Sie sind auf Seite 1von 18

MB No: 3738

Name of Work: Gawali Dev pandan Rasta.


Place: Redwa
Work Code: 1824013617/RC/1234701962

SN NMR No. M/Day From To Rate Amount


17518 60 3/21/2023 3/27/2023 256 15360.00
1
17519 7 3/21/2023 3/27/2023 256 1792.00
405 60 4/7/2023 4/13/2023 273 16380.00
406 60 4/7/2023 4/13/2023 273 16380.00
407 60 4/7/2023 4/13/2023 273 16380.00
2 408 60 4/7/2023 4/13/2023 273 16380.00
409 60 4/7/2023 4/13/2023 273 16380.00
410 60 4/7/2023 4/13/2023 273 16380.00
411 30 4/7/2023 4/13/2023 273 8190.00
412 70 4/14/2023 4/20/2023 273 19110.00
413 70 4/14/2023 4/20/2023 273 19110.00
414 70 4/14/2023 4/20/2023 273 19110.00
3 415 70 4/14/2023 4/20/2023 273 19110.00
416 70 4/14/2023 4/20/2023 273 19110.00
417 70 4/14/2023 4/20/2023 273 19110.00
418 35 4/14/2023 4/20/2023 273 9555.00
1070 60 4/23/2023 4/29/2023 273 16380.00
1071 60 4/23/2023 4/29/2023 273 16380.00
1072 60 4/23/2023 4/29/2023 273 16380.00
1073 60 4/23/2023 4/29/2023 273 16380.00
4
1074 60 4/23/2023 4/29/2023 273 16380.00
1075 60 4/23/2023 4/29/2023 273 16380.00
1076 60 4/23/2023 4/29/2023 273 16380.00
1077 6 4/23/2023 4/29/2023 273 1638.00
1386 60 4/30/2023 5/6/2023 273 16380.00
1387 60 4/30/2023 5/6/2023 273 16380.00
1388 60 4/30/2023 5/6/2023 273 16380.00
1389 60 4/30/2023 5/6/2023 273 16380.00
5
1390 60 4/30/2023 5/6/2023 273 16380.00
1391 60 4/30/2023 5/6/2023 273 16380.00
1392 60 4/30/2023 5/6/2023 273 16380.00
1393 6 4/30/2023 5/6/2023 273 1638.00
1696 60 5/9/2023 5/15/2023 273 16380.00
1697 60 5/9/2023 5/15/2023 273 16380.00
1698 60 5/9/2023 5/15/2023 273 16380.00
6 1699 60 5/9/2023 5/15/2023 273 16380.00
1700 60 5/9/2023 5/15/2023 273 16380.00
1701 60 5/9/2023 5/15/2023 273 16380.00
1702 36 5/9/2023 5/15/2023 273 9828.00
2454 70 5/18/2023 5/24/2023 273 19110.00
2455 70 5/18/2023 5/24/2023 273 19110.00
2456 70 5/18/2023 5/24/2023 273 19110.00
2457 70 5/18/2023 5/24/2023 273 19110.00
7 2458 63 5/18/2023 5/24/2023 273 17199.00
2459 70 5/18/2023 5/24/2023 273 19110.00
2460 70 5/18/2023 5/24/2023 273 19110.00
2461 70 5/18/2023 5/24/2023 273 19110.00
2462 21 5/18/2023 5/24/2023 273 5733.00
3306 70 5/25/2023 5/31/2023 273 19110.00
3307 70 5/25/2023 5/31/2023 273 19110.00
3308 70 5/25/2023 5/31/2023 273 19110.00
3309 70 5/25/2023 5/31/2023 273 19110.00
8
3310 63 5/25/2023 5/31/2023 273 17199.00
3311 70 5/25/2023 5/31/2023 273 19110.00
3312 70 5/25/2023 5/31/2023 273 19110.00
3313 70 5/25/2023 5/31/2023 273 19110.00
0 P/Days 3287 TOTAL 896212.00
MB No #REF! Page No.
Name of Work #REF! Place Detail : #REF!
Agency 3788 MREGS
1 E Muster No. #REF! Period of Muster #REF! to #REF!
Previous Reference TMB P.No.
Measurement recorded by: Designnation Sect.ER

It.No Perticulars of Work N L B D/H Qtty. Rate Amount

1 Excavati for Catch /side water gutter in sort of soil.


Avg w 0 0.00 1 0 149.90 1.00 0.55 0.00
2A 2 860.50 1.00 0.55 946.55
For Pipe NP-2 1000mm: 0 8.00 1.00 0.40 0.00
0.00
946.55 104.00 98441.00
Cum

11 Pro. & Laying cement concrete Pipe NP-2 Class of 1000mm diameter in proper line.
Avg w 0 0.00
0 19.00 2.50 0.00
0.00
0.00 407.00 0.00
Rmt

9 Watering & Compaction of embankment formed of materials obtained from the road cutting laying in layers of 20cm to 30cm with vibratory Roller:
Avg w 0 0.00
Maximum Qnty 851.895 2B 1 0.90 1111.44 1000.30
0.00
1000.30 4.00 4001.00
Cum

2 Supplying HM/ Kankar at road site.


Avg w MEASUREMENT: 1 1000.00 3.30 0.20 660.00
Maximum Qnty, 660.00 1 8 3.00 1.80 0.50 21.60
2C 1 1 3.10 2.00 0.60 3.720
1 1 3.00 1.80 0.50 2.700
1 1 3.20 2.15 0.55 3.784
0.00
21.60 187.64 4053.00
cum

3A 1 203 3.00 1.90 0.55 636.29


1 1 3.10 2.00 0.60 3.720
1 1 3.20 2.10 0.55 3.696
1 1 3.20 2.15 0.55 3.784
0.00
636.29 187.64 119393.00
cum

1 0 2.50 1.70 0.40 0.00


0 0 3.10 2.00 0.60 0.000
0 0 3.20 2.10 0.55 0.000
0 0 3.20 2.15 0.55 0.000
It.No Perticulars of Work N L B D/H Qtty. Rate Amount
0.00
0.00 187.64 0.00
cum

8 Spreading HM/kankarat road site. Qtty. Collected VTMB P.No. 547.09


Avg w 0.00 3B 110.80 Qtty. Balance after spreading 0.00
4A 547.09 Qtty. Spread 547.09 43.52 23809.00
cum

10 Compaction of sub-Grade /gravel/metal layers for all widths with power roller/including necessary labour required.
C) For Hard Murum Compaction:
Avg w 0.00 4B 1 1000.00 3.30 3300.00
0.00
3300.00 3.00 9900.00
sqm

3 Supplying trap/granite/stone metal of required size by briging the boulders/Rubble at road


side,80mm.
Avg w Soling 80mm: 4C 1 55 3.00 1.90 0.500 156.75
Maximum Qnty, 495.00 1 1 3.00 2.00 0.50 3.000
1 1 3.10 2.00 0.55 3.410
1 1 2.90 1.95 0.500 2.827
0.00
156.75 526.60 82545.00
cum

5.00 1 79 2.75 1.85 0.550 220.89


1 1 3.00 2.00 0.50 3.000
1 1 3.10 2.00 0.55 3.410
1 1 3.00 1.95 0.500 2.925
0.00
220.89 526.60 116321.00
cum

6A 1 42 2.80 1.95 0.50 114.35


1 1 3.00 2.00 0.50 3.000
1 1 3.10 2.00 0.55 3.410
1 1 3.00 1.95 0.500 2.925
0.00
114.35 526.60 60217.00
cum

1 0 3.05 1.95 0.498 0.00


1 1 3.00 2.00 0.50 3.000
1 1 3.10 2.00 0.55 3.410
1 1 3.00 1.95 0.500 2.925
0.00
0.00 526.60 0.00
cum

1 0 3.00 1.90 0.50 0.00


1 1 3.00 2.00 0.50 3.000
It.No Perticulars of Work N L B D/H Qtty. Rate Amount
1 1 3.10 2.00 0.55 3.410
1 1 3.00 1.95 0.500 2.925
0.00
0.00 526.60 0.00
cum
It.No Perticulars of Work N L B D/H Qtty. Rate Amount
6 Spreading 80mm Metal for road work including sectioning ect.
Avg w 0.00
6B Qtty. Collected VTMB P.No. 491.99
Qtty. Balance after spreading 0.00
Qtty. Spread 491.99 54.52 26823.00
cum

2 Supplying HM/ Kankar at road site.


Avg w 0.00
For WBM Road 80mm Metalling: 1 43 2.90 1.80 0.50 112.23
Maximum Qnty, 184.50 1 1 2.90 1.80 0.50 2.610
Stacks: 6C 1 1 2.90 1.90 0.50 2.755
1 1 2.70 2.00 0.55 2.970
0.00
112.23 187.64 21059.00
cum

7A 1 27 2.90 1.80 0.50 70.47


1 1 2.90 1.80 0.50 2.610
1 1 2.90 1.90 0.50 2.755
1 1 2.70 2.00 0.55 2.970
0.00
70.47 187.64 13223.00
cum

8 Spreading HM/kankarat road site. 7B Qtty. Collected VTMB P.No. 182.70


Avg w 0.00 Qtty. Balance after spreading 0.00
Qtty. Spread 182.70 43.52 7951.00
cum

10 Compaction of sub-Grade /gravel/metal layers for all widths with power roller/including necessary labour required.
A)For 200mm loose (80mm/HM Layer).
Avg w 0.00 7C 1 1000.00 3.30 3300.00
3300.00 4.00 13200.00
sqm

4 Supplying trap/granite/stone metal of required size by briging the boulders/Rubble at road


side,40mm.
Avg w Soling 40mm: 7D 1 70 2.95 1.80 0.55 204.44
Maximu Qnty, 300.00 1 1 3.15 2.00 0.50 3.150
Stacks, 1 1 2.95 1.80 0.55 2.921
1 1 3.10 2.10 0.50 3.255
0.00
204.44 598.52 122358.00
cum

8A 1 32 3.05 1.95 0.50 94.60


1 1 3.15 2.00 0.50 3.150
1 1 2.95 1.90 0.55 3.083
1 1 3.10 2.10 0.50 3.255
0.00
94.60 598.52 56619.00
It.No Perticulars of Work N L B D/H Qtty. Rate Amount
cum
It.No Perticulars of Work N L B D/H Qtty. Rate Amount
1 0 2.95 1.90 0.50 0.00
1 1 3.15 2.00 0.50 3.150
1 1 3.00 1.90 0.55 3.135
1 1 3.10 2.10 0.50 3.255
0.00
0.00 598.52 0.00
cum

6 Spreading 40mm Metal for road work including sectioning ect.


Avg w 0.00
8B Qtty. Collected VTMB P.No. 299.03
Qtty. Balance after spreading 0.00
Qtty. Spread 299.03 54.52 16303.00
cum

5 Supplying Soft murum/ kankar at road site


Avg w 0.00 8C 1 61 2.50 1.60 0.40 97.60
Maximum Qnty, 99.58 1 1 2.50 1.60 0.40 1.60
Stack, 1 1 2.45 1.50 0.45 1.654
1 1 2.60 1.80 0.35 1.638
0.00
97.60 137.22 13393.00
cum

7 Spreading Soft Murum/kankar at road site.


Avg w 0.00 0.00 8D Qtty. Collected VTMB P.No. 97.60
Qtty. Balance after spreading 0.00
Qtty. Spread 97.60 43.52 4248.00
sqm

10 Compaction of sub-Grade /gravel/metal layers for all widths with power roller/including necessary labour required.
B)For 100mm loose (40mm/S.M layer).
Avg w 0.00 8E 1 1000.00 3.00 3000.00
0.00
3000.00 3.00 9000.00
cum

2 Supplying HM/ Kankar at road site.


Avg w 0.00
For Side shoulder: 8F 1 2 1000.00 0.55 0.20 220.00
Maximum Qnty, 220.00 1 180 5.00 0.55 0.40 197.01
Stacks, 1 1 5.00 0.55 0.40 1.100
1 1 5.20 0.50 0.45 1.170
1 1 4.90 0.45 0.50 1.103
0.00
197.01 187.64 36967.00
cum

1 0 5.00 0.55 0.40 0.00


1 1 5.00 0.55 0.40 1.100
1 1 5.20 0.50 0.45 1.170
1 1 4.90 0.45 0.50 1.103
0.00
0.00 187.64 0.00
It.No Perticulars of Work N L B D/H Qtty. Rate Amount
cum

8 Spreading HM/kankarat road site. 8G Qtty. Collected VTMB P.No. 197.01


Avg w 0.00 Qtty. Balance after spreading 0.00
Qtty. Spread 197.01 43.52 8574.00
cum

10 Compaction of sub-Grade /gravel/metal layers for all widths with power roller/including necessary labour required.
C) For Hard Murum Compaction:
Avg w 0.00 8H 2 1000.00 0.55 1.00 1100.00
0.00
1100.00 3.00 3300.00
cum

12 Providing & fixing of RCC precast cement concrete M15 Padestal of size 0.75x0.75x0.2m of km stone.
Avg w 0.00 0.00 0 1.00 0.00
0.00
0.00 262.00 0.00
Nos

13 Information Board. 8I 1 1.00 1.00 1.00


0.00
1.00 2550.00 2550.00
nos

874248.00
0.00
Total
Total Amount of labour work 874248.00
M/days as per NMR 102
Hence wages per day 8571.059
Say, 256
Total Amount of labour work, 26112

Allocation : MREGS
Ch.to.: #REF!
Rs. 26112.00
MB No: 3738
Name of Work: Gawali Dev pandan Rasta.
Place: Redwa
Work Code: 1824013617/RC/1234701962
ABSTRACT
MREGS Skilled STATE Skilled
I.No Item of work Total Quantity Unit Rate Skilled
Amount (40%) Amount (60%)

2 Supplying HM/ Kankar at road site. 1037.60 cum 329.00 136548.00 204822.00
Supplying trap/granite/stone metal of
3 required size by briging the 491.99 Cum 329.00 64746.00 97119.00
boulders/Rubble at road side,80mm.
Supplying trap/granite/stone metal of
4 required size by briging the 299.03 cum 329.00 39353.00 59029.00
boulders/Rubble at road side,40mm.
5 Supplying Soft murum/ kankar at road site 97.60 Cum 329.00 12844.00 19266.00
Watering & Compaction of embankment
formed of materials obtained from the road
9 1000.30 cum 76.00 30409.00 45613.00
cutting laying in layers of 20cm to 30cm
with vibratory Roller:

Compaction of sub-Grade /gravel/metal


10 layers for all widths with power
roller/including necessary labour required.

A)For 200mm loose (80mm/HM Layer). 3300.00 sqm 22.50 29700.00 44550.00
B)For 100mm loose (40mm/S.M layer). 3000.00 sqm 16.00 19200.00 28800.00
C)For Hard murum Road side Blanketting. 4400.00 sqm 16.00 28160.00 42240.00
11 Information Board. 1.00 Nos 6733.00 2693.00 4040.00

Rs. 363653 545479

Royalty charges 0 0
Testing Charges 10720.00 0.00

GST 18% 65458.00 98186.00


Contingencies 2% 7273.00 10910.00
Quality control 1.5% 0.00 0.00
Facilities for labour 2.7% 0.00 0.00

447104 654575
Page 11
STEEL N N L 6 MM ф 8 MM ф 10 MM ф 12 MM ф 16 MM ф 20 MM ф
12 Jali 6MM ф 8MM ф 10MM ф 12MM ф 16MM ф 20MM ф

40 4.00 3.00
No No L
Main 8 MM ф 40 10 2.90 - 1160.00 - - - -
Distt 8 MM ф 40 8 3.90 - 1248.00 - - - -
over lap 8 MM ф 9 2 0.45 - 8.10 - - - -

16 4.00 3.30
No No L
Main 8 MM ф 0 10 2.95 - 0.00 - - - -
Distt 8 MM ф 0 8 3.95 - 0.00 - - - -
over lap 8 MM ф 0 2 0.45 - 0.00 - - - -

0.00 2416.10 0.00 0.00 0.00 0.00


Wt Factor 0.22 0.39 0.62 0.89 1.58 2.47
0 942.28 0 0 0 0 942.28 0.942

942.280 0.942
Construction Of CC Road at #REF!
#REF!
#REF!

1 MB No #REF!

Sana Const Ch Bzr Bill Amount


1 9 200000.00
2 10 200000.00
3 11 200000.00
4 12 200000.00
5 13 200000.00
6 14 200000.00
7 15 200000.00
8 16 22969.00

1422969.00
1
I.No Item of work Quantity Rate Unit Amount

1 Supplying HM/ kankar #REF! 738.69 Cum #REF!

2 Compacting the HM #REF! 19.00 Cum #REF!

GSB - Grading I (Using Screening


3 14.235 2793.35 Cum 39763.00
Type A (13.2) mm Aggregate

#REF!

GST 12.00% #REF!


Insurance 1.00% #REF!

#REF!
4 Royalty charges.(Sand) 0.00 #REF! #REF!

Royalty charges.(Gravel / Murum) #REF! #REF! #REF!


#REF!

Rs #REF!
Say Rs #REF!

2
I.No Item of work Quantity Rate Unit Amount

GSB - Grading I (Using Screening


1 284.80 2793.35 Cum 795542.00
Type A (13.2) mm Aggregate

2 DLC Sub base 11.251 3999.54 Cum 44999.00

840541.00

GST 12.00% 100865.00


Insurance 1.00% 8405.00
I.No Item of work Quantity Rate Unit Amount

109270.00
3 Royalty charges.(Sand) 5.29 237.45 1256.00

Royalty charges.(Gravel / Murum) 51.26 216.25 11085.00


12341.00

962152.00
Say Rs 962200.00

3
I.No Item of work Quantity Rate Unit Amount

1 DLC Sub base 43.19 3999.54 Cum 172728.00

172728.00

GST 12.00% 20727.00


Insurance 1.00% 1727.00

22454.00
12 Royalty charges.(Sand) 20.30 237.45 4820.00

Royalty charges.(Gravel / Murum) 0.00 216.25 0.00


4820.00

200002.00
Say Rs 200000.00
4
I.No Item of work Quantity Rate Unit Amount

1 DLC Sub base #REF! 3999.54 Cum #REF!

2 CC M-30 PCC Rigid pavement 15.776 7449.50 Cum 117523.00

#REF!

GST 12.00% #REF!


Insurance 1.00% #REF!

#REF!
12 Royalty charges.(Sand) #REF! 237.45 #REF!

Royalty charges.(Gravel / Murum) 216.25 0.00


#REF!

Rs #REF!
Say Rs #REF!
5
I.No Item of work Quantity Rate Unit Amount

2 CC M-30 PCC Rigid pavement 23.481 7449.50 Cum 174922.00


I.No Item of work Quantity Rate Unit Amount

174922.00

GST 12.00% 20991.00


Insurance 1.00% 1749.00

22740.00
12 Royalty charges.(Sand) 9.86 237.45 2341.00

Royalty charges.(Gravel / Murum) 216.25 0.00


2341.00

Rs 200003.00
Say Rs 200000.00
6
I.No Item of work Quantity Rate Unit Amount

1 CC M-30 PCC Rigid pavement 23.481 7449.50 Cum 174922.00

174922.00

GST 12.00% 20991.00


Insurance 1.00% 1749.00

22740.00
12 Royalty charges.(Sand) 9.86 237.45 2341.00

Royalty charges.(Gravel / Murum) 216.25 0.00


2341.00

Rs 200003.00
Say Rs 200000.00
7
I.No Item of work Quantity Rate Unit Amount

1 CC M-30 PCC Rigid pavement 34.860 7449.50 Cum 259690.00

2 Cutting transverse contraction joints 791.03 72.00 Rmt 56954.00

3 Contraction joints Sealent 91.21 166.00 Rmt 15141.00

331785.00

GST 12.00% 39814.00


Insurance 1.00% 3318.00

43132.00
12 Royalty charges.(Sand) 14.64 237.45 3476.00

Royalty charges.(Gravel / Murum) 216.25 0.00


3476.00

Rs 378393.00
Say Rs 378400.00
8
I.No Item of work Quantity Rate Unit Amount
I.No Item of work Quantity Rate Unit Amount

1 Contraction joints Sealent 6.39 166.00 Rmt 1061.00


2 Informatory sign board #REF! 9284.00 Nos #REF!

#REF!

GST 12.00% #REF!


Insurance 1.00% #REF!

#REF!
3 Tesring Charges
Standard Consistency Fineness,
Specific Gravity, Setting Time (Initial
1 3370.00 3370.00
and Final), Compressive Strength.
Soundness
Compressive Strength OF C.C.
6 690.00 4140.00
Cube(Set of 3 cubes).

Water Absorption, Specific Gravity.


1 2600.00 2600.00
Impact Value Crushing Value.

Liquid limit and plastic Limit 1 1170.00 1170.00


11280.00

#REF!
Say Rs #REF!
TESTING FREQUENCY STATEMENT (PART-B) MREGS

SR.
ITEM OF WORK TESTS REQUIRED SHORT Amount
NO
1 Supplying 80mm Water absorbtion,impact/crushing value Flakiness index. 1 2600.00
Water absorbtion,impact/crushing value, Sieve analysis Flakiness
2 Supplying 40mm 1 2600.00
index.
3 Supplying of Hard murum Liquid limit/ Plastic limit 2 2760.00
4 Supplying of Sift murum Liquid limit/ Plastic limit 2 2760.00

Rs. 10720.00

Sub Divisional Engineer,


P.W.Sub Division, Chandur Bazar
RECOVERY STATEMENT FOR BILL
1. As per Royalty Statement.
2. As per Testing frequency Statement
#REF!
ROYALTY STATEMENT (PART-B)

Actual
SN Material Qtty Ratio Unit Rate Amount
Quantity

1 Badri,kankar,roda #REF! 1.150 #REF! Sqm 237.45 #REF!

2 Murim #REF! 1.00 #REF! Cum 216.25 #REF!

Total Amount Rs. 0.00

P.W.Sub
TESTING FREQUENCY STATEMENT (PART-B) MREGS

SR.
ITEM OF WORK TESTS REQUIRED SHORT Amount
NO
1 Murum Liquid/Plastic limit 0 0.00
Rs. 0.00

P.W.Sub
RECOVERY STATEMENT FOR BILL
1. As per Royalty Statement.
2. As per Testing frequency Statement
CERTIFICATE :
Certified that the Supplier use private
machinary and material purchase to his own
cost to work site hence recovery of Govt
machinery and material T & P is Nil.

P.W.Sub
Sub Divisional Engineer,
P.W.Sub Division, Chandur Bazar

Sub Divisional Engineer,


P.W.Sub Division, Chandur Bazar

Sub Divisional Engineer,


P.W.Sub Division, Chandur Bazar

Das könnte Ihnen auch gefallen