Sie sind auf Seite 1von 18

CABLE 7Q50--RAZ-LR-EEHS

WCA 392 lb/kft


WCW 324 lb/kft WCM 309.55 lb
WM 10
DEPTH 304 m

CABLE 7Q49RTZZ-EHS
WCA 409 lb/kft
WCW 338 lb/kft WCM 1747.98 lb
WM 9.4
DEPTH 1620 m

CABLE 7H47RTZ-HS
WCA 392 lb/kft
WCW 326 lb/kft WCM 1739.71 lb
WM 9.4
DEPTH 1670 m
PROFUNDIDADE DESCENDO PUXANDO CABO

0 475 1425 0

500 746 2239 542.969156166404

1000 1018 3054 1085.93831233281

1500 1289 3868 1628.90746849921

2000 1561 4683 2171.87662466561

2500 1832 5497 2714.84578083202

3000 2104 6312 3257.81493699842

3500 2375 7126 3800.78409316482

4000 2647 7941 4343.75324933123

4500 2918 8755 4886.72240549763

5000 3190 9570 5429.69156166404

5500 3461 10384 5972.66071783044

6000 3733 11198 6515.62987399684

6500 4004 12013 7058.59903016325

7000 4276 12827 7601.56818632965

475 1425
330.994
run1
GR CSNG GEM DSN SDL ICT WSTT ACRT
34.87 32.41 29.35 26.35 23.3 17.57 9.84 3.18
4827.53 4829.99 4833.05 4836.05 4839.1 4844.83 4852.56 4859.22

run2
GR MRIL DEPTH
18.46 6.21 4861.4
4842.94 4855.19 4861.4 4861.4 4861.4 4861.4 4861.4

run3
Amostragem
4508.2 inicio fin total (min)
tiempo de bombeio 18/11/2017 19:35 19/11/2017 2:23 408
mini DST 19/11/2017 2:56 19/11/2017 3:26 30
438

Amostragem
4489 inicio fin total (min)
tiempo de bombeio 19/11/2017 5:29 19/11/2017 14:52 563
mini DST 19/11/2017 15:20 19/11/2017 15:50 30
354

Amostragem
4531.7 inicio fin total (min)
tiempo de bombeio 20/11/2017 4:00 20/11/2017 11:17 437
mini DST 20/11/2017 11:27 20/11/2017 11:57 30
354

Amostragem
4616.7 inicio fin total (min)
tiempo de bombeio 20/11/2017 13:40 20/11/2017 19:22 342
mini DST 19/11/2017 11:27 19/11/2017 11:57 30
354

Amostragem
4690.5 inicio fin total (min)
tiempo de bombeio 20/11/2017 21:58 20/11/2017 23:25 87
mini DST 0
354

Amostragem
4690.6 inicio fin total (min)
tiempo de bombeio 21/11/2017 1:32 21/11/2017 14:19 767
mini DST 21/11/2017 14:30 21/11/2017 15:00 30
354

MINI DST
5676.6
mini DST 15/10/2016 3:19 15/10/2016 3:41 22

MINI DST
5763.1
mini DST 15/10/2016 7:30 15/10/2016 8:14 44

MINI DST
5875.6
mini DST 15/10/2016 13:12 15/10/2016 13:58 46
DEPTH ZAPATA
4862.4 4485

792

464
354
22
44
46
930 15.5

ABORTADO
8:02 - 8:06
CASING SIZE 10.75
CASING ID 9.156 RADIUS 4.578

RAW DATA OFFSET CORRECTED OUT


SDLCALI 8.54 0.616 RADIUS

RADIUS 1 4.4 0.178 4.578


RADIUS 2 4.5 0.078 4.578
RADIUS 3 4.6 -0.022 4.578
RADIUS 4 4.55 0.028 4.578
RADIUS 5 4.5 0.078 4.578
RADIUS 6 4.4 0.178 4.578

RAW OUT CORRECTED ID


OD 1-4 8.95 9.156
OD 2-5 9 9.156
OD 3-6 9 9.156
Factor de Flotacion (FF) usando Lodo (PPG) Peso de Lodo (lpg): 9.9
(FF)= (65.5-Peso del Lodo)/65.5 Peso de Herramienta (lbs): 3905
Peso de Herramienta en Lodo (lbs):
FF = 0.84885496183206
Factor de Flotacion (FF) usando Lodo (lb/ft3)
(FF)= (489-Peso del Lodo)/489 Tool Leng 117

FF= Den Flud/Dens Acer

Densidad Acero ( lb/gl) = 78.67


Densidad Acero ( g/cm3) = 7.85 peso 2705.7879104256

FF= 0.874157874666
0.125842 254.7879104256

g 32.2 ft/s2

Vol=pi*(d/2)^2*L

Vol cabo = 8.88 gl/1000ft

Vol ferramenta = 3.14*(0.304/2)^2*L

Vol (ft3) = 8.48794752


52.7950335744
3314.779
DT (Msec) 80
Zona (ft) 164
ITT (msec) 13.12

Zona (mts) 50
TOP DRIVE HEIGHT 30
SHEAVE HORIZONTAL DISTANCE 5.5
ANGLE 10.38886
m
m
deg
TALLY READ
CASING THICKNESS 0.797 0.83

CASING ID 9.16 9.04


CASING MATERIAL SOUND VELOCITY 3.17
5.48

TCAL
-2.00

Das könnte Ihnen auch gefallen