Loop
Loop
Loop 2 ke AC 50 L/dt
CD 10 L/dt
DA 140 L/dt
(𝐿 𝑥 𝑆)/𝑄𝑜
Loop 1 Jalur Pipa D (m) L (m) Qo (m3/dt) S (m) L x S (m)
(𝐿 𝑥 𝑆)/𝑄𝑜
Jalur Pipa D (m) L (m) Qo (m3/dt) S (m) L x S (m)
Loop 2
AC 0.25 1500 0.05 0.007071161832 10.6067427 212.13485497
CD 0.25 1200 - 0.01 - 0.000360077736 - 0.43209328 43.209328262
DA 0.3 1000 - 0.14 - 0.019564861689 - 19.5648617 139.74901207
S -9.3902122 395.0931953
Trial 2
Misal Debit CHw = 100
Asumsi debit yang masuk
Loop 1 ke AB 130 L/dt
BC 50 L/dt
CA 50 L/dt
Loop 2 ke AC 50 L/dt
CD 10 L/dt
DA 140 L/dt
(𝐿 𝑥 𝑆)/𝑄𝑜
Loop 1 Jalur Pipa D (m) L (m) Qo (m3/dt) S (m) L x S (m)
(𝐿 𝑥 𝑆)/𝑄𝑜
(𝐿 𝑥 𝑆)/𝑄𝑜
Jalur Pipa D (m) L (m) Qo (m3/dt) S (m) L x S (m)
Loop 2
AC 0.25 1500 0.078584 0.016321679593 24.4825194 311.54568455
CD 0.25 1200 0.002847 3.52397778E-05 0.04228773 14.853065193
DA 0.3 1000 - 0.012715 - 0.000231273137 - 0.23127314 18.189000124
S 24.293534 344.58774987
Trail 3
Misal Debit CHw = 100
Asumsi debit yang masuk
Loop 1 ke AB 130 L/dt
BC 50 L/dt
CA 50 L/dt
Loop 2 ke AC 50 L/dt
CD 10 L/dt
DA 140 L/dt
(𝐿 𝑥 𝑆)/𝑄𝑜
Loop 1 Jalur Pipa D (m) L (m) Qo (m3/dt) S (m) L x S (m)
(𝐿 𝑥 𝑆)/𝑄𝑜
Jalur Pipa D (m) L (m) Qo (m3/dt) S (m) L x S (m)
Loop 2
AC 0.25 1500 0.033793 0.003425436552 5.13815483 152.04976367
CD 0.25 1200 - 0.04082 - 0.004858601942 - 5.83032233 142.83004239
DA 0.3 1000 - 0.05069 - 0.002987075191 - 2.98707519 58.928293369
S -3.6792427 353.80809943
Trail 4
Misal Debit CHw = 100
Asumsi debit yang masuk
Loop 1 ke AB 130 L/dt
BC 50 L/dt
CA 50 L/dt
Loop 2 ke AC 50 L/dt
CD 10 L/dt
DA 140 L/dt
(𝐿 𝑥 𝑆)/𝑄𝑜
(𝐿 𝑥 𝑆)/𝑄𝑜
Loop 1 Jalur Pipa D (m) L (m) Qo (m3/dt) S (m) L x S (m)
(𝐿 𝑥 𝑆)/𝑄𝑜
Jalur Pipa D (m) L (m) Qo (m3/dt) S (m) L x S (m)
Loop 2
AC 0.25 1500 0.059551 0.009771177673 14.6567665 246.11944702
CD 0.25 1200 - 0.03526 - 0.003705685332 - 4.4468224 126.11521265
DA 0.3 1000 - 0.03784 - 0.001739199902 - 1.7391999 45.961942452
S 8.47074421 418.19660213
Trail 5
Misal Debit CHw = 100
Asumsi debit yang masuk
Loop 1 ke AB 130 L/dt
BC 50 L/dt
CA 50 L/dt
Loop 2 ke AC 50 L/dt
CD 10 L/dt
DA 140 L/dt
(𝐿 𝑥 𝑆)/𝑄𝑜
Loop 1 Jalur Pipa D (m) L (m) Qo (m3/dt) S (m) L x S (m)
(𝐿 𝑥 𝑆)/𝑄𝑜
Jalur Pipa D (m) L (m) Qo (m3/dt) S (m) L x S (m)
Loop 2
AC 0.25 1500 0.048704 0.006735892571 10.1038389 207.45286987
CD 0.25 1200 - 0.04624 - 0.006118982987 - 7.34277958 158.79713635
DA 0.3 1000 - 0.02499 - 0.000807248952 - 0.80724895 32.302879234
S 1.95381032 398.55288545
DQ Qkoreksi
DQ Qkoreksi
DQ Qkoreksi
DQ Qkoreksi
DQ Qkoreksi
DQ Qkoreksi
DQ Qkoreksi
DQ Qkoreksi