape.
Faire refroidir le moteur ou le
remplacer.
Remplacer la carte mre.
Contrler
Nous envoyer la pompe.
Contrler le raccord du
capteur de Hall.
Contrler les tuyaux flexibles.
la membrane.
Contrler la contre-pression.
Remplacer la membrane.
- 174 -
Rev. 9-06.11
12.2.1
Origine possible
La pompe doseuse ne
fonctionne pas, aucun
affichage sur lafficheur.
Formation de dpts ou
damalgames ; les soupapes se
sont dessches.
Lindicateur de niveau
apparat sur lafficheur bien
que le rcipient soit plein.
PRECAUTION
Elimination
Remplacer le cble de rseau.
Contrler la tension de rseau.
Vrifier le raccordement selon le plan
des bornes.
Rincer la tte de dosage via la conduite
daspiration, dmonter ventuellement
les soupapes et les nettoyer ou les
remplacer.
Dbloquer le flotteur.
Bien serrer les connecteurs, nettoyer les
contacts, Vrifier si le connecteur de
pontage est enfich.
Remplacer le dispositif de signalisation
de ltat vide.
Seuls des lectriciens spcialiss sont autoriss excuter des rparations de nature lectrique
(observer les rgles de scurit de la caisse de prvoyance daccidents VB G 4 et ZH 1/11) !
PRECAUTION
Des composants qui conduisent la tension, peuvent tre dgags lorsque des
couvercles sont ouverts ou lorsque des pices sont retires, sauf si cela est possible
sans outil. Des points de raccordement peuvent aussi conduire la tension.
417101799_EMP_IV_E60.docx
- 175 -
Rev. 9-06.11
13
Fig. 13.1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Designation
01400
Soupape daspiration/
de pression
Pos
417101799_EMP_IV_E60.docx
- 176 -
02100
Type
04500
249075
-249055
06300
07500
-249503
249504
249074
249505
249041
249506
-413031067
34950160
34950145
34950134
34950136
34950138
34950139
34950153
34950105
34950149
34950151
--34950164
34950165
--413031055
34950152
34950147
34950146
34950148
34950124
417002063
415204603
413119274
34950123
417002137
415204601
413071033
34950125
418461544
249690
418244171
418244180
34950119
413031066
-34950144
34950135
34950137
34950101
34950150
34950184
34950163
34950177
417401005
413119236
34950131
418441042
34950209
248186
418441010
34950120
418441041
418244179
418441009
Rev. 9-06.11
13.1.1
Pos
5
13.1.2
01400
02100
34950261
04500
06300
--
07500
Art n .
250160
250161
250162
250163
250164
250165
250166
250167
250168
250169
250170
250171
13.1.2.1 Tte de pompe bloc de service - Version "HP" Pressions plus hautes
existant de:
417101799_EMP_IV_E60.docx
Art n .
Sur demande
Sur demande
- 177 -
Rev. 9-06.11
14
Donnes techniques
14.1
Codes de pompe
1. Version lectrique
...
E 60 = (Explications : voir au chapitre 14.1.1)
...
2. Dbit de la pompe 50 Hz
(60 Hz)
=
=
=
=
PP
PVDF
V4A
PVC
(standard)
Viton B
EPDM
Kalrez
(standard)
Cramique
V4A
Tflon
(standard)
=
=
=
=
PP
PVDF
V4A
PVC
(standard)
8. Ressort de soupape
01
10
99
=
=
=
9. Connexion au rseau
01
99
10. Tension/Frquence
E60
04500 PP
06 FP
KE
PP 99
99
03
01
02
03
04
05
=
=
=
=
=
115V / 50 Hz
115V / 60 Hz
230V / 50 Hz
230V / 60 Hz
3N 230V / 400V
(standard)
417101799_EMP_IV_E60.docx
- 178 -
Rev. 9-06.11
Codes de pompe 2
11. Raccord du ct aspiration
11
14
15
18
19
20
99
=
=
=
=
=
=
=
(standard)
=
=
=
=
=
=
=
(standard)
=
=
=
=
PP
PVDF
V4A
aucun raccord
(standard)
=
=
(standard)
99
99
99
99
01
carter standard
04500
PP
06
FP
KE
PP
99
99
03
99
(code de pompe 1)
417101799_EMP_IV_E60.docx
99
99
99
99
01
(code de pompe 2)
- 179 -
Rev. 9-06.11
14.1.1
mA)
Mode de charge (dclench par une impulsion dautorisation externe ; une quantit ajuste
auparavant est dose).
Entres :
Surveillance du niveau dans les contenants (pr-avertissement de niveau et signalisation de ltat
vide)
Impulsion
Signal normalis
Autorisation (dsigne aussi un autre endroit comme blocage du dosage)
Surveillance du dosage
Sorties :
Surveillance du niveau dans les contenants (pr-avertissement de niveau et signalisation de
ltat vide)
Message de dfaut
Signal de course
E60PLUS
417101799_EMP_IV_E60.docx
- 180 -
Rev. 9-06.11
14.2
Dimensions
Fig. 14.1
Alimentation
Type
C1
00140
00210
00450
00630
00750
133,5
133,5
142,5
142,5
142,5
170
170
190
220
220
174
174
194
225
225
Dimension [mm]
L
H1
392
392
412
412
412
14.3
14.3.1
Donnes electrique
280
280
303,5
318,5
318,5
H2
216
216
263
293
293
1"
1"
2"
2"
2"
Designation
Tension dalimentation
115V 50/60 Hz
230V 50/60 Hz
3PE 400V 50/60 Hz
Courant de dmarrage maximal IA ( IN 3,3) 115V 50/60 Hz
230V 50/60 Hz
3PE 400V 50/60 Hz
Puissance du moteur
115V 50/60 Hz
230V 50/60 Hz
3PE 400V 50/60 Hz
Calibre de fusible
115 V
230 V
Type de protection
Puissance de distribution pour une mise en circuit sous 24 V
Sortie de signalisation de ltat vide
Sortie du signal de course
Puissance de distribution pour une mise en circuit sous 230 V
Sortie de signalisation de ltat vide
Sortie du signal de course
417101799_EMP_IV_E60.docx
- 181 -
5,1 / 7,6 A
2,5 / 3,8 A
1,2 / 1,05 A
16,8 / 25,1 A
8,25 / 12,5 A
4,0 / 3,5 A
0,3 kW
0,3 kW
0,37 kW
12,5 A
6,3 A
IP 55
24 V 3 A AC/DC
24 V 0,3 A DC
230 V / 3 A AC/DC
Raccord selon VDE non autoris
Rev. 9-06.11
14.3.2
Dsignation
Dbit de la pompe [l/h]*/**
Contre-pression maximale de dosage [bar] **
Nombre de courses [1/min] pour 50 Hz
Quantit de dosage / course [ml] 50 Hz/60 Hz
Prcision de reproduction [voir au chapitre 14.6]
Viscosit maximale pouvant tre convoye [mPas]
Temprature ambiante admissible
Hauteur daspiration [mWs] pour un rglage de course de 100 %***
Contre-pression maximale de dosage [bar]
Diamtre minimal recommand
Raccord daspiration [ID mm]
Raccord de pression [ID mm]
Poids [kg] (environ)
14.3.3
210
8
19,4
29,2
450
6
07500
630
4
750
3
144
87,5
120
62,5
87,5
< 3%
200 mPas
5-40C
2
0,5
DN 20 DN 20 DN 25 DN 30
DN 30
DN 12 DN 12 DN 20 DN 25
DN 25
23,5
25,5
27,2
Dsignation
Dbit de la pompe [l/h]*
Contre-pression maximale de dosage [bar]
Volume dbit [cm]/course
*
**
***
14.3.4
140
10
01400
02100
135
12
18,1
202
10
28
Les valeurs sont dtermines avec de leau comme matire de dosage sous une temprature de 20C.
Avec une frquence de rseau de 60 Hz, la performance de dbit augmente de 20 % et la contre-pression de dosage
diminue de 20 %.
Les hauteurs daspiration ont t dtermines avec des soupapes propres et humidifies pour une course de dosage de
100% et une frquence de course maximale.
Mise en circuit des entres et des sorties (voir aussi au chapitre 7.2.3
Surveillance de
rupture de
membrane
Surveillance du
dosage
417101799_EMP_IV_E60.docx
Mise en tat
doccupation
borne X1
ergots 1 + 3
borne X1
ergots 2 + 3
borne X1
ergots 4 + 3
borne X1
ergots 6 + 7
borne X1
ergots 8 + 7
borne X1
ergots 9 + 10
borne X2
ergots :
13 + 14 +
15 + 16
borne X2
ergots 20 + 21
Courant externe
lentre nest pas sans potentiel!
Attention :
Respecter la polarit du signal
raccord !
Commutateur lectronique
Alimentation en tension par la
sortie de 5 V / pompe
(borne X2, ergots 15 + 16)
Contact sans potentiel
Attention : ne raccorder aucune
tension externe !
- 182 -
Valeurs
0/4-20 mA,
Rsistance ohmique
apparente denviron
50 ohm
Rev. 9-06.11
14.4
Sorties
Mise en tat
doccupation
Alimentation externe
borne X1
ergots 5 + 3
Signal de course
borne X1
ergots 11 + 12
Message de ltat
vide, de rserve, et
de dfaut
borne X3
ergots 1 + 2
Valeurs
Tension externe
Matriaux
Tte de dosage :
Membrane :
Joints dtanchit :
Billes de soupape :
Ressorts de soupape :
Botier :
Couleur :
417101799_EMP_IV_E60.docx
- 183 -
Rev. 9-06.11
14.5
14.5.1
Pos.
1
3
4
Couleur de brin
(Cble de
raccordement)
brun
bleu
noir
Dsignation
Pr-avertissement de niveau
Signalisation de ltat vide
GND
14.6
ATTENTION
Si la signalisation de ltat vide nest pas utilise, le contact 3/4 doit toujours tre pont !
Le capuchon de protection prvu cet effet tablit le pontage entre les contacts et doit
tre enfich dans ce cas.
REMARQUE
Les entres de signalisation de ltat vide et de rserve peuvent tre inverses dans le
menu Configuration / Contact de niveau (voir au chapitre 10.3.8).
Performances de dosage
Lexactitude de dosage reproductible est denviron 3 % pour une longueur de course
minimale de 30 % et des conditions constantes.
En raison de la caractristique de la pompe, des performances plus leves peuvent se
produire jusqu ce que la temprature de service soit atteinte.
Il est possible dobtenir un dosage prcis si les points suivants sont observs :
a) toutes les indications sur la performance de dosage se rfrent aux mesures avec de
leau sous une temprature de 20 C ainsi que pour une tension dalimentation constante
et lorsque la pompe doseuse tourne la temprature de service.
b Si une pr-pression (1 bar au maximum) est applique sur le ct aspiration, la pression
diffrentielle entre le ct aspiration et le ct pression doit tre au moins de 1 bar. La
colonne deau montante sur la pompe doseuse soit tre assure par un agencement
correspondant des soupapes.
14.7
REMARQUE
Une soupape de maintien de pression ou une soupape de dosage nest pas un organe
darrt qui ferme absolument.
ATTENTION
Le rglage de la course de dosage doit tre excut uniquement lorsque la pompe tourne,
si la vis de rglage de course est dcharge.
417101799_EMP_IV_E60.docx
- 184 -
Rev. 9-06.11
14.7.1
130
120
110
100
90
80
70
60
1 bar
2 bar
4 bar
6 bar
8 bar
10 bar
50
40
30
20
10
0
10
20
30
40
50
60
70
80
90
100
14.7.2
Performance de dbit - type 01400 / 12 bar (version spciale : pressions plus leves)
Fig. 14.4
170
160
150
140
130
120
110
100
90
80
70
60
1 bar
2 bar
4 bar
6 bar
8 bar
10 bar
12 bar
50
40
30
20
10
0
10
20
30
40
50
60
70
80
90
100
417101799_EMP_IV_E60.docx
- 185 -
Rev. 9-06.11
14.7.3
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
1 bar
2 bar
4 bar
6 bar
8 bar
60
50
40
30
20
10
0
10
20
30
40
50
60
70
80
90
100
14.7.4
190
180
170
160
150
140
130
120
110
100
90
80
70
1 bar
2 bar
4 bar
6 bar
8 bar
10 bar
60
50
40
30
20
10
0
10
20
30
40
50
60
70
80
90
100
417101799_EMP_IV_E60.docx
- 186 -
Rev. 9-06.11
14.7.5
Fig. 14.7
520
500
480
460
440
420
400
380
360
340
320
300
280
260
240
220
200
180
160
140
120
100
80
60
40
20
0
1 bar
2 bar
3 bar
4 bar
5 bar
6 bar
10
20
30
40
50
60
70
80
90
100
14.7.6
600
550
500
450
400
350
300
1 bar
2 bar
3 bar
4 bar
250
200
150
100
50
0
10
20
30
40
50
60
70
80
90
100
417101799_EMP_IV_E60.docx
- 187 -
Rev. 9-06.11
14.7.7
600
550
500
450
400
350
1 bar
2 bar
3 bar
300
250
200
150
100
50
0
10
20
30
40
50
60
70
80
90
100
417101799_EMP_IV_E60.docx
- 188 -
Rev. 9-06.11
15
Dclaration de conformit
417101799_EMP_IV_E60.docx
- 189 -
Rev. 9-06.11