Sie sind auf Seite 1von 1

Y=2800 Y=2800

WATER
TANK

Y=2700 Y=2700

NTC WORKSHOP

Y=2600 Y=2600

1 2

4 5

6 7

8 9
Y=2500 Y=2500
10 11

12 13
*
* 14 15
* *

* 16
*
17 18
*
*
* 19
*
* 20 21
Y=2400 * Y=2400
* 22 23
*
AH

*
* 24 25
*
LL

* *
26 27
NU

* *

*
*
SIKANDAR
*
KHAN MARI
NEW COAL YARD W. SHOP
* *
FENCING
Y=2300 *
Y=2300
*

*
*
CO
* AL
* RA *

M
* *

* CHECK POST
*
*

* *

Y=2200 *
SHREDDER
PANEL ROOM
LEVEL 112.850
Y=2200
RDF SHREDDER

Rotor 2
*
BARBED WIRE

Gewinde
Links-
Gewinde
Rechts-
TYRE SHREDDER
HEIGHT 6'

Gewinde
Links-
X = 3390.50

Gewinde
Rechts-

Y = 2186.50

Rotor 1
Gewinde
Links-
Gewinde
Rechts-

Gewinde
Links-
Gewinde
Rechts-
Gewinde
Links-
Gewinde
Rechts-
Gewinde
Links-
Gewinde
Rechts-
BARRIER

Gewinde
Links-
Gewinde
Rechts-
Gewinde
Links-
Gewinde
Rechts-
Gewinde
Links-
Gewinde
Rechts-
WASH ROOM

y
urit
*
W=6'x4'
Door
Security 3' 1/2"
Room

W=4'x4'

W=4'x4'
4Mx3M

Sec
*
W=6'x4'
X = 3384.00
Y = 2169.04
CHECK POST

*
4'x4'

Pos eck
t
Ch
WASH ROOM
* AL
CO TE
GA *
ets
Toil

CONTRACTORS
*

CONTAINERS
22 DRIVER
* CONTRACT LABOURS
L ROOM
* AC CANTEEN
HOTEL
CE
COAL Stor
e
OFFI 26 HOTEL
*
LABOR ROOM * PCC FLOOR
* BARBER SHOP
*
Y=2100 * STAm
F 21 PCC RAMP FLOOR
MOTOR CYCLE REPAIRING SHOP MILK SHOP Y=2100
* VRMRoo
* 16 VULCANIZING
*
* MOTOR
LABER
ROOM
CYCLE
SHED M.CYCLE
PROPOSED HIACE SHED
SHED
16
24 17

OFFICE
OLD SHOP GARD

SAM
FIRE ROOM
KILN F OLD TIME FIGHTING
SHOP

2
OPPICE SHED

24
5 9 8 LINE-2 UNION
* *

8950
MAIN OFFICE

3
13 323
12
14
GATE
10 F.O A

11500

33644
Slag Hopper
4
*

33
3 25 11 F.O 18

8950
33 5
15
23
6
ACPL MAIN
* * *

ROA
19

D
24 M

9
DESPATCH
OFFICE

29
*

F.O
* * * *

60 M
* * * *

GATE
* *
Y=2000 PROPOSED ROOM * * Y=2000

102000
*
*

17' x 12.5' *
*
*

125 125 125 125 125 125 125 125 125


*
327 *
MOSQ. B. CO EXTENT

100
*

LONY BLOCKION

300
BLOCK- *
*

WEIGH A
B. CO
47350

LINE-1 BRIDGE *
BATH LONY *

D
B. CO
KILN 15,000 TON
* LONY ROOM BLOCK-
LUBRICATION

CL ROOM BLOCK- C
B *
* *

D
19
3825x4900

* * B. CO BATH
3825x4900

* LONY *
*
3825x4900

* BLOCK- ROOM
ENTRANCE
3000x3571

BAG HOUSE *
(1000 AP

* D
T)

CRANE

* *
HE

50 Ton

4800x4725
* *
W.R

* * * *
GATE

19100
FOR ELECTRICAL MOTOR
EXISTING SHED

L2-20
SECURITY BUILDING SHOP
Chemical
20
PACKING PLANT L-2
Room

Y=1900 D D Y=1900
3000 2

GENERAL STORE
T
E#

TOILE
PIL

T BATT
AH
NALL
ERY
2
ACPL MAIN ROAD
MAIN GATE

R.C.C. PLATFORM

TURBINE MAIN

S
WHR
CONTRA
PROPOSED LOCATION OF
ACID TANK BUNDLES 1200X1200X1200MM
LEVEL 0,00
ACC. CTOR
(WHRS) L OF HOIST
C

YARD NO.2
HEAVY PARTS STORE

CON

COMPRESSED AIR STATION


TRA
ACC CTOR CONTRACTOR
.
BUNDLES 1200X1200X1200MM
LEVEL 0,00

ACC.

8197
3000 # 1

41000
T

* * * * *
*
E

CONTRACTOR
PIL

15603
21
ACC.
*
1.6 M OVER HEAD CABLE

*
YARD NO.1 MV HOOKUP
PANEL 4mx4m
TRAY FOR WHRS

YARD NO.3 *
*
D

SE
CONTRACTOR
ACC.

WE
FLOORING

* *

RA
*

GE
Y=1800 * * Y=1800

NA
CONTRACTOR
33787

ACC.
* AH

L
* NALL

LA
ROOM MAIN
YARD NO.4

* *

H
* *
PASSAGE

* *
CONTRACTOR
ACC. L AH
AL

E
CRUSHER
EXISTING PRE-FABRICATED

*
GUEST HOUSE

AG
BUCKET TOIL
BATT ET N
GRINDING ERY IN
OVERHEAD

AIN
WATER TANK

MEDIA
YARD
* MA

DR
*
R15 R15
8.8

FLOORING
AH

IN
SHED
NALL

RA
CR-2 TRAFO
STEEL YAARD * MAIN
*
GATE CRUSHER *
Y=1700 1
* Y=1700
*
*
RETAINING SHED OIL DRUM
WALL AUTO CIVIL WORKSHOP
12x30 M
* W/S

E
LUB. USED LUB.

AG
* SUPERVISOR
ROOM
ROOM YARD

IN
OFFICES
AL WORKSHOP

DRIVER

MINING OFFICE MOSQUE MAIN WOODEN STORE

A
ROOM
WASH
SPARE PART PLUMBING W/S BRICK

DR
ROOM
SHED
* ROOM FOR PAINTING W/S
STORES
*

IN
CONTAINER
* AUTO WORK THRUST BORING

RA
CONTAINER

* SHOP MAZAR
** *
CONTAINER

*
MECHANIC

* FENCE

* ROMANIAN YARD
5M WIDE CONCRETE ROAD

ROOM
132kv TERMINATION
FENCE

PAD Mounted
PAD Mounted
TRANSFORMER TRANSFORMER
PVC PIPE
150mm Ø
DRAW PIT

2 NO. 150mm Ø PVC PIPE


GT

GT
N

500 x 600 500 x 600


2 NO. 150mm Ø PVC PIPE
SA

CT

SA

PT
500 X 600

PTR

2 NO. 150mm
PI

Ø PVC PIPE
CB
FABRICATIO

1200 x 1200
BUS DS

BUS DS

500 X 600
PI

* 1200 x 1200 1200 X 1200


YARD

GT

GT

500 x 600

EXISTING WB
CT

PTR
5M WIDE CONCRETE ROAD

5M WIDE CONCRETE ROAD


SA

PROPOSED
CB

DIESEL STORAGE TANK

Y=1600 Y=1600
20x3.5M
BUS DS

WEIGH BRIDGE AND DESPENSER


CB

24x3M TOILET
CT

BATTERY
EXISTING WB
1200 x 1200

8x4.5M
132kv TERMINATION

GT

GT

*
500 x 600

PTR

PT
SA

CT

SA

NTC TRAFO
PI

CB

CONTRACTOR'S
BUS DS

BUS DS

OFFICE
ROOM

HILL
THRUST BORING THRUST BORING THRUST BORING THRUST BORING
500 x 600

PI

EXISTING
CONTROL

THRUST BORING
500 x 600 500 x 600
ROOM
PROPOSED 13X13ft
CONTROL
GT

GT

ROOM
20x12ft

QC
* SWITCHYARD
GATE-2
5M WIDE CONCRETE ROAD

*
FENCE

ROOM
SWITCHYARD
GATE-1

NTC
ROO
MS
PROPOSED

D
OLD PRAYING
CRICKET
PROPOSED LOCATION
NEW BRICK MECHANICAL CONTRACTOR AREA

ROA
S SHED

PROPOSED LOCATION FOR 20 MW SOLAR SYSTEM


LINE-3
STORES SHED CABLE TRENCH F-TYPE GROUND

MAIN
AD GOTH
* ARD HAJI BAR
G-TYPE ROAD TOW
PROPOSED CABLE ROUTE *

ACPL
R15 R15

Y=1500 Y=1500

20 MW SOLAR SYSTEM
CIVIL FOUNDATION
7100 X7100 X 1700

*
THRUST BORING
MAZAR TOTAL AREA
WATER
COOLER *
11 KVA TRANSMISSION
LINE
(WITHIN BOUNDARY WALL) AREA
~99 Acres (EXCLUDING ROAD ALONG THE
BOUNDARY WALL, MAZAR AND NALA)
*
PRE-CAST BOUNDARY WALL ~79 Acres
*
R.LENGTH = ~1930 MTR

LINE #3 PROPOSED LOCATION OF


ACID TANK
(WHRS)
* OP OP OP

*
Y=1400 Y=1400 Y=1400
*
OP

D
ROA
*
* *

AIN
*
* *

LM
* THRUST BORING * NALA

ACP
*
*

Y=1300 Y=1300 * PROJECT OFFICE


Y=1300

CCR
GLASS
MCD
T4

WALL
300

INVERTERS
×
300
2

CENTRAL
500

FROM
CP

ENTRY
×
T2

ROOM
500

500

CABLE
500

×
OFFICE

MV
ROOM
T3

W/R

T1 1000
500
500

×
*

1200
C B

W/R

HUDDLE
35kV套管 35kV套管

c A
35kV套管

AUX
b 0a

TRAFO
ROOM
SECURITY

Draw
Pit
DOOR

LINE
TRANSMISSION
ROOM

UG
OUTPUT
CABLE
THRUST BORING
* * CONTROL
ROOM

IN
*

GATE
MA
THRUST BORING
*
* * OP

E-2
*
PATHWAY

GAT
* LAVATORY
FOR MAZAR
* BARBED WIRE FENCING
PORTABLE R.LENGTH = 530 MTR
WASHROOM

NALA
Y=1200 Y=1200 * * Y=1200
*
* *
* * X=3410.576
* *
* Y=1184.281 NALA
*
*
* OP
*
*
*
TCF SCHOOL MAZAR
*
*
X=2600

X=2700

X=2800

X=2900

X=3000

X=3100

X=3200

X=3300

X=3400

NALA NALA NALA

Y=1100 Y=1100 AGE


Y=1100
DRAIN
MAGAZINE RAIN
BARRIER POLE NALA
CHAIN LINK FENCING NALA
R.LENGTH = ~1330 MTR

AGE
NALA
HELECOPTER DRAIN
PAD RAIN
HELECOPTER OP
PAD

Y=1000 Y=1000
ACPL MA
IN ROAD
OP
DI SEC. POST ACPL MAIN
RAIN DRAIN
AGE
PIPE ROAD

ACPL MA OP
IN ROAD

TH
Y=900 O ACPL MA Y=900
G IN ROAD
O
RA
RD X
A
W
TO ACPL MA
IN ROAD
D
A
RO

X=4500

X=4600
MAGAZINE SOLAR PANEL
SEC. ROOM & POST
ACPL EXISTING ACQUIRED LAND
Y=800 ACPL PURCHASED LAND-1 Y=800

MAGAZINE ACPL MAIN BOUNDARY WALL


20 MW SOLAR SYSTEM

ROAD
X=3800

X=3900

X=4000

X=4100

X=4200

X=4300

X=4400

X=4700

X=4800

X=4900

X=5000

X=5100

X=5200

X=5300

X=5400

X=5500

X=5600
GAS LINE
X=3600
X=2400

X=2500

X=2600

X=2700

X=2800

X=2900

X=3000

X=3100

X=3200

X=3300

X=3400

X=3500

X=3700

BOUNDA
RY
Y=700 ACPL MAI Y=700
N ROAD

FOR APPROVAL
DETAIL 'X' Employer:

ATTOCK CEMENT PAKISTAN LIMITED

Contractor:

PROTECH

EXAMINED KM
20 MW ON GRID SOLAR SYSTEM
CHECKED NAJ
DESIGNED 33 KV UNDERGROUND CABLE ROUTE
& DRAWN SS

DATE 27-02-2021 SCALE DWG NO. ACPL/PV20MW/C-03

Das könnte Ihnen auch gefallen