Sie sind auf Seite 1von 13

General Notes

FIRST AID BUILDING


108 MILE

STRUCTURE DRAWING

1. REV-A0. 8.12.2017
No. Revision/Issue Date

DRAWING TITLE

Project Name and Address

FIRST AID BUILDING

108 MILE

Project Sheet

Date

Scale
FIRST AID BUILDING (108 MILE)
General Notes

Drawings
DRAWING LIST(Structural Drawings)

REV-A0 REV-A1 REV-A2 REV-A3 REMARK


SR NO. DESCRIPTION DRAWING NO
DATE DATE DATE DATE
1. DRAWING LIST ST-FAB-001 8.12.2017

2. SPECIFICATIONS FOR STEEL STRUCTURE ST-FAB-002A 8.12.2017

3. SPECIFICATIONS FOR R.C STRUCTURE ST-FAB-002B 8.12.2017

4. FOUNDATION PLAN ST-FAB-003 8.12.2017

5. STEEL COLUMN PLAN ST-FAB-004 8.12.2017

6. ANCHOR BOLT PLAN ST-FAB-005 8.12.2017

7. RAFTER & PURLIN PLAN ST-FAB-006 8.12.2017

8. END WALL CROSS SECTION ST-FAB-007 8.12.2017

9. TYPICAL CROSS SECTION ST-FAB-008 8.12.2017

10. CROSS SECTION @ GL-B @ GL-C ST-FAB-009 8.12.2017

11. FOOTING DETAILS ST-FAB-010 8.12.2017

12. DETAILS SCHEDULES ST-FAB-011 8.12.2017

1. REV-A0. 8.12.2017
No. Revision/Issue Date

DRAWING TITLE

DRAWING LIST

Project Name and Address

FIRST AID BUILDING

108 MILE

Project Sheet

Date

ST-FAB-001
Scale
General Notes

1. GENERAL NOTES

a

4. WELDING

5. TENSION FOR STRUCTURAL BOLT

1. REV-A0. 8.12.2017
No. Revision/Issue Date

DRAWING TITLE

SPECIFICATIONS FOR
STEEL STRUCTURE

Project Name and Address

FIRST AID BUILDING

108 MILE

Project Sheet

Date

ST-FAB-002A
Scale
General Notes

1. GENERAL NOTES(CONCRETE)

f'c=2500 psi f'c=3000 psi f'c=3500 psi


Bottom Bar size
fy(psi) fy(psi) fy(psi)
(mm)
40000 50000 60000 40000 50000 60000 40000 50000 60000
8 5.0 6.3 7.6 4.6 5.8 6.9 4.3 5.3 6.4
10 6.3 7.9 9.4 5.7 7.2 8.6 5.3 6.7 8.0
12 7.6 9.4 11.3 6.9 8.6 10.3 6.4 8.0 9.6
16 10.1 12.6 15.1 9.2 11.5 13.8 8.5 10.6 12.8
18 11.3 14.2 17.0 10.3 13.0 15.5 9.6 12.0 14.4
20 12.6 15.7 18.9 11.5 14.4 17.2 10.6 13.3 16.0
22 13.9 17.3 20.8 12.6 15.9 19.0 11.7 14.6 17.6
24 15.1 18.9 22.7 13.8 17.3 20.7 12.8 16.0 19.2
25 15.7 19.7 23.6 14.4 18.0 21.6 13.3 16.6 20.0

f'c=2500 psi f'c=3000 psi f'c=3500 psi


Bottom Bar size
Structural Ties fy(psi) fy(psi) fy(psi)
fy(psi) fy(psi) (mm)
member and stirrups
40000 50000 60000 40000 50000 60000 40000 50000 60000
ALL 50,000 ALL 50,000 8 10.1 12.6 15.1 9.2 11.5 13.8 8.5 10.6 12.8
10 12.6 15.7 18.9 11.5 14.4 17.2 10.6 13.3 16.0
12 15.1 18.9 22.7 13.8 17.2 20.7 12.8 16.0 19.2
16 20.2 25.2 30.2 18.4 23.0 27.6 17.0 21.3 25.6
18 22.7 28.3 34.0 20.7 25.9 31.0 19.1 24.0 28.8
20 25.2 31.5 37.8 23.0 28.7 34.5 21.3 26.6 32.0
22 34.6 43.3 52.0 31.6 39.5 47.5 29.3 36.6 44.0
24 37.8 47.2 56.7 34.5 43.1 51.8 31.9 40.0 48.0
25 39.4 49.2 59.1 35.9 44.9 53.9 33.3 41.6 50.0

f'c=2500 psi f'c=3000 psi f'c=3500 psi


Bottom Bar size
fy(psi) fy(psi) fy(psi)
(mm)
40000 50000 60000 40000 50000 60000 40000 50000 60000
8 8.4 10.5 12.6 6.3 7.9 9.4 6.3 7.9 9.4
10 10.5 13.1 15.7 7.9 9.8 11.8 7.9 9.8 11.8
12 12.6 15.7 18.9 9.4 11.8 14.2 9.4 11.8 14.2
16 16.8 21.0 25.1 12.6 15.7 18.9 12.6 15.7 18.9
18 18.9 23.6 28.3 14.2 17.7 21.3 14.2 17.7 21.3
20 20.9 26.2 31.4 15.7 19.7 23.6 15.7 19.7 23.6
22 23.0 28.8 34.6 17.3 21.7 26.0 17.3 21.7 26.0
24 25.1 31.5 37.7 18.9 23.6 28.3 18.9 23.6 28.3
25 26.2 32.8 39.3 19.7 24.6 29.5 19.7 24.6 29.5

f'c=2500 psi f'c=3000 psi f'c=3500 psi


Bottom Bar size
fy(psi) fy(psi) fy(psi)
f'c=2500 psi f'c=3000 psi f'c=3500 psi (mm)
Bottom Bar size 40000 50000 60000 40000 50000 60000 40000 50000 60000
fy(psi) fy(psi) fy(psi)
(mm) 8 6.0 6.3 7.6 4.6 5.8 6.9 4.3 5.3 6.4
40000 50000 60000 40000 50000 60000 40000 50000 60000
10 6.3 7.9 9.4 5.7 7.2 8.6 5.3 6.7 8.0
8 10.1 12.6 15.1 9.2 11.5 13.8 8.5 10.6 12.8 12 7.6 9.4 11.3 6.9 8.6 10.3 6.4 8.0 9.6
10 12.6 15.7 18.9 11.5 14.4 17.2 10.6 13.3 16.0 16 10.1 12.6 15.1 9.2 11.5 13.8 8.5 10.6 12.8
1. REV-A0. 8.12.2017
12 15.1 18.9 22.7 13.8 17.2 20.7 12.8 16.0 19.2 18 11.3 14.2 17.0 10.3 13.0 15.5 9.6 12.0 14.4
16 20.2 25.2 30.2 18.4 23.0 27.6 17.0 21.3 25.6 20 12.6 15.7 18.9 11.5 14.4 17.2 10.6 13.3 16.0 No. Revision/Issue Date
18 22.7 28.3 34.0 20.7 25.9 31.0 19.1 24.0 28.8 22 13.9 17.3 20.8 12.6 15.9 19.0 11.7 14.6 17.6
20 25.2 31.5 37.8 23.0 28.7 34.5 21.3 26.6 32.0 24 15.1 18.9 22.7 13.8 17.3 20.7 12.8 16.0 19.2 DRAWING TITLE

22 34.6 43.3 52.0 31.6 39.5 47.5 29.3 36.6 44.0 25 15.7 19.7 23.6 14.4 18.0 21.6 13.3 16.6 20.0
24 37.8 47.2 56.7 34.5 43.1 51.8 31.9 40.0 48.0
25 39.4 49.2 59.1 35.9 44.9 53.9 33.3 41.6 50.0
SPECIFICATIONS FOR
RC STRUCTURE
f'c=2500 psi f'c=3000 psi f'c=3500 psi
Top Bar size fy(psi) fy(psi) fy(psi)
(mm)
40000 50000 60000 40000 50000 60000 40000 50000 60000
Project Name and Address

8 13.1 16.4 19.6 12.0 15.0 17.9 11.1 13.8 16.6


10 16.4 20.4 24.6 15.0 18.7 22.4 13.8 17.3 20.8 FIRST AID BUILDING
12 19.6 24.6 29.5 17.9 22.4 26.9 16.6 20.8 25.0
16 26.3 32.8 39.3 23.9 29.9 35.9 22.1 27.7 33.3
108 MILE
18 29.5 36.8 44.2 26.9 33.7 40.3 24.8 31.2 37.4
20 32.8 41.0 49.1 29.9 37.3 44.9 27.7 34.6 41.6
22 45.0 56.3 67.6 41.1 51.4 61.8 38.1 47.6 57.2
24 49.1 61.4 73.7 44.9 56.0 67.3 41.5 52.0 62.4 Project Sheet

25 51.2 64.0 76.8 46.7 58.4 70.1 43.3 54.1 65.0


Date

ST-FAB-002B
Scale
General Notes

A B C D E F

X1 X2 X3
18700

4100 3000 4500 3000 4100

GB GB GB GB GB
4

25

25

25

25
F2C2 F1C1 F1C1 F1C1 F1C1 F2C2

2500

2500
3120

GB GB
Y1 Y1
5000

GB

GB

GB

GB

GB

GB
GB

2500

2500
1880

62 F1C1 F1C1 F1C1 F1C1 62


F2C2
F2C2
3
GB GB
1000 1000
12000

GB
2000

2000
GB

GB

GB

GB

GB

GB
2
GB

F2C2
1945

1945
F1C1 F1C1 F1C1 F1C1 F2C2
62 62
GB GB
5000

GB

GB

GB

GB

GB

GB
3055

3055 1. REV-A0. 8.12.2017


No. Revision/Issue Date
F2C2 F1C1 F1C1 F1C1 F1C1 F2C2
25

25

25

25
1 Y2 Y2
DRAWING TITLE

GB GB GB GB GB
FOUNDATION PLAN

X1 X2 X3 Project Name and Address

FIRST AID BUILDING

108 MILE

FOUNDATION PLAN
Project Sheet

Date

ST-FAB-003
Scale
General Notes

A B C D E F

X1 X2 X3
18700

4100 3000 4500 3000 4100

25

25

25

25
HC2 HC1 HC1 HC1 HC1 HC2

Y1 Y1
5000

62 62
HC2 HC1 HC1 HC1 HC1 HC2
3
12000

2000

2
HC2 HC1 HC1 HC1 HC1 HC2
62 62
5000

1. REV-A0. 8.12.2017
No. Revision/Issue Date

DRAWING TITLE
25

25

25

25
1 Y2 Y2 STEEL COLUMN PLAN
HC2 HC1 HC1 HC1 HC1 HC2

X1 X2 X3
Project Name and Address

LEGEND
FIRST AID BUILDING

108 MILE

HC1 = H-300x150 mm(36.7 Kg/m)


HC2 = H-250x125 mm(25.7 Kg/m) STEEL COLUMN PLAN Project Sheet

Date

ST-FAB-004
Scale
A B C D E F
General Notes

X1 X2 X3
18700

4100 3000 4500 3000 4100

25

25

25

25
HC2 HC1 HC1 HC1 HC1 HC2

Y1 Y1
5000

62 62
HC2 HC1 HC1 HC1 HC1 HC2
3
12000

2000

2
HC2 HC1 HC1 HC1 HC1 HC2
62 62
5000

1. REV-A0. 8.12.2017
25

25

25

25
1 Y2 Y2 No. Revision/Issue Date

HC2 HC1 HC1 HC1 HC1 HC2 DRAWING TITLE

ANCHOR BOLT PLAN

LEGEND X1 X2 X3
500 550
400
Project Name and Address

350
FIRST AID BUILDING

ANCHOR BOLT PLAN


400
250

145

108 MILE
225
375

145

180
Project Sheet

160 Date

H-250x125 mm(25.7 Kg/m) H-300x150 mm(36.7 Kg/m) ST-FAB-005


Scale

350 x 225 x 20t M.S Base Plate 400 x 250 x 20t M.S Base Plate
with 4# Ø25mm Anchor Bolt (600mm-L) with 4# Ø25mm Anchor Bolt (600mm-L)
General Notes

A B C D E F

X1 X2 X3
18700

4100 3000 4500 3000 4100

FB1

FB1

FB1
1500
FB1
4
TB TB TB TB
TB PL

PL

PL

Y1 Y1
5000

PL
R1 R2 R2 R2 R2 R1
PL

PL
3 PL
12000

PL
2000

TB TB TB TB TB
PL

2 PL

PL

PL
R1 R2 R2 R2 R2 R1
5000

PL

PL 1. REV-A0. 8.12.2017
No. Revision/Issue Date

PL DRAWING TITLE

1 Y2 PL
TB
TB
TB TB TB
Y2 RAFTER & PURLIN PLAN
FB1
1500

FB1

FB1

FB1

X1 X2 X3
Project Name and Address

LEGEND FIRST AID BUILDING

108 MILE
FB1 = H-200x100 (21.3 kg/m)
R1 = H-250x125 (29.6 kg/m)
RAFTER & PURLIN PLAN Project Sheet

R2 = H-300x150 (36.7 kg/m)


Date

TB = H-200x100 (21.3 kg/m) ST-FAB-006


Scale

PL = Purlin = C-100x50x20x2@850mm C/C


General Notes

1 2 3 4
12000

5000 2000 5000

Ridge Cover

0.396mm THK. Pre-Painted Galvanized Steel Sheet Roof

R1 = H-250x125 (29.6 kg/m)H-Section Rafter


11°
Purlin = C-100x50x20x2@850mm C/C

TB = H-200x100 (21.3 kg/m) H-Section Tie Beam

Brick Wall Brick Wall


1331

TB
R2 R2
1. REV-A0. 8.12.2017
No. Revision/Issue Date
4500

DRAWING TITLE

TB TB
3169

END WALL CROSS SECTION

Project Name and Address

FIRST AID BUILDING


450

108 MILE

Project Sheet

END WALL CROSS SECTION Date

ST-FAB-007
Scale
1 2 3 4
General Notes

12000

5000 2000 5000

Ridge Cover
0.396mm THK. Pre-Painted Galvanized Steel Sheet Roof
R2 = H-300x150 (36.7 kg/m)H-Section Rafter
Purlin = C-100x50x20x2@850mm C/C
11°

TB = H-200x100 (21.3 kg/m) H-Section Tie Beam

Brick Wall Brick Wall


1331

TB
R2 R2
1. REV-A0. 8.12.2017
No. Revision/Issue Date
4500

DRAWING TITLE

TB TB
3169

END WALL CROSS SECTION

Project Name and Address

FIRST AID BUILDING


450

108 MILE

Project Sheet

Date

ST-FAB-008
Scale

TYPICAL CROSS SECTION


1 2 3 4
General Notes

12000

5000 2000 5000

Ridge Cover
0.396mm THK. Pre-Painted Galvanized Steel Sheet Roof
R2 = H-300x150 (36.7 kg/m)H-Section Rafter
Purlin = C-100x50x20x2@850mm C/C
11°

TB = H-200x100 (21.3 kg/m) H-Section Tie Beam


Brick Wall

Brick Wall 150mm thk; Decking Slab


1331

1500 1500
TB
R2 R2
1. REV-A0. 8.12.2017

FB1 FB1 No. Revision/Issue Date


4500

FB1 FB1 DRAWING TITLE

TB TB
3169

END WALL CROSS SECTION

Project Name and Address

FIRST AID BUILDING


450

108 MILE

Project Sheet

Date

ST-FAB-009
Scale

CROSS SECTION @ GL-B @ GL-C


General Notes

H-250x125(29.6 Kg/m) Steel Column H-300x150(36.7 Kg/m) Steel Column

25mmØ Anchor Bolt & Nut With Spring Washer 25mmØ Anchor Bolt & Nut With Spring Washer
20mm THK. Base Plate 20mm THK. Base Plate
600

600
Plinth Level Plinth Level

225x225 R.C Ground Beam 225x225 R.C Ground Beam


3# T-18 Top & 3# T-18 Bottom Bar 3# T-18 Top & 3# T-18 Bottom Bar
With 6.5mm Stirrup @ 150mm C/C With 6.5mm Stirrup @ 150mm C/C
~1800

~1800
500x375 R.C Short Column 550x400 R.C Short Column
8# T-20 With 8mm Stirrup @ 200mm C/C 8# T-20 With 8mm Stirrup @ 200mm C/C
75

75
75 75 75 75
(1:3:6) Lean Concrete (1:3:6) Lean Concrete
75

75
Hard Core Hard Core
225.0000 225.0000
225

225
150

150
1150 1650

1500
1000
1000x1000x300 Footing
1500x1500x300 Footing
500 550
500x375 R.C Short Column 550x400 R.C Short Column
1000

1. REV-A0. 8.12.2017
375

1500

400
8# T-20 With 8mm Stirrup @ 200mm C/C 8# T-20 With 8mm Stirrup @ 200mm C/C No. Revision/Issue Date
75
75 DRAWING TITLE

T-16 @ 150mm C/C Both Way FOOTING DETAILS


T-16 @ 150mm C/C Both Way
75

H-250x125(29.6 Kg/m) Column 75


F1C1
Project Name and Address

FIRST AID BUILDING


F2C2 H-300x150(36.7 Kg/m) Column
108 MILE

Project Sheet

Date

ST-FAB-010
Scale
General Notes

f'c = 3000 psi fy = 50000 psi


RC SHORT COLUMN SCHEDULE Beam Clear cover = 3"

No. Type Size STEEL REINFORCEMENT Remark

1. C1 550 x 400 8# T-20 With 8mm Stirrup @ 200mm C/C ---

2. C2 500x375 8# T-20 With 8mm Stirrup @ 200mm C/C ---

f'c = 3000 psi fy = 50000 psi


RC FOOTING SCHEDULE Beam Clear cover = 3"

STEEL REINFORCEMENT
No. Type Size Layer Remark
LONG DIRECTION SHORT DIRECTION

1. F1 1000 x 1000 x 300 T-16 @ 150mm C/C T-16 @ 150mm C/C 1-Layers -

2. F2 1500 x 1500 x 300 T-16 @ 150mm C/C T-16 @ 150mm C/C 1-Layers -

1. REV-A0. 8.12.2017
f'c = 3000 psi fy = 50000 psi
GROUND BEAM SCHEDULE Beam Clear cover = 1½" No. Revision/Issue Date

DRAWING TITLE

Left End Support Mid Span Right End Support


Name Size Torsion Steel Stirrup Remark
Top Bottom Top Bottom Top Bottom DETAILS SCHEDULES

GB1 225 x 225 3T- 18mm 3T- 18mm 3T- 18mm 3T- 18mm 3T- 18mm 3T- 18mm - T-6.5mm @150mm C/C @ Plinth level
Project Name and Address

FIRST AID BUILDING

108 MILE

Project Sheet

Date

ST-FAB-011
Scale

Das könnte Ihnen auch gefallen