Estimate

Excavation Length Width


F1 3 3
F2 6 4.25
TOTAL

Formworks Length Height


F1
F2
C1-F1 0.4 12.35
C1-F2 0.4 14.2
Slab (1) 0.15 35.7
Slab (2) 0.15 10.7
Beam 0.7 46.8
TOTAL

Steelworks Length Diameter (steel)


F1 2.85 0.016
F2 (x) 5.85 0.016
F2(y) 4.1 0.016
C1@F1 (Vertical) 12.57 0.016
C1@F1 (Lateral Ties) 1.28 0.01
C1@F2 (Vertical) 14.57 0.016
C1@F2(Lateral Ties) 1.28 0.01
Beam (Horizontal) 60.2 0.016
Beam (Stirrups) 0.94 0.01
Beam(3rd Floor) 19 0.016
Beam(3rd Floor Stirrups) 0.94 0.01
TOTAL

Concreting Length Width


F1 3 3
F2 6 4.25
C1@F1 0.4 0.4
C1@F2 0.4 0.4
Beam 0.7 0.4
TOTAL
Height Qty. Volume (m^3)
1.5 10 135
1.5 2 76.5
211.5

No. of Faces Qty. Area (m^2)


0
0
4 10 197.6
4 8 181.76
2 1 10.71
2 1 3.21
2 2 131.04
524.32

No. of bars Unit weight Kilogram (kg)


640 8050 2952.2325280761
128 8050 1211.9691431049
64 8050 424.707135618
60 8050 1220.7093051946
500 8050 404.6371337824
48 8050 1131.9481035281
464 8050 375.50326015
8 8050 779.4929745183
480 8050 285.2691793166
4 8050 123.0096886698
54 8050 32.0927826731
8941.5712346321

Height Qty. Volume (m^3)


0.5 10 45
0.5 2 25.5
12.65 10 20.24
14.65 8 18.752
60.2 1 16.856
126.348