LAPORAN HARIAN SIPIL

No Tgl Request Lokasi Jenis Pekerjaan Jenis Kerusakan Solusi Perbaikan

SIPIL

Diperbaiki,dibobok temboknya cari jalur


1 6/3/2019 fus 8 Request pipa ripeng bocor,tembok jadi basah
yang bocor,diganti pipa ripengnya

2 6/3/2019 Pos Security Request atap lapuk Diperbaiki,diganti kayu yang lapuk

ELEKTRIK
1 6/3/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 6/3/2019 Pump House Schedule (Rutin) Catat pemakaian air jetpump
Pompa DW-2 trouble, Pompa tidak bisa Kontrol level air, pengoperasian 3
3 6/3/2019 Pump House Request
running jetpump
4 6/3/2019 DEG Schedule (Rutin) Test run genset
5 6/3/2019 jalan utama Request cek lampu jalan
6 6/3/2019 Gudang Elektrik Schedule (Rutin) 5S
N HARIAN SIPIL
Target Tanggal Status Cost of Manpower M
Jam Perbaikan KET
Dikerjakan Selesai Realisasi Akhir Qty Price/h Total Qty Price/unit

08.15 - 11.40 6/3/2019 6/3/2019 6/3/2019 Continue 7 20500 143500

12.45 - 15.55 6/3/2019 6/3/2019 6/3/2019 Continue 7 20500 143500

08.10 - 08.30 6/3/2019 6/3/2019 6/3/2019 Finish 1 20500 20500


08.30 - 09.00 6/3/2019 6/3/2019 6/3/2019 Finish 1 20500 20500
08.15 - 15.50 6/3/2019 6/3/2019 6/3/2019 Continue 2 20500 41000
08.30 - 09.30 6/3/2019 6/3/2019 6/3/2019 Finish 2 20500 41000
09.30 - 11.45 6/3/2019 6/3/2019 6/3/2019 Continue 4 20500 82000
12.50 - 15.55 6/3/2019 6/3/2019 6/3/2019 Finish 4 20500 82000
M
Total
LAPORAN HARIAN INDOOR

No Tanggal Nama Petugas Lokasi

INDOOR
BBD1-3,7,12,18,GRB 2,6,GRA 1-6,FUS
1 6/3/2019 Sunenah, Juheti, Priyatin
18,19,20
Office, Toilet Kantin, Musholla, Pot Tanaman,
2 6/3/2019 Mariyah
ISR,R100

3 6/3/2019 Cahya Kolam Renang, Koridor BBD 27-37

Komunal, Ora-ori, Kantin, Toilet Musholla, Pot


4 6/3/2019 Masrurah
Tanaman, R100
OUTDOOR
1 6/3/2019 Fauzi, Masduki hal.bd depan
2 6/3/2019 suhemi, Halawi All Area
3 6/3/2019 yadi(ManPower) Komunal - Luar Depan, BD/BBD
4 6/3/2019 Muslimin Komunal - DEG - FUS
5 6/3/2019 Kurtubi komunal-luar depan ,fulltank
6 6/3/2019 misri (ManPower) Garasi BD - BD - BBD
7 6/3/2019 Otong S. depan pos security
Note : Status Akhir, Finish=Selesai, Continue=Lanjut.
LAPORAN HARIAN INDOOR OUTDOOR

Jenis Pekerjaan Status Akhir KET

Cleaning ruangan, dan pembersihan rumput koridor/halaman terbuka Finish On Schedule

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang, penjernihan air kolam
Continue cuti
renang, pembersihan saluran air koridor

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Pemotongan rumput mesin gendong Continue On Schedule


Pembuangan sampah Finish On Schedule
pembuangan sampah,sapu jalan Finish On Schedule
Penyapuan jalan Finish On Schedule
penyiraman tanaman, pendangiran tanaman serutan Finish On Schedule
Penyapuan jalan Finish On Schedule
Pemotongan rumput mesin dorong Finish On Schedule
No Tgl Request Lokasi Jenis Pekerjaan Jenis Kerusakan

1 6/3/2019 fus 8 request ,tembok rembes,pipa ripeng bocor

1 5/31/2019 Pos Security Request Atap lapuk


Wastafel kamar mandi anak bocor, wastafel
2 5/31/2019 FUA-2 Request
kamar mandi ruang tamu mampet
1 5/29/2019 Pos Security Request Atap lapuk
1 5/28/2019 GRB-2 Request Drain kitchen sink mampet
2 5/28/2019 GRB-3 Request Ada indikasi rayap di kitchen set
3 5/28/2019 Pos Security Request Atap lapuk
1 5/27/2019 Gudang Material Schedule (Rutin) 5S
2 5/27/2019 GRB-2 Request Floor drain kamar mandi mampet
3 5/27/2019 GRB-3 Request Ada indikasi rayap di kitchen set
1 5/25/2019 Fuel Tank Request Kran valve jalur hydrant bocor
2 5/25/2019 Gudang Sipil Schedule (Rutin) 5S
1 5/24/2019 Pump House, R.KompoRequest Menutup bekas bobokan pasang pipa jetpump
2 5/24/2019 Gudang Sipil Schedule (Rutin) Pengecekan stok material
3 5/24/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
4 5/24/2019 FUS -10 Request Perbaikan kran wastafel bocor, drain sink mampet

1 5/23/2019 FUS-8 Request Menutup bekas bobokan perbaikan pipa air panas
2 5/23/2019 All Area Request Sweeping genteng jatuh
1 5/22/2019 BBD-1 Schedule (Urgent) Perbaikan kayu pembatas koridor
2 5/22/2019 BBD-12 Request Kloset bocor
3 5/22/2019 FUS-8 Request Ram nyamuk ruang tamu sobek
1 5/21/2019 BBD-1 Schedule (Urgent) Perbaikan kayu pembatas koridor
1 5/20/2019 BBD-1 Schedule (Urgent) Perbaikan kayu pembatas koridor
1 5/18/2019 BBD-1 Schedule (Urgent) Perbaikan kayu pembatas koridor
1 5/17/2019 FUS-10 Request Sink mampet
2 5/17/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
No Tgl Request Lokasi Jenis Pekerjaan Jenis Kerusakan

3 5/17/2019 BBD-1 Schedule (Urgent) Perbaikan kayu pembatas koridor


1 5/16/2019 Pump House Request Pembuatan rumah pompa jetpump
2 5/16/2019 BD/BBD Request Sweeping genteng jatuh
1 5/15/2019 BD-17 Request Perbaikan unit rumah
2 5/15/2019 GRB-5 Request Perbaikan pintu kamar mandi seret
3 5/15/2019 FUS-17 Request Perbaikan pintu arah conblok dan pintu dapur
1 5/14/2019 BD-17 Request Perbaikan unit rumah
2 5/14/2019 FUM-3 Request Kran wastafel kotor, air keluar menyebar

1 5/13/2019 Pump House, DEG Request Pemasangan instalasi pompa jetpump

1 5/11/2019 BBD-1 Schedule (Urgent) Perbaikan tiang kayu koridor lapuk

2 5/11/2019 FUS-8 Request Bocor atap dapur

1 5/10/2019 Parkir Motor (Depan Mu


Request Atap bocor, gypsum lapuk
2 5/10/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
Kran shower kamar mandi atas bocor lagi (netes
1 5/9/2019 FUS-1 Request
kecil)
2 5/9/2019 Parkir Motor (Depan Mu
Request Atap bocor, gypsum lapuk
Sink mampet, floor drain dapur mampet, shower
1 5/8/2019 FUS-1 Request
kamar mandi atas bocor

2 5/8/2019 FUV-1 Request Setting meja


1 5/7/2019 Parkir Motor (Depan Mu
Request Atap bocor, gypsum lapuk
2 5/7/2019 Kantin Request Setting meja
1 5/6/2019 Parkir Motor (Depan Mu
Request Atap bocor, gypsum lapuk
2 5/6/2019 FUS-10 Request Talang dapur bocor
No Tgl Request Lokasi Jenis Pekerjaan Jenis Kerusakan

1 5/4/2019 BBD-1 Schedule (Urgent) Perbaikan kayu pembatas dan tiang koridor lapuk
1 5/3/2019 FUS 9-10 Request Keramik naik kamar tidur
2 5/3/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
Pengecekan atas plafon, ada lubang yang bisa
1 5/2/2019 FUS 9-10 Request
menjadi jalur keluar masuk musang
1 4/30/2019 FUS-5 Request Atap bocor KTU
2 4/30/2019 All Area Request Fogging
Pengecekan atas plafon, ada lubang yang bisa
3 4/30/2019 FUS 9-10 Request
menjadi jalur keluar masuk musang
1 4/29/2019 FUS-5 Request Atap bocor KTU
2 4/29/2019 Gudang Sipil Schedule (Rutin) Pengecekan stok material
3 4/29/2019 Pump House Request Menambal bekas bobokan pipa pompa jetpump
1 4/27/2019 Kolam Renang Request Keramik lepas
2 4/27/2019 FUS-5 Request Atap bocor KTU
1 4/26/2019 Pump House Request Pengeboran air
2 4/26/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
1 4/25/2019 Pump House Request Pengeboran air

2 4/25/2019 FUS-5 Request Plafon kamar tidur utama berlubang

1 4/24/2019 BBD-37 Schedule (Urgent) Perbaikan kayu pembatas koridor lapuk


1 4/23/2019 Gudang Sipil Request Keramik naik

2 4/23/2019 FUS 9-10 Request Ada bau bangkai di area balkon

3 4/23/2019 BBD-37 Schedule (Urgent) Perbaikan kayu pembatas koridor lapuk


No Tgl Request Lokasi Jenis Pekerjaan Jenis Kerusakan

1 4/22/2019 BBD-37 Schedule (Urgent) Perbaikan kayu pembatas koridor lapuk


1 4/20/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/20/2019 FUS-2 Request Pintu arah conblok seret (keramik naik)
1 4/18/2019 GRB-2 Request Sink bocor, floor drain kamar mandi mampet
Perbaikan talang bocor dan pembersihan talang
2 4/18/2019 FUS-16 Request
mampet

3 4/18/2019 R. Mahyong Request Perbaikan keramik naik dan pecah

4 4/18/2019 FUS-2 Request Pintu arah conblok seret (keramik naik)

Perbaikan talang bocor dan pembersihan talang


1 4/16/2019 FUS-16 Request
mampet
1 4/15/2019 FUS-15 Request Perbaikan talang bocor
Perbaikan talang bocor dan pembersihan talang
2 4/15/2019 FUS-11 Request
mampet
1 4/13/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/13/2019 FUS-15 Request Perbaikan talang bocor

1 4/12/2019 FUS-14 Request Plafon luar dan talang arah taman hampir jatuh
2 4/12/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
1 4/11/2019 FUS-12 Request Plafon luar hampir jatuh
2 4/11/2019 Komunal Request Kayu penyangga pot besar lapuk
3 4/11/2019 GRB-2 Request Drain sink bocor
1 4/10/2019 BBD-8 Schedule (Urgent) Perbaikan kayu pembatas koridor lapuk
2 4/10/2019 FUV-6 Request Perbaikan kayu atap garasi lapuk
3 4/10/2019 BBD 26-27 Schedule (Urgent) Perbaikan unit rumah
1 4/9/2019 Komunal Schedule (Urgent) Pengecekan pintu-pintu ruangan
2 4/9/2019 GRA & GRB Request Pengecekan hook gordyn
No Tgl Request Lokasi Jenis Pekerjaan Jenis Kerusakan

1 4/8/2019 GRA 2-5 Request Perbaikan atap bocor


2 4/8/2019 FUS-2 Request Ada bocor atap teras dapur
1 4/6/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
Air hujan yang jatuh ke talang koridor menetes
2 4/6/2019 GRA 1-2 Request
mengenai outdoor AC
3 4/6/2019 Ora-ori Request Drain wastafel mampet
4 4/6/2019 BD-11 Request Kran shower mandi dan kran wastafel bocor
1 4/5/2019 FUS-2 Request Ada bocor atap teras dapur
2 4/5/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
Keramik lepas ruang tamu, kran shower mandi
1 4/4/2019 FUS-10 Request
kamar mandi lt.2 bocor

2 4/4/2019 GRA Request Pengecekan atap saat hujan


3 4/4/2019 FUS-2 Request Ada bocor atap teras dapur
1 4/2/2019 Komunal Schedule (Urgent) Pengecekan pintu ruangan area komunal
1 4/1/2019 BBD-8 Schedule (Safety) Perbaikan kayu pembatas koridor lapuk
1 3/30/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/30/2019 BBD-8 Request Perbaikan kayu pembatas koridor lapuk
Setting meja seperti semula (bekas dipakai
1 3/29/2019 Kantin Request
meeting)
2 3/29/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
3 3/29/2019 BBD-8 Request Perbaikan kayu pembatas koridor lapuk
1 3/28/2019 FUS-10 Request Sink dapur mampet, kran bocor
2 3/28/2019 BBD-8 Schedule (Urgent) Perbaikan kayu pembatas koridor
3 3/28/2019 FUV-3 Request Kerangka tempat tidur tidak kokoh
4 3/28/2019 Toilet Musholla Request Handle pintu lepas
1 3/27/2019 Kantin Request Perbaikan drain wastafel bocor leher angsa
2 3/27/2019 BBD-8 Schedule (Urgent) Perbaikan kayu pembatas koridor
3 3/27/2019 FUS-10 Request Sink dapur mampet, kran bocor
1 3/26/2019 FUV-6 Schedule (Urgent) Perbaikan atap garasi
No Tgl Request Lokasi Jenis Pekerjaan Jenis Kerusakan

2 3/26/2019 Gudang Sipil Schedule (Rutin) Perbaikan atap garasi


3 3/26/2019 BBD-27 Schedule (Urgent) Perbaikan unit rumah
1 3/25/2019 FUV-6 Schedule (Urgent) Perbaikan atap garasi
1 3/23/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/23/2019 FUV-6 Schedule (Urgent) Perbaikan atap garasi
3 3/23/2019 Gudang Kolam Renan Request Pengecatan daun pintu
1 3/22/2019 FUV-6 Schedule (Urgent) Perbaikan atap garasi
2 3/22/2019 ISR Schedule (Urgent) Perbaikan meja dispenser
3 3/22/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
1 3/21/2019 FUV-1 Request Perbaikan pintu arah taman lapuk
2 3/21/2019 FUV-6 Schedule (Urgent) Perbaikan atap garasi
3 3/21/2019 Kantin Request Melepas sambungan meja
1 3/20/2019 FUV-1 Request Perbaikan pintu arah taman lapuk
2 3/20/2019 BBD-22 Request Bantu elektrik service AC
3 3/20/2019 Kantin Request Perbaikan wastafel mampet
4 3/20/2019 BBD-26 Request Perbaikan unit rumah
1 3/19/2019 BBD-26 Request Perbaikan unit rumah
Pemasangan brankas dan engsel gembok lemari
2 3/19/2019 BBD-22 Request
pakaian
1 3/19/2019 BBD-26 Request Perbaikan unit rumah
Pemasangan brankas dan engsel gembok lemari
2 3/19/2019 BBD-22 Request
pakaian

1 3/18/2019 Komunal Request Atap bocor

Pembersihan & cat ulang dinding kotor,


2 3/18/2019 Komunal Request
pengecekan toilet
3 3/18/2019 ISR Request Setting meja
1 3/16/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/16/2019 Komunal Request Atap bocor
3 3/16/2019 BBD-26 Request Perbaikan unit rumah
No Tgl Request Lokasi Jenis Pekerjaan Jenis Kerusakan

Perbaikan (menambal) dinding bekas perbaikan


1 3/15/2019 FUS-9 Request
AC KTU, perbaikan box gordyn KTU

2 3/15/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin


3 3/15/2019 BBD-37 Request Perbaikan atap bocor
1 3/14/2019 BD 19-21 Request Perbaikan atap bocor
2 3/14/2019 BBD-26 Request Perbaikan unit rumah
Pemasangan brankas dan engsel gembok almari
3 3/14/2019 BBD-21 Request
pakaian
1 3/13/2019 BD 19-21 Request Perbaikan atap bocor
Pemasangan safety box dan engsel gembok
2 3/13/2019 BBD 18, 23, 30, 31 Request
untuk lemari pakaian
1 3/12/2019 BD 19-21 Request Perbaikan atap bocor
2 3/12/2019 BBD 2, 5, 7, 18, 19 Request Perbaikan genteng hampir jatuh
1 3/11/2019 GRA-1 Request Talang dan kayu koridor lapuk
2 3/11/2019 BD-21 Request Plafon gypsum lapuk karena bocor
1 3/9/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/9/2019 FUV-6 Request Pengecekan rutin
3 3/9/2019 Komunal (Kantin) Request Plafon gypsum lapuk karena bocor
4 3/9/2019 Toilet Musholla Request Wastafel mampet
1 3/8/2019 Komunal Request Perbaikan atap bocor
2 3/8/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
1 3/6/2019 BBD-26 & BBD-27 Schedule (Urgent) Perbaikan unit rumah
2 3/6/2019 FUS-3 Request Indovision menarik perangkat
1 3/5/2019 BBD-25 & BBD-26 Schedule (Urgent) Perbaikan unit rumah
2 3/5/2019 ISR Request Atap bocor
3 3/5/2019 BBD 8-10 Project Penggantian atap baja ringan
1 3/4/2019 Ora-ori Request Kloset bocor
2 3/4/2019 BBD-25 & BBD-26 Schedule (Urgent) Perbaikan unit rumah
No Tgl Request Lokasi Jenis Pekerjaan Jenis Kerusakan

3 3/4/2019 Ora-ori Request Urinoir bocor


1 3/2/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/2/2019 BBD-25 & BBD-26 Schedule (Urgent) Perbaikan unit rumah
1 3/1/2019 BBD-37 (koridor) Request Perbaikan koridor miring
2 3/1/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
1 2/28/2019 BBD-37 (koridor) Request Perbaikan koridor miring
1 2/27/2019 BBD-25 Schedule (Urgent) Perbaikan unit rumah
2 2/27/2019 BBD-37 (koridor) Request Perbaikan koridor miring
1 2/26/2019 BBD 24-27 Schedule (Urgent) Perbaikan unit rumah
2 2/26/2019 FUS-11 Request Perbaikan drain sink mampet dan bocor
Pemasangan engsel gembok pada almari
3 2/26/2019 BBD-31 Request
pakaian
1 2/25/2019 Lap. Parkir Tennis Request Kran air bocor
2 2/25/2019 Gudang Sipil Schedule (Rutin) Pengecekan stok material
3 2/25/2019 FUS-17 Request Pintu dapur terkunci
4 2/25/2019 Gudang Sipil Schedule (Rutin) 5S
1 2/23/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/23/2019 BBD 33-37 Request Perbaikan atap koridor (genteng pecah)
3 2/23/2019 BBD, GRA/B Request Sweeping genteng jatuh dan pecah
1 2/22/2019 CPG, FUS-20 Request Perbaikan atap ayunan
2 2/22/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
1 2/21/2019 FUV-2 Request Sweeping rayap
1 2/20/2019 BD-24 Request Perbaikan kayu koridor lapuk
Perbaikan kursi lipat, setting meja bulat untuk
2 2/20/2019 ISR Request
simulasi compliance
1 2/19/2019 BD-24 Request Perbaikan kayu koridor lapuk
2 2/19/2019 FUV-2 Request Plafon gypsum KTU berlubang
1 2/18/2019 BD-24 Request Perbaikan kayu koridor lapuk
1 2/16/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/16/2019 FUA-1 Request Doorseal pintu rusak
No Tgl Request Lokasi Jenis Pekerjaan Jenis Kerusakan

3 2/16/2019 FUS-12 Request Gypsum atap ruang tamu ada rembes air
1 2/15/2019 BD-24 Request Perbaikan kayu koridor lapuk
2 2/15/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
1 2/14/2019 BD-24 Request Perbaikan kayu koridor lapuk
1 2/13/2019 BD-24 Request Perbaikan kayu koridor lapuk
1 2/12/2019 FUS-1, FUS-8, FUA-2 Request Pembagian stiker mobil access pebeka
2 2/12/2019 Toilet Musholla Request Wastafel mampet
3 2/12/2019 BD-24 Request Perbaikan kayu koridor lapuk
4 2/12/2019 FUM-3 Request Kloset kamar mandi pembantu tidak bisa flushing
5 2/12/2019 FUS-2 Request Kran air teras dapur (kamar pembantu) patah

Bocor rembes dinding dapur, kran air belakang


1 2/11/2019 FUS-2 Request
(belakang kamar pembantu) patah

2 2/11/2019 BD-24 Request Perbaikan kayu koridor lapuk

1 2/9/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/9/2019 BD 27-32 Request Perbaikan atap koridor bocor

Pipa supply air dingin input water heater bocor


1 2/8/2019 FUV-1 Request
sambungan
Kran wastafel kamar mandi pembantu dan kran
2 2/8/2019 FUV-1 Request
mesin cuci bocor
3 2/8/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
1 2/7/2019 BD-16 Request Atap bocor

Pipa supply air dingin input water heater bocor


2 2/7/2019 FUV-1 Request
sambungan
1 2/6/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
2 2/6/2019 All Area Request Pembagian sticker kendaraan 2019
No Tgl Request Lokasi Jenis Pekerjaan Jenis Kerusakan

3 2/6/2019 FUV-2 Request Perbaikan slot bawah pintu alumunium rusak


4 2/6/2019 BD-16 Request Atap bocor
1 2/4/2019 BBD-26 Request Perbaikan plafon gypsum lapuk terkena rayap
1 2/2/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/2/2019 BD-32 Request Perbaikan kran shower bocor
3 2/2/2019 GRB-1 Request Atap koridor bocor
4 2/2/2019 FUS-11 Request Sink mampet
1 2/1/2019 BD-32 Request Perbaikan atap bocor
2 2/1/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
Note : Status Akhir, Finish=Selesai, Continue=Lanjut.

Dilaporkan

Tgl :
LAPORAN HARIAN SIPIL

Jam Target Tanggal Status Cost of M


Solusi Perbaikan KET
Perbaikan Dikerjakan Selesai Realisasi Akhir Qty
dicari titik bocor ,di bobok tembok yang 08.15-15.55 6/3/2019 6/3/2019 6/3/2019 continue
rembes,ganti pipa ripeng

Diperbaiki, kayu yang lapuk diganti 08.15 - 11.40 5/31/2019 5/31/2019 5/31/2019 Continue 7
Diperbaiki 12.45 - 15.55 5/31/2019 5/31/2019 5/31/2019 Finish 7
Diperbaiki, kayu yang lapuk diganti 08.15 - 15.55 5/29/2019 5/29/2019 5/29/2019 Continue 14
Diperbaiki, dirojok 08.15 - 14.30 5/28/2019 5/28/2019 5/28/2019 Finish 8
Dicek, disemprot anti rayap 10.00 - 11.00 5/28/2019 5/28/2019 5/28/2019 Finish 2
Dicek 14.30 - 15.50 5/28/2019 5/28/2019 5/28/2019 Continue 4
08.15 - 15.55 5/27/2019 5/27/2019 5/27/2019 Finish 8
Diperbaiki, dirojok 09.00 - 10.45 5/27/2019 5/27/2019 5/27/2019 Finish 4
Dicek, disemprot anti rayap 13.30 - 14.30 5/27/2019 5/27/2019 5/27/2019 Continue 2
Diperbaiki, sementara diikat karet 07.15 - 08.30 5/25/2019 5/25/2019 5/25/2019 Finish 2
08.30 - 11.55 5/25/2019 5/25/2019 5/25/2019 Finish 8
Didempul 08.15 - 14.00 5/24/2019 5/24/2019 5/24/2019 Finish 5
08.30 - 11.25 5/24/2019 5/24/2019 5/24/2019 Finish 4
14.00 - 15.30 5/24/2019 5/24/2019 5/24/2019 Finish 2
13.10 - 15.50 5/24/2019 5/24/2019 5/24/2019 Finish 3

Didempul dan dicat 08.15 - 11.55 5/23/2019 5/23/2019 5/23/2019 Finish 8


13.10 - 15.50 5/23/2019 5/23/2019 5/23/2019 Finish 6
08.15 - 15.55 5/22/2019 5/22/2019 5/22/2019 Continue 10
Diperbaiki 10.00 - 11.50 5/22/2019 5/22/2019 5/22/2019 Finish 2
Diperbaiki, ganti kawat ram nyamuk 10.00 - 11.50 5/22/2019 5/22/2019 5/22/2019 Finish 2
08.15 - 15.55 5/21/2019 5/21/2019 5/21/2019 Continue 14
08.15 - 15.55 5/20/2019 5/20/2019 5/20/2019 Continue 14
07.10 - 11.55 5/18/2019 5/18/2019 5/18/2019 Continue 10
Diperbaiki, dirojok 08.15 - 10.30 5/17/2019 5/17/2019 5/17/2019 Finish 4
10.30 - 11.40 5/17/2019 5/17/2019 5/17/2019 Finish 3
LAPORAN HARIAN SIPIL

Jam Target Tanggal Status Cost of M


Solusi Perbaikan KET
Perbaikan Dikerjakan Selesai Realisasi Akhir Qty
13.00 - 15.55 5/17/2019 5/17/2019 5/17/2019 Continue 7
08.15 - 14.00 5/16/2019 5/16/2019 5/16/2019 Continue 10
14.00 - 15.50 5/16/2019 5/16/2019 5/16/2019 Continue 4
Dempul dan cat dinding retak, perbaikan kran
08.15 - 10.30 5/15/2019 5/15/2019 5/15/2019 Finish 5
dan shower, perbaikan almari
Diperbaiki 10.30 - 11.00 5/15/2019 5/15/2019 5/15/2019 Finish 1
Diperbaiki 11.00 - 15.50 5/15/2019 5/15/2019 5/15/2019 Finish 8
Dempul dan cat dinding retak, perbaikan kran
08.15 - 15.55 5/14/2019 5/14/2019 5/14/2019 Continue 14
dan shower, perbaikan almari
Diperbaiki 13.10 -14.00 5/14/2019 5/14/2019 5/14/2019 Finish 1

Pasang pipa dari sumur bor ke pump house dan


08.15 - 15.55 5/13/2019 5/13/2019 5/13/2019 Continue 14
pembuatan rumah pompa untuk jetpump

07.20 - 08.00 5/11/2019 5/11/2019 5/11/2019 Finish 2


Dicek, kemungkinan dari pipa air panas, dinding
Bekas bobokan dinding
luar atas dapur dibobok, pipa ada yang pecah, 08.00 - 11.55 5/11/2019 5/11/2019 5/11/2019 Continue 8
belum ditutup
dipotong dan disambung baru
Ganti gypsum 08.15 - 15.50 5/10/2019 5/10/2019 5/10/2019 Finish 11
13.10 - 14.30 5/10/2019 5/10/2019 5/10/2019 Finish 3
Diperbaiki, ditukar 13.10 - 15.00 5/9/2019 5/9/2019 5/9/2019 Finish 4
Ganti gypsum 08.15 - 15.50 5/9/2019 5/9/2019 5/9/2019 Continue 10
Diperbaiki 08.15 - 10.30 5/8/2019 5/8/2019 5/8/2019 Finish 4

Kaki meja tidak rata, diset ketinggiannya agar


10.30 - 15.55 5/8/2019 5/8/2019 5/8/2019 Finish 10
rata
Diperbaiki 08.15 - 15.50 5/7/2019 5/7/2019 5/7/2019 Continue Gypsum belum diganti 13
Kaki meja tidak rata, diset ketinggiannya agar
14.30 - 15.00 5/7/2019 5/7/2019 5/7/2019 Finish 1
rata
Diperbaiki 08.15 - 15.50 5/6/2019 5/6/2019 5/6/2019 Continue Hujan 12
Diperbaiki 13.45 - 14.30 5/6/2019 5/6/2019 5/6/2019 Continue Baru dicek 2
LAPORAN HARIAN SIPIL

Jam Target Tanggal Status Cost of M


Solusi Perbaikan KET
Perbaikan Dikerjakan Selesai Realisasi Akhir Qty

Kayu yang lapuk diganti 07.10 - 11.50 5/4/2019 5/4/2019 5/4/2019 Continue 10
Diperbaiki, keramik yang pecah diganti 08.20 - 16.20 5/3/2019 5/3/2019 5/3/2019 Finish 12
14.00 - 15.00 5/3/2019 5/3/2019 5/3/2019 Finish 2
Plafon ditutup kembali 08.20 - 15.50 5/2/2019 5/2/2019 5/2/2019 Finish 14
Menambal gypsum plafon 08.20 - 14.00 4/30/2019 4/30/2019 4/30/2019 Finish 4
09.30 -11.30 4/30/2019 4/30/2019 4/30/2019 Finish 6
14.00 - 15.50 4/30/2019 4/30/2019 4/30/2019 Continue 4
Bongkar scaffolding 08.20 - 11.50 4/29/2019 4/29/2019 4/29/2019 Finish 8
13.10 - 15.50 4/29/2019 4/29/2019 4/29/2019 Finish 3
Didempul dan dicat 13.10 - 15.50 4/29/2019 4/29/2019 4/29/2019 Finish 3
Diperbaiki, dipasang kembali 07.30 - 09.00 4/27/2019 4/27/2019 4/27/2019 Continue 2
Pasang scaffolding 07.30 - 11.50 4/27/2019 4/27/2019 4/27/2019 Continue 8
Pemasangan pompa jetpump 08.15 - 16.20 4/26/2019 4/26/2019 4/26/2019 Continue 12
10.30 - 11.30 4/26/2019 4/26/2019 4/26/2019 Finish 2
Pemasangan pompa jetpump 08.15 - 15.50 4/25/2019 4/25/2019 4/25/2019 Continue 12

Ada indikasi bocor, besok


Dicek ke atas plafon, ada bocor atau tidak, akan dilanjut untuk naik ke
13.20 - 14.20 4/25/2019 4/25/2019 4/25/2019 Continue 2
gypsum berlubang ditutup atas genteng dengan
scaffolding

08.15 - 15.50 4/24/2019 4/24/2019 4/24/2019 Continue 14


Diperbaiki, diganti 08.15 - 10.00 4/23/2019 4/23/2019 4/23/2019 Finish 4

Bekas plafon yang dibuka


Dicek, ada bangkai musang di plafon luar belum ditutup lagi, untuk
10.00 - 13.45 4/23/2019 4/23/2019 4/23/2019 Continue 6
balkon FUS-10, dibuang menghilangkan bau
bangkai

13.45 - 15.55 4/23/2019 4/23/2019 4/23/2019 Continue 4


LAPORAN HARIAN SIPIL

Jam Target Tanggal Status Cost of M


Solusi Perbaikan KET
Perbaikan Dikerjakan Selesai Realisasi Akhir Qty
08.15 - 15.55 4/22/2019 4/22/2019 4/22/2019 Continue 14
07.05 - 07.30 4/20/2019 4/20/2019 4/20/2019 Finish 1
Keramik dibongkar dan pasangan keramik agak
07.30 - 11.50 4/20/2019 4/20/2019 4/20/2019 Finish 10
diturunkan
Diperbaiki 08.15 - 10.00 4/18/2019 4/18/2019 4/18/2019 Finish 4
10.00 - 11.55 4/18/2019 4/18/2019 4/18/2019 Finish 4

Keramik belum dipasang


Keramik dibongkar dan diganti 13.10 - 14.15 4/18/2019 4/18/2019 4/18/2019 Continue 2
lagi
Sementara dipasang
Keramik dibongkar dan pasangan keramik agak
14.15 - 15.50 4/18/2019 4/18/2019 4/18/2019 Continue karpet, keramik belum 4
diturunkan
dipasang lagi
Scaffolding belum
08.15 - 15.55 4/16/2019 4/16/2019 4/16/2019 Continue 14
dibongkar
08.15 - 09.00 4/15/2019 4/15/2019 4/15/2019 Finish 2
Scaffolding belum
09.00 - 15.50 4/15/2019 4/15/2019 4/15/2019 Continue 12
dibongkar
07.05 - 07.30 4/13/2019 4/13/2019 4/13/2019 Finish 1
Scaffolding belum
07.30 - 11.50 4/13/2019 4/13/2019 4/13/2019 Continue 10
dibongkar
Scaffolding belum
Diperbaiki 08.15 - 16.20 4/12/2019 4/12/2019 4/12/2019 Continue 14
dibongkar
13.30 - 14.45 4/12/2019 4/12/2019 4/12/2019 Finish 2
Diperbaiki 08.15 - 15.00 4/11/2019 4/11/2019 4/11/2019 Continue 12
Diganti 15.00 - 15.50 4/11/2019 4/11/2019 4/11/2019 Finish 1
Diperbaiki 15.00 - 15.50 4/11/2019 4/11/2019 4/11/2019 Finish 1
Pengecatan kayu baru 08.15 - 09.30 4/10/2019 4/10/2019 4/10/2019 Finish 1
Pengecatan kayu baru 08.15 - 10.00 4/10/2019 4/10/2019 4/10/2019 Continue 2
10.00 - 15.50 4/10/2019 4/10/2019 4/10/2019 Continue 10
Pintu yang seret atau susah dibuka tutup
08.15 - 15.30 4/9/2019 4/9/2019 4/9/2019 Finish 7
diperbaiki, pintu yang kusam dicat ulang
Hook gordyn yang patah diganti 08.15 - 15.55 4/9/2019 4/9/2019 4/9/2019 Finish 7
LAPORAN HARIAN SIPIL

Jam Target Tanggal Status Cost of M


Solusi Perbaikan KET
Perbaikan Dikerjakan Selesai Realisasi Akhir Qty
08.15 - 11.55 4/8/2019 4/8/2019 4/8/2019 Finish 8
Menutup/menambal dinding bekas bobok
13.05 - 15.50 4/8/2019 4/8/2019 4/8/2019 Finish 6
perbaikan pipa air panas
07.05 - 07.30 4/6/2019 4/6/2019 4/6/2019 Finish 1
Talang diperbaiki, dilem agar tidak bocor 07.30 - 10.00 4/6/2019 4/6/2019 4/6/2019 Finish 6
Diperbaiki, dirojok 10.00 - 11.50 4/6/2019 4/6/2019 4/6/2019 Finish 2
Diperbaiki 09.30 - 11.50 4/6/2019 4/6/2019 4/6/2019 Finish 2
Bocor dari pipa air panas, diperbaiki 08.10 - 16.20 4/5/2019 4/5/2019 4/5/2019 Continue masih ditest 12
10.00 - 11.00 4/5/2019 4/5/2019 4/5/2019 Finish 2
Keramik direkatkan kembali, kran diperbaiki 08.10 - 11.55 4/4/2019 4/4/2019 4/4/2019 Finish 8

Sementara diberi plastik


GRA 2, 3, 5 ada bocor 13.10 - 15.00 4/4/2019 4/4/2019 4/4/2019 Continue 4
proteksi
Dicek, kemungkinan dari water heater 15.00 - 15.50 4/4/2019 4/4/2019 4/4/2019 Continue Baru dicek 2
Pintu yang seret atau susah dibuka tutup, Pintu gudang elektrik
08.10 - 15.55 4/2/2019 4/2/2019 4/2/2019 Continue 14
diperbaiki settingnya belum
Kayu yang lapuk diganti 08.10 - 15.55 4/1/2019 4/1/2019 4/1/2019 Continue 14
07.05 - 07.30 3/30/2019 3/30/2019 3/30/2019 Finish 1
Kayu yang lapuk diganti 07.30 - 11.55 3/30/2019 3/30/2019 3/30/2019 Continue 10
08.15 - 10.30 3/29/2019 3/29/2019 3/29/2019 Finish 5
10.30 - 11.30 3/29/2019 3/29/2019 3/29/2019 Finish 1
Kayu yang lapuk diganti 10.30 - 16.25 3/29/2019 3/29/2019 3/29/2019 Continue 8
Diperbaiki 08.15 - 11.00 3/28/2019 3/28/2019 3/28/2019 Finish 3
Kayu yang lapuk diganti 08.15 - 15.55 3/28/2019 3/28/2019 3/28/2019 Continue 9
Dicek, baut kendor, diperbaiki 11.00 - 11.50 3/28/2019 3/28/2019 3/28/2019 Finish 1
Dipasang kembali 13.10 - 14.00 3/28/2019 3/28/2019 3/28/2019 Finish 1
08.15 - 09.30 3/27/2019 3/27/2019 3/27/2019 Finish 1
Kayu yang lapuk diganti 08.15 - 11.55 3/27/2019 3/27/2019 3/27/2019 Finish 7
Diperbaiki 14.00 - 16.00 3/27/2019 3/27/2019 3/27/2019 Continue Sedang dikerjakan 6
08.15 - 11.55 3/26/2019 3/26/2019 3/26/2019 Finish 8
LAPORAN HARIAN SIPIL

Jam Target Tanggal Status Cost of M


Solusi Perbaikan KET
Perbaikan Dikerjakan Selesai Realisasi Akhir Qty
13.10 - 15.55 3/26/2019 3/26/2019 3/26/2019 Finish 3
13.10 - 15.50 3/26/2019 3/26/2019 3/26/2019 Continue 3
08.15 - 15.55 3/25/2019 3/25/2019 3/25/2019 Continue 14
07.05 - 07.30 3/23/2019 3/23/2019 3/23/2019 Finish 1
07.30 - 10.30 3/23/2019 3/23/2019 3/23/2019 Continue 6
10.30 - 11.50 3/23/2019 3/23/2019 3/23/2019 Finish 4
08.10 - 16.25 3/22/2019 3/22/2019 3/22/2019 Continue 10
Ganti tripleks 2cm 08.20 - 10.00 3/22/2019 3/22/2019 3/22/2019 Finish 2
10.00 - 11.20 3/22/2019 3/22/2019 3/22/2019 Finish 2
Pengecatan kusen baru 08.10 - 09.00 3/21/2019 3/21/2019 3/21/2019 Finish 2
09.00 - 15.50 3/21/2019 3/21/2019 3/21/2019 Continue 10
10.30 - 11.30 3/21/2019 3/21/2019 3/21/2019 Finish 2
Belum dicat, dempul masih
Ganti kusen, kayu lapuk terkena rayap 08.10 - 16.00 3/20/2019 3/20/2019 3/20/2019 Continue 7
basah
08.20 - 11.50 3/20/2019 3/20/2019 3/20/2019 Finish 4
13.00 - 14.00 3/20/2019 3/20/2019 3/20/2019 Finish 1
14.00 - 15.50 3/20/2019 3/20/2019 3/20/2019 Continue 2
Penggantian gypsum lapuk 08.10 - 16.00 3/19/2019 3/19/2019 3/19/2019 Continue 14
10.30 - 11.55 3/19/2019 3/19/2019 3/19/2019 Finish 2
Penggantian gypsum lapuk 08.10 - 16.00 3/19/2019 3/19/2019 3/19/2019 Continue 14
10.30 - 11.55 3/19/2019 3/19/2019 3/19/2019 Finish 2

Ganti plafon gypsum yang lapuk terkena bocor 08.10 - 16.00 3/18/2019 3/18/2019 3/18/2019 Continue Sedang dikerjakan 7

08.10 - 16.00 3/18/2019 3/18/2019 3/18/2019 Continue Sedang dikerjakan 7


14.30 - 15.30 3/18/2019 3/18/2019 3/18/2019 Finish 2
07.05 - 07.30 3/16/2019 3/16/2019 3/16/2019 Finish 1
Diperbaiki, talang karpet aus 07.30 - 09.00 3/16/2019 3/16/2019 3/16/2019 Continue 4
Penggantian gypsum lapuk 09.00 - 11.50 3/16/2019 3/16/2019 3/16/2019 Continue 6
LAPORAN HARIAN SIPIL

Jam Target Tanggal Status Cost of M


Solusi Perbaikan KET
Perbaikan Dikerjakan Selesai Realisasi Akhir Qty

08.15 - 10.30 3/15/2019 3/15/2019 3/15/2019 Finish 5

10.30 - 11.20 3/15/2019 3/15/2019 3/15/2019 Finish 2


13.10 - 15.55 3/15/2019 3/15/2019 3/15/2019 Finish 7
Ganti gypsum plafon 08.15 - 12.00 3/14/2019 3/14/2019 3/14/2019 Finish 8
Penggantian gypsum lapuk 13.10 - 16.00 3/14/2019 3/14/2019 3/14/2019 Continue 5
13.15 - 14.00 3/14/2019 3/14/2019 3/14/2019 Finish 1
Ganti gypsum plafon 08.15 - 15.50 3/13/2019 3/13/2019 3/13/2019 Continue 14
15.50 - 16.00 3/13/2019 3/13/2019 3/13/2019 Continue Sedang dikerjakan 1
Diperbaiki, diganti 08.15 - 11.50 3/12/2019 3/12/2019 3/12/2019 Continue 8
Dipasang lagi 13.00 - 15.55 3/12/2019 3/12/2019 3/12/2019 Finish 6
Diperbaiki, diganti 08.15 - 10.50 3/11/2019 3/11/2019 3/11/2019 Finish 6
Diperbaiki, gypsum dibongkar 10.50 - 15.50 3/11/2019 3/11/2019 3/11/2019 Continue 8
07.05 - 07.30 3/9/2019 3/9/2019 3/9/2019 Finish 1
07.30 - 08.30 3/9/2019 3/9/2019 3/9/2019 Finish 2
Sementara diganti tripleks
Bocor atap sudah diperbaiki, gypsumnya diganti 08.30 - 11.00 3/9/2019 3/9/2019 3/9/2019 Continue 6
melamin
Diperbaiki, dirojok 11.00 - 11.50 3/9/2019 3/9/2019 3/9/2019 Finish 2
Perbaikan genteng turun dan talang karpet aus 08.20 - 14.30 3/8/2019 3/8/2019 3/8/2019 Finish 10
14.30 - 16.20 3/8/2019 3/8/2019 3/8/2019 Finish 4
08.20 - 15.50 3/6/2019 3/6/2019 3/6/2019 Continue 14
14.00 - 14.30 3/6/2019 3/6/2019 3/6/2019 Finish 1
08.20 - 11.50 3/5/2019 3/5/2019 3/5/2019 Continue 8
Diperbaiki, genteng turun 13.10 - 16.00 3/5/2019 3/5/2019 3/5/2019 Finish 6
Pasang scaffolding 09.00 - 17.00 3/5/2019 3/5/2019 3/5/2019 Continue 7
Diperbaiki, ganti karet kloset dan aksesoris
08.15 - 08.50 3/4/2019 3/4/2019 3/4/2019 Finish 1
kloset
08.20 - 15.50 3/4/2019 3/4/2019 3/4/2019 Continue 11
LAPORAN HARIAN SIPIL

Jam Target Tanggal Status Cost of M


Solusi Perbaikan KET
Perbaikan Dikerjakan Selesai Realisasi Akhir Qty
Part dalam kran aus, diganti 13.10 - 14.30 3/4/2019 3/4/2019 3/4/2019 Finish 2
07.05 - 07.30 3/2/2019 3/2/2019 3/2/2019 Finish 1
07.30 - 11.55 3/2/2019 3/2/2019 3/2/2019 Continue 10
Perbaikan level ketinggian tiang koridor 08.20 - 16.20 3/1/2019 3/1/2019 3/1/2019 Continue 11
13.30 - 15.00 3/1/2019 3/1/2019 3/1/2019 Finish 3
Perbaikan level ketinggian tiang koridor 08.20 - 15.50 2/28/2019 2/28/2019 2/28/2019 Continue 14
Pengecekan kran dan shower 08.20 - 15.50 2/27/2019 2/27/2019 2/27/2019 Continue 12
Dicek 14.30 - 15.50 2/27/2019 2/27/2019 2/27/2019 Continue Di-barikade 2
Pengecekan kran dan shower 08.20 - 15.50 2/26/2019 2/26/2019 2/26/2019 Continue 11
Diperbaiki, dirojok 13.10 - 15.00 2/26/2019 2/26/2019 2/26/2019 Finish 2
15.00 - 15.50 2/26/2019 2/26/2019 2/26/2019 Finish 1
Diperbaiki 08.20 - 10.00 2/25/2019 2/25/2019 2/25/2019 Finish 2
08.20 - 15.50 2/25/2019 2/25/2019 2/25/2019 Finish 5
Menunggu penghuni
Sementara handle dibongkar 09.00 - 11.00 2/25/2019 2/25/2019 2/25/2019 Continue 2
membeli sparepart
10.00 - 15.50 2/25/2019 2/25/2019 2/25/2019 Finish 5
07.05 - 07.30 2/23/2019 2/23/2019 2/23/2019 Finish 1
Diganti 07.30 - 10.00 2/23/2019 2/23/2019 2/23/2019 Finish 6
Dibersihkan 10.00 - 11.50 2/23/2019 2/23/2019 2/23/2019 Finish 4
Diganti terpal 08.20 - 16.20 2/22/2019 2/22/2019 2/22/2019 Finish 10
10.30 - 14.00 2/22/2019 2/22/2019 2/22/2019 Finish 4
Pintu kamar mandi pembantu ganti tripleks,
08.20 - 15.50 2/21/2019 2/21/2019 2/21/2019 Continue 14
kusen pintu kamar tidur pembantu diganti
Kayu yang lapuk diganti 08.20 - 11.50 2/20/2019 2/20/2019 2/20/2019 Finish 8
13.05 - 16.00 2/20/2019 2/20/2019 2/20/2019 Finish 6
Kayu yang lapuk diganti 08.15 - 15.50 2/19/2019 2/19/2019 2/19/2019 Continue 12
Diperbaiki, didempul dan dicat 13.05 - 14.00 2/19/2019 2/19/2019 2/19/2019 Finish 2
Kayu yang lapuk diganti 08.15 - 15.50 2/18/2019 2/18/2019 2/18/2019 Continue 14
07.05 - 07.30 2/16/2019 2/16/2019 2/16/2019 Finish 1
Diganti 07.30 - 08.30 2/16/2019 2/16/2019 2/16/2019 Finish 2
LAPORAN HARIAN SIPIL

Jam Target Tanggal Status Cost of M


Solusi Perbaikan KET
Perbaikan Dikerjakan Selesai Realisasi Akhir Qty
Rembes dari nat keramik kamar mandi, di nat
08.30 - 11.50 2/16/2019 2/16/2019 2/16/2019 Continue Sedang dikerjakan 8
ulang dan didempul gypsum yang kotor
Kayu yang lapuk diganti 08.15 - 16.20 2/15/2019 2/15/2019 2/15/2019 Continue 11
10.00 - 11.25 2/15/2019 2/15/2019 2/15/2019 Finish 3
Kayu yang lapuk diganti 08.15 - 15.50 2/14/2019 2/14/2019 2/14/2019 Continue 14
Kayu yang lapuk diganti 08.15 - 15.50 2/13/2019 2/13/2019 2/13/2019 Continue 14
08.10 - 08.50 2/12/2019 2/12/2019 2/12/2019 Finish 1
Diperbaiki, dirojok 08.30 - 09.30 2/12/2019 2/12/2019 2/12/2019 Finish 1
Kayu yang lapuk diganti 08.50 - 15.50 2/12/2019 2/12/2019 2/12/2019 Continue 10
Diperbaiki, ganti karet kloset 13.10 - 14.00 2/12/2019 2/12/2019 2/12/2019 Finish 1
Diganti 14.00 - 15.00 2/12/2019 2/12/2019 2/12/2019 Finish 1
Rembes dari bocor talang menyebabkan Kran patah belum diganti,
tembok retak, talang diperbaiki, tembok 08.10 - 11.50 2/11/2019 2/11/2019 2/11/2019 Continue menunggu penghuni beli 8
didempul dan dicat part nya
Baru menyiapkan kayu
Kayu yang lapuk diganti 13.10 - 15.50 2/11/2019 2/11/2019 2/11/2019 Continue materialnya (diserut, di- 6
meny)
07.05 - 07.30 2/9/2019 2/9/2019 2/9/2019 Finish 1
Genteng yang pecah diganti, karpus retak
07.30 - 11.50 2/9/2019 2/9/2019 2/9/2019 Finish 10
diperbaiki

Diperbaiki 08.15 - 10.00 2/8/2019 2/8/2019 2/8/2019 Finish 4

Diperbaiki 10.00 - 11.30 2/8/2019 2/8/2019 2/8/2019 Finish 3


13.10 -15.30 2/8/2019 2/8/2019 2/8/2019 Finish 4
Diperbaiki, gypsum yang berlubang ditambal
08.15 - 11.50 2/7/2019 2/7/2019 2/7/2019 Finish 8
dan dicat
Bekas bobokan dinding
Diperbaiki 13.10 - 15.50 2/7/2019 2/7/2019 2/7/2019 Continue 6
belum ditutup
08.15 - 10.00 2/6/2019 2/6/2019 2/6/2019 Finish 4
10.00 - 11.50 2/6/2019 2/6/2019 2/6/2019 Continue 4
LAPORAN HARIAN SIPIL

Jam Target Tanggal Status Cost of M


Solusi Perbaikan KET
Perbaikan Dikerjakan Selesai Realisasi Akhir Qty
Diganti 13.10 - 13.30 2/6/2019 2/6/2019 2/6/2019 Finish 2
Plafon gypsum belum
Diperbaiki 13.30 - 15.50 2/6/2019 2/6/2019 2/6/2019 Continue 4
ditambal
08.15 - 15.55 2/4/2019 2/4/2019 2/4/2019 Continue 14
07.05 - 07.30 2/2/2019 2/2/2019 2/2/2019 Finish 1
Diganti 1 set 07.30 - 11.50 2/2/2019 2/2/2019 2/2/2019 Finish tukar dari BD-30 5
Ganti talang karpet dan tripleks 07.30 - 11.50 2/2/2019 2/2/2019 2/2/2019 Continue Belum dicat 5
Diperbaiki 13.00 - 15.00 2/2/2019 2/2/2019 2/2/2019 Continue Sedang dikerjakan 4
Perbaikan plafon gypsum lapuk 08.15 - 15.50 2/1/2019 2/1/2019 2/1/2019 Finish 14
10.00 - 11.30 2/1/2019 2/1/2019 2/1/2019 Finish 2

Disetujui

Tgl :
Cost of Manpower M
Price/h Total Qty Price/unit Total

20500 143500
20500 143500
20500 287000
20500 164000
20500 41000
20500 82000
20500 164000
20500 82000
20500 41000
20500 41000
20500 164000
20500 102500
20500 82000
20500 41000
20500 61500

20500 164000
20500 123000
20500 205000
20500 41000
20500 41000
20500 287000
20500 287000
20500 205000
20500 82000
20500 61500
Cost of Manpower M
Price/h Total Qty Price/unit Total
20500 143500
20500 205000
20500 82000
20500 102500
20500 20500
20500 164000
20500 287000
20500 20500

20500 287000

20500 41000

20500 164000

20500 225500
20500 61500
20500 82000
20500 205000
20500 82000

20500 205000
20500 266500
20500 20500
20500 246000
20500 41000
Cost of Manpower M
Price/h Total Qty Price/unit Total
20500 205000
20500 246000
20500 41000
20500 287000
20500 82000
20500 123000
20500 82000
20500 164000
20500 61500
20500 61500
20500 41000
20500 164000
20500 246000
20500 41000
20500 246000

20500 41000

20500 287000
20500 82000

20500 123000

20500 82000
Cost of Manpower M
Price/h Total Qty Price/unit Total
20500 287000
20500 20500
20500 205000
20500 82000
20500 82000

20500 41000

20500 82000

20500 287000
20500 41000
20500 246000
20500 20500
20500 205000

20500 287000
20500 41000
20500 246000
20500 20500
20500 20500
20500 20500
20500 41000
20500 205000
20500 143500
20500 143500
Cost of Manpower M
Price/h Total Qty Price/unit Total
20500 164000
20500 123000
20500 20500
20500 123000
20500 41000
20500 41000
20500 246000
20500 41000
20500 164000

20500 82000
20500 41000
20500 287000
20500 287000
20500 20500
20500 205000
20500 102500
20500 20500
20500 164000
20500 61500
20500 184500
20500 20500
20500 20500
20500 20500
20500 143500
20500 123000
20500 164000
Cost of Manpower M
Price/h Total Qty Price/unit Total
20500 61500
20500 61500
20500 287000
20500 20500
20500 123000
20500 82000
20500 205000
20500 41000
20500 41000
20500 41000
20500 205000
20500 41000
20500 143500
20500 82000
20500 20500
20500 41000
20500 287000
20500 41000
20500 287000
20500 41000

20500 143500

20500 143500
20500 41000
20500 20500
20500 82000
20500 123000
Cost of Manpower M
Price/h Total Qty Price/unit Total

20500 102500

20500 41000
20500 143500
20500 164000
20500 102500
20500 20500
20500 287000
20500 20500
20500 164000
20500 123000
20500 123000
20500 164000
20500 20500
20500 41000
20500 123000
20500 41000
20500 205000
20500 82000
20500 287000
20500 20500
20500 164000
20500 123000
20500 143500
20500 20500
20500 225500
Cost of Manpower M
Price/h Total Qty Price/unit Total
20500 41000
20500 20500
20500 205000
20500 225500
20500 61500
20500 287000
20500 246000
20500 41000
20500 225500
20500 41000
20500 20500
20500 41000
20500 102500
20500 41000
20500 102500
20500 20500
20500 123000
20500 82000
20500 205000
20500 82000
20500 287000
20500 164000
20500 123000
20500 246000
20500 41000
20500 287000
20500 20500
20500 41000
Cost of Manpower M
Price/h Total Qty Price/unit Total
20500 164000
20500 225500
20500 61500
20500 287000
20500 287000
20500 20500
20500 20500
20500 205000
20500 20500
20500 20500

20500 164000

20500 123000

20500 20500
20500 205000

20500 82000

20500 61500
20500 82000
20500 164000

20500 123000
20500 82000
20500 82000
Cost of Manpower M
Price/h Total Qty Price/unit Total
20500 41000
20500 82000
20500 287000
20500 20500
20500 102500
20500 102500
20500 82000
20500 287000
20500 41000
No Tgl Request Lokasi Jenis Pekerjaan Jenis Kerusakan

1 6/3/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 6/3/2019 Pump House Schedule (Rutin) Catat pemakaian air jetpump
3 6/3/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
4 6/3/2019 DEG Schedule (Rutin) Test run genset
5 6/3/2019 jalan utama Request cek lampu jalan
6 6/3/2019 Gudang Elektrik Schedule (Rutin) 5S
1 5/31/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 5/31/2019 Pump House Schedule (Rutin) Catat pemakaian air jetpump
3 5/31/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
4 5/31/2019 DEG Schedule (Rutin) Test run genset
Pond I ( Belakang
5 5/31/2019 Request Sedot air pond
Pos Security)
6 5/31/2019 Gudang Elektrik Schedule (Rutin) 5S
1 5/29/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 5/29/2019 Pump House Schedule (Rutin) Catat pemakaian air jetpump
3 5/29/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
4 5/29/2019 Pump House Request Catat debit air
5 5/29/2019 Koridor Request Penggantian lampu koridor yang mati
6 5/29/2019 DEG Schedule (Rutin) Test run genset
7 5/29/2019 Gudang Elektrik Schedule (Rutin) Pengecekan stok material
1 5/28/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 5/28/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
3 5/28/2019 Pump House Schedule (Rutin) Catat pemakaian air jetpump
4 5/28/2019 R. Kompos Request Perapihan galian kabel pompa jetpump
5 5/28/2019 FUS-9 Request AC KTU tidak dingin
6 5/28/2019 BD Request Pengecekan cover box ELCB
7 5/28/2019 FUS Request Penggantian lampu taman yang mati
1 5/27/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 5/27/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
3 5/27/2019 DEG Request Test run genset
4 5/27/2019 R. Kompos Request Perapihan galian kabel pompa jetpump
5 5/27/2019 Pump House Request Perbaikan sensor jetpump no.2
6 5/27/2019 BBD-1 Request Tiang antena miring
1 5/25/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 5/25/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running

3 5/25/2019 DEG Request Test run genset


4 5/25/2019 Pump House Request Perbaikan sensor jetpump no.2
1 5/24/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 5/24/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
3 5/24/2019 R. Kompos Request Perapihan galian kabel pompa jetpump
4 5/24/2019 DEG Request Test run genset
5 5/24/2019 Pump House Request Perbaikan sensor jetpump no.2
6 5/24/2019 Pump House Request Pemasangan flow meter jetpump
1 5/23/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 5/23/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
3 5/23/2019 Kolam Renang Request Pemasangan pompa filter setelah service
1 5/22/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
3 5/22/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
4 5/22/2019 Pump House Request Pemasangan sensor otomatis jetpump
5 5/22/2019 Kolam Renang Request Pemasangan pompa filter setelah service
6 5/22/2019 FUV-1 Request Posisi lamu garasi terkena bocor atap
1 5/21/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
3 5/21/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
4 5/21/2019 Pump House Request Pemasangan sensor otomatis jetpump
5 5/21/2019 Gudang Elektrik Request 5S
1 5/20/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
3 5/20/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
4 5/20/2019 Pump House Schedule (Rutin) Perawatan (cleaning) ruang pompa
5 5/20/2019 Pump House Request Pemasangan sensor otomatis jetpump
1 5/18/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
3 5/18/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
4 5/18/2019 ISR Request Perapihan peralatan setelah buka bersama
1 5/17/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
3 5/17/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
4 5/17/2019 All Area (Outdoor) Schedule (Rutin) Pengecekan lampu jalan, taman dan koridor
4 5/17/2019 Pump House Request Pemasangan sensor otomatis jetpump
1 5/16/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
3 5/16/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
4 5/16/2019 FUS-10 Request Listrik trip, sumber trip dari water heater
1 5/15/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
3 5/15/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
4 5/15/2019 BD-17 Request Perbaikan unit rumah
5 5/15/2019 GRB-5 Request Perbaikan pesawat telepon
6 5/15/2019 FUS-10 Request Listrik trip
1 5/14/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
3 5/14/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
4 5/14/2019 BD-17 Request Perbaikan unit rumah
5 5/14/2019 FUS-9 Request Pasang cover lampu ruang tamu
6 5/14/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
7 5/14/2019 Pump House Request Ambil sampel air jetpump
1 5/13/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
3 5/13/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
4 5/13/2019 Pump House, DEG Request Instalasi pompa jetpump
5 5/13/2019 Pump House Request Ukur debit air pompa jetpump
6 5/13/2019 Kolam Renang Request Pompa filter trip

7 5/13/2019 ISR Request Setting ruangan untuk training


1 5/11/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
3 5/11/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running

4 5/11/2019 Kolam Renang Request Pompa filter trip


5 5/11/2019 DEG Request Pengeboran sumur air bersih
1 5/10/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
3 5/10/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
4 5/10/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
5 5/10/2019 BBD-21 Request AC kamar tidur menyebabkan listrik trip
1 5/9/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
3 5/9/2019 GRB-5 Request Pengecekan TV
4 5/9/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
1 5/8/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
3 5/8/2019 DEG Request Pelatihan pengoperasian genset untuk security

4 5/8/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
5 5/8/2019 Taman FUS baru Request Lampu taman mati
6 5/8/2019 FUS-17 Request Lampu teras mati
1 5/7/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 5/7/2019 ISR Request Pasang tambahan kabel sambungan
3 5/7/2019 DEG Request Pelatihan pengoperasian genset untuk security
4 5/7/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running

Mendampingi Telkom pasang FO untuk jaringan


5 5/7/2019 Outdoor Request
internet
6 5/7/2019 FUM-3 Schedule (Rutin) Pengecekan rutin
1 5/6/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 5/6/2019 DEG Request Pelatihan pengperasian genset untuk security

3 5/6/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
4 5/6/2019 FUS-10 Request AC ruang tamu tidak dingin
5 5/6/2019 DEG Schedule (Rutin) Test run genset
1 5/4/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 5/4/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
1 5/3/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 5/3/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
3 5/3/2019 All Area Schedule (Rutin) Catat KWh
AC ruang tamu mati, selang drain mesin cuci
4 5/3/2019 FUS-17 Request
lepas
Mendampingi Telkom pasang FO untuk jaringan
6 5/3/2019 Outdoor Request
internet
1 5/2/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 5/2/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
3 5/2/2019 Kolam Renang Request Pompa filter trouble
4 5/2/2019 ISR Request Setting ruangan untuk training
5 5/2/2019 Pos Security Request Telepon wireless tidak bisa dipakai
Mendampingi Telkom pasang FO untuk jaringan
6 5/2/2019 Outdoor Request
internet
1 4/30/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/30/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
3 4/30/2019 ISR Request Perapihan peralatan listrik setelah training
Mematikan dan menyalakan panel alarm
4 4/30/2019 Pos Security Request
selama fogging
5 4/30/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
1 4/29/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/29/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
3 4/29/2019 DEG Schedule (Rutin) Test run genset
Pasang dan merapikan lagi proyektor untuk
4 4/29/2019 Office Request
induction
5 4/29/2019 FUS-1 Request Bantu penghuni angkat TV
1 4/27/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/27/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
1 4/26/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/26/2019 FUS-12 Request AC ruang tamu ada bangkai cicak
3 4/26/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
4 4/26/2019 Pump House Request Pasang pompa jetpump
1 4/25/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/25/2019 Gudang Elektrik Schedule (Rutin) Cek stock material
3 4/25/2019 Office Request Pengecekan kabel CPU komputer Pak Robin

4 4/25/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
5 4/25/2019 Pump House Request Pengeboran air
1 4/24/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/24/2019 Pump House Schedule (Rutin) Cleaning rutin
3 4/24/2019 GRB-5 Request Lampu kamar tidur mati
5 4/24/2019 Pump House Request Pompa DW-2 trouble, Pompa tidak bisa running
1 4/23/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/23/2019 BBD-1 Request Tiang antena roboh
3 4/23/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
5 4/23/2019 Pump House Request Pompa DW-2 trouble
1 4/22/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/22/2019 ISR Request Pengecekan peralatan listrik untuk training
3 4/22/2019 Ora-ori Request Lampu ada yang mati
4 4/22/2019 DEG Schedule (Rutin) Test run genset
5 4/22/2019 Pump House Request Pompa DW-2 trouble
6 4/22/2019 FUA-1 Request Mesin cuci tidak bisa digunakan
1 4/18/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/18/2019 Pump House Request Pengecekan pompa transfer 1

3 4/18/2019 Pos Security Request Telepon wireless rusak

1 4/16/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/16/2019 Pump House Request Pengecekan pompa transfer 1
3 4/16/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
4 4/16/2019 BBD-32 Schedule (Rutin) Service AC
1 4/15/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/15/2019 Kolam Renang Request Perbaikan pompa filter kolam
3 4/15/2019 ISR Request Perapihan peralatan setelah training
4 4/15/2019 Pump House Request Pengecekan pompa transfer 1
1 4/13/2019 Kolam Renang Request Perbaikan pompa filter kolam
1 4/12/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/12/2019 Pump House Request Pengecekan pompa trnasfer 1
3 4/12/2019 Kantin Request Microwave tidak panas
4 4/12/2019 Kolam Renang Request Pengecekan pompa filter
1 4/11/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/11/2019 DW1 & DW2 Schedule (Rutin) Ceklist pompa
3 4/11/2019 Kolam Renang Request Perbaikan pompa filter kolam
Penambahan kabel sambungan listrik untuk
4 4/11/2019 ISR Request
training
5 4/11/2019 Pump House Request Pompa transfer 1 tidak ngangkat
1 4/10/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/10/2019 Kolam Renang Request Perbaikan pompa filter kolam
3 4/10/2019 Ora-ori Request Lampu mati
4 4/10/2019 ISR Request Setting ruangan untuk training
1 4/9/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/9/2019 BBD Schedule (Rutin) Perawatan panel
3 4/9/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
4 4/9/2019 BBD-12 Schedule (Rutin) Service AC
4 4/9/2019 FUA-1 Request Mesin cuci tidak dapat digunakan
1 4/8/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/8/2019 FUSBD, BD Schedule (Rutin) Perawatan panel
3 4/8/2019 DEG Schedule (Rutin) Test run genset
Pond I (Belakang
4 4/8/2019 Request Sedot air pond
Pos Security)
1 4/5/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/5/2019 BBD-12 Request Pengecekan listrik trip
3 4/5/2019 BBD-21 Request Peralatan listrik di dapur ada yang nyetrum
4 4/5/2019 BBD-12 Schedule (Rutin) Service AC
1 4/4/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/4/2019 All area Schedule (Rutin) Catat KWh
3 4/4/2019 DEG Schedule (Rutin) Test run genset
4 4/4/2019 Pump House & DEG Schedule (Rutin) Perawatan rutin ( cleaning)
5 4/4/2019 FUS-8 Request Pengecekan lampu teras dapur mati
1 4/2/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/2/2019 All area Schedule (Rutin) Catat KWh
3 4/2/2019 Office, R. Mahyong Schedule (Rutin) Service AC Sahabat Lama
4 4/2/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
1 4/1/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 4/1/2019 GRA-3 Request Cover lampu ruang tamu jatuh
3 4/1/2019 CR, G.Elektrik Schedule (Rutin) Service AC Sahabat Lama
Koridor GRA-6, GRB-
4 4/1/2019 Request Lampu emergency koridor berkedip
1, BBD-2
5 4/1/2019 BD-22 Request Pengecekan lampu gantung
1 3/29/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
Perapihan peralatan listrik setelah dipakai
2 3/29/2019 Kantin Request
meeting
FUS-3, FUS-19,
3 3/29/2019 Schedule (Rutin) Service AC Sahabat Lama
FUS-18
4 3/29/2019 FUS-18 Request Penggantian ELCB rumah rusak
5 3/29/2019 All Area (unit kosong) Request Pengecekan power listrik
1 3/28/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/28/2019 Koridor Request Pengecekan lampu koridor
FUA-2, FUS-16,
3 3/28/2019 Schedule (Rutin) Service AC Sahabat Lama
FUS-19
1 3/27/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
Pond I ( Belakang
2 3/27/2019 Request Sedot air pond
Pos Security)
3 3/27/2019 All Area Schedule (Rutin) Pengecekan lampu jalan
4 3/27/2019 Koridor Schedule (Rutin) Pengecekan lampu koridor
5 3/27/2019 Kantin Request Setting ruangan untuk meeting
1 3/26/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/26/2019 Pump House Schedule (Rutin) Pengecekan pompa DW dan pompa transfer
3 3/26/2019 DEG Schedule (Rutin) Test run genset
4 3/26/2019 FUM-3 & FUS-10 Schedule (Rutin) Service AC Sahabat Lama
5 3/26/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
1 3/25/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/25/2019 Gudang Elektrik Schedule (Rutin) Pengecekan stok material
3 3/25/2019 FUA-1 & FUS-8 Schedule (Rutin) Service AC Sahabat Lama
1 3/22/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/22/2019 Pond I (Pos Security) Request Sedot air pond
3 3/22/2019 FUV-1 & FUV-2 Schedule (Rutin) Service AC Sahabat Lama
4 3/22/2019 ISR Request AC KTU tidak dapat dimatikan dari remote
1 3/21/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/21/2019 BBD-30 Request Lampu spot kamar tidur mati
3 3/21/2019 FUS-1 & FUV-3 Schedule (Rutin) Service AC Sahabat Lama
4 3/21/2019 FUV-3 Request AC KTU tidak dapat dimatikan dari remote
5 3/21/2019 Kolam Renang Request Pengecekan mesin pompa filter
6 3/21/2019 GRA-1 Request Indovision ganti kabel
1 3/20/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/20/2019 BBD-22 Request AC ruang tamu bocor
3 3/20/2019 FUS-2 & FUS-7 Schedule (Rutin) Service AC Sahabat Lama
4 3/20/2019 FUA-1 Request Perbaikan kulkas tidak dingin
5 3/20/2019 FUV-3 Request AC KTU tidak dapat dimatikan dari remote
1 3/19/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/19/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
3 3/19/2019 FUM-1 & FUM-2 Schedule (Rutin) Service AC Sahabat Lama
4 3/19/2019 ISR Request Cek microphone wireless
1 3/18/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/18/2019 DEG Schedule (Rutin) Test run genset
3 3/18/2019 FUS-12 & FUS-15 Schedule (Rutin) Service AC Sahabat Lama
4 3/18/2019 ISR Request Setting ruangan untuk seminar
5 3/18/2019 Komunal Request Pengecekan exhaust fan kamar mandi
1 3/15/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/15/2019 BD-16 Request Perbaikan AC tidak bisa nyala
3 3/15/2019 FUS-11, FUS-14 Schedule (Rutin) Service AC Sahabat Lama
1 3/14/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/14/2019 DEG & Pump House Schedule (Rutin) Perawatan/cleaning

3 3/14/2019 FUS-9 Schedule (Rutin) Service AC Sahabat Lama


4 3/14/2019 ISR Request Setting ruangan untuk seminar
1 3/13/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/13/2019 DEG Request Pelatihan pemakaian genset bersama security
3 3/13/2019 FUS 20 Schedule (Rutin) Service AC Sahabat Lama
Pengecekan kelengkapan peralatan listrik dan
4 3/13/2019 GRA Request
lampu fasilitas dalam ruang

5 3/13/2019 GRB, BBD 30, 31, 33 Request Pengecekan layanan TV indovision


1 3/12/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/12/2019 DEG Request Pelatihan pemakaian genset bersama security
3 3/12/2019 FUV 5-6 Schedule (Rutin) Service AC Sahabat Lama
4 3/12/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
Perbaikan TV tidak ada tayangan (dari
5 3/12/2019 BBD-21 Request
Indovision)
1 3/11/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/11/2019 DEG Request Pelatihan pemakaian genset bersama security
3 3/11/2019 ISR Schedule (Rutin) Service AC Sahabat Lama
4 3/11/2019 FUS-9 Request AC KTU bocor
1 3/8/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/8/2019 FUS-6, FUS-5 Schedule (Rutin) Service AC Sahabat Lama
3 3/8/2019 FUS-5 Request AC Ruang Tamu tidak dingin
4 3/8/2019 FUM-3 Schedule (Rutin) Pengecekan rutin
1 3/6/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/6/2019 Kantin, FUS-9 Schedule (Rutin) Service AC Sahabat Lama

3 3/6/2019 FUS-9 Request AC KTU tidak dingin, AC KTA berisik

4 3/6/2019 BBD-21 Request Ada yang menyetrum peralatan di dapur


1 3/5/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
R100, RGH, G.
2 3/5/2019 Schedule (Rutin) Service AC Sahabat Lama
Elektrik
3 3/5/2019 GRB-6 Request AC ruang tamu mati sendiri
4 3/5/2019 BBD-33 Request AC ruang tamu tidak dingin
5 3/5/2019 FUS-12 Request Ada bau gas di dapur
1 3/4/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 3/4/2019 GRB-1 Request Lampu dapur berbunyi
3 3/4/2019 DEG Schedule (Rutin) Test run genset
4 3/4/2019 ISR Request Setting ruangan untuk training
1 3/1/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
Perapihan OHP dan kabel sambungan setelah
2 3/1/2019 Office Request
digunakan untuk meeting
3 3/1/2019 All Area Schedule (Rutin) Catat KWh
4 3/1/2019 ISR Request Pengecekan lampu
1 2/28/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/28/2019 FUS-9 Request Pengecekan tikus di dapur

3 2/28/2019 BBD 26-27 Schedule (Rutin) Service AC


1 2/27/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/27/2019 Kolam Renang Request Pipa pelindung kabel lepas klem
3 2/27/2019 BBD-25 Schedule (Rutin) Service AC
1 2/26/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
Pond I ( Belakang
2 2/26/2019 Request Sedot air pond
Pos security)
3 2/26/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
4 2/26/2019 Gudang Elektrik Schedule (Rutin) Pengecekan stok material
5 2/26/2019 Halaman BD Request Lampu taman tiang hijau ada yang kedip-kedip
1 2/25/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
Waterheater tidak panas, lampu teras koridor
2 2/25/2019 BD-11 Request
mati
3 2/25/2019 ISR Request Setting ruangan untuk training
1 2/22/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/22/2019 BBD 19, 20, 24 Schedule (Rutin) Service AC
1 2/21/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/21/2019 BBD 6, 10, 11 Schedule (Rutin) Service AC
1 2/20/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/20/2019 Gudang Elektrik Request Mesin steam AC rusak
3 2/20/2019 BBD 3-5 Schedule (Rutin) Service AC
4 2/20/2019 ISR Request Perapihan kabel sambungan setelah training
1 2/19/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/19/2019 FUS-9 Request Listrik trip
3 2/19/2019 DEG Schedule (Rutin) Test run diesel
4 2/19/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
5 2/19/2019 Kantin Request Lampu spot hampir jatuh
6 2/19/2019 FUM-3 Request Cek water heater
7 2/19/2019 Halaman BD Request Pipa pelindung kabel CCTV pecah, kabel terlihat
1 2/18/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/18/2019 FUS-10 Request AC KTU tidak bisa nyala
3 2/18/2019 GRB 1-3 Schedule (Rutin) Service AC
1 2/15/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
Pond I (Belakang
2 2/15/2019 Request Sedot air pond
Pos Security)
3 2/15/2019 GRB 5-6 Schedule (Rutin) Service AC
1 2/14/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/14/2019 GRA 1-3 Schedule (Rutin) Service AC
1 2/13/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/13/2019 BD-16 Schedule (Rutin) Service AC
3 2/13/2019 GRA-5 & GRA-6 Schedule (Rutin) Service AC
4 2/13/2019 FUS-11 Request AC ruangg tamu tidak bisa menyala
5 2/13/2019 BBD-33 Request TV tidak ada koneksi
1 2/12/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/12/2019 DW-1 Request Test pompa
3 2/12/2019 Gudang Elektrik Request Pengecekan data AC rusak
4 2/12/2019 FUM-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
1 2/11/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
FUSBD-3 & FUSBD-
2 2/11/2019 Schedule (Rutin) Service AC
5
1 2/8/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/8/2019 Fuel Tank Schedule (Rutin) Perawatan/cleaning ruangan
3 2/8/2019 FUS-9 Request AC KTU tidak dingin
1 2/7/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
FUSBD-1 & FUSBD-
2 2/7/2019 Schedule (Rutin) Service AC
2
3 2/7/2019 FUSBD, BD Schedule (Rutin) Perawatan (cleaning) cover lampu koridor
1 2/6/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/6/2019 Fum-3 & FUV-2 Schedule (Rutin) Pengecekan rutin
3 2/6/2019 FUS-9 Request Penggantian lampu gantung
4 2/6/2019 Pump House & DEG Schedule (Rutin) Perawatan/cleaning ruangan
5 2/6/2019 BD-31 Request Melepas motorfan outdoor AC
1 2/4/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/4/2019 All Area Schedule (Rutin) Catat KWh rumah
3 2/4/2019 DEG Request Test running genset
Pengecekan lampu koridor dan emergency
4 2/4/2019 Koridor Schedule (Rutin)
koridor
1 2/1/2019 DW1 & DW2 Schedule (Rutin) Cek/catat pemakaian air DW 1 dan DW 2
2 2/1/2019 FUS-8 Request Sensor AC ruang tamu rusak
3 2/1/2019 All Area Schedule (Rutin) Catat KWh rumah
4 2/1/2019 Kolam Renang Request Test mesin vacuum kolam
Note : Status Akhir, Finish=Selesai, Continue=Lanjut.

Dilaporkan

Tgl :
LAPORAN HARIAN ELEKTRIK

Target Tanggal Status


Solusi Perbaikan Jam Perbaikan
Dikerjakan Selesai Realisasi Akhir

08.10 - 08.30 6/3/2019 6/3/2019 6/3/2019 Finish


08.30 - 09.00 6/3/2019 6/3/2019 6/3/2019 Finish
Kontrol level air, pengoperasian 3 jetpump 08.15 - 15.50 6/3/2019 6/3/2019 6/3/2019 Continue
08.30 - 09.30 6/3/2019 6/3/2019 6/3/2019 Finish
09.30 - 11.45 6/3/2019 6/3/2019 6/3/2019 Continue
12.50 - 15.55 6/3/2019 6/3/2019 6/3/2019 Finish
08.10 - 08.30 5/31/2019 5/31/2019 5/31/2019 Finish
08.30 - 09.00 5/31/2019 5/31/2019 5/31/2019 Finish
Kontrol level air, pengoperasian 3 jetpump 08.15 - 15.50 5/31/2019 5/31/2019 5/31/2019 Continue
08.30 - 09.30 5/31/2019 5/31/2019 5/31/2019 Finish
09.30 - 11.45 5/31/2019 5/31/2019 5/31/2019 Finish
12.50 - 15.55 5/31/2019 5/31/2019 5/31/2019 Finish
08.10 - 08.30 5/29/2019 5/29/2019 5/29/2019 Finish
08.30 - 09.00 5/29/2019 5/29/2019 5/29/2019 Finish
Kontrol level air, pengoperasian 3 jetpump 08.15 - 15.50 5/29/2019 5/29/2019 5/29/2019 Continue
08.30 - 09.00 5/29/2019 5/29/2019 5/29/2019 Finish
09.00 - 10.30 5/29/2019 5/29/2019 5/29/2019 Continue
13.30 - 15.00 5/29/2019 5/29/2019 5/29/2019 Finish
09.00 - 11.50 5/29/2019 5/29/2019 5/29/2019 Finish
08.10 - 08.30 5/28/2019 5/28/2019 5/28/2019 Finish
Kontrol level air, pengoperasian 3 jetpump 08.15 - 15.50 5/28/2019 5/28/2019 5/28/2019 Continue
08.30 - 09.00 5/28/2019 5/28/2019 5/28/2019 Finish
09.00 - 14.00 5/28/2019 5/28/2019 5/28/2019 Finish
Diperbaiki, ganti kapasitor, tambah freon 09.00 - 11.30 5/28/2019 5/28/2019 5/28/2019 Finish
Cover diperbaiki posisinya, yang lapuk ditarik ke gudang 13.00 - 14.00 5/28/2019 5/28/2019 5/28/2019 Continue
14.00 - 15.50 5/28/2019 5/28/2019 5/28/2019 Continue
08.10 - 08.30 5/27/2019 5/27/2019 5/27/2019 Finish
Kontrol level air, pengoperasian 3 jetpump 08.15 - 15.50 5/27/2019 5/27/2019 5/27/2019 Continue
08.30 - 10.00 5/27/2019 5/27/2019 5/27/2019 Continue
10.00 - 14.00 5/27/2019 5/27/2019 5/27/2019 Continue
14.00 - 15.35 5/27/2019 5/27/2019 5/27/2019 Continue
Diperbaiki, diberi support 15.00 - 15.55 5/27/2019 5/27/2019 5/27/2019 Finish
07.15 - 07.30 5/25/2019 5/25/2019 5/25/2019 Finish
Kontrol level air, pengoperasian 3 jetpump 07.30 - 11.55 5/25/2019 5/25/2019 5/25/2019 Continue

Accu dilepas, buat dicharge di Shop n Drive 08.00 - 10.30 5/25/2019 5/25/2019 5/25/2019 Continue
08.30 - 11.50 5/25/2019 5/25/2019 5/25/2019 Continue
08.15 - 08.30 5/24/2019 5/24/2019 5/24/2019 Finish
Kontrol level air, pengoperasian 3 jetpump 08.30 - 15.55 5/24/2019 5/24/2019 5/24/2019 Continue
08.30 - 11.45 5/24/2019 5/24/2019 5/24/2019 Continue
Accu dijumper, tidak bisa nyala 13.10 - 15.30 5/24/2019 5/24/2019 5/24/2019 Continue
08.30 - 15.50 5/24/2019 5/24/2019 5/24/2019 Continue
09.00 - 11.00 5/24/2019 5/24/2019 5/24/2019 Finish
08.15 - 08.30 5/23/2019 5/23/2019 5/23/2019 Finish
Kontrol level air, pengoperasian 3 jetpump 08.30 - 15.55 5/23/2019 5/23/2019 5/23/2019 Continue
Pompa no.1 masih rusak, dilepas lagi 08.30 - 14.30 5/23/2019 5/23/2019 5/23/2019 Continue
08.15 - 08.30 5/22/2019 5/22/2019 5/22/2019 Finish
Kontrol level air, pengoperasian 3 jetpump 08.30 - 15.55 5/22/2019 5/22/2019 5/22/2019 Continue
08.30 - 11.55 5/22/2019 5/22/2019 5/22/2019 Continue
13.10 - 15.30 5/22/2019 5/22/2019 5/22/2019 Continue
Posisi lampu digeser 14.00 - 15.00 5/22/2019 5/22/2019 5/22/2019 Finish
08.15 - 08.30 5/21/2019 5/21/2019 5/21/2019 Finish
Kontrol level air, pengoperasian 3 jetpump 08.30 - 15.30 5/21/2019 5/21/2019 5/21/2019 Continue
08.30 - 15.30 5/21/2019 5/21/2019 5/21/2019 Continue
Kabel-kabel yang sudah tidak terpakai dan accu bekas
10.30 - 14.00 5/21/2019 5/21/2019 5/21/2019 Continue
dipindahkan ke DEG
07.15 - 07.30 5/20/2019 5/20/2019 5/20/2019 Finish
Kontrol level air, pengoperasian 3 jetpump 07.30 - 11.50 5/20/2019 5/20/2019 5/20/2019 Continue
08.30 - 12.00 5/20/2019 5/20/2019 5/20/2019 Finish
13.10 - 16.00 5/20/2019 5/20/2019 5/20/2019 Continue
07.15 - 07.30 5/18/2019 5/18/2019 5/18/2019 Finish
Kontrol level air, pengoperasian 3 jetpump 07.30 - 11.50 5/18/2019 5/18/2019 5/18/2019 Continue
08.30 - 09.30 5/18/2019 5/18/2019 5/18/2019 Finish
08.15 & 15.45 5/17/2019 5/17/2019 5/17/2019 Finish
Kontrol level air, pengoperasian 3 jetpump 08.15 - 15.50 5/17/2019 5/17/2019 5/17/2019 Continue
Lampu yang kedip-kedip di data 08.30 - 10.30 5/17/2019 5/17/2019 5/17/2019 Finish
10.30 - 15.50 5/17/2019 5/17/2019 5/17/2019 Continue
08.15 & 15.45 5/16/2019 5/16/2019 5/16/2019 Finish
Kontrol level air, pengoperasian 3 jetpump 08.15 - 15.50 5/16/2019 5/16/2019 5/16/2019 Continue
Ganti elemen dan termostat 08.30 - 14.30 5/16/2019 5/16/2019 5/16/2019 Finish
08.15 & 15.45 5/15/2019 5/15/2019 5/15/2019 Finish
Kontrol level air, pengoperasian 3 jetpump 08.15 - 15.50 5/15/2019 5/15/2019 5/15/2019 Continue
08.15 - 10.30 5/15/2019 5/15/2019 5/15/2019 Continue
10.30 - 11.50 5/15/2019 5/15/2019 5/15/2019 Finish
Dicek, sumber trip dari water heater 13.10 - 15.50 5/15/2019 5/15/2019 5/15/2019 Continue
08.15 & 15.45 5/14/2019 5/14/2019 5/14/2019 Finish
Kontrol level air, pengoperasian 3 jetpump 08.15 - 15.50 5/14/2019 5/14/2019 5/14/2019 Continue
08.15 - 16.00 5/14/2019 5/14/2019 5/14/2019 Continue
13.45 - 14.10 5/14/2019 5/14/2019 5/14/2019 Finish
13.10 - 14.00 5/14/2019 5/14/2019 5/14/2019 Finish
13.10 - 13.45 5/14/2019 5/14/2019 5/14/2019 Finish
08.15 & 15.45 5/13/2019 5/13/2019 5/13/2019 Finish
Kontrol level air, pengoperasian 3 jetpump 08.15 - 15.50 5/13/2019 5/13/2019 5/13/2019 Continue
08.15 - 10.30 5/13/2019 5/13/2019 5/13/2019 Finish
08.20 - 09.30 5/13/2019 5/13/2019 5/13/2019 Finish
Dicek, Pompa no.1 trip, pompa no.2 bearing bermasalah,
09.00 - 11.55 5/13/2019 5/13/2019 5/13/2019 Continue
pompa dilepas untuk diservis

13.10 - 15.50 5/13/2019 5/13/2019 5/13/2019 Continue


08.15 & 15.45 5/11/2019 5/11/2019 5/11/2019 Finish
Isi air suplai dari luar, kontrol volume air dan pompa 07.30 - 12.00 5/11/2019 5/11/2019 5/11/2019 Continue

Dicek, Pompa no.1 trip dari contactor, pompa no.2 bearing


07.30 - 09.00 5/11/2019 5/11/2019 5/11/2019 Continue
bermasalah
08.00 - 12.00 5/11/2019 5/11/2019 5/11/2019 Continue
08.15 & 15.45 5/10/2019 5/10/2019 5/10/2019 Finish
Isi air suplai dari luar, kontrol volume air dan pompa 08.30 - 16.00 5/10/2019 5/10/2019 5/10/2019 Continue
09.30 - 10.30 5/10/2019 5/10/2019 5/10/2019 Finish
Kompressor short, diganti outdoor 10.30 - 14.45 5/10/2019 5/10/2019 5/10/2019 Finish
08.15 & 15.45 5/9/2019 5/9/2019 5/9/2019 Finish
TV hanya ada channel MNC 08.30 - 10.00 5/9/2019 5/9/2019 5/9/2019 Continue
Isi air suplai dari luar, kontrol volume air dan pompa 09.30 - 16.00 5/9/2019 5/9/2019 5/9/2019 Continue
08.15 & 15.45 5/8/2019 5/8/2019 5/8/2019 Finish
08.30 - 09.30 5/8/2019 5/8/2019 5/8/2019 Continue

Isi air suplai dari luar, kontrol volume air dan pompa 09.30 - 16.00 5/8/2019 5/8/2019 5/8/2019 Continue
Lampu yang mati, diganti 10.30 - 15.00 5/8/2019 5/8/2019 5/8/2019 Finish
Diganti 14.00 - 15.00 5/8/2019 5/8/2019 5/8/2019 Finish
08.15 & 15.45 5/7/2019 5/7/2019 5/7/2019 Finish
08.00 - 09.00 5/7/2019 5/7/2019 5/7/2019 Finish
08.30 - 09.30 5/7/2019 5/7/2019 5/7/2019 Continue
Isi air suplai dari luar, kontrol volume air dan pompa 09.30 - 16.15 5/7/2019 5/7/2019 5/7/2019 Continue

Gali conblok untuk jalur kabel 10.30 - 15.00 5/7/2019 5/7/2019 5/7/2019 Finish
14.30 - 16.00 5/7/2019 5/7/2019 5/7/2019 Finish
08.15 & 15.45 5/6/2019 5/6/2019 5/6/2019 Finish
08.30 - 09.30 5/6/2019 5/6/2019 5/6/2019 Continue

Isi air suplai dari luar, kontrol volume air dan pompa 09.30 - 16.40 5/6/2019 5/6/2019 5/6/2019 Continue
Tambah freon 13.10 - 14.30 5/6/2019 5/6/2019 5/6/2019 Finish
14.30 - 15.30 5/6/2019 5/6/2019 5/6/2019 Continue
08.15 & 16.30 5/4/2019 5/4/2019 5/4/2019 Finish
Isi air suplai dari luar, kontrol volume air dan pompa 09.30 - 16.40 5/4/2019 5/4/2019 5/4/2019 Continue
08.15 & 16.30 5/3/2019 5/3/2019 5/3/2019 Finish
Isi air suplai dari luar, kontrol volume air dan pompa 09.30 - 16.40 5/3/2019 5/3/2019 5/3/2019 Continue
08.30 - 14.00 5/3/2019 5/3/2019 5/3/2019 Finish
Diperbaiki 10.00 - 11.30 5/3/2019 5/3/2019 5/3/2019 Finish

14.00 - 16.00 5/3/2019 5/3/2019 5/3/2019 Continue


08.15 & 16.30 5/2/2019 5/2/2019 5/2/2019 Finish
Isi air suplai dari luar, kontrol volume air dan pompa 09.30 - 16.40 5/2/2019 5/2/2019 5/2/2019 Continue
Pompa no.1 dan no.2 dicek 09.00 - 11.00 5/2/2019 5/2/2019 5/2/2019 Continue
13.30 - 15.45 5/2/2019 5/2/2019 5/2/2019 Finish
Baterai sudah tidak dapat menyimpan daya 13.30 - 14.15 5/2/2019 5/2/2019 5/2/2019 Continue
14.15 - 16.00 5/2/2019 5/2/2019 5/2/2019 Continue
08.15 & 16.30 4/30/2019 4/30/2019 4/30/2019 Finish
Isi air suplai dari luar, kontrol volume air dan pompa 09.30 - 16.40 4/30/2019 4/30/2019 4/30/2019 Continue
08.30 - 10.30 4/30/2019 4/30/2019 4/30/2019 Finish
09.00 - 11.50 4/30/2019 4/30/2019 4/30/2019 Finish
14.15 - 15.00 4/30/2019 4/30/2019 4/30/2019 Finish
08.15 & 16.30 4/29/2019 4/29/2019 4/29/2019 Finish
Isi air suplai dari luar, kontrol volume air dan pompa 09.30 - 16.40 4/29/2019 4/29/2019 4/29/2019 Continue
09.00 - 10.00 4/29/2019 4/29/2019 4/29/2019 Finish
10.30 - 13.45 4/29/2019 4/29/2019 4/29/2019 Finish
15.00 - 15.50 4/29/2019 4/29/2019 4/29/2019 Finish
08.15 & 16.30 4/27/2019 4/27/2019 4/27/2019 Finish
Isi air suplai dari luar, kontrol volume air dan pompa 09.30 - 16.40 4/27/2019 4/27/2019 4/27/2019 Continue
08.15 & 16.30 4/26/2019 4/26/2019 4/26/2019 Finish
Indoor dibersihkan 08.30 - 10.00 4/26/2019 4/26/2019 4/26/2019 Finish
Isi air suplai dari luar, kontrol volume air dan pompa 09.30 - 16.40 4/26/2019 4/26/2019 4/26/2019 Continue
Pasang instalasi listrik untuk pompa 08.45 - 15.40 4/26/2019 4/26/2019 4/26/2019 Finish
08.15 & 16.30 4/25/2019 4/25/2019 4/25/2019 Finish
11.30 - 14.30 4/25/2019 4/25/2019 4/25/2019 Finish
08.30 - 09.00 4/25/2019 4/25/2019 4/25/2019 Finish

Isi air suplai dari luar, kontrol volume air dan pompa 09.30 - 16.40 4/25/2019 4/25/2019 4/25/2019 Continue
Pasang pompa jetpump 08.45 - 15.40 4/25/2019 4/25/2019 4/25/2019 Continue
08.15 & 16.30 4/24/2019 4/24/2019 4/24/2019 Finish
08.30 - 11.00 4/24/2019 4/24/2019 4/24/2019 Finish
Diperbaiki, ganti ballast 14.00 - 14.30 4/24/2019 4/24/2019 4/24/2019 Finish
Isi air suplai dari luar, kontrol volume air dan pompa 09.30 - 16.40 4/24/2019 4/24/2019 4/24/2019 Continue
08.15 & 16.30 4/23/2019 4/23/2019 4/23/2019 Finish
Diperbaiki, diberdirikan dan diberi support 08.30 - 09.30 4/23/2019 4/23/2019 4/23/2019 Finish
13.10 - 15.00 4/23/2019 4/23/2019 4/23/2019 Finish
Pompa tidak bisa running 09.30 - 16.40 4/23/2019 4/23/2019 4/23/2019 Continue
08.15 & 16.30 4/22/2019 4/22/2019 4/22/2019 Finish
Ditest 08.00 - 08.20 4/22/2019 4/22/2019 4/22/2019 Finish
Diganti 08.20 - 08.30 4/22/2019 4/22/2019 4/22/2019 Finish
08.30 - 09.30 4/22/2019 4/22/2019 4/22/2019 Finish
Pompa tidak bisa running 09.30 - 14.30 4/22/2019 4/22/2019 4/22/2019 Continue
Dicek, diperbaiki 14.30 - 16.00 4/22/2019 4/22/2019 4/22/2019 Continue
08.15 & 16.30 4/18/2019 4/18/2019 4/18/2019 Finish
Ditest 08.20 - 15.30 4/18/2019 4/18/2019 4/18/2019 Continue

Dicek, baterai sudah tidak bisa menyimpan daya 10.30 - 14.00 4/18/2019 4/18/2019 4/18/2019 Continue

08.15 & 16.30 4/16/2019 4/16/2019 4/16/2019 Finish


Ditest 08.20 - 10.30 4/16/2019 4/16/2019 4/16/2019 Continue
10.30 - 11.55 4/16/2019 4/16/2019 4/16/2019 Finish
13.10 - 16.00 4/16/2019 4/16/2019 4/16/2019 Finish
08.15 & 16.30 4/15/2019 4/15/2019 4/15/2019 Finish
Penggantian karet siel dan baut 08.20 - 12.00 4/15/2019 4/15/2019 4/15/2019 Finish
08.30 - 09.30 4/15/2019 4/15/2019 4/15/2019 Finish
Ditest 13.10 - 16.00 4/15/2019 4/15/2019 4/15/2019 Continue
Penggantian karet siel dan baut 08.00 - 12.00 4/13/2019 4/13/2019 4/13/2019 Continue
08.15 & 16.30 4/12/2019 4/12/2019 4/12/2019 Finish
Dicek dan ditest 08.30 - 15.30 4/12/2019 4/12/2019 4/12/2019 Finish
Diperbaiki 08.30 - 09.00 4/12/2019 4/12/2019 4/12/2019 Continue
10.00 - 11.00 4/12/2019 4/12/2019 4/12/2019 Continue
08.15 & 16.30 4/11/2019 4/11/2019 4/11/2019 Finish
08.20 - 09.00 4/11/2019 4/11/2019 4/11/2019 Continue
Pompa dicek, ditest 09.00 - 14.00 4/11/2019 4/11/2019 4/11/2019 Continue
08.20 - 09.00 4/11/2019 4/11/2019 4/11/2019 Finish
Diperbaiki, ditest 14.00 - 16.00 4/11/2019 4/11/2019 4/11/2019 Continue
08.15 & 16.30 4/10/2019 4/10/2019 4/10/2019 Finish
Pompa setelah perbaikan dipasang 08.20 - 15.00 4/10/2019 4/10/2019 4/10/2019 Continue
Diganti 15.00 - 15.10 4/10/2019 4/10/2019 4/10/2019 Finish
15.10 - 16.00 4/10/2019 4/10/2019 4/10/2019 Continue
08.15 & 16.30 4/9/2019 4/9/2019 4/9/2019 Finish
08.20 - 11.30 4/9/2019 4/9/2019 4/9/2019 Finish
10.00 - 11.55 4/9/2019 4/9/2019 4/9/2019 Finish
13.10 - 16.00 4/9/2019 4/9/2019 4/9/2019 Finish
Dicek dan diperbaiki 13.15 - 14.45 4/9/2019 4/9/2019 4/9/2019 Finish
08.15 & 16.30 4/8/2019 4/8/2019 4/8/2019 Finish
08.20 - 11.50 4/8/2019 4/8/2019 4/8/2019 Finish
13.10 - 14.00 4/8/2019 4/8/2019 4/8/2019 Finish
14.00 - 16.00 4/8/2019 4/8/2019 4/8/2019 Finish
08.15 & 16.30 4/5/2019 4/5/2019 4/5/2019 Finish
Trip dari ballast lampu ruang tamu, diperbaiki 08.20 - 11.30 4/5/2019 4/5/2019 4/5/2019 Finish
Dicek, semua normal, aman tidak nyetrum 13.05 - 14.10 4/5/2019 4/5/2019 4/5/2019 Finish
14.10 - 16.20 4/5/2019 4/5/2019 4/5/2019 Continue
08.15 & 16.30 4/4/2019 4/4/2019 4/4/2019 Finish
08.20 - 12.00 4/4/2019 4/4/2019 4/4/2019 Finish
09.30 - 10.00 4/4/2019 4/4/2019 4/4/2019 Finish
11.00 - 16.00 4/4/2019 4/4/2019 4/4/2019 Finish
Diperbaiki, pitting kendor 13.10 - 14.00 4/4/2019 4/4/2019 4/4/2019 Finish
08.15 & 16.30 4/2/2019 4/2/2019 4/2/2019 Finish
08.20 - 16.00 4/2/2019 4/2/2019 4/2/2019 Continue
09.30 - 15.45 4/2/2019 4/2/2019 4/2/2019 Finish
Lampu teras dapur FUM-3 mati 10.00 - 11.30 4/2/2019 4/2/2019 4/2/2019 Continue
08.15 & 16.30 4/1/2019 4/1/2019 4/1/2019 Finish
Puing pecahan cover dibersihkan 08.20 - 09.00 4/1/2019 4/1/2019 4/1/2019 Continue
09.30 - 15.30 4/1/2019 4/1/2019 4/1/2019 Finish
Diganti baru 09.00 - 09.30 4/1/2019 4/1/2019 4/1/2019 Finish
11.30 - 11.55 4/1/2019 4/1/2019 4/1/2019 Finish
08.15 & 16.30 3/29/2019 3/29/2019 3/29/2019 Finish
08.20 - 09.00 3/29/2019 3/29/2019 3/29/2019 Finish

09.00 - 15.45 3/29/2019 3/29/2019 3/29/2019 Finish


Diganti baru 13.10 - 14.30 3/29/2019 3/29/2019 3/29/2019 Finish
Listrik di-OFF-kan dari panel pusat, ELCB dan MCB rumah
09.00 - 11.25 3/29/2019 3/29/2019 3/29/2019 Finish
di-OFF-kan juga
08.15 & 16.30 3/28/2019 3/28/2019 3/28/2019 Finish
Cleaning coer lampu 08.20 - 16.00 3/28/2019 3/28/2019 3/28/2019 Finish
08.00 - 15.30 3/28/2019 3/28/2019 3/28/2019 Finish
08.15 & 16.30 3/27/2019 3/27/2019 3/27/2019 Finish
08.20 - 10.30 3/27/2019 3/27/2019 3/27/2019 Finish
09.00 - 11.50 3/27/2019 3/27/2019 3/27/2019 Finish
Cleaning coer lampu 13.10 - 16.00 3/27/2019 3/27/2019 3/27/2019 Continue
15.00 - 16.30 3/27/2019 3/27/2019 3/27/2019 Finish
08.15 & 16.30 3/26/2019 3/26/2019 3/26/2019 Finish
08.20 - 10.00 3/26/2019 3/26/2019 3/26/2019 Finish
08.20 - 09.00 3/26/2019 3/26/2019 3/26/2019 Finish
09.00 - 15.30 3/26/2019 3/26/2019 3/26/2019 Finish
10.00 - 11.50 3/26/2019 3/26/2019 3/26/2019 Finish
08.15 & 16.30 3/25/2019 3/25/2019 3/25/2019 Finish
08.20 - 15.50 3/25/2019 3/25/2019 3/25/2019 Finish
09.00 - 16.00 3/25/2019 3/25/2019 3/25/2019 Finish
08.15 & 16.30 3/22/2019 3/22/2019 3/22/2019 Finish
08.20 - 11.00 3/22/2019 3/22/2019 3/22/2019 Finish
09.00 - 16.00 3/22/2019 3/22/2019 3/22/2019 Finish
Diperbaiki, ganti sensor 13.40 - 16.00 3/22/2019 3/22/2019 3/22/2019 Finish
08.15 & 16.30 3/21/2019 3/21/2019 3/21/2019 Finish
Diganti 08.20 - 09.30 3/21/2019 3/21/2019 3/21/2019 Finish
09.30 - 16.00 3/21/2019 3/21/2019 3/21/2019 Finish
Diperbaiki, ganti sensor 13.10 - 15.00 3/21/2019 3/21/2019 3/21/2019 Finish
Pompa no.1 bocor, pompa no.2 ada bau hangus 09.30 - 10.30 3/21/2019 3/21/2019 3/21/2019 Continue
Kabel rusak karena lembab, sehingga TV tidak ada tayangan 10.30 - 12.00 3/21/2019 3/21/2019 3/21/2019 Finish
08.15 & 16.30 3/20/2019 3/20/2019 3/20/2019 Finish
Diperbaiki 08.20 - 11.50 3/20/2019 3/20/2019 3/20/2019 Finish
09.30 - 16.00 3/20/2019 3/20/2019 3/20/2019 Finish
08.15 - 09.00 &
3/20/2019 3/20/2019 3/20/2019 Finish
13.10 - 15.50
Diperbaiki 15.20 - 16.00 3/20/2019 3/20/2019 3/20/2019 Continue
08.15 & 16.30 3/19/2019 3/19/2019 3/19/2019 Finish
10.00 - 11.50 3/19/2019 3/19/2019 3/19/2019 Finish
09.30 - 16.00 3/19/2019 3/19/2019 3/19/2019 Finish
13.30 - 14.00 3/19/2019 3/19/2019 3/19/2019 Finish
08.15 & 16.30 3/18/2019 3/18/2019 3/18/2019 Finish
08.30 - 09.30 3/18/2019 3/18/2019 3/18/2019 Finish
09.30 - 16.00 3/18/2019 3/18/2019 3/18/2019 Finish
09.30 - 11.00 3/18/2019 3/18/2019 3/18/2019 Finish
Dibersihkan 14.00 - 16.00 3/18/2019 3/18/2019 3/18/2019 Finish
08.15 & 16.30 3/15/2019 3/15/2019 3/15/2019 Finish
08.30 - 11.00 3/15/2019 3/15/2019 3/15/2019 Finish
09.30 - 16.00 3/15/2019 3/15/2019 3/15/2019 Finish
08.15 & 16.30 3/14/2019 3/14/2019 3/14/2019 Finish
08.30 - 14.00 3/14/2019 3/14/2019 3/14/2019 Finish

Perbaikan pipa AC KTU 09.30 - 15.00 3/14/2019 3/14/2019 3/14/2019 Continue


14.00 - 16.00 3/14/2019 3/14/2019 3/14/2019 Continue
08.15 & 16.30 3/13/2019 3/13/2019 3/13/2019 Finish
08.30 - 09.30 3/13/2019 3/13/2019 3/13/2019 Finish
09.30 - 15.45 3/13/2019 3/13/2019 3/13/2019 Finish
Lampu yang mati atau perlengkapan yang rusak diperbaiki 09.30 - 16.00 3/13/2019 3/13/2019 3/13/2019 Continue

Layanan terblokir (E4) 11.00 - 13.40 3/13/2019 3/13/2019 3/13/2019 Finish


08.15 & 16.30 3/12/2019 3/12/2019 3/12/2019 Finish
08.30 - 09.30 3/12/2019 3/12/2019 3/12/2019 Continue
09.30 - 15.45 3/12/2019 3/12/2019 3/12/2019 Finish
10.30 - 11.50 3/12/2019 3/12/2019 3/12/2019 Finish
14.00 - 15.30 3/12/2019 3/12/2019 3/12/2019 Finish
08.15 & 16.30 3/11/2019 3/11/2019 3/11/2019 Finish
08.30 - 09.30 3/11/2019 3/11/2019 3/11/2019 Continue
09.30 - 15.00 3/11/2019 3/11/2019 3/11/2019 Finish
Pipa ada yang retak saat service AC sahabat lama 14.30 - 16.30 3/11/2019 3/11/2019 3/11/2019 Continue
08.15 & 16.30 3/8/2019 3/8/2019 3/8/2019 Finish
09.00 - 16.00 3/8/2019 3/8/2019 3/8/2019 Finish
Diperbaiki, ganti kapasitor, sekalian servis rutin Sahabat
09.00 - 11.20 3/8/2019 3/8/2019 3/8/2019 Finish
Lama
14.30 - 15.30 3/8/2019 3/8/2019 3/8/2019 Finish
08.15 & 16.30 3/6/2019 3/6/2019 3/6/2019 Finish
09.00 - 11.50 3/6/2019 3/6/2019 3/6/2019 Finish

Dicek, AC KTU ganti outdoor, AC KTA kotor dibersihkan,


13.10 - 16.00 3/6/2019 3/6/2019 3/6/2019 Finish
seluruh AC sekalian di-servis oleh Sahabat Lama

Dicek 16.00 - 17.00 3/6/2019 3/6/2019 3/6/2019 Continue


08.15 & 16.30 3/5/2019 3/5/2019 3/5/2019 Finish
09.00 - 16.00 3/5/2019 3/5/2019 3/5/2019 Continue
Dicek, ditest 13.10 - 14.00 3/5/2019 3/5/2019 3/5/2019 Finish
14.00 - 15.10 3/5/2019 3/5/2019 3/5/2019 Finish
Dicek, karet sield gas bermasalah, diperbaiki 15.10 - 16.00 3/5/2019 3/5/2019 3/5/2019 Finish
08.15 & 16.30 3/4/2019 3/4/2019 3/4/2019 Finish
Ganti ballast 08.30 - 09.00 3/4/2019 3/4/2019 3/4/2019 Finish
09.00 - 12.00 3/4/2019 3/4/2019 3/4/2019 Finish
13.10 - 16.00 3/4/2019 3/4/2019 3/4/2019 Finish
08.15 & 16.30 3/1/2019 3/1/2019 3/1/2019 Finish
08.30 - 08.50 3/1/2019 3/1/2019 3/1/2019 Finish
08.50 - 14.00 3/1/2019 3/1/2019 3/1/2019 Finish
14.00 - 16.00 3/1/2019 3/1/2019 3/1/2019 Finish
08.15 & 16.30 2/28/2019 2/28/2019 2/28/2019 Finish
Bongkar-cleaning kompor dan geser kulkas 08.30 - 11.55 2/28/2019 2/28/2019 2/28/2019 Finish

13.00 - 16.00 2/28/2019 2/28/2019 2/28/2019 Finish


08.15 & 16.30 2/27/2019 2/27/2019 2/27/2019 Finish
Diklem ulang 08.30 - 11.55 2/27/2019 2/27/2019 2/27/2019 Finish
13.00 - 16.00 2/27/2019 2/27/2019 2/27/2019 Finish
08.15 & 16.30 2/26/2019 2/26/2019 2/26/2019 Finish
08.30 - 10.00 2/26/2019 2/26/2019 2/26/2019 Finish
10.00 - 11.50 2/26/2019 2/26/2019 2/26/2019 Finish
08.30 - 16.00 2/26/2019 2/26/2019 2/26/2019 Finish
Lampu diganti 13.10 - 13.45 2/26/2019 2/26/2019 2/26/2019 Finish
08.15 & 16.30 2/25/2019 2/25/2019 2/25/2019 Finish
Waterheater ganti termostat, lampu pakai power dari BD-10
08.30 - 11.50 2/25/2019 2/25/2019 2/25/2019 Finish
(listrik BD-10 di-ON-kan)
13.10 - 16.00 2/25/2019 2/25/2019 2/25/2019 Finish
08.15 & 16.30 2/22/2019 2/22/2019 2/22/2019 Finish
08.30 - 16.30 2/22/2019 2/22/2019 2/22/2019 Finish
08.15 & 16.30 2/21/2019 2/21/2019 2/21/2019 Finish
08.30 - 16.00 2/21/2019 2/21/2019 2/21/2019 Finish
08.15 & 16.30 2/20/2019 2/20/2019 2/20/2019 Finish
Diperbaiki 08.30 - 10.30 2/20/2019 2/20/2019 2/20/2019 Finish
10.30 - 15.00 2/20/2019 2/20/2019 2/20/2019 Finish
15.00 - 16.00 2/20/2019 2/20/2019 2/20/2019 Finish
08.15 & 16.30 2/19/2019 2/19/2019 2/19/2019 Finish
Lampu dapur bermasalah, harus ganti ballast 08.30 - 09.00 2/19/2019 2/19/2019 2/19/2019 Finish
09.00 - 11.00 2/19/2019 2/19/2019 2/19/2019 Finish
10.00 - 11.50 2/19/2019 2/19/2019 2/19/2019 Finish
Diperbaiki 10.00 - 10.30 2/19/2019 2/19/2019 2/19/2019 Finish
13.10 - 15.00 2/19/2019 2/19/2019 2/19/2019 Finish
Diperbaiki, agar kabel kembali terproteksi 14.00 - 16.00 2/19/2019 2/19/2019 2/19/2019 Finish
08.15 & 16.30 2/18/2019 2/18/2019 2/18/2019 Finish
Diperbaiki 08.30 - 10.30 2/18/2019 2/18/2019 2/18/2019 Finish
10.30 - 16.00 2/18/2019 2/18/2019 2/18/2019 Finish
08.15 & 16.30 2/15/2019 2/15/2019 2/15/2019 Finish
08.30 - 11.00 2/15/2019 2/15/2019 2/15/2019 Finish
09.30 - 16.00 2/15/2019 2/15/2019 2/15/2019 Finish
08.15 & 16.30 2/14/2019 2/14/2019 2/14/2019 Finish
08.30 - 16.00 2/14/2019 2/14/2019 2/14/2019 Finish
08.15 & 16.30 2/13/2019 2/13/2019 2/13/2019 Finish
08.30 - 10.30 2/13/2019 2/13/2019 2/13/2019 Finish
10.30 - 16.00 2/13/2019 2/13/2019 2/13/2019 Finish
Setting remote 13.05 - 13.30 2/13/2019 2/13/2019 2/13/2019 Finish
Salah sambungan kabel 13.30 - 14.00 2/13/2019 2/13/2019 2/13/2019 Finish
08.15 & 16.30 2/12/2019 2/12/2019 2/12/2019 Finish
08.30 - 16.00 2/12/2019 2/12/2019 2/12/2019 Continue
08.30 - 11.50 2/12/2019 2/12/2019 2/12/2019 Finish
13.10 - 15.00 2/12/2019 2/12/2019 2/12/2019 Finish
08.15 & 16.30 2/11/2019 2/11/2019 2/11/2019 Finish
08.30 - 16.00 2/11/2019 2/11/2019 2/11/2019 Finish
08.15 & 16.30 2/8/2019 2/8/2019 2/8/2019 Finish
08.30 - 11.30 2/8/2019 2/8/2019 2/8/2019 Finish
Ditambah freon, ada indikasi pipa bocor (belum ketemu titik
13.20 - 16.00 2/8/2019 2/8/2019 2/8/2019 Continue
bocornya)
08.15 & 16.30 2/7/2019 2/7/2019 2/7/2019 Finish
09.00 - 14.00 2/7/2019 2/7/2019 2/7/2019 Finish
14.00 - 16.00 2/7/2019 2/7/2019 2/7/2019 Continue
08.15 & 16.30 2/6/2019 2/6/2019 2/6/2019 Finish
09.00 - 11.00 2/6/2019 2/6/2019 2/6/2019 Finish
11.00 - 11.50 2/6/2019 2/6/2019 2/6/2019 Finish
09.00 - 16.00 2/6/2019 2/6/2019 2/6/2019 Finish
13.10 - 15.30 2/6/2019 2/6/2019 2/6/2019 Finish
08.15 & 16.30 2/4/2019 2/4/2019 2/4/2019 Finish
Diganti 08.30 - 11.50 2/4/2019 2/4/2019 2/4/2019 Finish
10.00 - 11.45 2/4/2019 2/4/2019 2/4/2019 Finish
Lampu yang kedip-kedip diganti 13.10 - 16.00 2/4/2019 2/4/2019 2/4/2019 Finish
08.15 & 16.30 2/1/2019 2/1/2019 2/1/2019 Finish
Diganti 08.30 - 15.00 2/1/2019 2/1/2019 2/1/2019 Finish
09.00 - 16.00 2/1/2019 2/1/2019 2/1/2019 Continue
14.00 - 14.30 2/1/2019 2/1/2019 2/1/2019 Finish

Disetujui

Tgl :
Cost of Manpower M
KET
Qty Price/h Total Qty Price/unit Total

1 20500 20500
1 20500 20500
2 20500 41000
2 20500 41000
4 20500 82000
4 20500 82000
1 20500 20500
1 20500 20500
2 20500 41000
2 20500 41000
4 20500 82000
4 20500 82000
1 20500 20500
1 20500 20500
2 20500 41000
1 20500 20500
1 20500 20500
4 20500 82000
4 20500 82000
1 20500 20500
2 20500 41000
1 20500 20500
2 20500 41000
4 20500 82000
2 20500 41000
4 20500 82000
1 20500 20500
2 20500 41000
4 20500 82000
6 20500 123000
Masih ditest 1 20500 20500
1 20500 20500
1 20500 20500
2 20500 41000

Accu masih dicharge di Shop n


3 20500 61500
Drive
Masih ditest 20500 0
1 20500 20500
2 20500 41000
3 20500 61500
Genset belum bisa nyala 2 20500 41000
4 20500 82000
2 20500 41000
1 20500 20500
6 20500 123000
Pompa no.2 sudah OK 8 20500 164000
1 20500 20500
4 20500 82000
6 20500 123000
2 20500 41000
1 20500 20500
1 20500 20500
4 20500 82000
4 20500 82000
6 20500 123000
1 20500 20500
4 20500 82000
4 20500 82000
6 20500 123000
1 20500 20500
4 20500 82000
2 20500 41000
1 20500 20500
4 20500 82000
4 20500 82000
Baru 1 sensor 6 20500 123000
1 20500 20500
4 20500 82000
10 20500 205000
1 20500 20500
2 20500 41000
4 20500 82000
1 20500 20500
6 20500 123000
1 20500 20500
2 20500 41000
10 20500 205000
1 20500 20500
2 20500 41000
1 20500 20500
1 20500 20500
2 20500 41000
4 20500 82000
1 20500 20500
6 20500 123000

LCD belum dipasang (nunggu


2 20500 41000
dikirim dari MFI)
1 20500 20500
5 20500 102500

4 20500 82000
Sedang dikerjakan 2 20500 41000
1 20500 20500
7 20500 143500
2 20500 41000
Ditukar dari BBD-19 4 20500 82000
1 20500 20500
2 20500 41000
10 20500 205000
1 20500 20500
1 20500 20500

6 20500 123000
5 20500 102500
1 20500 20500
1 20500 20500
1 20500 20500
1 20500 20500
6 20500 123000

3 20500 61500
2 20500 41000
1 20500 20500
1 20500 20500

3 20500 61500
1 20500 20500
1 20500 20500
1 20500 20500
OT 7 20500 143500
1 20500 20500
7 20500 143500
6 20500 123000
3 20500 61500

2 20500 41000
1 20500 20500
7 20500 143500
Pompa no.2 OK 4 20500 82000
2 20500 41000
1 20500 20500
2 20500 41000
1 20500 20500
7 20500 143500
4 20500 82000
1 20500 20500
2 20500 41000
1 20500 20500
7 20500 143500
2 20500 41000
2 20500 41000
1 20500 20500
OT 1 20500 20500
OT 7 20500 143500
1 20500 20500
4 20500 82000
5 20500 102500
5 20500 102500
1 20500 20500
4 20500 82000
2 20500 41000

5 20500 102500
Air sedang dikuras 5 20500 102500
1 20500 20500
6 20500 123000
2 20500 41000
8 20500 164000
1 20500 20500
2 20500 41000
4 20500 82000
8 20500 164000
1 20500 20500
1 20500 20500
1 20500 20500
2 20500 41000
8 20500 164000
Sedang dikerjakan 2 20500 41000
1 20500 20500
4 20500 82000
Sementara pakai baterai sekali
pakai (baterai charge sedang 3 20500 61500
order)
1 20500 20500
4 20500 82000
4 20500 82000
Outdoor AC KTU ditukar dari BBD-
6 20500 123000
35
1 20500 20500
8 20500 164000
1 20500 20500
6 20500 123000
Pompa belum ditest 8 20500 164000
1 20500 20500
Pompa sudah normal lagi 12 20500 246000
Microwave ditarik ke gudang 1 20500 20500
2 20500 41000
1 20500 20500
Sedang dikerjakan 1 20500 20500
Karet siel masih bocor 10 20500 205000
1 20500 20500
Sedang ditest 4 20500 82000
1 20500 20500
Belum ditest run 12 20500 246000
1 20500 20500
Sedang dikerjakan 2 20500 41000
1 20500 20500
6 20500 123000
2 20500 41000
6 20500 123000
2 20500 41000
1 20500 20500
8 20500 164000
2 20500 41000
2 20500 41000
1 20500 20500
8 20500 164000
2 20500 41000
4 20500 82000
1 20500 20500
4 20500 82000
1 20500 20500
8 20500 164000
1 20500 20500
1 20500 20500
5 20500 102500
7 20500 143500
Lampu belum diganti 2 20500 41000
1 20500 20500
Cover lampu belum diganti 1 20500 20500
7 20500 143500
1 20500 20500
1 20500 20500
1 20500 20500
1 20500 20500

7 20500 143500
4 20500 82000
4 20500 82000
1 20500 20500
7 20500 143500
7 20500 143500
1 20500 20500
2 20500 41000
6 20500 123000
6 20500 123000
2 20500 41000
1 20500 20500
4 20500 82000
1 20500 20500
7 20500 143500
FUV-2 tidak mau diganggu (tidak
2 20500 41000
dicek)
1 20500 20500
7 20500 143500
7 20500 143500
1 20500 20500
3 20500 61500
7 20500 143500
3 20500 61500
1 20500 20500
1 20500 20500
7 20500 143500
6 20500 123000
Baru dicek 1 20500 20500
2 20500 41000
1 20500 20500
4 20500 82000
6 20500 123000
3 20500 61500
Sedang dikerjakan 4 20500 82000
1 20500 20500
2 20500 41000
7 20500 143500
1 20500 20500
1 20500 20500
2 20500 41000
7 20500 143500
2 20500 41000
4 20500 82000
1 20500 20500
6 20500 123000
14 20500 287000
1 20500 20500
8 20500 164000

Dinding belum dirapikan bekas


6 20500 123000
bobokan (sipil)
4 20500 82000
1 20500 20500
2 20500 41000
7 20500 143500
6 20500 123000

2 20500 41000
1 20500 20500
2 20500 41000
7 20500 143500
2 20500 41000
2 20500 41000
1 20500 20500
1 20500 20500
6 20500 123000
4 20500 82000
1 20500 20500
7 20500 143500
6 20500 123000
1 20500 20500
1 20500 20500
8 20500 164000

Tukar outdoor dari FUM-2 6 20500 123000

Sedang dikerjakan 2 20500 41000


1 20500 20500
7 20500 143500
1 20500 20500
1 20500 20500
1 20500 20500
1 20500 20500
2 20500 41000
6 20500 123000
6 20500 123000
1 20500 20500
2 20500 41000
8 20500 164000
4 20500 82000
1 20500 20500
Tikus tidak ada, hanya ada banyak
8 20500 164000
kotoran tikus, sudah dibersihkan

6 20500 123000
1 20500 20500
8 20500 164000
6 20500 123000
1 20500 20500
2 20500 41000
2 20500 41000
11 20500 225500
1 20500 20500
1 20500 20500
8 20500 164000
6 20500 123000
1 20500 20500
14 20500 287000
1 20500 20500
14 20500 287000
1 20500 20500
4 20500 82000
8 20500 164000
2 20500 41000
1 20500 20500
2 20500 41000
4 20500 82000
2 20500 41000
1 20500 20500
Water heater OK 2 20500 41000
4 20500 82000
1 20500 20500
4 20500 82000
10 20500 205000
1 20500 20500
3 20500 61500
14 20500 287000
1 20500 20500
14 20500 287000
1 20500 20500
4 20500 82000
8 20500 164000
1 20500 20500
1 20500 20500
1 20500 20500
7 20500 143500
4 20500 82000
2 20500 41000
1 20500 20500
14 20500 287000
1 20500 20500
7 20500 143500
masih dipantau 6 20500 123000
1 20500 20500
10 20500 205000
4 20500 82000
1 20500 20500
2 20500 41000
1 20500 20500
7 20500 143500
3 20500 61500
1 20500 20500
8 20500 164000
4 20500 82000
6 20500 123000
1 20500 20500
Ambil dari BBD-25 8 20500 164000
6 20500 123000
2 20500 41000
LAPORAN HARIAN IN

No Tanggal Nama Petugas Lokasi

BBD1-3,7,12,18,GRB 2,6,GRA 1-6,FUS


1 6/3/2019 Sunenah, Juheti, Priyatin
18,19,20
Office, Toilet Kantin, Musholla, Pot
2 6/3/2019 Mariyah
Tanaman, ISR,R100

3 6/3/2019 Cahya Kolam Renang, Koridor BBD 27-37

Komunal, Ora-ori, Kantin, Toilet Musholla,


4 6/3/2019 Masrurah
Pot Tanaman, R100
Komunal, Ora-ori, Kantin, Toilet Musholla,
4 5/31/2019 Masrurah
Pot Tanaman, Lap. Tennis
1 5/29/2019 Sunenah, Juheti, Priyatin BD 10-17, 27, 32, GRB, FUV-5, FUV-6
Office, Toilet Kantin, Musholla, Pot
2 5/29/2019 Mariyah
Tanaman, RGH, R.Laundry

3 5/29/2019 Cahya Kolam Renang, Koridor BBD 27-37

Komunal, Ora-ori, Kantin, Toilet Musholla,


4 5/29/2019 Masrurah
Pot Tanaman, RGH, R.Laundry

BBD 21, 23-28, 32, GRB 2, 5, FUM-3,


1 5/28/2019 Sunenah, Juheti, Priyatin
FUV-2, FUM-1, FUA-3
Office, Toilet Kantin, Musholla, Pot
2 5/28/2019 Mariyah
Tanaman, CR, Lap. Tennis

3 5/28/2019 Cahya Kolam Renang, Koridor BBD 27-37

Komunal, Ora-ori, Kantin, Toilet Musholla,


4 5/28/2019 Masrurah
Pot Tanaman, CR, Lap. Tennis

BBD 1-7, 12, 18, GRA, GRB 2-5, FUS-14,


1 5/27/2019 Sunenah, Juheti, Priyatin
FUS-19, FUS-20
Office, Toilet Kantin, Musholla, Pot
2 5/27/2019 Mariyah
Tanaman, ISR, R100

3 5/27/2019 Cahya Kolam Renang, Kantin

Komunal, Ora-ori, Kantin, Toilet Musholla,


4 5/27/2019 Masrurah
Pot Tanaman, R100
1 5/25/2019 Sunenah, Juheti, Priyatin BD 10-23, 27, 32, GRB
Office, Toilet Kantin, Musholla, Pot
2 5/25/2019 Mariyah
Tanaman

3 5/25/2019 Cahya Kolam Renang, Komunal

Komunal, Ora-ori, Kantin, Toilet Musholla,


4 5/25/2019 Masrurah
Pot Tanaman

BBD 21, 23, 32-37, FUM-3, FUV-2, GRB-


1 5/24/2019 Sunenah, Juheti, Priyatin
1, GRB-5, GRB-6, Koridor BD 24-32

Office, Toilet Kantin, Musholla, Pot


2 5/24/2019 Mariyah
Tanaman, Lap. Tennis

3 5/24/2019 Cahya Kolam Renang

Komunal, Ora-ori, Kantin, Toilet Musholla,


4 5/24/2019 Masrurah
Pot Tanaman, Lap. Tennis
BBD 1-3, 7, 12, 18-20, GRB-2, Koridor
1 5/23/2019 Sunenah, Juheti
BD 32 - R100-R.Laundry
Office, Toilet Kantin, Musholla, Pot
2 5/23/2019 Mariyah
Tanaman, SO, KB

3 5/23/2019 Cahya Kolam Renang, GRA/B, ISR

Komunal, Ora-ori, Kantin, Toilet Musholla,


4 5/23/2019 Masrurah
Pot Tanaman, SO, KB
1 5/22/2019 Priyatin, Sunenah, Juheti BD 10-17, 27, 32, GRB
Office, Toilet Kantin, Musholla, Pot
2 5/22/2019 Mariyah
Tanaman, RGH, R.Laundry
3 5/22/2019 Cahya Kolam Renang

Komunal, Ora-ori, Kantin, Toilet Musholla,


4 5/22/2019 Masrurah
Pot Tanaman, RGH, R.Laundry

BBD 21-24, 27, 32, FUM-3, FUV-2, GRB-


1 5/21/2019 Priyatin, Sunenah, Juheti
2, FUM-1, FUA-3
Office, Toilet Kantin, Musholla, Pot
2 5/21/2019 Mariyah
Tanaman

3 5/21/2019 Cahya Kolam Renang

Komunal, Ora-ori, Kantin, Toilet Musholla,


4 5/21/2019 Masrurah
Pot Tanaman
BBD 1-3, 7, 12, 18, GRA, GRB-2, FUS
1 5/20/2019 Priyatin, Sunenah, Juheti
14, 16, 18
Office, Toilet Kantin, Musholla, Pot
2 5/20/2019 Mariyah
Tanaman, ISR, R100

3 5/20/2019 Cahya Kolam Renang, Komunal

Komunal, Ora-ori, Kantin, Toilet Musholla,


4 5/20/2019 Masrurah
Pot Tanaman, R100
1 5/18/2019 Priyatin, Sunenah, Juheti BD 10-23, 27, 29, 31-32, GRB
Office, Toilet Kantin, Musholla, Pot
2 5/18/2019 Mariyah
Tanaman

3 5/18/2019 Cahya Kolam Renang

Komunal, Ora-ori, Kantin, Toilet Musholla,


4 5/18/2019 Masrurah
Pot Tanaman

1 5/17/2019 Priyatin, Sunenah BBD 21-24, 32, GRB-2, Koridor GRB

Office, Toilet Kantin, Musholla, Pot


2 5/17/2019 Mariyah
Tanaman, Lap. Tennis

3 5/17/2019 Rukman Kolam Renang


Komunal, Ora-ori, Kantin, Toilet Musholla,
4 5/17/2019 Masrurah
Pot Tanaman, Lap. Tennis

1 5/16/2019 Priyatin, Sunenah, Juheti BBD 1-20, GRB 1-2, Koridor BD 17-23

Office, Toilet Kantin, Musholla, Pot


2 5/16/2019 Mariyah
Tanaman, ISR

3 5/16/2019 Rukman Kolam Renang

Komunal, Ora-ori, Kantin, Toilet Musholla,


4 5/16/2019 Masrurah
Pot Tanaman, ISR
1 5/15/2019 Priyatin, Sunenah BD 10-17, 27, 32, GRB, FUSBD
Office, Toilet Kantin, Musholla, Pot
2 5/15/2019 Muslimin
Tanaman, ISR, R.Laundry

3 5/15/2019 Cahya Kolam Renang, Komunal

Ora-ori, Kantin, Toilet Musholla, Pot


4 5/15/2019 Masrurah
Tanaman, R.Laundry
BBD 21-24, 32, GRB 1-2, FUM-3, FUV-2,
1 5/14/2019 Priyatin, Masrurah, Sunenah
FUA-3, FUM-1
Office, Toilet Kantin, Musholla, Pot
2 5/14/2019 Mariyah
Tanaman, CR, Lap. Tennis

3 5/14/2019 Cahya Kolam Renang, Komunal

Komunal, Ora-ori, Kantin, Toilet Musholla,


4 5/14/2019 Juheti
Pot Tanaman, Lap. Tennis
BBD 1-3, 12, 18, GRA, GRB 1-2, Koridor
1 5/13/2019 Priyatin, Masrurah, Sunenah
BD 27-32
Office, Toilet Kantin, Musholla, Pot
2 5/13/2019 Mariyah
Tanaman, ISR, R100

3 5/13/2019 Cahya Kolam Renang

Komunal, Ora-ori, Kantin, Toilet Musholla,


4 5/13/2019 Juheti
Pot Tanaman, R100
1 5/11/2019 Priyatin, Masrurah, Sunenah BD 10-23, 27, 30-32, GRB
Office, Toilet Kantin, Musholla, Pot
2 5/11/2019 Mariyah
Tanaman

3 5/11/2019 Cahya Kolam Renang

Komunal, Ora-ori, Kantin, Toilet Musholla,


4 5/11/2019 Juheti
Pot Tanaman
BBD 21-23, 29-32, FUM-3, FUV-2,
1 5/10/2019 Priyatin, Masrurah
Koridor FUSBD
BBD 33-37, FUM-3, FUV-2, Koridor
2 5/10/2019 Mariyah, Sunenah
FUSBD
Kolam Renang, Komunal, Ora-ori, Kantin,
3 5/10/2019 Cahya
Pot Tanaman, Lap. Tennis
Office, Toilet Kantin, Musholla, Pot
4 5/10/2019 Muslimin
Tanaman, Lap. Tennis
1 5/9/2019 Priyatin, Masrurah, Sunenah BD 15-16, 27, GRB 1-3, FUSBD 1-2
3 5/9/2019 Cahya Kolam Renang, Komunal, Ora-ori, Kantin

Office, Toilet Kantin, Musholla, ISR, Pot


4 5/9/2019 Mariyah
Tanaman
1 5/8/2019 Priyatin, Masrurah BD 15-16, 27, GRB 1-3, FUSBD 1-2
2 5/8/2019 Mariyah, Sunenah BD 10-14, 27, 32, GRB 5-6, FUSBD 3-5

Kolam Renang, Komunal, Ora-ori, Toilet


3 5/8/2019 Cahya
Musholla, Kantin, Koridor BBD 27-37

Office, Toilet Kantin, Musholla, Kantin, Pot


4 5/8/2019 Muslimin
Tanaman
BBD 21-24, 32, FUM-3, FUV-2, GRB 1-2,
1 5/7/2019 Priyatin, Masrurah
FUA-3, FUV-5
BBD 25-28, FUM-3, FUV-2, FUS-6, FUM-
2 5/7/2019 Mariyah, Sunenah
1
Kolam Renang, Komunal, Ora-ori, Toilet
3 5/7/2019 Cahya
Musholla, Kantin, R.Merah
Office, Toilet Kantin, Musholla, ISR,
4 5/7/2019 Muslimin
Kantin, CR
BBD 1-3, 12, 18, GRB 1-2, GRA 5-6, FUS
1 5/6/2019 Priyatin, Masrurah
16&18
2 5/6/2019 Mariyah, Sunenah BBD 5-7, 19-20, GRA 1-3, FUS 19&20
Kolam Renang, Komunal, Ora-ori, Toilet
3 5/6/2019 Cahya
Musholla, Kantin, ISR

4 5/6/2019 Muslimin Office, Toilet Kantin, Musholla, ISR, R100


1 5/4/2019 Priyatin, Masrurah BD 15-20, 23, 27, 30, GRB 1-3
2 5/4/2019 Mariyah, Sunenah BD 10-14, 21-22, 27, 31-32, GRB 5-6
Kolam Renang, Komunal, Ora-ori, Toilet
3 5/4/2019 Rukman
Musholla, Kantin, ISR
4 5/4/2019 Toyibah Office, Toilet Kantin, Musholla, ISR
BBD 21-23, 32-37, GRB 1-2, FUM-3,
1 5/3/2019 Priyatin, Masrurah, Sunenah
FUV-2, GRB 3-5, Koridor GRB
Komunal, Ora-ori, Toilet Musholla, Kantin,
2 5/3/2019 Mariyah
ISR

3 5/3/2019 Rukman Kolam Renang

4 5/3/2019 Toyibah Office, Toilet Kantin, Musholla, ISR


BBD 1-3, 12, 18, GRB 1-3, Koridor BBD
1 5/2/2019 Priyatin, Masrurah
1-7
BBD 5-7, 19-20, GRB 5-6, Koridor BBD
2 5/2/2019 Mariyah, Sunenah
11-17
Kolam Renang, Komunal, Ora-ori, Toilet
3 5/2/2019 Rukman
Musholla, Kantin, ISR
Office, Toilet Kantin, Musholla, Pot
4 5/2/2019 Toyibah
Tanaman, ISR
1 4/30/2019 Priyatin, Mariyah, Sunenah BBD 21-27, 32, GRB, FUM-3, FUV-2
Komunal, Ora-ori, Toilet Musholla, ISR,
2 4/30/2019 Cahya
Lap. Tennis
Office, Toilet Kantin, Musholla, Pot
4 4/30/2019 Toyibah
Tanaman, ISR
BBD 1-3, 7, 12, 18, GRA, GRB 1-3, FUS
1 4/29/2019 Priyatin, Masrurah, Sunenah
18, 19, 20
Office, Toilet Kantin, Musholla, Pot
2 4/29/2019 Mariyah
Tanaman
4 4/29/2019 Toyibah ISR
Kolam Renang, Komunal, Ora-ori, Toilet
5 4/29/2019 Rukman
Muhsolla, Kantin, Pot Tanaman
1 4/27/2019 Priyatin, Masrurah BD 15-20, 23, 27, 29, GRB 1-3
2 4/27/2019 Mariyah, Sunenah BD 10-14, 21-22, 27, 31-32, GRB 5-6
Office, Toilet Kantin, Musholla, Pot
4 4/27/2019 Toyibah
Tanaman
Kolam Renang, Komunal, Ora-ori, Toilet
5 4/27/2019 Rukman
Muhsolla, Kantin, Pot Tanaman
BBD 21-24, 32, 34-37, FUM-3, FUV-2,
1 4/26/2019 Priyatin, Sunenah
GRB 1-2, Koridor BBD 32-37
Komunal, Ora-ori, Toilet Musholla, Kantin,
2 4/26/2019 Masrurah
Pot Tanaman, Lap. Tennis
Office, Toilet Kantin, Musholla, Pot
4 4/26/2019 Toyibah
Tanaman, Lap. Tennis

5 4/26/2019 Rukman Kolam Renang, Komunal

1 4/25/2019 Priyatin, Masrurah, Sunenah BBD 1-7, 12, 18-20, GRB 1-2
Office, Toilet Kantin, Musholla, Pot
2 4/25/2019 Mariyah
Tanaman, Kantin
4 4/25/2019 Toyibah ISR
Kolam Renang, Komunal, Ora-ori, Toilet
5 4/25/2019 Rukman
Musholla, Kantin
1 4/24/2019 Priyatin, Masrurah, Sunenah BD 10-16, 27, 32, GRB, FUSBD
Komunal, Ora-ori, Toilet Musholla,
2 4/24/2019 Mariyah
R.Laundry, RGH
Office, Toilet Kantin, Musholla, Pot
4 4/24/2019 Toyibah
Tanaman, R.Laundry, RGH

5 4/24/2019 Rukman Kolam Renang, GRA/B

BBD 21-24, 28-29, 32, GRB, FUM-3,


1 4/23/2019 Priyatin, Masrurah, Sunenah
FUV-2, FUA-3, FUM-1
Office, Toilet Kantin, Musholla, Pot
2 4/23/2019 Mariyah
Tanaman
4 4/23/2019 Toyibah ISR
Kolam Renang, Komunal, Ora-ori, Toilet
5 4/23/2019 Rukman
Musholla, Kantin, CR
BBD 1-3, 7, 12, 18, GRB 1-2, BBD 30, 31,
1 4/22/2019 Priyatin, Masrurah, Sunenah
33, GRA, FUS-3, FUS-14
Office, Toilet Kantin, Musholla, Pot
2 4/22/2019 Mariyah
Tanaman
4 4/22/2019 Toyibah ISR
Kolam Renang, Komunal, Ora-ori, Toilet
5 4/22/2019 Rukman
Musholla, Kantin, CR
1 4/20/2019 Priyatin, Masrurah BD 15-20, 23, 27, 30, GRB 1-3
2 4/20/2019 Mariyah, Sunenah BD 10-14, 21, 22, 27, 31-32, GRB 5-6
Office, Toilet Kantin, Musholla, Pot
4 4/20/2019 Toyibah
Tanaman, ISR
Kolam Renang, Komunal, Ora-ori, Toilet
5 4/20/2019 Rukman
Musholla, Kantin
BBD 1-7, 12, 18-20, 31, GRB 1-2, Koridor
1 4/18/2019 Priyatin, Sunenah, Masrurah
BBD 18-27
Komunal, Ora-ori, Toilet Musholla, Kantin,
2 4/18/2019 Mariyah
Pot Tanaman, SO, KB
Office, Toilet Kantin, Musholla, Pot
4 4/18/2019 Toyibah
Tanaman, SO, KB

5 4/18/2019 Rukman Kolam Renang

BBD 21-24, 28-32, FUM-3, FUV-2, FUV-5,


1 4/16/2019 Priyatin, Sunenah, Masrurah
FUV-6
Komunal, Ora-ori, Toilet Musholla, Kantin,
2 4/16/2019 Mariyah
Pot Tanaman, Lap. Tennis
Office, Toilet Kantin, Musholla, Pot
4 4/16/2019 Toyibah
Tanaman, Lap. Tennis

5 4/16/2019 Rukman Kolam Renang

BDB 1-2, 7, 12, 18, 31, GRB 1-2, GRA,


1 4/15/2019 Priyatin, Sunenah, Mariyah
FUS 18, 19, 20
Office, Toilet Kantin, Musholla, Pot
4 4/15/2019 Toyibah
Tanaman, ISR, R100

Kolam Renang, Komunal, Ora-ori, Toilet


5 4/15/2019 Rukman
Musholla, Kantin, Pot Tanaman, R100

1 4/13/2019 Priyatin, Sunenah, Mariyah BD 10-23, 27, 30-32, GRB 1-2

Office, Toilet Kantin, Musholla, Pot


4 4/13/2019 Toyibah
Tanaman
Kolam Renang, Komunal, Ora-ori, Toilet
5 4/13/2019 Rukman
Musholla, Kantin, Pot Tanaman
BBD 21-23, 30-32, FUM-3, FUV-2, GRB
1 4/12/2019 Priyatin, Sunenah
1-2, Koridor BBD 1-7
Office, Toilet Kantin, Musholla, Kantin, Pot
3 4/12/2019 Mariyah
Tanaman
4 4/12/2019 Toyibah ISR
Kolam Renang, Komunal, Ora-ori, Toilet
5 4/12/2019 Rukman
Musholla, Kantin, Pot Tanaman
BBD 1-2, 7, 12, 18, 30-31, GRB1-3,
1 4/11/2019 Priyatin, Sunenah
Koridor BD 17-24
Komunal, Ora-ori, Toilet Musholla, Kantin,
2 4/11/2019 Masrurah
Pot Tanaman
Office, Toilet Kantin, Musholla, Kantin, Pot
3 4/11/2019 Mariyah
Tanaman
4 4/11/2019 Toyibah ISR

5 4/11/2019 Rukman Kolam Renang

BD 15-16, 27, GRB 1-3, BBD 30-31,


1 4/10/2019 Priyatin, Masrurah
FUM-2, FUSBD 1-2
BD 10-14, 27, 32, GRB 5-6, FUM-2,
2 4/10/2019 Sunenah, Mariyah
FUSBD 3-5
Office, Toilet Kantin, Musholla, Pot
4 4/10/2019 Toyibah
Tanaman, ISR
Kolam Renang, Komunal, Ora-ori, Toilet
5 4/10/2019 Rukman
Musholla, Kantin
BBD 21-24, 30-32, FUM-3, FUV-2, GRB-
1 4/9/2019 Priyatin, Masrurah
1, FUA-3, FUV-5
BBD 33-37, GRB-2, FUM-3, FUV-2, FUS-
2 4/9/2019 Sunenah, Mariyah
6, FUM-1
Office, Toilet Kantin, Musholla, Pot
4 4/9/2019 Toyibah
Tanaman, CR, Lap. Tennis

Kolam Renang, Komunal, Ora-ori, Toilet


5 4/9/2019 Rukman
Musholla, Kantin, Lap. Tennis

BBD 1-2, 7, 12, 18, 30, 31, 33, GRB 1-2,


1 4/8/2019 Priyatin, Sunenah, Mariyah
GRA, FUS 16, 18, 19, 20
Komunal, Ora-ori, Toilet Musholla, Kantin,
2 4/8/2019 Masrurah
Pot Tanaman, R100
Office, Toilet Kantin, Musholla, Pot
4 4/8/2019 Toyibah
Tanaman, ISR, R100

5 4/8/2019 Rukman Kolam Renang, Komunal

BD 16-20, 23, 27, 29, GRB 1-3, BBD 30-


1 4/6/2019 Priyatin, Masrurah
31
BD 10-14, 21-22, 27, 31-32, GRB 5-6,
2 4/6/2019 Mariyah, Sunenah
BBD-33
Office, Toilet Kantin, Musholla, Pot
4 4/6/2019 Toyibah
Tanaman
Kolam Renang, Komunal, Ora-ori, Toilet
5 4/6/2019 Rukman
Musholla, Kantin
BBD 21-23, 30-32, FUM-3, FUV-2GRB 1-
1 4/5/2019 Priyatin, Masrurah, Sunenah
3, Koridor GRB - ISR
Office, Toilet Kantin, Musholla, Pot
2 4/5/2019 Mariyah
Tanaman, Lap. Tennis
Komunal, Ora-ori, Toilet Musholla, Kantin,
4 4/5/2019 Muslimin
Pot Tanaman Lap. Tennis

5 4/5/2019 Rukman Kolam Renang

BBD 1-3, 12, 18, 30, 31, GRB 1-3, FUM-


1 4/4/2019 Priyatin, Masrurah
2, FUA-3
2 4/4/2019 Mariyah, Sunenah BBD 5-7, 19-20, 33, FUM-2, FUA-3
Office, Toilet Kantin, Musholla, Pot
4 4/4/2019 Toyibah
Tanaman, So, KB

Kolam Renang, Komunal, Ora-ori, Toilet


5 4/4/2019 Rukman
Muhsolla, Kantin, Pot Tanaman, SO, KB

BBD 21-24, 30-32, GRB-3, FUM-3, FUV-


1 4/2/2019 Priyatin, Masrurah
2, FUS 3, 6, 14
BBD 25-28, 33, GRB 1-2, FUM-3, FUV-2,
2 4/2/2019 Mariyah, Sunenah
FUS 3, 6, 14
Office, Toilet Kantin, Musholla, Pot
4 4/2/2019 Toyibah
Tanaman, Lap. Tennis
Kolam Renang, Komunal, Ora-ori, Toilet
5 4/2/2019 Rukman Muhsolla, Kantin, Pot Tanaman, Lap.
Tennis

BBD 1-2, 7, 12, 18, 30, 31, 33, GRB 1-3,


1 4/1/2019 Priyatin, Masrurah, Sunenah
GRA, FUS-16, FUS-18, FUS-19, FUS-20

Office, Toilet Kantin, Musholla, Pot


4 4/1/2019 Toyibah
Tanaman, CR, R100

Kolam Renang, Komunal, Ora-ori, Toilet


5 4/1/2019 Rukman
Muhsolla, Kantin, Pot Tanaman, R100

BD 15-20, 23, 27, 29-30, BBD 30, 31,


1 3/30/2019 Priyatin, Masrurah
GRB 1-3
BD 10-14, 21-22, 27, 31-32, BBD-33,
2 3/30/2019 Sunenah, Mariyah
GRB 5-6
Office, Toilet Kantin, Musholla, Pot
4 3/30/2019 Toyibah
Tanaman
Kolam Renang, Komunal, Ora-ori, Toilet
5 3/30/2019 Rukman
Muhsolla, Kantin, Pot Tanaman
BBD 21-23, 28-33, FUM-3, FUV-2, GRB
1 3/29/2019 Priyatin, Masrurah, Sunenah
1-2, Koridor FUSBD & BD 10-16
Komunal, Ora-ori, Toilet Musholla, Kantin,
2 3/29/2019 Cahya
Pot Tanaman
Office, Toilet Kantin, Musholla, Pot
3 3/29/2019 Toyibah
Tanaman

4 3/29/2019 Rukman Kolam Renang

BBD 1-7, 11-12, 18-20, 30, 31, 33, GRB


1 3/28/2019 Priyatin, Masrurah, Sunenah
1-2, Koridor BD 24-32 & GRB
2 3/28/2019 Mariyah Office, Kantin
3 3/28/2019 Toyibah ISR
Kolam Renang, Komunal, Ora-ori, Toilet
4 3/28/2019 Rukman Musholla, Kantin, Pot Tanaman, Toilet
Kantin, Toilet Kantin, Musholla
BD 10-17, 27, 32, BBD 30, 31, 33, GRB,
1 3/27/2019 Priyatin, Masrurah, Sunenah
FUSBD
Komunal, Office, Toilet Kantin, Musholla,
2 3/27/2019 Mariyah
Kantin
3 3/27/2019 Toyibah ISR
Kolam Renang, Komunal, Ora-ori, Toilet
4 3/27/2019 Rukman Musholla, Kantin, Pot Tanaman, Toilet
Kantin
BBD 21-24, 30-37, GRB 1-2, FUM-3 &
1 3/26/2019 Priyatin, Masrurah, Sunenah
FUV-2
Komunal, Office, Toilet Kantin, Musholla,
2 3/26/2019 Mariyah
Lap. Tennis
3 3/26/2019 Toyibah ISR
Kolam Renang, Komunal, Ora-ori, Toilet
4 3/26/2019 Rukman Musholla, Kantin, Pot Tanaman, Toilet
Kantin, Lap. Tennis
BBD 1-3, 7, 12, 18, 30-31, 33, GRB 1-2,
1 3/25/2019 Priyatin, Masrurah, Sunenah
GRA, FUS 18-20
Komunal, Office, Toilet Kantin, Musholla,
2 3/25/2019 Mariyah
ISR
3 3/25/2019 Toyibah ISR
Kolam Renang, Komunal, Ora-ori, Toilet
4 3/25/2019 Rukman Musholla, Kantin, Pot Tanaman, Toilet
Kantin
BD 10, 15-20, 24, 27, 29-30, BBD 30-31,
1 3/23/2019 Priyatin, Masrurah
GRB 1-3
BD 10-14, 21-22, 27, 31-32, BBD-33,
2 3/23/2019 Mariyah, Sunenah
GRB 5-6
Office, Toilet Kantin, Musholla, Pot
3 3/23/2019 Toyibah
Tanaman, ISR
Kolam Renang, Komunal, Ora-ori, Toilet
4 3/23/2019 Rukman
Musholla, Kantin, Pot Tanaman
BBD 21-23, 28-33, FUM-3, FUV-2, GRB-
1 3/22/2019 Sunenah, Masrurah, Priyatin
1, Koridor BBD 12-27
Komunal, Ora-ori, Toilet Musholla, Kantin,
2 3/22/2019 Mariyah
Pot Tanaman, Lap. Tennis
Office, Toilet Kantin, Musholla, Pot
3 3/22/2019 Toyibah
Tanaman, Lap. Tennis

4 3/22/2019 Rukman Kolam Renang, ISR

BBD 1-3, 12, 18, 30, 31, Koridor BBD 18-


1 3/21/2019 Sunenah, Mariyah
27
BBD 5-7, 19-20, 33, GRB-1, Koridor BBD
2 3/21/2019 Priyatin, Masrurah
28-37
Office, Toilet Kantin, Musholla, Pot
3 3/21/2019 Toyibah
Tanaman, SO, KB
Kolam Renang, Komunal, Kantin, Ora-ori,
4 3/21/2019 Rukman
Toilet Musholla, SO, KB
BD 10-14, 27, 32, GRB 5-6, BBD-33,
1 3/20/2019 Sunenah, Mariyah
FUSBD 3&5, FUM-2
BD 10, 15, 16, 27, BBD 30, 31, GRB 1-3,
2 3/20/2019 Priyatin, Masrurah
FUSBD 1&2, FUM-2
Office, Toilet Kantin, Musholla, Pot
3 3/20/2019 Toyibah
Tanaman, RGH, R.Laundry
Kolam Renang, Komunal, Kantin, Ora-ori,
4 3/20/2019 Rukman
Toilet Musholla, RGH, R.Laundry
BBD 21-23, 30-33, FUM-3 FUV-2, FUS-3,
1 3/19/2019 Masrurah, Sunenah, Mariyah
FUS-6, FUA-3
Office, Toilet Kantin, Musholla, Pot
3 3/19/2019 Toyibah
Tanaman, ISR
Kolam Renang, Komunal, Kantin, Ora-ori,
4 3/19/2019 Rukman
Toilet Musholla, ISR
BBD 1-3, 7, 12, 18, 30, 31, 3,, GRA, FUS-
1 3/18/2019 Priyatin, Masrurah, Sunenah
16, FUS-18, FUS-19, FUS-20
Komunal, Ora-ori, Toilet Musholla, Kantin,
2 3/18/2019 Mariyah
Pot Tanaman, ISR
Office, Toilet Kantin, Musholla, Pot
3 3/18/2019 Toyibah
Tanaman, ISR

4 3/18/2019 Rukman Kolam Renang, Komunal, Kantin, ISR

BD 10-20, 22-23, 27, 29-32, GRB, BBD


1 3/16/2019 Priyatin, Mariyah, Sunenah
30-31
Komunal, Ora-ori, Toilet Musholla, Kantin,
2 3/16/2019 Masrurah
Pot Tanaman
Office, Toilet Kantin, Musholla, Pot
3 3/16/2019 Toyibah
Tanaman
BBD 21-24, 30-33, FUM-3, FUV-2,
1 3/15/2019 Priyatin, Masrurah, Sunenah
Koridor BBD 18-27
Komunal, Ora-ori, Toilet Musholla, Kantin,
2 3/15/2019 Mariyah
Pot Tanaman, Lap. Tennis
Office, Toilet Kantin, Musholla, Pot
3 3/15/2019 Toyibah
Tanaman, Lap. Tennis

4 3/15/2019 Rukman Kolam Renang

BBD 1-3, 12, 18, 30, 31, Koridor BBD 12-


1 3/14/2019 Priyatin, Masrurah
17
BBD 5-7, 19-20, 33, GRB-2, Koridor BBD
2 3/14/2019 Sunenah, Mariyah
1-7
Office, Toilet Kantin, Musholla, Pot
3 3/14/2019 Toyibah
Tanaman, ISR
Kolam Renang, Komunal, Ora-ori, Kantin,
4 3/14/2019 Rukman
Toilet Musholla
BD 15-16, 27, GRB 1-3, BBD 30-31,
1 3/13/2019 Priyatin, Masrurah
FUSBD 1-2, FUM-2
BD 11-14, 27, 32, GRB 5-6, FUSBD 3-5,
2 3/13/2019 Sunenah, Mariyah
FUM-2
Office, Toilet Kantin, Musholla, Pot
3 3/13/2019 Toyibah
Tanaman, RGH, R.Laundry

Kolam Renang, Komunal, Ora-ori, Kantin,


4 3/13/2019 Rukman
Toilet Musholla, RGH, R.Laundry

BBD 21-24, 30-32, GRB-1, FUM-3, FUV-


1 3/12/2019 Priyatin, Masrurah
2, FUS-6, FUM-1
BBD 25-28, 33, FUM-3, FUV-2, FUV-6,
2 3/12/2019 Sunenah, Mariyah
FUA-3
Office, Toilet Kantin, Musholla, Pot
3 3/12/2019 Toyibah
Tanaman, ISR, CR, Lap. Tennis
Kolam Renang, Komunal, Ora-ori, Kantin,
4 3/12/2019 Rukman
Toilet Musholla, Lap. Tennis
BBD 1-2, 12, 18, 30, 31, GRA 5-6, FUS-
1 3/11/2019 Priyatin, Masrurah
16, FUS-18
BBD 7, 19, 20, 33, GRA 1-3, FUS-19,
2 3/11/2019 Sunenah, Mariyah
FUS-20
Office, Toilet Kantin, Musholla, Pot
3 3/11/2019 Toyibah
Tanaman, ISR, R100
Kolam Renang, Komunal, Ora-ori, Kantin,
4 3/11/2019 Rukman
Toilet Musholla, R100
BD 10-20, 22-25, 27, 30-32, GRB, BBD
1 3/9/2019 Priyatin, Sunenah, Masrurah
30, 31, 33
Office, Toilet Kantin, Musholla, Pot
2 3/9/2019 Mariyah
Tanaman
Kolam Renang, Komunal, Ora-ori, Kantin,
4 3/9/2019 Rukman
Toilet Musholla
BBD 21-23, 30-32, FUM-3, FUV-2,
1 3/8/2019 Priyatin, Sunenah
Koridor FUSBD & BD 10-16
Office, Toilet Kantin, Musholla, Pot
2 3/8/2019 Mariyah
Tanaman, Lap. Tennis, ISR
Komunal, Ora-ori, Toilet Musholla, Kantin,
3 3/8/2019 Masrurah
Lap. Tennis

4 3/8/2019 Rukman Kolam Renang, Koridor BBD 27-37


BD 11-16, 24-25, 27, 31, GRB, BBD 30,
1 3/6/2019 Priyatin, Sunenah, Masrurah
31, 33, FUS-3, FUS-14
Office, Toilet Kantin, Musholla, Pot
2 3/6/2019 Mariyah
Tanaman
3 3/6/2019 Toyibah Office, ISR
Kolam Renang, Komunal, Ora-ori, Toilet
4 3/6/2019 Rukman
Musholla, Kantin
BBD 21-23, 30-32, FUM-3, FUV-2, GRB
1 3/5/2019 Priyatin, Sunenah
1, 3, 5, 6, FUA-3, FUS-6
Office, Toilet Kantin, Musholla, Pot
2 3/5/2019 Muslimin
Tanaman
3 3/5/2019 Toyibah Office, ISR
Kolam Renang, Komunal, Ora-ori, Toilet
4 3/5/2019 Rukman
Musholla, Kantin
BBD 1-3, 7, 12, 18, 30-31, GRA, FUS 18,
1 3/4/2019 Priyatin, Sunenah, Muslimin
19, 20
Office, Toilet Kantin, Musholla, Pot
2 3/4/2019 Mariyah
Tanaman, ISR
Kolam Renang, Komunal, Ora-ori, Toilet
4 3/4/2019 Rukman
Musholla, Kantin, ISR
BD 15-20, 23-25, 27, GRB 1-3, BBD 30-
1 3/2/2019 Priyatin, Masrurah
31
BD 10-14, 22, 24-25, 27, 31-32, GRB 5-6,
2 3/2/2019 Mariyah, Sunenah
BBD-33
Office, Toilet Kantin, Musholla, Pot
3 3/2/2019 Toyibah
tanaman
Kolam Renang, Komunal, Ora-ori, Kantin,
4 3/2/2019 Rukman
Toilet Musholla
BBD 21-23, 30-37, FUM-3, FUV-2,
1 3/1/2019 Priyatin, Masrurah, Sunenah
Koridor BBD 18-27
Komunal, Ora-ori, Toilet Musholla, Kantin,
2 3/1/2019 Mariyah
Pot Tanaman, Lap. Tennis
Office, Toilet Kantin, Musholla, Pot
3 3/1/2019 Toyibah
tanaman, Lap. Tennis

4 3/1/2019 Rukman Kolam Renang


BBD 1-3, 10-12, 18, 30, Koridor BD 24-32
1 2/28/2019 Priyatin, Masrurah
& Koridor Laundry

2 2/28/2019 Sunenah, Mariyah BBD 5-9, 19-20, 31, Koridor GRB - ISR

Office, Toilet Kantin, Musholla, Pot


3 2/28/2019 Toyibah
tanaman, ISR, SO, KB
Kolam Renang, Komunal, Ora-ori, Toilet
4 2/28/2019 Rukman Musholla, Kantin, Pot Tanaman, ISR, SO,
KB
BD 11-16, 24-25, 27, 32, BBD 30-31,
1 2/27/2019 Priyatin, Masrurah, Sunenah
GRB, FUM-2, FUSBD
Office, Toilet Kantin, Musholla, Pot
2 2/27/2019 Mariyah
tanaman
Kolam Renang, Komunal, Ora-ori, Toilet
3 2/27/2019 Rukman
Musholla, Kantin, Pot Tanaman
4 2/27/2019 Toyibah Komunal, Office, ISR
BBD 21-24, 30-32, GRB 5-6, Fum-3,
1 2/26/2019 Priyatin, Masrurah, Sunenah
FUV-2, FUM-1, FUV-5
Office, Toilet Kantin, Musholla, Pot
2 2/26/2019 Mariyah
tanaman
Kolam Renang, Komunal, Ora-ori, Toilet
3 2/26/2019 Rukman
Musholla, Kantin, Pot Tanaman
4 2/26/2019 Toyibah Komunal, Office, ISR
BBD 1-3, 12, 18, 31, GRA 1, 5, 6, FUS-
1 2/25/2019 Priyatin, Masrurah
16, FUS-18

2 2/25/2019 Mariyah, Sunenah BBD 5-9, 30, GRA 2-3, FUS-19, FUS-20

Kolam Renang, Komunal, Ora-ori, Toilet


3 2/25/2019 Rukman
Musholla, Kantin, Pot Tanaman, ISR

Office, Toilet Kantin, Musholla, Pot


4 2/25/2019 Toyibah
Tanaman, ISR
BD 15-20, 23-25, 27, 29-30, GRB 1-3,
1 2/23/2019 Priyatin, Masrurah
BBD 30-31

2 2/23/2019 Mariyah, Sunenah BD 10-14, 22, 24-25, 27, 31-32, GRB 5-6
Kolam Renang, Komunal, Ora-ori, Toilet
3 2/23/2019 Rukman
Musholla, Kantin, Pot Tanaman
Office, Toilet Kantin, Musholla, Pot
4 2/23/2019 Toyibah
Tanaman
BBD 21-23, 29-32, GRB-1, FUM-3, FUV-
1 2/22/2019 Priyatin, Masrurah, Sunenah
2, Koridor BBD 28-37

2 2/22/2019 Mariyah Komunal, Ora-ori, Toilet Musholla, Kantin

3 2/22/2019 Rukman Kolam Renang, ISR

Office, Toilet Kantin, Musholla, Pot


4 2/22/2019 Toyibah
Tanaman, ISR

1 2/21/2019 Priyatin, Masrurah BBD 1-3, 18, 30-31, Koridor BBD 1-7

BBD 5-9, 19-20, GRB 5-6, Koridor BBD 1-


2 2/21/2019 Mariyah, Sunenah
7

Kolam Renang, Komunal, Ora-ori, Toilet


3 2/21/2019 Rukman
Musholla, Kantin, Pot Tanaman, SO, KB

Office, Toilet Kantin, Musholla, Pot


4 2/21/2019 Toyibah
Tanaman, ISR, SO, KB
BD 15-16, 24-25, 27, BBD 30-31, GRB 1-
1 2/20/2019 Priyatin, Masrurah, Sunenah
3, FUSBD1-2, FUM-2
BD 11-14, 24-15, 27, 32, GRB 5-6,
2 2/20/2019 Priyatin, Masrurah, Sunenah
FUSBD 3-5, FUM-2
Kolam Renang, Komunal, Ora-ori, Toilet
3 2/20/2019 Rukman Musholla, Kantin, Pot Tanaman, RGH,
R.Laundry
Office, Toilet Kantin, Musholla, Pot
4 2/20/2019 Toyibah
Tanaman, RGH, R.Laundry
BBD 21-24, 30-32, GRB-2, FUM-3, FUV-
1 2/19/2019 Priyatin, Masrurah, Sunenah
2, FUA-3, FUV-5
BBD 25-28, FUM-3, FUV-2, FUS-6, FUM-
2 2/19/2019 Priyatin, Masrurah, Sunenah
1, GRB 5-6
Kolam Renang, Komunal, Ora-ori, Toilet
3 2/19/2019 Rukman Musholla, Kantin, Pot Tanaman, Lap.
Tennis
Office, Toilet Kantin, Musholla, Pot
4 2/19/2019 Toyibah
Tanaman, Lap. Tennis
BBD 1-2, 7, 18-19, 30-31, GRA, GRB-6,
1 2/18/2019 Priyatin, Masrurah, Sunenah
FUS 16, 18, 19, 20

Kolam Renang, Komunal, Ora-ori, Toilet


2 2/18/2019 Rukman
Musholla, Kantin, R100, Pot Tanaman

Office, Toilet Kantin, Musholla, Pot


3 2/18/2019 Toyibah
Tanaman, R100
BD 10-20, 24-25, 27, 32, BBD 30-31,
1 2/16/2019 Priyatin, Masrurah, Sunenah
GRB
2 2/16/2019 Mariyah Komunal, Ora-ori, Toilet Musholla
Office, Toilet Kantin, Musholla, Pot
3 2/16/2019 Toyibah
Tanaman
BBD 21-23, 29-32, FUM-3, FUV-2,
1 2/15/2019 Priyatin, Masrurah, Sunenah
Koridor BBD 8-37
Komunal, Ora-ori, Toilet Musholla, Lap.
2 2/15/2019 Mariyah
Tennis
Office, Toilet Kantin, Musholla, Pot
3 2/15/2019 Toyibah
Tanaman, Lap. Tennis

5 2/15/2019 Rukman Kolam Renang, Koridor Kolam Renang

BBD 1-2, 7, 12, 18, 30, 31, GRB-1,


1 2/14/2019 Priyatin, Mariyah
Koridor BBD 18-27
Office, Toilet Kantin, Musholla, Pot
3 2/14/2019 Toyibah
Tanaman, SO, KB

Kolam Renang, Komunal, Ora-ori, Toilet


5 2/14/2019 Rukman
Musholla, Kantin, Pot Tanaman, SO, KB

BD 15-16, 24-25, 27, BBD-30, GRB 1-3,


1 2/13/2019 Priyatin, Masrurah
FUM-2, FUSBD 1-2
BD 11-14, 24-25, 27, 32, BBD-31, GRB 5-
2 2/13/2019 Mariyah, Sunenah
6, FUM-2, FUSBD 3-5
Office, Toilet Kantin, Musholla, Pot
3 2/13/2019 Toyibah
Tanaman, RGH, R.Laundry
Kolam Renang, Komunal, Ora-ori, Toilet
5 2/13/2019 Rukman Musholla, Kantin, Pot Tanaman, RGH,
R.Laundry
BBD 21-23, 29-32, FUM-3, FUV-2, FUA-
1 2/12/2019 Priyatin, Masrurah
3, FUV-5
BBD 31, 33-37, FUM-3, FUV-2, FUS-6,
2 2/12/2019 Mariyah, Sunenah
FUM-1
Office, Toilet Kantin, Musholla, Pot
3 2/12/2019 Toyibah
Tanaman, CR, Lap. Tennis
Kolam Renang, Komunal, Ora-ori, Toilet
5 2/12/2019 Rukman Musholla, Kantin, Pot Tanaman, Lap.
Tennis
BBD 1-3, 12, 18, 30, GRA 1, ,5, 6, FUS-
1 2/11/2019 Priyatin, Masrurah
16 & FUS-18
BBD 5-7, 19-20, GRA 2-3, FUS-19 &
2 2/11/2019 Mariyah, Sunenah
FUS-20
Office, Toilet Kantin, Musholla, Pot
3 2/11/2019 Toyibah
Tanaman, ISR, R100

Kolam Renang, Komunal, Ora-ori, Toilet


5 2/11/2019 Rukman
Musholla, Kantin, Pot Tanaman, R100

BD 15-20, 23-25, 27, 29-30, BBD-31,


1 2/9/2019 Priyatin, Masrurah
GRB 1-3
BD 10-14, 22, 24-25, 27, 31-32, BBD-30,
2 2/9/2019 Mariyah, Sunenah
GRB 5-6
Office, Toilet Kantin, Musholla, Pot
3 2/9/2019 Toyibah
Tanaman
Komunal, Ora-ori, Kantin, Toilet Musholla,
4 2/9/2019 Juheti
Pot Tanaman

5 2/9/2019 Rukman Kolam Renang, ISR

BBD 21-24, 29-32, FUM-3, FUV-2,


1 2/8/2019 Priyatin, Masrurah
Koridor BD 17-23
BBD 33-37, FUM-3, FUV-2, Koridor
2 2/8/2019 Mariyah, Sunenah
BD.10 - R100
Office, Toilet Kantin, Musholla, Pot
3 2/8/2019 Toyibah
Tanaman, Lap. Tennis
Komunal, Ora-ori, Kantin, Toilet Musholla,
4 2/8/2019 Juheti
Pot Tanaman, Lap. Tennis

5 2/8/2019 Rukman Kolam Renang

1 2/7/2019 Priyatin, Masrurah BBD 1-3, 12, 18, 30-31, Koridor FUSBD

BBD 5-9, 19-20, GRB-1, Koridor BBD 8-


2 2/7/2019 Mariyah, Sunenah
17
4 2/7/2019 Toyibah Office, Toilet Kantin, Musholla, SO, KB
Kolam Renang, Komunal, Kantin, Ora-ori,
5 2/7/2019 Rukman
Toilet Musholla, SO, KB
BD 15-16, 24-25, 27, GRB 1-3, BBD 30-
1 2/6/2019 Priyatin, Masrurah
31, FUV-5, FUA-3
BD 11-14, 24-25, 27, 32, GRB 5-6, FUM-
2 2/6/2019 Mariyah, Sunenah
1, FUS-6
Komunal, Office, Ora-ori, Kantin, RGH,
4 2/6/2019 Juheti
R.Laundry
Kolam Renang, Toilet Kantin, Musholla,
5 2/6/2019 Rukman
RGH, R.Laundry
BBD 1-3, 12, 18, 30-31, GRA 1, 5, 6,
1 2/4/2019 Priyatin, Masrurah
FUS-16 & FUS-18
BBD 7-8, 19-20, GRA 2-3, FUS-19 &
2 2/4/2019 Mariyah, Sunenah
FUS-20
Office, Toilet Kantin, Musholla, Pot
3 2/4/2019 Toyibah
Tanaman, ISR, R100
Komunal, Ora-ori, Kantin, Toilet Musholla,
4 2/4/2019 Juheti
Pot Tanaman, R100

5 2/4/2019 Rukman Kolam Renang, GRA/B

BD 15-20, 23-25, 27, 29-30, GRB 1-3,


1 2/2/2019 Priyatin, Masrurah
BBD 30-31
2 2/2/2019 Mariyah, Sunenah BD 10-14, 22, 24-25, 27, 31-32, GRB 5-6

Office, Toilet Kantin, Musholla, Pot


3 2/2/2019 Toyibah
Tanaman
Komunal, Ora-ori, Kantin, Toilet Musholla,
4 2/2/2019 Juheti
Pot Tanaman

5 2/2/2019 Rukman Kolam Renang

BBD 21-23, 29-32, FUM-3, FUV-2,


1 2/1/2019 Priyatin, Masrurah
Koridor BBD 18-23
BBD 33-37, BD-11, FUM-3, FUV-2,
2 2/1/2019 Mariyah, Sunenah
Koridor BBD-37
Office, Toilet Kantin, Musholla, Pot
3 2/1/2019 Toyibah
Tanaman, ISR, Lap. Tennis
Komunal, Ora-ori, Kantin, Toilet Musholla,
4 2/1/2019 Juheti
Pot Tanaman, Lap. Tennis

5 2/1/2019 Rukman Kolam Renang, Komunal

Note : Status Akhir, Finish=Selesai, Continue=Lanjut.


LAPORAN HARIAN INDOOR

Jenis Pekerjaan Status Akhir KET

Cleaning ruangan, dan pembersihan rumput koridor/halaman


Finish On Schedule
terbuka

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Continue cuti
penjernihan air kolam renang, pembersihan saluran air koridor

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule


Cleaning ruangan Finish On Schedule
Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Continue On Schedule
penjernihan air kolam renang, pembersihan saluran air koridor

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


penjernihan air kolam renang, vacuum kolam renang, Continue On Schedule
penyapuan daun kering koridor

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Cleaning ruangan Finish On Schedule


Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Continue On Schedule
penjernihan air kolam renang, penyapuan halaman terbuka

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule


Cleaning ruangan Finish On Schedule
Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


penjernihan air kolam renang, pembersihan saluran grating tepi Continue On Schedule
kolam, pemangkasan tanaman planter box

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Cleaning ruangan, dan pembersihan rumput koridor/halaman


Finish On Schedule
terbuka

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Continue On Schedule
penjernihan air kolam renang, vacuum kolam renang

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Cleaning ruangan, dan pembersihan rumput koridor/halaman


Finish On Schedule
terbuka

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


penjernihan air kolam renang, vacuum kolam renang, Continue On Schedule
pemangkasan tanaman

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule


Cleaning ruangan Finish On Schedule
Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule
Perawatan kolam renang, penyapuan lantai kolam renang,
Continue On Schedule
penjernihan air kolam renang, vacuum kolam renang

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


penjernihan air kolam renang, vacuum kolam renang, Continue On Schedule
pembersihan saluran air tepi kolam

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


penjernihan air kolam renang, vacuum kolam renang, cleaning Continue On Schedule
ruangan

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule


Cleaning ruangan Finish On Schedule
Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Continue On Schedule
penjernihan air kolam renang, vacuum kolam renang

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Cleaning ruangan, dan pembersihan rumput koridor/halaman


Finish On Schedule
terbuka

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Continue On Schedule
penjernihan air kolam renang, vacuum kolam renang
Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Cleaning ruangan, dan pembersihan rumput koridor/halaman


Finish On Schedule
terbuka
Cleaning ruangan dan toilet, penyiraman tanaman pot, setting
Finish On Schedule
ruangan untuk buka bersama ADM
Perawatan kolam renang, penyapuan lantai kolam renang,
Continue On Schedule
penjernihan air kolam renang, vacuum kolam renang
Cleaning ruangan dan toilet, penyiraman tanaman pot, setting
Finish On Schedule
ruangan untuk buka bersama ADM
Cleaning ruangan Finish On Schedule
Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


penjernihan air kolam renang, vacuum kolam renang, cleaning Continue On Schedule
ruangan

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


penjernihan air kolam renang, vacuum kolam renang, cleaning Continue On Schedule
ruangan

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Continue On Schedule
penjernihan air kolam renang, pembersihan gulma batu koridor

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule


Cleaning ruangan Finish On Schedule
Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
vacuum kolam renang

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Cleaning ruangan, dan pembersihan rumput koridor/halaman


Finish On Schedule
terbuka
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Perawatan kolam renang, Cleaning ruangan dan toilet Finish On Schedule

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule


Cleaning ruangan Finish On Schedule
Perawatan kolam renang, Cleaning ruangan dan toilet, vacuum
Finish On Schedule
kolam renang

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule


Cleaning ruangan Finish On Schedule
Cleaning ruangan Finish On Schedule

Perawatan kolam renang, Cleaning ruangan dan toilet,


Finish On Schedule
penyapuan daun kering koridor

Cleaning ruangan dan toilet Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Perawatan kolam renang, Cleaning ruangan dan toilet,


Finish On Schedule
penyapuan halaman terbuka

Cleaning ruangan dan toilet, stand-by training Finish On Schedule


Cleaning ruangan Finish On Schedule
Cleaning ruangan Finish On Schedule
Perawatan kolam renang, Cleaning ruangan dan toilet, setting
Finish On Schedule
tarawih

Cleaning ruangan dan toilet, setting tarawih Finish On Schedule


Cleaning ruangan Finish On Schedule
Cleaning ruangan Finish On Schedule
Perawatan kolam renang, Cleaning ruangan dan toilet Finish On Schedule
Cleaning ruangan dan toilet Finish On Schedule
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, Cleaning ruangan dan toilet, vacuum


Finish On Schedule
kolam renang, pemangkasan rumput planter box gazebo

Cleaning ruangan dan toilet, stand-by training Continue On Schedule


Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka
Perawatan kolam renang, Cleaning ruangan dan toilet, setting
Finish On Schedule
ruangan untuk training
Cleaning ruangan dan toilet, penyiraman tanaman pot, setting
Finish On Schedule
ruangan untuk training
Cleaning ruangan Finish On Schedule
Cleaning ruangan dan toilet, penyiraman tanaman pot Continue On Schedule

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Cleaning ruangan Finish On Schedule


Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule
Stand-by training Finish On Schedule
Perawatan kolam renang, penyapuan lantai kolam renang,
Finish On Schedule
cleaning ruangan dan toilet
Cleaning ruangan Finish On Schedule
Cleaning ruangan Finish On Schedule
Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruangan dan toilet
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Stand-by training Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


vacuum kolam renang, pemangkasan tanaman planter box Finish On Schedule
komunal
Cleaning ruangan Finish On Schedule
Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule
Stand-by training Finish On Schedule
Perawatan kolam renang, penyapuan lantai kolam renang,
Finish On Schedule
cleaning ruangan dan toilet
Cleaning ruangan Finish On Schedule
Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
pemangkasan dan pendangiran tanaman the-tehan

Cleaning ruangan Finish On Schedule


Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule
Stand-by training Finish On Schedule
Perawatan kolam renang, penyapuan lantai kolam renang,
Finish On Schedule
cleaning ruangan dan toilet

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, penyiraman tanaman pot Finish On Schedule


Stand-by training Finish On Schedule
Perawatan kolam renang, penyapuan lantai kolam renang,
Finish On Schedule
cleaning ruangan dan toilet
Cleaning ruangan Finish On Schedule
Cleaning ruangan Finish On Schedule
Cleaning ruangan dan toilet, perawatan tanaman pot, setting
Finish On Schedule
ruangan untuk training
Perawatan kolam renang, penyapuan lantai kolam renang,
Finish On Schedule
cleaning ruangan dan toilet
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Cleaning ruangan dan toilet, perawatan tanaman pot Finish On Schedule

Cleaning ruangan dan toilet, perawatan tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
pendangiran tanaman soka tepi kolam

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan tanaman pot Finish On Schedule

Cleaning ruangan dan toilet, perawatan tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
pembersihan gulma keramik tepi kolam

Cleaning ruangan Finish On Schedule


Cleaning ruangan dan toilet, perawatan tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruangan dan toilet

Cleaning ruangan, dan pembersihan rumput koridor/halaman


Finish On Schedule
terbuka

Cleaning ruangan dan toilet, perawatan tanaman pot Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruangan dan toilet
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule


Stand-by training Finish On Schedule
Perawatan kolam renang, penyapuan lantai kolam renang,
Finish On Schedule
cleaning ruangan dan toilet
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule


Stand-by training Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
vacuum kolam renang, pemangkasan rumput samping gazebo

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman, setting


Finish On Schedule
ruangan untuk training
Perawatan kolam renang, penyapuan lantai kolam renang,
Finish On Schedule
cleaning ruangan dan toilet
Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


cleaning ruangan dan toilet, pemangkasan serutan depan Finish On Schedule
musholla

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
vacuum kolam renang, pemangkasan tanaman planter box

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
vacuum kolam renang, cleaning ruangan dan toilet

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


vacuum kolam renang, pembersihan gulma yang tumbuh di sela Finish On Schedule
keramik tepi kolam

Cleaning ruangan Finish On Schedule


Cleaning ruangan Finish On Schedule
Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
vacuum kolam renang, cleaning ruangan dan toilet

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
vacuum kolam renang, cleaning ruangan dan toilet

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
vacuum kolam renang, cleaning ruangan dan toilet

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
vacuum kolam renang, cleaning ruangan dan toilet
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Cleaning ruangan dan toilet, perawatan pot tanaman Finish Pengalihan


Stand-by training Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


vacuum kolam renang, pemangkasan rumput planter box Finish On Schedule
gazebo
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka
Cleaning ruangan, stand-by meeting Continue On Schedule
Stand-by training Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruangan dan toilet

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman, setting


Finish On Schedule
kantin untuk meeting
Stand-by training Continue On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruangan dan toilet, setting kantin untuk meeting

Cleaning ruangan (FUV-2 tidak mau di-cleaning) Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule


Stand-by training Continue On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruangan dan toilet

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule


Stand-by training Continue On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruangan dan toilet
Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman, setting


Finish On Schedule
ruangan untuk training
Perawatan kolam renang, penyapuan lantai kolam renang,
Finish On Schedule
cleaning ruangan dan toilet
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
vacuum kolam renang, pembersihan gulma teras ISR
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruang dan toilet

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruang dan toilet

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman, stand-by


Continue On Schedule
seminar
Perawatan kolam renang, penyapuan lantai kolam renang,
Continue On Schedule
cleaning ruang dan toilet, stand-by seminar

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman, setting


Finish On Schedule
ISR
Cleaning ruangan dan toilet, perawatan pot tanaman, setting
Finish On Schedule
ISR
Perawatan kolam renang, penyapuan lantai kolam renang,
Finish On Schedule
cleaning ruang dan toilet, setting ruangan

Cleaning ruangan Finish On Schedule

Cleaning ruangan, dan pembersihan rumput koridor/halaman


Finish On Schedule
terbuka

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan, dan pembersihan rumput koridor/halaman


Finish On Schedule
terbuka
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
vacuum kolam renang
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruangan dan toilet

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule


Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruangan dan toilet

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruangan dan toilet

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruangan dan toilet

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruangan dan toilet
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Continue On Schedule
vacuum kolam renang, pembersihan gulma batu koridor
Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule


Cleaning ruangan, stand-by training Finish On Schedule
Perawatan kolam renang, penyapuan lantai kolam renang,
Finish On Schedule
cleaning ruangan dan toilet

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule


Cleaning ruangan, stand-by training Finish On Schedule
Perawatan kolam renang, penyapuan lantai kolam renang,
Finish On Schedule
cleaning ruangan dan toilet

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman, setting


Finish On Schedule
ISR untuk training
Perawatan kolam renang, penyapuan lantai kolam renang,
Finish On Schedule
cleaning ruangan dan toilet, setting ruangan untuk training

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, cleaning ruangan dan toilet Finish On Schedule

Cleaning ruangan, dan pembersihan rumput koridor/halaman


Finish On Schedule
terbuka

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Continue On Schedule
vacuum kolam renang, pembersihan saluran air tepi kolam
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Cleaning ruangan dan toilet, perawatan pot tanaman Continue On Schedule

Perawatan kolam renang, cleaning ruangan dan toilet,


Continue On Schedule
perawatan pot tanaman

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, cleaning ruangan dan toilet,


Finish On Schedule
perawatan pot tanaman
Cleaning ruangan, stand-by training Continue On Schedule
Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, cleaning ruangan dan toilet,


Finish On Schedule
perawatan pot tanaman
Cleaning ruangan, stand-by training Continue On Schedule
Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Perawatan kolam renang, cleaning ruangan dan toilet,


Finish On Schedule
perawatan pot tanaman, setting ruangan untuk training

Cleaning ruangan dan toilet, perawatan pot tanaman, setting


Finish On Schedule
ruangan untuk training

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule


Perawatan kolam renang, cleaning ruangan dan toilet,
Finish On Schedule
perawatan pot tanaman

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan, dan pembersihan rumput koridor/halaman


Finish On Schedule
terbuka
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka
Perawatan kolam renang, vacuum kolam renang, setting
Finish On Schedule
ruangan untuk training
Cleaning ruangan dan toilet, perawatan pot tanaman, setting
Finish On Schedule
ruangan untuk training
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Perawatan kolam renang, cleaning ruangan dan toilet,


Finish On Schedule
perawatan pot tanaman

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Perawatan kolam renang, cleaning ruangan dan toilet,


Finish On Schedule
perawatan pot tanaman

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule


Perawatan kolam renang, cleaning ruangan dan toilet,
Finish On Schedule
perawatan pot tanaman

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan Finish On Schedule

Perawatan kolam renang, cleaning ruangan dan toilet,


Finish On Schedule
perawatan pot tanaman

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan Finish On Schedule


Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule
Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan, dan pembersihan sawang koridor Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
vacuum kolam renang, pembersihan sawang koridor
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruangan dan toilet, perawatan pot tanaman

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule


Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruangan dan toilet, perawatan pot tanaman

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruangan dan toilet, perawatan pot tanaman

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruangan dan toilet, perawatan pot tanaman

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
pembersihan gulma teras samping
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Continue On Schedule
vacuum kolam renang, pembersihan gulma koridor
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka
Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule
Perawatan kolam renang, penyapuan lantai kolam renang,
Finish On Schedule
cleaning ruangan dan toilet

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
cleaning ruangan dan toilet

Cleaning ruangan Finish On Schedule

Cleaning ruangan Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
pemangkasan dan pendangiran tanaman
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


Finish On Schedule
pembersihan gulma koridor
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka
Cleaning ruangan, dan pembersihan rumput koridor/halaman
Finish On Schedule
terbuka

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Cleaning ruangan dan toilet, perawatan pot tanaman Finish On Schedule

Perawatan kolam renang, penyapuan lantai kolam renang,


pemangkasan tanaman planter box komunal, vacuum kolam Finish On Schedule
renang

Dilaporkan Disetujui

Tgl : Tgl :
LAPORAN HARIAN OUTDOOR

No Tanggal Nama Petugas Lokasi Jenis Pekerjaan Status Akhir KET

1 5/31/2019 Fauzi, Masduki BBD 18-27 Pemotongan rumput mesin gendong Finish On Schedule
2 5/31/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
3 5/31/2019 Suhemi Komunal - Luar Depan, BD/BBD Penyiraman tanaman, pengangkutan sampah koridor Finish On Schedule
1 6/3/2019 Fauzi, Masduki hal.bd depan Pemotongan rumput mesin gendong Continue On Schedule
2 6/3/2019 suhemi, Halawi All Area Pembuangan sampah Finish On Schedule
3 6/3/2019 yadi(ManPower) Komunal - Luar Depan, BD/BBD pembuangan sampah,sapu jalan Finish On Schedule
4 6/3/2019 Muslimin Komunal - DEG - FUS Penyapuan jalan Finish On Schedule
5 6/3/2019 Kurtubi komunal-luar depan ,fulltank penyiraman tanaman, pendangiran tanaman serutan Finish On Schedule
6 6/3/2019 misri (ManPower) Garasi BD - BD - BBD Penyapuan jalan Finish On Schedule
7 6/3/2019 Otong S. depan pos security Pemotongan rumput mesin dorong Finish On Schedule
3 5/29/2019 Suhemi All Area Pembuangan sampah Continue On Schedule
4 5/29/2019 Muslimin Pos Security Pruning pohon kersen Finish On Schedule
5 5/29/2019 Kurtubi BBD 1-17 Pemotongan rumput mesin dorong Finish On Schedule
6 5/29/2019 Otong S. BBD 28-37 Pemotongan rumput mesin gendong Continue On Schedule
1 5/28/2019 Masduki, Fauzi FUS 1-7 & BBD 28-37 (trotoar) Pemotongan rumput mesin gendong Finish Pengalihan
2 5/28/2019 Rohili, Halawi All Area, Kolam Renang Pembuangan sampah, pelatihan penggunaan pompa pemadam Continue On Schedule
3 5/28/2019 Rukman Komunal - Luar Depan, GRA/B, Ko Penyiraman tanaman, pemangkasan tanaman the-tehan, pelatihan penggunaan pompa Continue On Schedule
4 5/28/2019 Muslimin Komunal, DEG, FUS Penyapuan jalan dan halaman terbuka Finish On Schedule
5 5/28/2019 Kurtubi Komunal, ISR Pemangkasan tanaman the-tehan trotoar & planter box komunal Finish On Schedule
6 5/28/2019 Otong S. BBD 18-27 Pemotongan rumput mesin dorong Finish On Schedule
7 5/28/2019 Suhemi BD.24 - BBD.1 Pembersihan saluran air besar Finish On Schedule
1 5/27/2019 Masduki, Fauzi Lap. Tennis Pemangkasan tanaman bambu dengan scaffolding Finish Pengalihan
2 5/27/2019 Rohili, Halawi All Area Pembuangan sampah Continue On Schedule
3 5/27/2019 Rukman Lap. Parkir Tennis Penyapuan halaman terbuka, pembersihan gulma conblok Finish On Schedule
4 5/27/2019 Muslimin Komunal - Luar Depan, Komunal - Penyiraman tanaman, penyapuan jalan Finish On Schedule
5 5/27/2019 Kurtubi Trotoar Office, Komunal Pemangkasan tanaman the-tehan trotoar & plante box komunal Continue On Schedule
6 5/27/2019 Otong S. BBD 28-37 Pemotongan rumput mesin dorong Finish On Schedule
7 5/27/2019 Suhemi BBD 1-18, BBD/BD/GRA/B Pembersihan saluran air besar, pengangkutan sampah koridor Finish On Schedule
1 5/25/2019 Masduki, Fauzi Lap. Tennis Pemangkasan tanaman bambu dengan scaffolding Continue Pengalihan
2 5/25/2019 Rohili, Halawi Komunal, BBD, Shop n Drive Penyiraman tanaman, pengangkutan sampah koridor, bawa accu genset buat dicharge Finish On Schedule
3 5/25/2019 Rukman Lap. Tennis Pemangkasan tanaman bambu dengan scaffolding Continue Pengalihan
4 5/25/2019 Muslimin Koridor BBD-27, Trotoar Office Pembersihan gulma DPT koridor, pemupukan dan penyiraman bungur Finish On Schedule
5 5/25/2019 Kurtubi DEG-Kantin Pemangkasan tanaman the-tehan trotoar Finish On Schedule
6 5/25/2019 Otong S. Belakang Pos Security Pemotongan rumput mesin dorong Finish On Schedule
7 5/25/2019 Suhemi BBD 18-28 Pembersihan saluran air besar Finish On Schedule
1 5/24/2019 Masduki, Fauzi Lap. Tennis Pemangkasan tanaman bambu dengan scaffolding Continue Pengalihan
2 5/24/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
3 5/24/2019 Rukman Lap. Tennis Pemangkasan tanaman bambu dengan scaffolding Continue Pengalihan
4 5/24/2019 Muslimin Koridor BBD 18-27 Pembersihan gulma DPT koridor Finish On Schedule
5 5/24/2019 Kurtubi All Area, BD/BBD, Trotoar Office Penyapuan jalan, pengangkutan sampah koridor, penyiraman tanaman bungur Finish On Schedule
6 5/24/2019 Otong S. Kantin Pemotongan rumput mesin dorong Finish On Schedule
7 5/24/2019 Suhemi Pos Security - FUSBD Pembersihan saluran air besar Finish On Schedule
1 5/23/2019 Masduki Lap. Tennis Pemangkasan tanaman bambu dengan scaffolding Continue Pengalihan
2 5/23/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
3 5/23/2019 Rukman Lap. Tennis Pemangkasan tanaman bambu dengan scaffolding Continue Pengalihan
4 5/23/2019 Muslimin Lap. Parkir Tennis, BD-FUSBD Pembersihan gulma kacang-kacangan, bantu file Pak Asep MCCI Continue On Schedule
5 5/23/2019 Kurtubi Koridor GRA, Koridor BBD 20-27 Pembersihan saluran air, pembersihan gulma DPT koridor Continue On Schedule
6 5/23/2019 Otong S. Kantin, BD-FUSBD Pemotongan rumput mesin dorong, bantu file Pak Asep MCCI Continue On Schedule
LAPORAN HARIAN OUTDOOR

7 5/23/2019 Add. MP BD-FUSBD, Lap. Tennis Bantu file Pak Asep MCCI, pemangkasan tanaman bambu Continue Pengalihan
8 5/23/2019 Add. MP BD-FUSBD, Lap. Tennis Bantu file Pak Asep MCCI, pemangkasan tanaman bambu Continue Pengalihan
1 5/22/2019 Masduki, Fauzi Lap. Tennis Pemangkasan tanaman bambu dengan scaffolding Continue Pengalihan
2 5/22/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
4 5/22/2019 Rukman Lap. Tennis Pemangkasan tanaman bambu dengan scaffolding Continue Pengalihan
5 5/22/2019 Muslimin Komunal - DEG - FUS, Trotoar OfficPenyapuan jalan, pemupukan tanaman bungur Finish On Schedule
6 5/22/2019 Kurtubi Komunal - Pos Security - BD - BB Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
7 5/22/2019 Otong S. FUS 1-7 Pemotongan rumput mesin dorong Finish On Schedule
1 5/21/2019 Masduki, Fauzi FUA, FUM Pemotongan rumput mesin gendong Finish On Schedule
2 5/21/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
3 5/21/2019 Suhemi Lap. Tennis Pemangkasan tanaman bambu Continue Pengalihan
4 5/21/2019 Rukman CPG, Trotoar Office Pemangkasan tanaman, pendangiran dan pemupukan tanaman bungur Finish On Schedule
5 5/21/2019 Muslimin Lap. Pakir Tennis Pembersihan gulma kacang-kacangan Continue On Schedule
6 5/21/2019 Otong S. FUS 8-10, FUA, FUM Pemotongan rumput mesin dorong Finish On Schedule
1 5/20/2019 Masduki, Fauzi Balong Pemotongan rumput mesin gendong Finish On Schedule
2 5/20/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
3 5/20/2019 Suhemi Balong, BD/BBD/GRA/B Perapihan karung sampah, pengangkutan sampah koridor Continue On Schedule
4 5/20/2019 Rukman CPG Pemangkasan tanaman the-tehan Finish On Schedule
5 5/20/2019 Muslimin Lap. Pakir Tennis Pembersihan gulma kacang-kacangan Continue On Schedule
6 5/20/2019 Otong S. FUV 1-3 Pemotongan rumput mesin dorong Finish On Schedule
1 5/18/2019 Masduki, Fauzi CPG Pemotongan rumput mesin gendong Finish On Schedule
2 5/18/2019 Rohili, Otong Halaman BD Pemotongan rumput mesin gendong Continue On Schedule
3 5/18/2019 Suhemi FUS 8-10, FUM-2 Pemangkasan tanaman Finish On Schedule
4 5/18/2019 Rukman CPG Pemangkasan tanaman the-tehan Continue On Schedule
4 5/18/2019 Muslimin Lap. Pakir Tennis Pembersihan gulma kacang-kacangan Continue On Schedule
5 5/18/2019 Kurtubi CPG Pemotongan rumput mesin dorong Finish Pengalihan
6 5/18/2019 Add. MP FUV-6 Pembersihan gulma septictank Finish Pengalihan
7 5/18/2019 Add. MP FUV-6 Pembersihan gulma septictank Finish Pengalihan
1 5/17/2019 Masduki, Otong Balong Pemotongan rumput mesin gendong Continue On Schedule
2 5/17/2019 Rohili All Area Pembuangan sampah Finish On Schedule
3 5/17/2019 Suhemi All Area Pembuangan sampah Finish On Schedule
4 5/17/2019 Muslimin ISR Perapihan ruangan dan peralatan setelah buka bersama Finish Pengalihan
5 5/17/2019 Kurtubi CPG Pemotongan rumput mesin dorong Continue Pengalihan
6 5/17/2019 Add. MP CPG Pembersihan gulma septictank Finish Pengalihan
7 5/17/2019 Add. MP FUM, FUA, FUS 8-10 Pembersihan gulma jalan setapak Finish Pengalihan
1 5/16/2019 Masduki, Fauzi Halaman BD, Fuel Tank Pemotongan rumput mesin gendong Continue On Schedule
2 5/16/2019 Rohili All Area, DEG-Musholla-Pump Hou Pembuangan sampah, pemotongan rumput mesin gendong Finish On Schedule
3 5/16/2019 Suhemi All Area, Komunal - Pos Security Pembuangan sampah, pemangkasan tanaman the-tehan Finish Pengalihan
4 5/16/2019 Muslimin Komunal, ISR Pembersihan saluran air grating kecil, setting ruangan untuk buka bersama Finish Pengalihan
5 5/16/2019 Otong Halaman BD, DEG-Musholla-PumpPemotongan rumput mesin dorong, pemotongan rumput mesin gendong Continue On Schedule
6 5/16/2019 Add. MP Lap. Parkir Tennis Penyapuan halaman terbuka, pembersihan gulma conblok, pendangiran tanaman Finish Pengalihan
7 5/16/2019 Add. MP All Area, BD/BBD Penyapuan jalan, pengangkutan sampah koridor Finish Pengalihan
1 5/15/2019 Masduki, Fauzi GRA/B, R100 Pemotongan rumput mesin gendong Finish On Schedule
2 5/15/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
3 5/15/2019 Rukman komunal, GRA/B, ISR Perawatan tanaman bambu air, perawatan taman Continue Pengalihan
4 5/15/2019 Suhemi komunal, GRA/B, ISR Perawatan tanaman bambu air, perawatan taman Finish Pengalihan
5 5/15/2019 Muslimin Indoor Bantu pekerjaan cleaning Finish Pengalihan
6 5/15/2019 Kurtubi BD 18-23 Pembersihan saluran air halaman taman Finish On Schedule
7 5/15/2019 Otong GRA/B, ISR, R100 Pemotongan rumput mesin dorong Finish On Schedule
1 5/14/2019 Masduki, Fauzi Halaman BD Pemotongan rumput mesin gendong Continue On Schedule
LAPORAN HARIAN OUTDOOR

2 5/14/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule


3 5/14/2019 Rukman Luar Depan Pebeka Kerja bakti pembersihan area tepi jalan depan Pebeka, pembersihan saluran air luar Finish Pengalihan
4 5/14/2019 Suhemi All Area, BD/BBD/GRA/B Pembersihan filter saluran air, pengangkutan sampah koridor Finish On Schedule
5 5/14/2019 Muslimin Lap. Parkir Tennis Pembersihan gulma kacang-kacangan Continue On Schedule
6 5/14/2019 Kurtubi Fuel Tank - Pump House Pemangkasan tanaman the-tehan trotoar Finish On Schedule
7 5/14/2019 Otong Depan Pos Security Pemotongan rumput mesin dorong Finish On Schedule
1 5/13/2019 Masduki, Fauzi Luar Depan Pebeka Kerja bakti pembersihan area tepi jalan depan Pebeka, penyapuan dan pruning tanaman Finish Pengalihan
2 5/13/2019 Rohili All Area Pembuangan sampah Finish On Schedule
3 5/13/2019 Rukman Luar Depan Pebeka Kerja bakti pembersihan area tepi jalan depan Pebeka, pembersihan saluran air luar Continue On Schedule
4 5/13/2019 Suhemi All Area Pembuangan sampah Finish On Schedule
5 5/13/2019 Muslimin Luar Depan Pebeka Kerja bakti pembersihan area tepi jalan depan Pebeka, penyapuan dan pruning tanaman Finish On Schedule
6 5/13/2019 Kurtubi Pos Security - Garas BD, BBD/BD Pembersihan saluran air tembok barat, pengangkutan sampah koridor Continue On Schedule
7 5/13/2019 Otong Luar Depan Pebeka Kerja bakti pembersihan area tepi jalan depan Pebeka, pembersihan saluran air luar Continue On Schedule
1 5/11/2019 Masduki, Fauzi Gudang Outdoor Cleaning area, perawatan mesin potong rumput dan chainsaw Continue Pengalihan
2 5/11/2019 Halawi, Rohili FUS, FUA Pencucian bak sampah Finish On Schedule
3 5/11/2019 Rukman Lap. Tennis Penyapuan halaman dalam lapangan dan jalan setapak Finish On Schedule
4 5/11/2019 Suhemi FUM Pemangkasan tanaman planter box dapur Finish On Schedule
5 5/11/2019 Muslimin Lap. Parkir Tennis Pembersihan gulma kacang-kacangan Continue On Schedule
6 5/11/2019 Kurtubi Luar Depan Pebeka Pendangiran tanaman pucuk merah Finish On Schedule
7 5/11/2019 Otong Balong Pemotongan rumput mesin dorong Continue On Schedule
1 5/10/2019 Masduki, Fauzi Balong, Gudang Outdoor Perapihan pohon jambu kering, perawatan mesin potong rumput Continue Pengalihan
2 5/10/2019 Halawi, Rohili All Area Pembuangan sampah Finish On Schedule
3 5/10/2019 Rukman Lap. Parkir Tennis Pembersihan gulma kacang-kacangan Continue On Schedule
4 5/10/2019 Suhemi All Area, BD/BBD/GRA/B Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
5 5/10/2019 Muslimin Indoor Cleaning ruangan dan toilet, stand-by training Continue Pengalihan
6 5/10/2019 Kurtubi Luar Depan Pebeka Pemangkasan tanaman pucuk merah Finish On Schedule
7 5/10/2019 Otong Balong Pemotongan rumput mesin dorong Continue On Schedule
1 5/9/2019 Masduki, Fauzi Balong, Gudang Outdoor Perapihan pohon jambu kering, perawatan mesin potong rumput Continue Pengalihan
2 5/9/2019 Halawi, Rohili All Area Pembuangan sampah Finish On Schedule
4 5/9/2019 Rukman Komunal - Pos Security, Samping PPenyiraman tanaman bugenvil pot, pemangkasan dan pendangiran tanaman Finish On Schedule
5 5/9/2019 Kurtubi All Area, BD/BBD/GRA/B Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
6 5/9/2019 Suhemi Pos Security - Garasi BD Pemangkasan tanaman the-tehan trotoar Finish On Schedule
7 5/9/2019 Otong Balong Pemotongan rumput mesin dorong Continue On Schedule
1 5/8/2019 Masduki, Fauzi Balong Pemotongan rumput mesin gendong Continue On Schedule
2 5/8/2019 Halawi, Rohili All Area Pembuangan sampah Finish On Schedule
3 5/8/2019 Muslimin Indoor Cleaning ruangan dan toilet, stand-by training Continue Pengalihan
4 5/8/2019 Rukman Trotoar Office Pemangkasan dan pendangiran tanaman the-tehan Finish On Schedule
5 5/8/2019 Kurtubi All Area, BD/BBD/GRA/B Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
6 5/8/2019 Suhemi Pos Security - Garasi BD Pemangkasan tanaman the-tehan trotoar Continue On Schedule
7 5/8/2019 Otong Balong Pemotongan rumput mesin dorong Continue On Schedule
1 5/7/2019 Masduki, Fauzi ISR, Gudang Outdoor Perpihan dahan asam londo patah, perapihan pohon kering Finish Pengalihan
2 5/7/2019 Halawi, Rohili All Area Pembuangan sampah Finish On Schedule
3 5/7/2019 Muslimin Indoor Cleaning ruangan dan toilet, stand-by training Continue Pengalihan
4 5/7/2019 Rukman Komunal Pemangkasan tanaman planter box Finish On Schedule
5 5/7/2019 Kurtubi All Area, BD/BBD/GRA/B Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
6 5/7/2019 Suhemi ISR, Gudang Outdoor Perpihan dahan asam londo patah, perapihan pohon kering Finish On Schedule
7 5/7/2019 Otong Balong Pemotongan rumput mesin dorong Continue On Schedule
1 5/6/2019 Masduki, Fauzi Belakang Luar Pebeka Pembersihan saluran air Finish Pengalihan
2 5/6/2019 Halawi, Rohili All Area Pembuangan sampah Continue On Schedule
3 5/6/2019 Muslimin Indoor Cleaning ruangan dan toilet, setting tarawih Finish Pengalihan
LAPORAN HARIAN OUTDOOR

4 5/6/2019 Rukman Luar Depan, Pos Security - Garasi Penyapuan jalan, pembersihan saluran air Finish On Schedule
5 5/6/2019 Kurtubi Parkir Motor (Depan Musholla) Bantu pekerjaan sipil (pasang scaffolding) Continue On Schedule
6 5/6/2019 Suhemi Garasi BD - BBD - FUV, BBD/GRA/Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
7 5/6/2019 Otong Balong Pemotongan rumput mesin dorong Continue On Schedule
1 5/4/2019 Masduki, Fauzi FUS-10, Balong Pemotongan rumput mesin gendong Continue On Schedule
2 5/4/2019 Halawi Bengkel Perawatan mobil Finish On Schedule
3 5/4/2019 Muslimin Halaman BD (CCTV), Komunal - LuPendangiran tanaman kana, penyiraman tanaman Finish On Schedule
4 5/4/2019 Cahya Gudang Outdoor, Nursery, Kantin Penyapuan halaman terbuka, perapihan sampah Finish On Schedule
6 5/4/2019 Suhemi BBD 1-28 Pembersihan saluran air Finish On Schedule
7 5/4/2019 Otong Balong Pemotongan rumput mesin dorong Continue On Schedule
1 5/3/2019 Masduki, Fauzi FUS 11-16 Pemotongan rumput mesin gendong Finish On Schedule
2 5/3/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
3 5/3/2019 Kurtubi Pond I (belakang Pos) Pembersihan gulma Finish On Schedule
4 5/3/2019 Cahya Kantin - FUS.1 Pembersihan saluran air Finish On Schedule
6 5/3/2019 Suhemi FUS-16, BBD/GRA/B Penyapuan halaman terbuka, pengangkutan sampah koridor Finish On Schedule
7 5/3/2019 Otong FUS 1-5, Garasi FUS-10 Pemotongan rumput mesin dorong Finish On Schedule
1 5/2/2019 Masduki, Cahya FUS 1-7 Pemotongan rumput mesin gendong Finish On Schedule
2 5/2/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
3 5/2/2019 Kurtubi Pond I (belakang Pos) Pembersihan gulma Continue On Schedule
4 5/2/2019 Muslimin Komunal - DEG - FUS, FUS-1 (villaPenyapuan jalan, pemangkasan tanaman bugenvil Finish On Schedule
6 5/2/2019 Suhemi Pos Security - BD - BBD, GRA/B, Pembuangan sampah, pengangkutan sampah koridor Finish On Schedule
7 5/2/2019 Otong Kantin - FUS.7 Pemotongan rumput mesin dorong Finish On Schedule
1 4/30/2019 Masduki, Fauzi FUS 1-7, Kolam Renang Pemotongan rumput mesin gendong, pelatihan pompa pemadam Continue On Schedule
2 4/30/2019 Rohili All Area Pembuangan sampah Finish On Schedule
3 4/30/2019 Kurtubi DEG - Musholla Pemangkasan tanaman the-tehan trotoar Finish On Schedule
4 4/30/2019 Muslimin Komunal - DEG - FUS.10, Kolam RPenyapuan jalan, pelatihan pompa pemadam Finish On Schedule
5 4/30/2019 Cahya Komunal Bantu pekerjaan indoor Finish On Schedule
6 4/30/2019 Suhemi All Area Pembuangan sampah Finish On Schedule
7 4/30/2019 Otong Laundry, FUS 16-20 Pemotongan rumput mesin dorong Finish On Schedule
1 4/29/2019 Masduki, Fauzi Belakang Pos Security Pemotongan rumput mesin gendong Finish On Schedule
2 4/29/2019 Halawi, Rohili All Area Perapihan karung Finish On Schedule
3 4/29/2019 Kurtubi FUS-5, Pos Security - Garasi BD Bongkar scaffolding pekerjaan sipil, Pendangiran tanaman the-tehan trotoar Continue On Schedule
4 4/29/2019 Muslimin Lap. Parkir Tennis Pembersihan gulma kacang-kacangan Continue Pengalihan
5 4/29/2019 Cahya Komunal - Pos Security - BD, BB Penyapuan jalan, pengangkutan sampah koridor, pembersihan gulma jalan setapak Finish On Schedule
6 4/29/2019 Suhemi Samping Laundry Pemangkasan dan pendangiran tanaman soka Finish On Schedule
7 4/29/2019 Otong BBD 1-7, Laundry Pemotongan rumput mesin dorong Continue On Schedule
1 4/27/2019 Masduki, Fauzi Kantin Pemotongan rumput mesin gendong Finish On Schedule
2 4/27/2019 Halawi, Suhemi All Area Perapihan karung Finish On Schedule
3 4/27/2019 Kurtubi Pos Security - Garasi BD Pendangiran tanaman the-tehan trotoar Continue On Schedule
4 4/27/2019 Muslimin Komunal-ISR Pemangkasan tanaman Finish Pengalihan
5 4/27/2019 Cahya, Suhemi FUS-5 Psang scaffolding pekerjaan sipil, pruning glodogan bulat, mangga dan jambu Continue On Schedule
7 4/27/2019 Otong BBD 8-17 Pemotongan rumput mesin dorong Finish On Schedule
1 4/26/2019 Masduki, Fauzi FUS-1 (villa) Pemotongan rumput mesin gendong Finish On Schedule
2 4/26/2019 Halawi, Suhemi All Area Pembuangan sampah Finish On Schedule
3 4/26/2019 Kurtubi Pos Security - Garasi BD Pendangiran tanaman the-tehan trotoar Continue On Schedule
4 4/26/2019 Muslimin Komunal Pruning palem bismark Finish Pengalihan
5 4/26/2019 Cahya All Area Penyapuan jalan Finish On Schedule
7 4/26/2019 Otong BBD 18-27 Pemotongan rumput mesin dorong Finish On Schedule
1 4/25/2019 Masduki, Fauzi BBD 28-37 Pemotongan rumput mesin gendong Continue On Schedule
2 4/25/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
LAPORAN HARIAN OUTDOOR

3 4/25/2019 Kurtubi Komunal - Pos Security Pendangiran tanaman the-tehan trotoar Finish On Schedule
4 4/25/2019 Muslimin Pump House Penyapuan halaman terbuka, pembersihan saluran air Finish On Schedule
5 4/25/2019 Cahya FUM, FUV 1-3 Pembersihan gulma conblok Finish Pengalihan
6 4/25/2019 Suhemi Komunal - Pos Security - BD - BBDPenyapuan jalan, pengangkutan sampah koridor Finish On Schedule
7 4/25/2019 Otong BBD 28-37 Pemotongan rumput mesin dorong Finish Pengalihan
1 4/24/2019 Masduki, Fauzi Garasi BD - FUV.6 Pemotongan rumput mesin gendong Finish Pengalihan
2 4/24/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
3 4/24/2019 Kurtubi Komunal - Pos Security Pemangkasan tanaman the-tehan trotoar Finish On Schedule
4 4/24/2019 Muslimin BBD Pembersihan saluran air besar dan filter saluran Finish On Schedule
5 4/24/2019 Cahya FUS 17-20 Pembersihan tanah yang mengendap di saluran Continue Pengalihan
7 4/24/2019 Otong Halaman BD, ISR, GRB Pemotongan rumput mesin dorong Finish Pengalihan
1 4/23/2019 Masduki, Fauzi FUS 17-20 Penebangan pohon karet kebo, dan pruning mangga Finish Pengalihan
2 4/23/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
3 4/23/2019 Kurtubi FUV 2-3, BBD-28, Komunal - DEG Pemangkasan tanaman planter box dapur, pemangkasan tanaman alamanda, penyapuan Finish On Schedule
4 4/23/2019 Muslimin FUV-3 Pembersihan saluran air grating Finish On Schedule
5 4/23/2019 Cahya FUS, FUS-10 Penyapuan jalan, pembersihan saluran air grating kecil Finish Pengalihan
6 4/23/2019 Suhemi Pos Security - BD - BBD, BBD Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
7 4/23/2019 Otong Halaman BD Pemotongan rumput mesin dorong Continue Pengalihan
1 4/22/2019 Masduki, Fauzi DEG-G.Outdoor, Lap. Parkir Tennis Pemotongan rumput mesin gendong, penyapuan halaman terbuka dan pembersihan gul Finish Pengalihan
2 4/22/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
4 4/22/2019 Muslimin Komunal, GRB/BBD Pemangkasan tanaman planter box, pengangkutan sampah koridor Finish On Schedule
5 4/22/2019 Cahya Luar Depan Pebeka, FUS-10 Pembersihan gulma conblok, pembersihan saluran grating kecil Continue Pengalihan
6 4/22/2019 Suhemi Komunal - Pos Security - BD - BBDPenyapuan jalan Finish On Schedule
7 4/22/2019 Otong R100, BD 24-32 Pemotongan rumput mesin dorong Finish Pengalihan
1 4/20/2019 Masduki, Fauzi BBD-8 Perapihan dahan asam londo patah, penebangan kiara payung miring Finish Pengalihan
2 4/20/2019 Rohili, Halawi All Area Pencucian bak sampah biru Finish On Schedule
3 4/20/2019 Kurtubi Pos Security - Komunal - DEG - FUPenyapuan jalan Finish On Schedule
4 4/20/2019 Muslimin Koridor BD 20-23 Perapihan tanaman serutan dan pembersihan gulma teras koridor Finish Pengalihan
5 4/20/2019 Cahya BBD-8 Perapihan dahan asam londo patah, penebangan kiara payung miring Finish Pengalihan
6 4/20/2019 Suhemi Pos Security - BD - BBD Penyapuan jalan Finish On Schedule
7 4/20/2019 Otong Belakang Pos Security Pemotongan rumput mesin dorong Finish Pengalihan
1 4/18/2019 Masduki FUS-18 Penebangan pohon salam dan karet Continue Pengalihan
2 4/18/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
4 4/18/2019 Kurtubi Komunal - Pos Security - BD - BBDPenyapuan jalan Finish On Schedule
5 4/18/2019 Muslimin FUS-18 Penebangan pohon salam dan karet Continue Pengalihan
6 4/18/2019 Cahya FUS-18 Penebangan pohon salam dan karet Continue Pengalihan
7 4/18/2019 Otong FUM, FUA, FUS 8-10 Pemotongan rumput mesin dorong Finish Pengalihan
1 4/16/2019 Masduki, Fauzi Fuel Tan - Pump House - DEG - G. Pemotongan rumput mesin gendong Continue Pengalihan
2 4/16/2019 Rohili, Halawi All Area Pembuangan sapah Finish On Schedule
3 4/16/2019 Suhemi FUS-16 Pruning pohon nangka, pasang & bongkar scaffolding pekerjaan sipil Continue Pengalihan
4 4/16/2019 Kurtubi Komunal - DEG - FUS, FUM-3 Penyapuan jalan, pemangkasan tanaman planter box dapur Finish On Schedule
5 4/16/2019 Muslimin Pos Security - BD - BBD, BBD Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
6 4/16/2019 Cahya FUS-16 Pruning pohon nangka, pasang & bongkar scaffolding pekerjaan sipil Continue Pengalihan
7 4/16/2019 Otong FUV 1-5 Pemotongan rumput mesin dorong Finish Pengalihan
1 4/15/2019 Masduki, Fauzi Balong Pemotongan rumput mesin gendong Finish Pengalihan
2 4/15/2019 Rohili, Halawi All Area Pembuangan sapah Finish On Schedule
3 4/15/2019 Suhemi FUS-11 Pruning pohon mangga, pasang & bongkar scaffolding pekerjaan sipil Continue Pengalihan
4 4/15/2019 Kurtubi Komunal - Luar Depan, BD/BBD/G Penyiraman tanaman, pengangkutan sampah koridor Finish On Schedule
5 4/15/2019 Muslimin FUS 15-20 Pruning pohon dan penyapuan halaman terbuka Continue Pengalihan
6 4/15/2019 Cahya FUS-11 Pruning pohon mangga, pasang & bongkar scaffolding pekerjaan sipil Continue Pengalihan
LAPORAN HARIAN OUTDOOR

7 4/15/2019 Otong CPG, FUV-6 Pemotongan rumput mesin dorong Finish Pengalihan
1 4/13/2019 Masduki, Fauzi Balong Pemotongan rumput mesin gendong Continue Pengalihan
2 4/13/2019 Rohili FUS-15 Pruning pohon mangga, pasang & bongkar scaffolding pekerjaan sipil Continue On Schedule
3 4/13/2019 Suhemi FUS-15 Pruning pohon mangga, pasang & bongkar scaffolding pekerjaan sipil Continue Pengalihan
4 4/13/2019 Kurtubi DEG-Kantin Pemangkasan tanaman the-tehan trotoar dan penyapuan jalan Finish Pengalihan
5 4/13/2019 Muslimin FUS 15-20 Pruning pohon dan penyapuan halaman terbuka Continue Pengalihan
6 4/13/2019 Cahya FUS-14 Pruning pohon mangga, pasang & bongkar scaffolding pekerjaan sipil Finish Pengalihan
7 4/13/2019 Otong CPG Pemotongan rumput mesin dorong Finish Pengalihan
1 4/12/2019 Masduki Balong Pemotongan rumput mesin gendong Continue Pengalihan
2 4/12/2019 Rohili, Halawi All area Pembuangan sampah Finish On Schedule
3 4/12/2019 Suhemi FUS-14 Pruning pohon mangga, pasang & bongkar scaffolding pekerjaan sipil Finish Pengalihan
4 4/12/2019 Kurtubi Office-Musholla, DEG Pemangkasan tanaman the-tehan trotoar Continue Pengalihan
5 4/12/2019 Muslimin FUS 15-20, BBD/GRB Pruning pohon dan penyapuan halaman terbuka, pengangkutan sampah koridor Continue Pengalihan
6 4/12/2019 Cahya FUS-14 Pruning pohon mangga, pasang & bongkar scaffolding pekerjaan sipil Finish Pengalihan
7 4/12/2019 Otong Balong Pemotongan rumput mesin gendong Continue Pengalihan
1 4/11/2019 Masduki, Fauzi Halaman BD Pemotongan rumput mesin gendong Finish Pengalihan
2 4/11/2019 Rohili, Halawi All area Pembuangan sampah Finish On Schedule
3 4/11/2019 Suhemi FUS-12 Pemangkasan kiara payung, pasang & bongkar scaffolding pekerjaan sipil Finish Pengalihan
4 4/11/2019 Kurtubi Komunal - Pump House Pemangkasan tanaman the-tehan trotoar Finish Pengalihan
5 4/11/2019 Muslimin FUS.16 - BBD.37 Penyapuan halaman terbuka dan pembersihan lumut jalan setapak Finish Pengalihan
6 4/11/2019 Cahya FUS-12 Pemangkasan kiara payung, pasang & bongkar scaffolding pekerjaan sipil Finish Pengalihan
7 4/11/2019 Otong FUS-16 Pemangkasan pohon mangga, pembersihan saluran air Finish Pengalihan
1 4/10/2019 Masduki, Fauzi Halaman BD Pemotongan rumput mesin gendong Continue Pengalihan
2 4/10/2019 Rohili, Halawi All area Pembuangan sampah Finish On Schedule
3 4/10/2019 Suhemi Komunal - Pos Security Pemangkasan tanaman the-tehan trotoar Continue On Schedule
4 4/10/2019 Kurtubi Halaman BD Pemotongan rumput mesin dorong Continue Pengalihan
6 4/10/2019 Cahya Luar Depan, Balong Pemotongan rumput mesin gendong Continue Pengalihan
7 4/10/2019 Otong Luar Depan, Balong Pemotongan rumput mesin gendong Continue Pengalihan
1 4/9/2019 Masduki, Fauzi Halaman BD Pemotongan rumput mesin gendong Continue Pengalihan
2 4/9/2019 Rohili, Halawi All area Pembuangan sampah Finish On Schedule
3 4/9/2019 Suhemi GRA-R.Laundry, BBD Pemangkasan soka koridor, pengangkutan sampah koridor Finish On Schedule
4 4/9/2019 Kurtubi FUS-11, FUS 1-10, FUA, FUM, FUVPembersihan gulma kacang-kacangan, penyemprotan herbisida conblok Continue Pengalihan
5 4/9/2019 Muslimin Pos Security - Garasi BD Pemotongan rumput mesin gendong Continue Pengalihan
6 4/9/2019 Cahya Pos Security - Garasi BD Pemotongan rumput mesin gendong Continue Pengalihan
7 4/9/2019 Otong Balong Pemotongan rumput mesin dorong Continue Pengalihan
1 4/8/2019 Masduki Balong Pemotongan rumput mesin gendong Continue Pengalihan
2 4/8/2019 Rohili, Halawi All area Pembuangan sampah Finish On Schedule
3 4/8/2019 Suhemi Komunal - Pos Security - BD - BB Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
4 4/8/2019 Kurtubi Balong Pemotongan rumput mesin dorong Continue Pengalihan
6 4/8/2019 Muslimin Komunal Pemangkasan tanaman planter box Finish Pengalihan
7 4/8/2019 Cahya Balong Pemotongan rumput mesin gendong Continue Pengalihan
1 4/6/2019 Masduki, Fauzi Balong Pemotongan rumput mesin gendong Continue Pengalihan
2 4/6/2019 Rohili, Halawi FUS 1-10, FUA, FUM, FUV Pencucian bak sampah Finish On Schedule
3 4/6/2019 Suhemi Halaman BD, Depan Pos Security Pendangiran tanaman waru merah, perapihan tanaman bambu dan pembersihan tanama Continue Pengalihan
4 4/6/2019 Kurtubi All Area Pemangkasan tanaman bougenville Finish Pengalihan
5 4/6/2019 Otong S. Balong Pemotongan rumput mesin dorong Continue Pengalihan
6 4/6/2019 Muslimin FUS-1 (villa) Pembersihan gulma dan pendangiran tanaman Continue Pengalihan
7 4/6/2019 Cahya Balong Pembersihan gulma jalan setapak Continue Pengalihan
1 4/5/2019 Masduki, Fauzi Balong Pemotongan rumput mesin gendong Continue Pengalihan
2 4/5/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
LAPORAN HARIAN OUTDOOR

3 4/5/2019 Suhemi Garasi BD - BBD - FUV, BD/BBD/ Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
4 4/5/2019 Kurtubi Lap. Parkir Tennis Pembersihan gulma kacang-kacangan Continue Pengalihan
5 4/5/2019 Otong S. Balong Pemotongan rumput mesin dorong Continue Pengalihan
6 4/5/2019 Add MP All Area Perapihan karung sampah Finish Pengalihan
1 4/4/2019 Cahya BBD 18-27 Pemotongan rumput mesin gendong Finish Pengalihan
2 4/4/2019 Masduki, Fauzi Balong Pemotongan rumput mesin gendong Continue Pengalihan
3 4/4/2019 Muslimin BBD 18-27 Pemotongan rumput mesin gendong Finish Pengalihan
4 4/4/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
5 4/4/2019 Suhemi BBD 28-37 Pembersihan DPT soka koridor Continue On Schedule
6 4/4/2019 Kurtubi All Area, BBD Penyapuan jalan, pengangkutan sampah koridor Finish Pengalihan
7 4/4/2019 Otong S. Balong Pemotongan rumput mesin dorong Continue Pengalihan
1 4/2/2019 Cahya FUM, FUA, FUS 8-10 Pembersihan gulma jalan setapak Finish Pengalihan
2 4/2/2019 Masduki, Fauzi CPG Pemotongan rumput mesin gendong Finish Pengalihan
3 4/2/2019 Muslimin Lap. Parkir Tennis Pembersihan gulma kacang-kacangan Continue Pengalihan
4 4/2/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
5 4/2/2019 Suhemi BBD 28-31, BD/BBD/GRB Pembersihan DPT soka koridor, pengangkutan sampah koridor Continue On Schedule
6 4/2/2019 Kurtubi All Area Pembersihan filter saluran air Finish Pengalihan
7 4/2/2019 Otong S. FUS 1-5, 8-10 Pemotongan rumput mesin dorong Finish Pengalihan
1 4/1/2019 Cahya Komunal - Pos Security Pembersihan gulma conblok Finish Pengalihan
2 4/1/2019 Masduki, Fauzi CPG Pemotongan rumput mesin gendong Continue Pengalihan
3 4/1/2019 Muslimin Lap. Parkir Tennis Pembersihan gulma kacang-kacangan Continue Pengalihan
4 4/1/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
5 4/1/2019 Suhemi Pos Security - BD- BBD, BBD/BD/ Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
6 4/1/2019 Kurtubi Komunal - DEG - FUS, All Area Penyapuan jalan, pembersihan tanah di conblok Continue Pengalihan
7 4/1/2019 Otong S. FUS 16-20, GRA/B, ISR, FUS 6-7 Pemotongan rumput mesin dorong Finish Pengalihan
1 3/30/2019 Cahya Pos Security - Garasi BD, Nursery Pembersihan gulma conblok, pembibitan bambu air Continue Pengalihan
2 3/30/2019 Masduki, Fauzi Belakang Laundry Pemotongan rumput mesin gendong Finish Pengalihan
3 3/30/2019 Muslimin Pos Security - Garasi BD Pemangkasan tanaman the-tehan trotoar, pembersihan gulma conblok Finish Pengalihan
4 3/30/2019 Rohili, Halawi BBB, GRB, All Area, Bengkel Pencucian bak sampah koridor, perapihan karung sampah, service mobil di Bengkel (gant Finish On Schedule
5 3/30/2019 Suhemi Pos Security - BD- BBD, BD/GRB Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
6 3/30/2019 Kurtubi FUS 1-7 Pemangkasan tanaman Finish Pengalihan
7 3/30/2019 Otong S. Kantin Pemotongan rumput mesin dorong Finish Pengalihan
1 3/29/2019 Cahya Indoor Bantu pekerjaan indoor area komunal Finish Pengalihan
2 3/29/2019 Masduki, Fauzi ISR, GRA/B, R100, BD 25-32 Pemotongan rumput mesin gendong Finish Pengalihan
3 3/29/2019 Muslimin Pos Security - Garasi BD Pemangkasan tanaman the-tehan trotoar Continue Pengalihan
4 3/29/2019 Rohili, Halawi All Area Pembuangan sampah, perapihan sampah karung Finish On Schedule
5 3/29/2019 Suhemi Pos Security - Garasi BD Pemangkasan tanaman the-tehan trotoar Finish Pengalihan
6 3/29/2019 Kurtubi All Area, BD/BBD Penyapuan jalan, pengangkutan sampah koridor Finish Pengalihan
7 3/29/2019 Otong S. BBD 28-37 Pemotongan rumput mesin dorong Finish Pengalihan
1 3/28/2019 Cahya Luar Depan Pebeka Penyapuan jalan, pembersihan saluran air Finish Pengalihan
2 3/28/2019 Masduki, Fauzi Garasi BD - FUV (trotoar) Pemotongan rumput mesin gendong Finish Pengalihan
3 3/28/2019 Muslimin FUS 1-7 Pembersihan saluran air grating Finish Pengalihan
4 3/28/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
5 3/28/2019 Suhemi BBD 28-37, FUS 1-7 Pendangiran tanaman pucuk merah dan cemara Finish Pengalihan
6 3/28/2019 Kurtubi Office - G.Sipil Pemangkasan tanaman the-tehan trotoar, penyapuan jalan Finish Pengalihan
7 3/28/2019 Otong S. BBD 18-27 Pemotongan rumput mesin dorong Finish Pengalihan
1 3/27/2019 Cahya Komunal - Pos Security, Kantin Pemangkasan the-tehan trotoar, setting ruangan untuk meeting Continue Pengalihan
3 3/27/2019 Masduki, Fauzi Garasi BD - FUV Pemotongan rumput mesin gendong Continue Pengalihan
4 3/27/2019 Muslimin BBD 28-37 Pembersihan saluran air grating Continue Pengalihan
5 3/27/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
LAPORAN HARIAN OUTDOOR

6 3/27/2019 Suhemi BBD 28-37, FUS 1-7 Pendangiran tanaman pucuk merah dan cemara Continue Pengalihan
7 3/27/2019 Otong S. BBD 8-17 Pemotongan rumput mesin dorong Finish Pengalihan
1 3/26/2019 Cahya Komunal - Pos Security Pemangkasan the-tehan trotoar Continue Pengalihan
2 3/26/2019 Kurtubi BBD-18 & BBD-28, BD/BBD/GRB Pembersihan saluran air jalan penghubung koridor dan jalan raya, pengangkutan sampah Finish Pengalihan
3 3/26/2019 Masduki, Fauzi Office - DEG Pemotongan rumput mesin gendong Finish Pengalihan
4 3/26/2019 Muslimin Garasi BD - FUV Pembersihan saluran air tembok selatan Finish Pengalihan
5 3/26/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 3/26/2019 Suhemi Pos Security - Garasi BD Pendangiran tanaman pucuk merah Finish Pengalihan
7 3/26/2019 Otong S. R.Laundry, BBD 1-7 Pemotongan rumput mesin dorong Finish Pengalihan
1 3/25/2019 Cahya Komunal, Halaman BD (CCTV) Pemangkasan tanaman planter box, pemasangan support pohon cemara Finish Pengalihan
2 3/25/2019 Kurtubi Lap. Tennis Pembersihan saluran air Finish Pengalihan
3 3/25/2019 Masduki, Fauzi FUS 16-20 Pemotongan rumput mesin gendong Finish Pengalihan
4 3/25/2019 Muslimin CPG Pemangkasan the-tehan Finish Pengalihan
5 3/25/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 3/25/2019 Suhemi All Area, BD/BBD/GRB Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
7 3/25/2019 Otong S. BD 24-32, R100 Pemotongan rumput mesin dorong Finish Pengalihan
1 3/23/2019 Cahya Nursery Perawatan tanaman pot Finish Pengalihan
2 3/23/2019 Kurtubi Pond I (Belakang Pos Security) Pembersihan gulma Continue Pengalihan
3 3/23/2019 Masduki, Fauzi Komunal, DEG, Gudang Outdoor Penyapuan jalan, pembersihan saluran air Continue Pengalihan
4 3/23/2019 Muslimin Garasi BD - FUV Pembersihan saluran air tembok selatan Continue Pengalihan
5 3/23/2019 Rohili, Halawi GRB, BD& FUSBD, Bengkel Pencucian bak sampah koridor, perbaikan handle pintu bak mobil Finish On Schedule
6 3/23/2019 Suhemi BBD Pembersihan filter saluran air Finish Pengalihan
7 3/23/2019 Otong S. Halaman BD Pemotongan rumput mesin dorong Finish Pengalihan
1 3/22/2019 Cahya Nursery Perawatan tanaman pot Continue Pengalihan
2 3/22/2019 Kurtubi All Area Pembuangan sampah Finish Pengalihan
3 3/22/2019 Masduki, Fauzi FUS 11-16, FUS-7 Pemotongan rumput mesin gendong Finish Pengalihan
4 3/22/2019 Muslimin Garasi BD - FUV Pembersihan saluran air tembok selatan Continue Pengalihan
5 3/22/2019 Rohili All Area Pembuangan sampah Finish On Schedule
6 3/22/2019 Suhemi Halaman BD, BD/BBD Pemangkasan tanaman, pengangkutan sampah koridor Finish Pengalihan
7 3/22/2019 Otong S. Halaman BD Pemotongan rumput mesin dorong Continue Pengalihan
1 3/21/2019 Cahya All Area Pembersihan filter saluran air Finish Pengalihan
2 3/21/2019 Kurtubi Pond I (Belakang Pos Security) Pembersihan gulma dinding pond Continue Pengalihan
3 3/21/2019 Masduki, Fauzi FUS 11-20, FUS-7 Pemotongan rumput mesin gendong Continue Pengalihan
4 3/21/2019 Muslimin CPG Pemangkasan the-tehan Continue Pengalihan
5 3/21/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 3/21/2019 Suhemi Halaman BD, BD/BBD Pemangkasan tanaman, pengangkutan sampah koridor Continue Pengalihan
7 3/21/2019 Otong S. CPG Pemotongan rumput mesin dorong Finish Pengalihan
1 3/20/2019 Cahya FUV-1 Bantu pekerjaan sipil (ganti kusen pintu) Continue Pengalihan
2 3/20/2019 Kurtubi Lap. Tennis Pembersihan saluran air Finish On Schedule
3 3/20/2019 Masduki, Fauzi FUS-1 (villa) Pemotongan rumput mesin gendong Finish Pengalihan
4 3/20/2019 Muslimin Lap. Tennis Penyapuan halaman terbuka Finish Pengalihan
5 3/20/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 3/20/2019 Suhemi All Area, BD/BBD Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
7 3/20/2019 Otong S. CPG Pemotongan rumput mesin dorong Continue Pengalihan
1 3/19/2019 Cahya Komunal Bantu pekerjaan cleaning indoor (Ada seminar di ISR) Continue Pengalihan
2 3/19/2019 Kurtubi Pos Security - Komunal - DEG - FUPenyapuan jalan, pembersihan genangan air di jalan conblok Finish On Schedule
3 3/19/2019 Masduki, Fauzi Belakang Pos Security, Lap. Tennis Pemotongan rumput mesin gendong Finish Pengalihan
4 3/19/2019 Muslimin GRA/B, ISR, BBD Pendangiran tanaman, pengangkutan sampah koridor Finish Pengalihan
5 3/19/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 3/19/2019 Suhemi Halaman BD Pendangiran tanaman Finish Pengalihan
LAPORAN HARIAN OUTDOOR

7 3/19/2019 Otong S. Belakang Pos Security Pemotongan rumput mesin dorong Finish Pengalihan
1 3/18/2019 Cahya Fuel Tank, Komunal - Pos Security Pemangkasan the-tehan trotoar, pendangiran the-tehan trotoar Finish Pengalihan
2 3/18/2019 Kurtubi Pos Security - Komunal Pemangkasan the-tehan trotoar Finish Pengalihan
3 3/18/2019 Masduki, Fauzi Belakang Pos Security, Komunal - PPemotongan rumput mesin gendong Continue Pengalihan
4 3/18/2019 Muslimin Komunal pemangkasan tanaman planter box Finish Pengalihan
5 3/18/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 3/18/2019 Suhemi DEG-Musholla-Office Pemangkasan the-tehan trotoar Finish Pengalihan
7 3/18/2019 Otong S. Depan Pos Security, Halaman BD Pemotongan rumput mesin dorong Continue Pengalihan
1 3/16/2019 Cahya Lap. Parkir Tennis Pembersihan gulma kacang-kacangan Continue Pengalihan
2 3/16/2019 Kurtubi Pos Security - Garasi BD Pendangiran tanaman the-tehan trotoar Finish Pengalihan
3 3/16/2019 Masduki, Fauzi FUV Pemotongan rumput mesin gendong Finish Pengalihan
4 3/16/2019 Muslimin Lap. Tennis (Pump House) Pembersihan saluran air Finish Pengalihan
5 3/16/2019 Rohili, Halawi FUS Pencucian bak sampah Finish On Schedule
6 3/16/2019 Suhemi Pos Security - Garasi BD Pendangiran tanaman the-tehan trotoar Finish On Schedule
7 3/16/2019 Otong S. FUM, FUV Pemotongan rumput mesin dorong Finish Pengalihan
1 3/15/2019 Cahya Luar Depan Pebeka Pendangiran tanaman pucuk merah, re-plant bromelia Finish Pengalihan
2 3/15/2019 Kurtubi Komunal - Pos Security - Garasi BDPembersihan saluran air Continue On Schedule
3 3/15/2019 Masduki, Fauzi FUS 8-10, FUA, FUM Pemotongan rumput mesin gendong Finish Pengalihan
4 3/15/2019 Muslimin Lap. Tennis Pembersihan saluran air Finish Pengalihan
5 3/15/2019 Rohili All Area Pembuangan sampah Finish On Schedule
6 3/15/2019 Suhemi All Area Pembuangan sampah Finish On Schedule
7 3/15/2019 Otong S. FUM, FUV Pemotongan rumput mesin dorong Continue Pengalihan
1 3/14/2019 Cahya BBD-18, FUS-7 Pembersihan gulma septictank Finish Pengalihan
2 3/14/2019 Kurtubi Komunal - DEG - FUS, FUS-10 Penyapuan jalan, pembersihan saluran air Finish On Schedule
3 3/14/2019 Masduki, Fauzi FUS 1-6 Pemotongan rumput mesin gendong Finish Pengalihan
4 3/14/2019 Muslimin Lap. Tennis Pembersihan saluran air Continue Pengalihan
5 3/14/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 3/14/2019 Suhemi Komunal - BD - BBD - FUV, BBD/ Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
7 3/14/2019 Otong S. FUS 8-10, FUA Pemotongan rumput mesin dorong Finish Pengalihan
1 3/13/2019 Cahya Komunal - Luar Depan, Luar Depan,Penyapuan jalan, pembersihan gulma conblok, pendangiran tanaman tehtehan trotoar Continue On Schedule
2 3/13/2019 Kurtubi FUS-1 (villa) Pemangkasan dan pendangiran tanaman Continue Pengalihan
3 3/13/2019 Masduki, Fauzi BBD 28-37 Pemotongan rumput mesin gendong Continue On Schedule
4 3/13/2019 Muslimin Lap. Tennis Pembersihan gulma dalam lapangan Finish On Schedule
5 3/13/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 3/13/2019 Suhemi Garasi BD - BBD - FUV, Garasi BD-Penyapuan jalan, pendangiran tanaman the-tehan trotoar Continue Pengalihan
7 3/13/2019 Otong S. FUV Pemotongan rumput mesin dorong Continue On Schedule
1 3/12/2019 Cahya Komunal - DEG - G.Sipil Pembersihan gulma conblok Finish Pengalihan
2 3/12/2019 Kurtubi FUS 11-20 Pembersihan saluran air kecil Finish Pengalihan
3 3/12/2019 Masduki, Fauzi BBD 28-37 Pemotongan rumput mesin gendong Continue Pengalihan
4 3/12/2019 Muslimin FUV.6 - CPG Pembersihan saluran air grating Continue Pengalihan
5 3/12/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 3/12/2019 Suhemi FUV.6 - CPG Pembersihan saluran air grating Continue Pengalihan
7 3/12/2019 Otong S. BBD 1-7, R.Laundry Pemotongan rumput mesin dorong Continue Pengalihan
1 3/11/2019 Cahya BBD 1-28, Pos Security (CCTV), B Pembersihan saluran air besar, filter saluran, pengangkutan sampah koridor Finish Pengalihan
2 3/11/2019 Kurtubi DEG - Kantin Pemangkasan tanaman the-tehan trotoar Finish On Schedule
3 3/11/2019 Masduki, Fauzi Halaman BD Pemotongan rumput mesin gendong Finish Pengalihan
4 3/11/2019 Muslimin Komunal - DEG - FUS Penyapuan jalan Finish On Schedule
5 3/11/2019 Rohili All Area Pembuangan sampah Finish On Schedule
6 3/11/2019 Suhemi All Area Pembuangan sampah Finish Pengalihan
7 3/11/2019 Otong S. BBD 8-17 Pemotongan rumput mesin dorong Finish Pengalihan
LAPORAN HARIAN OUTDOOR

1 3/9/2019 Cahya Komunal - DEG - FUS - FUV Penyemprotan herbisida conblok Finish Pengalihan
2 3/9/2019 Kurtubi FUS 1-7 Pemangkasan tanaman planter box dapur Finish Pengalihan
3 3/9/2019 Masduki, Fauzi Halaman BD Pemotongan rumput mesin gendong Continue Pengalihan
4 3/9/2019 Muslimin Komunal Pemangkasan tanaman planter box Finish Pengalihan
5 3/9/2019 Rohili, Halawi BBD 1-10, FUSBD, BD 10-17, BengPencucian bak sampah koridor, perawatan mobil (cuci steam) Finish On Schedule
6 3/9/2019 Suhemi FUV-6 Pemangkasan tanaman trotoar Finish Pengalihan
7 3/9/2019 Otong S. BBD 19-27 Pemotongan rumput mesin dorong Finish On Schedule
1 3/8/2019 Cahya Halaman BD Pemotongan rumput mesin gendong Continue Pengalihan
2 3/8/2019 Kurtubi FUS 8-10, FUA Pemangkasan tanaman planter box dapur Finish Pengalihan
3 3/8/2019 Masduki Halaman BD Pemotongan rumput mesin gendong Continue Pengalihan
4 3/8/2019 Muslimin Komunal - Pos Security Pemangkasan tanaman the-tehan trotoar Finish Pengalihan
5 3/8/2019 Rohili, Halawi All Area Pembuangan sampah Continue On Schedule
6 3/8/2019 Suhemi BBD 28-37 Pemangkasan pucuk merah Finish Pengalihan
7 3/8/2019 Otong S. BBD 28-37, BBD-18 Pemotongan rumput mesin dorong Finish On Schedule
1 3/6/2019 Cahya BBD 1-28 Pembersihan saluran air besar Finish On Schedule
2 3/6/2019 Kurtubi FUS 8-10, FUA Pemangkasan tanaman planter box dapur Continue Pengalihan
3 3/6/2019 Masduki, Fauzi FUS 1-7(trotoar) Pemotongan rumput mesin gendong Finish Pengalihan
4 3/6/2019 Muslimin Komunal, Musholla Pemangkasan tanaman planter box Continue Pengalihan
5 3/6/2019 Rohili, Halawi All Area Pembuangan sampah Continue On Schedule
6 3/6/2019 Suhemi BBD 28-37 Pembersihan gulma conblok trotoar Continue Pengalihan
7 3/6/2019 Otong S. BBD 28-37 Pemotongan rumput mesin dorong Continue Pengalihan
1 3/5/2019 Cahya Garasi BD - BBD.28, BBD 1-28 Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
2 3/5/2019 Kurtubi FUS-1 (villa) Pemangkasan tanaman Finish On Schedule
3 3/5/2019 Masduki, Fauzi Garasi BD - FUV (trotoar selatan) Pemotongan rumput mesin gendong Finish Pengalihan
4 3/5/2019 Muslimin Indoor Cleaning ruangan dan toilet Finish Pengalihan
5 3/5/2019 Rohili, Halawi All Area Pembuangan sampah Continue On Schedule
6 3/5/2019 Suhemi FUV 2-3 Pembersihan gulma teras taman dan saluran Finish Pengalihan
7 3/5/2019 Otong S. Halaman BD, BD 24-32, R100 Pemotongan rumput mesin dorong Finish Pengalihan
1 3/4/2019 Cahya Halaman BD Pemotongan rumput mesin dorong Continue Pengalihan
2 3/4/2019 Kurtubi FUS-1 (villa) Pemangkasan tanaman Continue On Schedule
3 3/4/2019 Masduki, Fauzi Luar Depan, Garasi BD - FUV (trotoPemotongan rumput mesin gendong, pruning cabang pohon mangga yang mengenai gent Continue On Schedule
4 3/4/2019 Muslimin Indoor Cleaning ruangan dan toilet Finish Pengalihan
5 3/4/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 3/4/2019 Suhemi BD 24-32 Pembersihan gulma teras taman dan saluran Finish On Schedule
7 3/4/2019 Add.MP All Area Penyapuan jalan Finish On Schedule
1 3/2/2019 Cahya ISR, Kantin Pembersihan gulma septictank Finish On Schedule
2 3/2/2019 Kurtubi Koridor BD 10-16, FUS Pembersihan gulma teras koridor Finish On Schedule
3 3/2/2019 Otong S. BD 10-16 Pembersihan gulma teras taman Continue On Schedule
4 3/2/2019 Masduki, Fauzi Balong Pembersihan gulma jalan setapak Finish On Schedule
5 3/2/2019 Muslimin ISR, Kantin Pembersihan gulma septictank Finish On Schedule
6 3/2/2019 Rohili, Halawi BD, GRA, GRB, R.Laundry Pencucian bak sampah koridor Finish On Schedule
7 3/2/2019 Suhemi BD 24-32 Pembersihan gulma teras taman Continue On Schedule
1 3/1/2019 Cahya CPG, BBD-28 Pembersihan gulma septictank Finish On Schedule
2 3/1/2019 Kurtubi, Otong S. Koridor BD 17-23 Pembersihan gulma teras koridor Finish On Schedule
3 3/1/2019 Masduki, Fauzi FUS 8-10, FUA, FUM, FUV Pembersihan gulma jalan setapak Finish On Schedule
4 3/1/2019 Muslimin CPG, BBD-28 Pembersihan gulma septictank Finish On Schedule
5 3/1/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
7 3/1/2019 Suhemi Kantin - FUS.1 Pembersihan saluran air Finish On Schedule
1 2/28/2019 Cahya Pos Security - Garasi BD, Pos SecuPembersihan saluran air tembok barat, pembersihan talang air, pembersihan gulma septi Continue On Schedule
2 2/28/2019 Kurtubi BBD.8 - BBD.28, Koridor BD 17-23 Pembersihan saluran air, pembersihan gulma teras koridor Continue On Schedule
LAPORAN HARIAN OUTDOOR

3 2/28/2019 Masduki, Fauzi FUS 16-20, Balong Pemotongan rumput mesin gendong, pembersihan gulma jalan setapak Continue On Schedule
4 2/28/2019 Muslimin Garasi BD - BBD - FUV.6, Pos Secur Penyemprotan herbisida conblok, pembersihan talang air, pembersihan gulma septictank Continue On Schedule
5 2/28/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
7 2/28/2019 Suhemi All Area, BD/BBD, Kantin-FUS.17 Penyapuan jalan, pengangkutan sampah koridor, pembersihan saluran air Continue On Schedule
1 2/27/2019 Cahya Kolam Renang, Pos Security - GaraBantu elektrik pasang scaffolding pekerjaan kabel lampu, pembersihan saluran air tembo Continue On Schedule
2 2/27/2019 Kurtubi Kolam Renang, BD.24 - BBD.8 Bantu elektrik pasang scaffolding pekerjaan kabel lampu, pembersihan saluran air Finish On Schedule
3 2/27/2019 Masduki, Fauzi Pump House - DEG - G.Outdoor, KaPemotongan rumput mesin gendong Finish On Schedule
4 2/27/2019 Muslimin Gudang Sipil - FUS.1 Pembersihan saluran air tembok utara Continue On Schedule
5 2/27/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
7 2/27/2019 Suhemi All Area, BD/BBD Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
1 2/26/2019 Cahya Komunal Pemangkasan tanaman planter box Finish On Schedule
2 2/26/2019 Kurtubi All Area, BD/BBD Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
3 2/26/2019 Masduki, Fauzi Pump House - DEG - G.Outdoor Pemotongan rumput mesin gendong Continue On Schedule
4 2/26/2019 Muslimin Lap. Parkir Tennis Pembersihan gulma kacang-kacangan Finish On Schedule
5 2/26/2019 Rohili All Area Pembuangan sampah Finish On Schedule
6 2/26/2019 Otong S. Kolam renang Pemangkasan rumput planter box gazebo, pembersihan saluran air tepi kolam Finish On Schedule
7 2/26/2019 Suhemi All Area Pembuangan sampah Finish On Schedule
2 2/25/2019 Kurtubi All Area, Luar Depan Pebeka Penyapuan jalan, pembersihan gulma conblok Continue On Schedule
3 2/25/2019 Masduki, Fauzi Komunal - Pos Security (trotoar) Pemotongan rumput mesin gendong Finish On Schedule
5 2/25/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 2/25/2019 Otong S. Halaman BD Pemotongan rumput mesin dorong Continue On Schedule
7 2/25/2019 Suhemi Lap. Parkir Tennis Pembersihan gulma kacang-kacangan Continue On Schedule
1 2/23/2019 Cahya Pos Security - Garasi BD Pembersihan saluran air tembok barat Continue On Schedule
2 2/23/2019 Kurtubi Luar Depan Pebeka Pemangkasan tanaman pucuk merah Finish On Schedule
3 2/23/2019 Masduki, Fauzi Office, Fuel Tank, Pump House Pemotongan rumput mesin gendong Finish On Schedule
4 2/23/2019 Muslimin Lap. Parkir Tennis Pembersihan gulma conblok Finish On Schedule
5 2/23/2019 Rohili, Halawi All Area Pencucian bak sampah biru Finish On Schedule
6 2/23/2019 Otong S. Depan Pos Security Pemotongan rumput mesin dorong Finish On Schedule
7 2/23/2019 Suhemi All area, BD Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
1 2/22/2019 Cahya Balong Pembersihan saluran air grating Continue On Schedule
2 2/22/2019 Kurtubi Fuel Tank, Office, ISR Pemangkasan tanaman bulat Finish On Schedule
3 2/22/2019 Masduki, Fauzi Balong Pemotongan rumput mesin gendong Finish On Schedule
4 2/22/2019 Muslimin Fuel Tank - DEG Pemangkasan tanaman the-tehan trotoar Finish On Schedule
5 2/22/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 2/22/2019 Otong S. Belakang Pos Security Pemotongan rumput mesin dorong Finish On Schedule
7 2/22/2019 Suhemi All area, BBD/GRB/BD Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
1 2/21/2019 Cahya BBD 18-28, FUV-5 Pembersihan saluran air besar Finish On Schedule
2 2/21/2019 Kurtubi Pos Security - Garasi BD Pemangkasan tanaman the-tehan trotoar Finish On Schedule
3 2/21/2019 Masduki, Fauzi Balong Pemotongan rumput mesin gendong Finish On Schedule
4 2/21/2019 Muslimin Kantin, Komunal Pemangkasan tanaman the-tehan trotoar, pemangkasan dan pendangiran bayam merah, p Finish On Schedule
5 2/21/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 2/21/2019 Otong S. Kantin Pemotongan rumput mesin dorong Finish On Schedule
7 2/21/2019 Suhemi All area, BBD/GRB/BD Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
1 2/20/2019 Cahya ISR, R100, GRB Pemotongan rumput mesin gendong Finish On Schedule
2 2/20/2019 Kurtubi Pos Security - Garasi BD Pemangkasan tanaman the-tehan trotoar Continue On Schedule
3 2/20/2019 Masduki ISR, R100, GRB Pemotongan rumput mesin gendong Finish On Schedule
4 2/20/2019 Muslimin Pos Security, Lap. Parkir Tennis-Fu Pemangkasan tanaman the-tehan trotoar, pendangiran tanaman the-tehan trotoar Finish On Schedule
5 2/20/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 2/20/2019 Otong S. FUS 1-7, FUS-16 Pemotongan rumput mesin dorong Finish On Schedule
7 2/20/2019 Suhemi All area, BBD/GRB/BD Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
LAPORAN HARIAN OUTDOOR

1 2/19/2019 Cahya Garasi BD - BBD.28, Luar Depan PPruning kiara payung, pruning benalu tabebuia Finish On Schedule
2 2/19/2019 Kurtubi Pos Security - Garasi BD Pemangkasan pucuk merah Continue On Schedule
3 2/19/2019 Masduki Garasi BD - BBD.28, Luar Depan PPruning kiara payung, pruning benalu tabebuia Finish On Schedule
4 2/19/2019 Muslimin Office (trotoar), Samping Pos SecuriPendangiran tanaman the-tehan trotoar, pembersihan sampah daun kering dan pencabutan Finish On Schedule
5 2/19/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 2/19/2019 Otong S. Balong Pemotongan rumput mesin dorong Finish On Schedule
7 2/19/2019 Suhemi All area, BBD/GRB Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
1 2/18/2019 Cahya Komunal, Pos Security - Garasi BDPenggantian tanaman pot, pemangkasan tanaman pucuk merah trotoar Continue On Schedule
2 2/18/2019 Kurtubi Pos Security, Komunal - Pos SecuriPruning cemara, penyemprotan HPT Finish On Schedule
3 2/18/2019 Fauzi, Masduki Balong Pemotongan rumput mesin gendong Continue On Schedule
4 2/18/2019 Muslimin Komunal, Parkir Motor Penggantian tanaman pot, pemangkasan tanaman the-tehan trotoar Finish On Schedule
5 2/18/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 2/18/2019 Otong S. Balong Pemotongan rumput mesin dorong Continue On Schedule
7 2/18/2019 suhemi All area, BBD Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
1 2/16/2019 Cahya Balong Pembersihan sampah daun dan ranting kelapa kering Finish On Schedule
2 2/16/2019 Kurtubi Lap. Parkir Tennis Pendangiran tanaman the-tehan trotoar Finish On Schedule
3 2/16/2019 Fauzi, Masduki Gudang Outdoor Service mesin potong rumput Finish On Schedule
4 2/16/2019 Muslimin Komunal - Pos Security Pemangkasan tanaman the-tehan trotoar Finish On Schedule
5 2/16/2019 Rohili, Halawi BBD 1-10, GRA, GRB Pencucian bak sampah koridor Finish On Schedule
7 2/16/2019 Otong S. Balong Pemotongan rumput mesin dorong Continue On Schedule
1 2/15/2019 Cahya Balong Pembersihan sampah daun dan ranting kelapa kering Continue On Schedule
2 2/15/2019 Kurtubi Komunal - Pos Security Pendangiran tanaman the-tehan trotoar Finish On Schedule
3 2/15/2019 Fauzi, Masduki Balong Pemotongan rumput mesin gendong Continue On Schedule
4 2/15/2019 Muslimin Komunal - Pos Security Pemangkasan tanaman planter box dan tanaman the-tehan trotoar Continue On Schedule
5 2/15/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 2/15/2019 Suhemi All Area, BD/BBD/GRB Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
7 2/15/2019 Otong S. Pump House-Fuel Tank, DEG Pembersihan saluran air, pendangiran tanaman the-than trotoar Finish On Schedule
1 2/14/2019 Cahya Luar Belakang Pebeka Pembersihan saluran air Finish On Schedule
2 2/14/2019 Kurtubi Pos Security - Garasi BD Pendangiran tanaman the-tehan trotoar Finish On Schedule
3 2/14/2019 Fauzi, Masduki Luar Belakang Pebeka Pembersihan saluran air Finish On Schedule
4 2/14/2019 Muslimin Komunal - Pos Security Pembersihan saluran air Finish On Schedule
5 2/14/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 2/14/2019 Suhemi All Area, BD/BBD/GRB Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
7 2/14/2019 Otong S. Balong Pemotongan rumput mesin dorong Continue On Schedule
1 2/13/2019 Cahya Luar Belakang Pebeka, Pump HousPembersihan saluran air, pendangiran tanaman Continue On Schedule
2 2/13/2019 Kurtubi Pos Security - Garasi BD Pendangiran tanaman the-tehan trotoar Continue On Schedule
3 2/13/2019 Fauzi, Masduki Luar Belakang Pebeka Pembersihan saluran air, bobok saluran air Continue On Schedule
4 2/13/2019 Muslimin Komunal - Pos Security Pembersihan saluran air Continue On Schedule
5 2/13/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 2/13/2019 Suhemi All Area, BD/BBD/GRB Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
7 2/13/2019 Otong S. BBD 18-28 Pembersihan saluran air besar Finish On Schedule
1 2/12/2019 Cahya Luar Belakang Pebeka Pembersihan saluran air Continue On Schedule
2 2/12/2019 Kurtubi BBD-28 (trotoar), taman BD-10 Penebangan pohon cemara Finish On Schedule
3 2/12/2019 Fauzi, Masduki Luar Belakang Pebeka Pembersihan saluran air Continue On Schedule
4 2/12/2019 Muslimin BBD-28 (trotoar), taman BD-10 Penebangan pohon cemara Finish On Schedule
5 2/12/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 2/12/2019 Suhemi Komunal - Luar Depan, All Area Penyiraman tanaman, penyapuan jalan Finish On Schedule
7 2/12/2019 Otong S. Balong, Planter Box Musholla Pemotongan rumput mesin dorong, pemangkasan tanaman planter box Continue On Schedule
2 2/11/2019 Kurtubi CPG Pemangkasan tanaman the-tehan Finish On Schedule
3 2/11/2019 Fauzi, Masduki Luar Depan, FUS 11-20 Pemotongan rumput mesin gendong Continue On Schedule
LAPORAN HARIAN OUTDOOR

4 2/11/2019 Muslimin FUS 11-20, Komunal Pembersihan gulma conblok, pemangkasan the-tehan planter box Continue On Schedule
5 2/11/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 2/11/2019 Suhemi All Area Penyapuan jalan Finish On Schedule
7 2/11/2019 Otong S. Balong Pemotongan rumput mesin dorong Continue On Schedule
1 2/9/2019 Cahya FUS 2-7 Pembersihan gulma conblok Continue On Schedule
2 2/9/2019 Kurtubi CPG Pemangkasan tanaman the-tehan Continue On Schedule
3 2/9/2019 Fauzi, Masduki Garasi FUSBD Pembersihan gulma conblok Finish On Schedule
4 2/9/2019 Muslimin FUS 2-7 Pembersihan gulma conblok Continue On Schedule
5 2/9/2019 Rohili All Area Pencucian bak sampah biru Finish On Schedule
6 2/9/2019 Suhemi All Area Penyapuan jalan Finish On Schedule
7 2/9/2019 Otong S. Balong Pemotongan rumput mesin dorong Continue On Schedule
1 2/8/2019 Cahya FUV Pembersihan gulma conblok Finish On Schedule
2 2/8/2019 Kurtubi Fuel Tank, GRB Koridor Perawatan/cleaning ruangan, pembersihan gulma batu koridor Continue On Schedule
3 2/8/2019 Fauzi, Masduki FUV, FUM Pembersihan gulma conblok Finish On Schedule
4 2/8/2019 Muslimin Komunal - FUS.11 Pembersihan gulma conblok Finish On Schedule
5 2/8/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 2/8/2019 Suhemi FUV Pembersihan gulma conblok Finish On Schedule
7 2/8/2019 Otong S. CPG Pemotongan rumput mesin dorong Finish On Schedule
1 2/7/2019 Cahya Komunal - FUS.11 Pembersihan gulma conblok Continue On Schedule
2 2/7/2019 Kurtubi All Area, Lap. Tennis Pembersihan filter saluran air, penyapuan halaman terbuka Finish On Schedule
3 2/7/2019 Fauzi, Masduki FUS-1 (villa) Pemotongan rumput mesin gendong Finish On Schedule
4 2/7/2019 Muslimin Komunal - FUS.11 Pembersihan gulma conblok Continue On Schedule
5 2/7/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 2/7/2019 Suhemi All Area, BBD/BD/GRB Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
7 2/7/2019 Otong S. CPG Pemotongan rumput mesin dorong Continue On Schedule
2 2/6/2019 Kurtubi FUS 8-10 Pembersihan gulma conblok Finish On Schedule
3 2/6/2019 Fauzi, Masduki Halaman BD Pemotongan rumput mesin gendong Finish On Schedule
4 2/6/2019 Muslimin FUM, FUV-1 Pembersihan gulma conblok Continue On Schedule
5 2/6/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 2/6/2019 Suhemi All Area, BBD/BD/GRB Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
7 2/6/2019 Otong S. FUV 5-6 Pemotongan rumput mesin dorong Finish On Schedule
1 2/4/2019 Cahya Garasi BD - FUV.6 Pembersihan tanaman rambat tembok selatan Finish On Schedule
2 2/4/2019 Kurtubi BBD 28-37 Pembersihan saluran air grating Finish On Schedule
3 2/4/2019 Fauzi, Masduki Halaman BD Pemotongan rumput mesin gendong Continue On Schedule
4 2/4/2019 Muslimin Garasi BD - FUV.6 Pembersihan tanaman rambat tembok selatan Finish On Schedule
5 2/4/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
6 2/4/2019 Suhemi All Area, BBD/BD/GRB Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
7 2/4/2019 Otong S. FUM, FUA, FUS 8-10 Pemotongan rumput mesin dorong Finish On Schedule
1 2/2/2019 Cahya Garasi BD - FUV.6 Pembersihan tanaman rambat tembok selatan Continue On Schedule
2 2/2/2019 Kurtubi DEG Pemangkasan tanaman the-tehan trotoar Finish On Schedule
3 2/2/2019 Fauzi, Masduki BD 24-32 Pemotongan rumput mesin gendong Finish On Schedule
4 2/2/2019 Muslimin Garasi BD - FUV.6 Pembersihan tanaman rambat tembok selatan Continue On Schedule
5 2/2/2019 Rohili, Halawi FUS 11-20 Pencucian bak sampah hijau Finish On Schedule
6 2/2/2019 Suhemi All Area, BBD/BD Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
7 2/2/2019 Otong S. FUV 2-3 Pemotongan rumput mesin dorong Finish On Schedule
1 2/1/2019 Cahya Komunal, DEG, Halaman BD, Luar P
Demupukan tanaman baru, pemangkasan tanaman the-tehan trotoar Finish On Schedule
2 2/1/2019 Kurtubi All Area, BBD/GRB Penyapuan jalan, pengangkutan sampah koridor Finish On Schedule
3 2/1/2019 Fauzi, Masduki R.Laundry, R100 Pemotongan rumput mesin gendong Finish On Schedule
4 2/1/2019 Muslimin FUSBD Pembersihan saluran air dan gulma teras taman Finish On Schedule
5 2/1/2019 Rohili, Halawi All Area Pembuangan sampah Finish On Schedule
LAPORAN HARIAN OUTDOOR

6 2/1/2019 Suhemi Lap. Tennis Pembersihan saluran air Finish On Schedule


7 2/1/2019 Otong S. BBD 18-27, FUV-1 Pemotongan rumput mesin dorong Finish On Schedule