Sie sind auf Seite 1von 52

HakaGerodur

Technical
TechnischesHandbook
Handbuch

GEROtherm®®Erdwärmesysteme
GEROtherm Geothermal Systems
Zürich Wo Sieto
How uns finden
find us

HakaGerodur
HakaGerodurAG AG

Züric
Giessenstrasse 3
Giessenstrasse 3
hA
Meilen Ricken - St.Gallen CH-8717
CH-8717Benken
Benken
3
Winterthur

Rapperswil Uznach Telefon


Phone +41
+41(0)55
(0)55293
29325
2525
25
Zürichsee Kaltbrunn
Fax
Fax +41+41(0)55
(0)55293
29325
2599
99
Benken sekretariat@hakagerodur.ch
sekretariat@hakagerodur.ch
HakaGerodur www.hakagerodur.ch
www.hakagerodur.ch
Lin
Reichenburg th
A3, Ausfahrt
Zug - Gotthard Reichenburg Chur

Disclaimer
Haftungsausschluss
All
Diethe information
Angaben in thisWerk
in diesem document
wurdenhas mit
been compiled Sorgfalt
grösstmöglicher with thezusammengestellt.
greatest care
possible. All information on directives,
Sämtliche Angaben zu Verordnungen, Nor-
standards or other regulations has been
men oder sonstigen Regelwerken wurden in-
intensively researched.
Intensiv
spiterecherchiert.
of this, HakaGerodur AG accepts
no liabilitykann
Trotzdem for the
dietimeliness,
HakaGerodur correctness
AG keine
and
Gewährcompletely
für derenofAktualität,
this information.
RichtigkeitHa-
und
kaGerodur
Vollständigkeitaccepts no liability
übernehmen. claims for
Sie schliesst jeg-
any damage, of a material or immaterial
liche Haftungsansprüche aus, die sich auf
nature, caused by the use or non-use of
Schäden sowohl materieller als auch immate-
the information provided.
rieller Art beziehen, die durch die Nutzung
oder Nichtnutzung der zur Verfügung ge-
Copyright
stellten Informationen verursacht wurden.
HakaGerodur AG, Benken, Switzerland

Urheberrechte
All rights reserved. Text, pictures, gra-
phics and their
HakaGerodur AG,arrangement are subject
Benken, Schweiz
to copyright protection.
Alle Rechte vorbehalten. Texte, Bilder, Gra-
fiken sowie deren Anordnung unterliegen
Date
dem of publication:
Schutz 03/10/2016
des Urheberrechtes.

Redaktionsschluss: 03.10.2016
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

Table of Contents – Technical Manual for HakaGerodur AG Geothermal Systems

1. Fundamentals of geothermal energy................................................................................................................................ 3


2. General................................................................................................................................................................................. 4
2.1. Meaning of symbols............................................................................................................................................................................4
2.2. Planning and execution.......................................................................................................................................................................4
2.3. Correct use............................................................................................................................................................................................4
2.4. Warranty................................................................................................................................................................................................4
2.5. Notes......................................................................................................................................................................................................4
2.6. Quality mark..........................................................................................................................................................................................4
2.7. Disposal..................................................................................................................................................................................................4
3. HakaGerodur GEROtherm® systems................................................................................................................................... 5
3.1. GEROtherm® geothermal probes / GEROtherm® PUSH.................................................................................................................5
3.2. GEROtherm® coaxial probes...............................................................................................................................................................6
3.3. GEROtherm® soil collectors................................................................................................................................................................6
3.4. GEROtherm® energy piles...................................................................................................................................................................7
3.5. GEROtherm® manholes.......................................................................................................................................................................7
3.5.1. GEROtherm® small manholes................................................................................................................................................8
3.5.2. GEROtherm® manhole types 1 / 2 / 3 / 4............................................................................................................................9
3.5.2.1. Order forms for GEROtherm® Manhole types 1 / 2 / 3 / 4.........................................................................10
3.6. Technical data for GEROtherm® geothermal probes....................................................................................................................10
3.6.1. Technical data for GEROtherm® VARIO.............................................................................................................................12
3.6.1.1. Internal pressure resistance..............................................................................................................................12
3.6.1.2. Buckling pressure resistance............................................................................................................................12
3.6.1.3. Installation..........................................................................................................................................................12
3.6.1.4. Hydraulic pressure loss.....................................................................................................................................12
3.6.1.5. Calculation example showing energy savings with GEROtherm® VARIO................................................13
3.6.2. Technical data for GEROtherm® FLUX...............................................................................................................................13
3.6.2.1. Internal pressure resistance..............................................................................................................................13
3.6.2.2. Installation..........................................................................................................................................................13
3.6.2.3. Hydraulic pressure loss.....................................................................................................................................14
3.6.2.4. Borehole resistance with GEROtherm® FLUX................................................................................................14
3.6.2.5. Calculation example showing energy savings with GEROtherm® FLUX...................................................15
3.6.2.6. Thermal Response Test (TRT)...........................................................................................................................15
3.7. Technical data for GEROtherm® energy piles................................................................................................................................16
3.8. Chemical resistance...........................................................................................................................................................................17
3.9. Pipe series............................................................................................................................................................................................17
3.10. Pressure stages ..................................................................................................................................................................................17
4. Planning and installation of GEROtherm® geothermal probe systems......................................................................... 18
4.1. Planning basics...................................................................................................................................................................................18
4.1.1. Specifications for HakaGerodur AG geothermal systems...............................................................................................18
4.1.2. General planning information.............................................................................................................................................18
4.1.3. Dimensioning of GEROtherm® geothermal probe systems............................................................................................18
4.1.4. Design of SAVE collectors / distributors............................................................................................................................19
4.2. Installation of GEROtherm® geothermal probe systems..............................................................................................................20
4.2.1. General installation guidelines............................................................................................................................................20
4.2.2. Transport / storage of GEROtherm® geothermal probes and components.................................................................21
4.2.3. Sinking GEROtherm® geothermal probes ........................................................................................................................21
4.2.4. GEOtight® fabric packer.......................................................................................................................................................21
4.2.4.1. Possible applications.........................................................................................................................................22
4.2.4.2. Description of components..............................................................................................................................22
4.2.4.3. Installation instructions.....................................................................................................................................22
4.2.4.4. Installation examples .......................................................................................................................................23
4.2.4.5. More information..............................................................................................................................................24
4.2.5. Test procedure after sinking (pressure test / flow test as per SIA 384 / 6:2010)........................................................24
03/10/2016 | EWS-2082

4.2.6. Leak test as perSIA 384/6 (issue: 2010) ...........................................................................................................................24


4.2.7. Backfilling the borehole.......................................................................................................................................................25

1
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

5. Planning / installation regulations for soil collectors..................................................................................................... 25


6. Planning / installation regulations for energy piles....................................................................................................... 26
7. Installation of HakaGerodur SAVE collectors / distributors and manholes.................................................................. 26
7.1. Installation of HakaGerodur SAVE collectors / distributors.........................................................................................................26
7.2. Installation of HakaGerodur manholes...........................................................................................................................................27
7.2.1. Certificate of conformity......................................................................................................................................................27
7.2.2. Explications avant le montage............................................................................................................................................27
7.2.3. Caractéristiques du sol.........................................................................................................................................................27
7.2.4. Foundation.............................................................................................................................................................................27
7.2.5. Groundwater / Negative buoyancy....................................................................................................................................27
7.2.6. Earthwork...............................................................................................................................................................................27
7.2.7. Traffic loads............................................................................................................................................................................28
7.2.8. General...................................................................................................................................................................................28
8. Connecting pipes to the collector / distributor............................................................................................................... 28
9. Filling the GEROtherm® geothermal system and pressure testing................................................................................ 29
10. Operation of GEROtherm® geothermal systems............................................................................................................. 30
11. Maintenance of GEROtherm® geothermal systems........................................................................................................ 30
12. Shutting down geothermal systems................................................................................................................................ 30
13. Tables / Diagrams.............................................................................................................................................................. 31
13.1. Calculation of pressure loss in the brine circuit.............................................................................................................................31
13.1.1. Definition of the sample project.........................................................................................................................................31
13.1.2. Calculation of brine volume in the system........................................................................................................................31
13.1.3. Calculation of pressure loss in the system........................................................................................................................31
13.2. Pressure loss tables............................................................................................................................................................................32
13.2.1. Pressurised water pipes PE100-RC, S5, SDR 11, PN 16..................................................................................................32
13.2.2. Pressurised water pipes PE100-RC, S4, SDR 9, PN 20.....................................................................................................34
13.3. Long-period internal pressure diagram PE100..............................................................................................................................35
13.4. Diagram of relative pressure loss.....................................................................................................................................................36
13.5. Diagram of frost-proofness..............................................................................................................................................................36
13.6. Diagram of conductivity....................................................................................................................................................................37
13.7. Coil dimensions of roll packages.....................................................................................................................................................38
13.7.1. Coil dimensions of geothermal probes PN 166...............................................................................................................38
13.7.2. Coil dimensions of geothermal probes PN 20..................................................................................................................39
13.7.3. Coil dimensions of geothermal probes VARIO.................................................................................................................39
13.7.4. Coil dimensions of geothermal probes FLUX...................................................................................................................40
13.7.5. Coil dimensions of injection pipes......................................................................................................................................41
13.8. Drilling log template..........................................................................................................................................................................42
13.9. Sample test and acceptance report.................................................................................................................................................43
13.10. Sample record for the heated coil welding of pipes....................................................................................................................44
14. Certificates for GEROtherm® geothermal systems.......................................................................................................... 45
14.1. SKZ........................................................................................................................................................................................................45
14.2. Kiwa – Komo......................................................................................................................................................................................46
14.3. ISO 9001:2008...................................................................................................................................................................................47
15. Appendix............................................................................................................................................................................ 48
15.1. Table of figures...................................................................................................................................................................................48
15.2. List of tables........................................................................................................................................................................................49
16. HakaGerodur AG sites....................................................................................................................................................... 50
03/10/2016 | EWS-2082

2
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

1. Fundamentals of geothermal con of hope for the supply of energy. It The improved insulation standards for
energy can be used to replace fossil fuels, like oil new buildings (Minergie / Passive house
and gas, and will considerably reduce the standard) provide good prerequisites for
Geothermal energy is the energy that emissions of CO2. heat pumps, as lower flow temperatures
is stored in the form of heat under the in the heating circuit are needed to ser-
Earth‘s solid surface. Geothermal energy can be exploited as a vice the reduced need for heating. The
regenerative energy source through the efficiency and therefore the cost-effec-
use of geothermal probes. By means of a tiveness of geothermal systems is on the
30 – 50% of this energy originates from rise. The cost of a brine-water heat pump
the time of the Earth‘s creation and can heat carrier (generally a water / glycol mix-
ture) and using a heat pump, geothermal system is also falling with lower heat re-
be described as the residual heat of the quirements. The same applies to buildings
processes that took place at that time. The energy can be made available for the he-
ating of buildings and for the production in which insulation is retrofitted.
main part, around 50 – 70%, is the result
of the continuous decay of radioactive of hot water. Heat pumps and geothermal
elements in the Earth‘s interior; a small probes can also be used for the air con-
remainder is due to direct sunlight and/ ditioning of buildings, by releasing excess
or the indirect heat exchange with the air room heat into the subsoil.
or rainwater seeping through the Earth‘s
surface. It is now possible to air condition buildings
using geothermal probes, geothermal
Temperature fluctuations during the cour- energy storage and energy piles, without
se of a day can be detected down to a the need to make use of energy-intensive
depth of around 50 cm, while seasonal chillers. When you consider both possib-
differences can be found down to depths le uses – heating and cooling – from an
of 10 – 20 metres. The soil temperature economical aspect, the geothermal soluti-
below 20 metres is virtually constant. In on becomes even more efficient and eco-
Central Europe, the soil temperature at nomically attractive. The savings that can
this depth is approximately 11 to 12°C. be made currently lie at around 30 – 45%
Below this, the area with definable geo- compared to oilboilers and
thermal gradients unaffected by the sur-
face starts – in other words, the area with 20 – 30% compared to gas-conden-
a constant increase in temperature with sing boilers. Combined brine-water heat
increasing depth (around 3K per 100 pumps use a very high percentage of re-
metres). The temperature at a depth of newable energy in the form of geothermal
500 m in the Earth‘s mantle is a constant energy to provide heat. 100% of the ther-
25 – 30°C and 35 – 45°C at a depth of mal energy comes from 75% geothermal
1000 m. Geothermal energy is becoming energy and 25% drive energy. Brine-water
increasingly important, as the primary heat pumps therefore use energy for he-
energy is obtained through the utilisation ating, cooling and the production of hot
of an inexhaustible, regenerative energy water in an extremely efficient manner.
source. It has therefore become a bea-

Near
y -sur
erg f ac
a l en eg
rm eo
o the t he
rm
ge al
ep e
Geothermal probes
ne
De
Usage of mine water Ground collector
r gy
Thermal water Energy piles

Earth crust
Storage
Upper mantle

Sub-mantle

Outer core
03/10/2016 | EWS-2082

rc
Inne ore

Figure 1: Overview of geothermal energy

3
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

)) Correct and proper use equally con-


cerns the observance of the separate
operating and installation instructions.

2.4. Warranty

HakaGerodur AG accepts no liability for


any damage that occurs as a result of im-
proper use, incorrect use or work carried
out by untrained persons, including third
parties. Any modifications to components
and/or the use of non-original parts will
lead to the rejection of any warranty
claims for the complete GEROtherm® sys-
tem.

2.5. Notes

)) Every delivery must be checked for


Figure 2: Energy balance of near-surface geothermal energy completeness.
)) Progress of site work must be conti-
nuously documented in writing and
with diagrams to enable all pipe runs
With near-surface geothermal energy, 2. General to be traced, possibly for any future
geothermal heat is available in a suffi- work that needs to be done.
cient quantity to us all. This means that 2.1. Meaning of symbols )) All documents and information on the
everyone can make use of heat from the system must be retained.
Earth for the heating and cooling of indi-
vidual houses as well as whole apartment II Attention must be observed for cor-
blocks. Even large office and commercial rect and proper implementation.
buildings can be air conditioned in this )) Please observe the information! 2.6. Quality mark
way with ease. Although near-surface
geothermal energy is available everywhe- GEROtherm® pipes and distributors /
re, its utilisation is not possible in cases 2.2. Planning and execution collectors are made of PE100-RC in ac-
where boreholes cannot be drilled due to cordance with EN 12201-2 and are con-
groundwater- protection regulations. tinuously monitored by an independent
II All geothermal systems must be de-
quality control centre in line with Guide-
signed and installed in line with
The advantage of using near-surface geo- line HR3.26 issued by the South German
SIA 384 / 6 2010 or VDI Directive
thermal energy as a heat source is that no Plastics Centre (SKZ). The complete GE-
4640.
additional heating system is needed. The ROtherm® system is one of the first and
heat provided from just the heat pump is only geothermal systems to be certified in
fully sufficient to heat and cool detached accordance with this strict policy.
and semi-detached houses, as well as lar- 2.3. Correct use
ge buildings, such as apartment blocks or
commercial and industrial properties. The GEROtherm® geothermal systems are pro- 2.7. Disposal
energy is available locally and there is no duced in accordance with the accepted re-
need to transport the heating fuel, which i gulations and standards and are checked
produces CO2 emissions in turn. Dispose of accessories and packaging in
against safety standards. However, incor-
an environmentally-friendly manner.
rect or improper use can result in danger
to life and limb in addition to damage to
material property. The components of GE-
ROtherm® systems are designed for use as
heat carriers for heat pump systems with
brine circuits. Any other use or additional
use is regarded as improper.
03/10/2016 | EWS-2082

4
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

3. HakaGerodur GEROtherm® systems Near-surface geothermal energy (8 – 25°C)


GEROtherm ®
GEROtherm® GEROtherm® GEROtherm®
Near-surface geothermal energy, also
Geothermal Coaxial probes Soil collectors Energy piles
known as shallow geothermal energy,
probes
includes all geothermal energy installa-
tions within a depth range of 0 to 400 50 – 400 m deep 10 – 50 m deep 1 – 2 m deep 10 – 30 m deep
m, although geothermal probes are also Closed total system certified in line with SKZ HR 3.26
possible down to a depth of 400 m. The
Closed total system certified in line with SKZ HR 3.26
following systems are possible with ne-
ar-surface geothermal energy: Heat generation (heating and the provision of hot water) and cooling and
energy storage

Table 1: Near-surface geothermal energy systems


3.1. GEROtherm® geothermal probes /
GEROtherm® PUSH
The geothermal probe system used com- • Two geothermal probe heads or
prises the following: connecting parts (Y-sections), which
The HakaGerodur AG GEROtherm geo- ®
• Two geothermal probe feet, PN20, connect the vertical pipes to the hori-
thermal probe system is designed to make
U-shaped, with dirt collector and a mini- zontal connecting pipes leading to the
use of near-surface geothermal energy
mum pressure drop of < 10 mbar at 1.0 SAVE collector / distributor or directly to
systems (geothermal heating and geother-
m/s, in compliance with VDI guidelines, the heat pump
mal cooling). Non-standard geothermal
sheet 2 / chapter 5.2.2 „Production and
systems are produced from closed and
testing of geothermal probes“; and The South German Plastic Centre (SKZ)
maintenance-free high-quality polyethyle-
equipment for fixing weights as instal- published guidelines for the testing and
ne pipe systems. The heat is transported
lation aids, and a support beam for the monitoring of the pipe system HR 3.26
by a liquid heat carrier, such as a water /
GEROtherm® PUSH protective and im- in April 1999 entitled „Pipes and pipeline
glycol mixture (brine). The connected heat
pact-resistant sleeve [patent-pending] components made of PE100 for geother-
pump generates the necessary tempera-
• Four pipes with double-U probes, mal probe pipe systems.“ Apart from tes-
ture level for heating and cooling and for
pipe series [S5/ SDR 11/ PN 16], [S4/ ting and monitoring the PE 100-RC pipes
the provision of hot water.
SDR 9/ PN 20], [VARIO PN 16 to PN and fittings, the guidelines also describe
The HakaGerodur AG GEROtherm® geo-
20] or [FLUX PN 14 bis PN 32 bar] the testing and monitoring of the possible
thermal probe system is an environmen-
made of PE100-RC or PE100-RT,de- welding processes, such as
tally-friendly, qualitatively safe and very
pending on the installation depth of • Heating element sleeve welding (HD)
economical geothermal probe system that
the geothermal probe with outer pipe • Heating coil welding (HM)
has been in use for over 25 years. GERO-
diameters of 25, 32, 40 and 50 mm • Heating element butt welding (HS),
therm® geothermal probes are sunk into
and lengths of 50 to 400 metres; with which are used to connect the pipes and
boreholes with a depth of up to approx.
double metre marks and flow direction fittings. GEROtherm® geothermal probes
400 metres.
indicators (Flow / Return) and the complete GEROtherm® system,
manufactured by HakaGerodur, have suc-
cessfully passed the stringent initial test
and the half-yearly supervisory reviews in
accordance with Guideline HR 3.26. In the
test and monitoring provisions, the SKZ
confirms a service life of at least 100 years
for a pipe system that meets these con-
ditions. The HakaGerodur GEROtherm®
geothermal probe system therefore has a
service life of 100 years at an operating
temperature of 20°C in accordance with
EN 12201-2.
03/10/2016 | EWS-2082

Figure 3: Overview of GEROtherm® systems

5
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

Every GEROtherm® geothermal probe pro- 1 Trademark


duced carries a manufacturing certificate 2 Product name

in compliance with EN 10204 2.2. Users 3 Article number with barcode

therefore have the certainty that all geo- 4 Serial number with barcode
thermal probes supplied correspond to  5 Production date
the required standards as per the relevant 6 QSP = Quality self-inspecti-
product standards and that all the results  QSP
on; «237» = identification
of the internal product tests are explicitly  237
number of inspector
available for each product. This manufac-   7 Manufacturing certificate in
turing certificate guarantees end-to-end line with EN 10204 2.2
traceability of all parameters back to the   8 System certificate SKZ
raw material batch and the associated test H3.26 / A278
results provided by the supplier. 
9 System certificate KOMO
Figure 4: GEROtherm® manufacturing certificate for K84660/01
)) An installation certificate can also geothermal probes 10 Manufacturer‘s address
be produced and printed online at:
http://www.hakagerodur.ch by ente-
ring the details of the manufacturing
certificate.
At 1800 h/a At 2400 h/a
(heating) (heating + hot water)
Subsoil Specific extraction capacity Specific extraction capacity
3.2. GEROtherm® coaxial probes Dry, non-cohesive 10 W/m 2
8 W/m2
soil
The GEROtherm® KOAX coaxial probe is Cohesive soil, moist 20 – 30 W/m2 16 – 24 W/m2
an addition to the proven double-U geo-
thermal probes. Water-saturated sand/ 40 W/m2 32 W/m2
A simple coaxial probe is produced by in- gravel
serting two 63 mm and 40 mm diameter Table 2: Possible extraction capacity of soil collectors
pipes into one another.
3.3. GEROtherm® soil collectors II To avoid damage to the GEROtherm®
The brine liquid flows down through the soil collectors, the system must be
annular gap and up through the inner pressurised when being covered over.
Soil collectors are used for detached and
pipe, heating the liquid in heating mode
semi-detached houses in rural areas. Heat
and cooling it down in cooling mode.
is extracted by horizontal soil collectors Various soil collector systems with the cor-
in parts of the land that have not been responding approvals are used depending
The capacity of a coaxial probe with dia- developed. Heat is supplied to these sys- on the laying process used for the soil col-
meter 63 / 40 corresponds approximately tems, laid at a maximum depth of 2 me- lectors.
to that of a 32 mm-diameter double-U tres, by rain water and by solar radiation.
probe. The pressure rating of the outer It is therefore vitally important to ensure )) GEROtherm® PE 100-RC soil collec-
pipe is SDR 17, i.e. PN 10. The rigidity of that the extraction area remains free from tor pipe (good point load and crack
the pipe is therefore less than with SDR 11 development and it is essential to prevent resistance) with SKZ HR3.26 / A278
and installation is simpler. GEROtherm® the calculated area from being reduced. geothermal energy system monitoring
KOAX can be used in place of a double-U Soil collectors require a large surface area when laying without a bed of sand
probe with a diameter of 32 up to a depth and, for this reason, cannot be used ever-
of 50 metres. They have been successfully ywhere. The possible specific extraction
used with angled drilling processes. capacities of soil collectors depend on the The use of the highest quality polyethy-
available subsoil and can be taken from lene materials currently available enab-
the above Table 2 in accordance with VDI les the installation to be designed more
4640. Precise performance data can be cost-effectively by avoiding the necessity
found in VDI 4640 sheet 2 “Thermal utili- for a bed of sand. The latest generation
sation of the subsoil“. of polyethylene geothermal pipe systems
(so-called RC types) are used here. These
point load and crack-resistant geothermal
energy pipes are approved for laying wi-
thout a bed of sand. The lower additional
cost of the GEROtherm® KIT with PE100-
RC collectors saves on the expensive repla-
cement of the excavated material by re-
using it for refilling.
03/10/2016 | EWS-2082

6
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

3.4. GEROtherm® energy piles 3.5. GEROtherm® manholes

Energy piles are foundation piles (drilled HakaGerodur AG offers factory-connec-


or driven piles), which are fitted internally ted fully plastic shafts made of LD/HD-PE
with HakaGerodur PE100-RC plastic pipes in which geothermal probes, soil collec-
or “short“ GEROtherm® PE100RC geo- tors and energy baskets converge outsi-
thermal probes (25 or 32 mm diameter) de of the building. The use of manholes
as heat exchangers. Energy piles are pre- makes time-consuming processes, such as
dominantly deployed when constructing core drilling and fixing and insulation of
buildings that require piles to be sunk (pri- the SAVE, redundant. GEROtherm® man-
marily larger buildings). holes are available as small manhole types
S + M and manhole types 1– 4.
A differentiation is made between two
models:
• Drilled piles consist of reinforcing bas-
kets, in which the plastic pipes are laid
in a looped pattern or 10 – 20 m long
GEROtherm® geothermal probes are
fixed. Once fixed, the energy piles are
sunk into a borehole and the borehole
is then topped up with concrete.
• With driven piles, the GEROtherm®
energy pile has already been encased in
the factory and cast in place with con-
crete. Driven piles are delivered com-
plete to the building site and rammed
into the subsoil. It is important to ensure
that the pipe connections at the ends of
the piles are not damaged in this pro-
cess. Depending on the subsoil, the pile
and pipes can be exposed to high tem-
peratures during piling, in which case
the pipes must be cooled with water.

)) Energy piles generally need to be cal-


culated by qualified specialists with
regard to heat and cooling extraction
and the statics of the piles.
03/10/2016 | EWS-2082

7
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

3.5.1. GEROtherm® small manholes

Small manhole Type S Type M


General
Manhole material LD-PE LD-PE
Colour Black Black
Construction Vertical Vertical
Height including cover 910 mm 1310 mm
Dimension at base 750 mm 1130 mm
Negative buoyancy at base Yes Yes
Cover
Design centric centric
Dimension Ø 625 mm Ø 650 mm
Material LD-PE LD-PE
Max. load 200 kg 200 kg
Seal rainwater-tight rainwater-tight
Odour-tightly sealed No No
Application Can be walked upon, cycle path, gravel Can be walked upon, cycle path, gravel
path, garden path, garden
Installed collector / distributor
Dimension of collector / distributor SAVE 97 SAVE 125
Max. volumetric flow of brine circuit 5.4 m3/h 16.2 m3/h
Connection dimensions 40 / 50 mm 40 / 50 mm
Number of connections 2– 4 4–8
Shut-off valves Ball valve Ball valve
Regulating valves Inline Setter 20 –70 l/min Inline Setter 20 –70 l/min
Vent valve No No
Heat pump outlet
Dimension 63 mm 75 –110 mm (depending on connection)
Main shut-off valve None None
Thermal
Max. operating temperature + 40°C + 40°C
Min. operating temperature – 20°C – 20°C

Table 3: Overview of GEROtherm® small manholes


03/10/2016 | EWS-2082

8
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

3.5.2. GEROtherm® manhole types 1 / 2 / 3 / 4

Manhole Type 1 Type 2 Type 3 Type 4


General
Manhole material HD-PE HD-PE HD-PE HD-PE
Colour Black Black Black Black
Construction Vertical Horizontal Horizontal Horizontal
Height including cover ≈ 1400 mm ≈ 1300 – 1500 mm ≈ 1500 – 1700 mm ≈ 2300 mm
External dimension of basic pipe 1000 / 1200 mm 1000 / 1200 mm 1200 / 1400 mm 1960 mm
Negative buoyancy Individual Individual Individual Individual
Transport option Crane eyelets Crane eyelets Crane eyelets Crane eyelets
Pipe inlet connection Pressurised Pressurised Pressurised Pressurised
water-tight water-tight water-tight water-tight
Use in groundwater Up to 10 mWS Up to 10 mWS Up to 10 mWS Up to 10 mWS
Customised manufacture Yes Yes Yes Yes
Integration of LED light Optional Optional Optional Optional
Integration of sump pump Optional Optional Optional Optional
Integration of other fittings Optional Optional Optional Optional
Cover
Design Eccentric Offset Offset Offset
Domed entry de 630 mm de 630 mm de 630 mm de 630 mm
Material Cast iron Cast iron Cast iron Cast iron
Load A15, B125, D400 A15, B125, D400 A15, B125, D400 A15, B125, D400
Seal Impermeable to rain- Impermeable to rain- Impermeable to rain- Impermeable to rain-
water water water water
Sealed odour-tight Yes Yes Yes Yes
Application Car parks, roads Car parks, roads Car parks, roads Car parks, roads
Entry PE steps PE steps Optional V2A / Alu / Optional V2A / Alu /
PE ladder PE ladder
Level adjustment on site Optional Optional Optional Optional
Sealed from groundwater Optional Optional Optional Optional
Installed collector / distributor
Dimension of collector / distributor SAVE 97 / 125 SAVE 125 / 180 / 250 SAVE 125 / 180 / 250 SAVE 125 / 180 / 250
Max. volumetric flow of brine 5.4 / 16.2 m /h
3
16.2 / 35 / 70 m /h
3
16.2 / 35 / 70 m /h
3
16.2 / 35 / 70 m3/h
circuit (extendible) (extendible) (extendible)
Connection dimensions 32 / 40 / 50 mm 32 / 40 / 50 mm 40 / 50 mm 40 / 50 mm
Number of connections 2–5 6 – 11 12 – 36 37 and above
Shut-off valves Ball valve Ball valve Ball valve Ball valve
Measuring range of regulating 8-30 l/min 8-30 l/min 8-30 l/min 8-30 l/min
valves 10-25 l/min 10-25 l/min 10-25 l/min 10-25 l/min
20-60 l/min 20-60 l/min 20-60 l/min 20-60 l/min
20-70 l/min 20-70 l/min 20-70 l/min 20-70 l/min
Heat pump outlet
Dimension 63 – 110 mm 63 – 250 mm 63 – 250 mm 63 – 250 mm
Main shut-off, shut-off valve No Optional Optional Optional
Thermal
Max. operating temperature + 40°C + 40°C + 40°C + 40°C
03/10/2016 | EWS-2082

Min. operating temperature – 20°C – 20°C – 20°C – 20°C

Table 4: Overview of GEROtherm® manhole types 1 / 2 / 3 / 4

9
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

3.5.2.1. Order forms for GEROtherm®


Manhole types 1 / 2 / 3 / 4

Forms for types 1 – 4 can be comple-


ted via the following link for enqui-
ries and orders about specific projects:
www.hakagerodur.ch

These forms form the basis for a specific


quotation for a building or to order man-
holes.

3.6. Technical data for GEROtherm®


geothermal probes

GEROtherm® geothermal probes are


made of high-grade polyethylene mate-
Figure 5: Total greenhouse gas emissions in the manufacture, transport and disposal of
rials (PE100-RC (Resistance to Crack)) or
different materials
PE100-RT (Raised Temperature). These
(Source: Georg Fischer GmbH, www.georgfischer.de)
materials have optimum properties for
geothermal applications, such as:
Only new material that has been proces- geothermal systems. In summer, the high
• Long service life (100 years @ 20°C; EN sed after successfully passing the inco- level of solar radiation and thus the high
12201-2) ming goods inspection and thus contains thermal gain by the collectors is balanced
• Low hydraulic resistance no recycled material is used as the starting out by the delayed heat requirement by
• No corrosion problems, as fully plastic material (granulate) for the production of the heating system in winter. The ener-
pipes HakaGerodur GEROtherm® geothermal gy gained in the collectors is fed into the
• Resistant to cold and heat probe systems. The relevant parameters soil in summer by means of a geothermal
• Impact-resistant are continuously monitored throughout probe after reducing its temperature by a
• Installation-friendly modular system the extrusion process. Fully automatic heat exchanger (< 25°C).
• Optimum safety with regard to polluti- measuring technology is used in each
on of the soil (drinking water) extrusion line for 100% inspection of Geothermal probes can be selected from
• Patented probe foot (CH Patent 687 the geothermal probe with regard to its a range of different materials depending
268, EU Patent 1 036 974, and other dimensions, wall thickness and pipe sur- on the different locational factors of the
patents pending) faces. The pipes are automatically discar- property. The following matrix provides an
ded in the event of deviations from the overview of the different material proper-
defined parameter limit values, ensuring ties. The figures given are averages.
Polyethylene has been used as a pipe ma-
that any geothermal probes whose quality
terial in the service supply sector (drinking
has been impaired do not leave the pro-
water, heating, gas, industry etc.) for 60
duction plant.
years. This has resulted in many years of
In addition, production samples are in-
experience in the manufacturing, proces-
spected at defined regular intervals with a
sing and use of this material. The polyethy-
long-period internal pressure test.
lene types used, PE100RC and PE100-RT,
GEROtherm® geothermal probes and the
permit a long service life of 100 years at
complete GEROtherm® system, manufac-
20°C in line with the applicable ISO, EN
tured by HakaGerodur, have successfully
and DIN standards (EN 12201-2).
passed the stringent initial test and the
The joining processes, such as butt wel-
half-yearly supervisory reviews in accor-
ding (HM) and heating coil welding (HW),
dance with SKZ Guideline HR 3.26. In the
are well tested and require no other ma-
test and monitoring provisions, the SKZ
terials. There is therefore no need for seals
confirms a service life of at least 100 years
or screw fittings in the soil, as these are
for a pipe system that meets these con-
material-locking joints. The flexibility and
ditions. The HakaGerodur GEROtherm®
impact resistance of the material also per-
geothermal probe system therefore has a
mits the problem-free installation of the
service life of 100 years (at an operating
components, even at extreme tempera-
temperature of 20°C in accordance with
tures.
EN 12201-2).
Unlike other pipe materials, polyethylene
has an optimum ecological balance (see
PE-RT is used if the geothermal probe is
03/10/2016 | EWS-2082

Figure 5).
required to withstand higher temperatu-
res, which may be the case with hot ther-
mal springs or a combination or solar and

10
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

Properties Standard PE100-RC PE100-RT


Physical
Density ISO 1183 0.96 g/cm3 0.94 g/cm3
Pipe roughness acc. to Prandtl-Colebrook 0.03 mm 0.03 mm
Coefficient of permeability at 20°C
0.072 cm3/m x bar x d
Oxygen O2
– 0.056 cm3/m x bar x d
Methane CH4
0.280 cm3/m x bar x d
Carbon dioxide CO2
Minimum bending radius for pipes @ 0°C – 50 x dn 50 x dn
Minimum bending radius for pipes @ 10°C – 35 x dn 35 x dn
Minimum bending radius for pipes @ 20°C – 20 x dn 20 x dn
Mechanical
Modulus of tension (23°C, v=1 mm/min, ISO 527-1, -2 900 MPa 850 MPa
secant)
Line tension (23°C, v=50 mm/min) ISO 527-1, -2 23 MPa 22 MPa
Tensile strain (23°C, v=50 mm/min) ISO 527-1, -2 9% 8%
FNCT (4.0MPa, 2% Arkopal N 100, 80°C) ISO 16770 >/=8760h >/=350h
Elongation at break EN 638 >/= 350% >/= 760 %
HS, HD, HM pressing / HS, HD, HM pressing /
Available joining technologies –
clamping clamping
DIN 53752 1.8 x 10-4 K-1 1.8 x 10-4 K-1
Average thermal coefficient of elongation
DIN 52328 or 0.18 mm/K or 0.18 mm/K
Effect
Impact strength ISO 179 no fracture no fracture
Hardness
Shore hardness (Shore D (3 sec)) ISO 868 63 59
Thermal
Max. operating temperature – + 40°C + 95°C
Min. operating temperature – – 20°C – 40°C
Thermal conductivity DIN 52612 0.42 W/mK 0.41 W/mK
Storage
Max. recommended storage time after
– 5 a* 5 a*
production date
UV stabilisation – Yes* Yes*

Table 5: Material properties of GEROtherm® geothermal probes

* UV resistance is ensured with black PE Ý The pipe material used by HakaGero-


pipes through the addition of soot. As the dur AG is stabilised in a comparable man-
sole manufacturer, LyondellBasell (former- ner; implying that a storage period of 5
ly Höchst AG) has published investigations years should present no problems at our
in the past in which black Hostalen pipes latitude.
were exposed to outside weathering in
Frankfurt for up to 18 years, and no si- )) The figures given are guideline valu-
gnificant deterioration of the long-period es and can vary depending on the
internal pressure could be measured. processing processes. In most cases,
they represent the average values of
measurements performed on several
samples. The stated technical proper-
ties are only intended as a planning
guide and do not represent guaran-
teed properties.
03/10/2016 | EWS-2082

11
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

3.6.1. Technical data for GEROtherm® Wall thickness Internal pressure Buckling pressure
VARIO resistance resistance*

GEROtherm® VARIO geothermal probes


are available for drilling at depths of more
than 160 metres with depth-dependent
reliability and safety. They combine the
positive properties of many well-known
geothermal probes. Apart from the nor-
mal demands placed on GEROtherm®
geothermal probes, the following proper-
ties are also beneficial:

• The hydraulic pressure loss is significant-


ly lower than with PN 20 geothermal
probes
• The internal pressure resistance is gu-
aranteed depth-dependent up to 200 * at 20°C / 1 h in compliance with SIA 384/6

metres (20 bar).


• Significantly improved buckling pressu- Figure 6: Wall thickness distribution with internal pressure and buckling pressure re-
re resistance at lower depths. sistance of a GEROtherm® Vario
• Optimum heat transfer
• Fully plastic solution and thus cor- pressure must be calculated to prevent 3.6.1.4. Hydraulic pressure loss
rosion-resistant with a service life of buckling. With wash drilling, this external
over 100 years in compliance with over-pressure is caused by the wash dril-
SIA 384 / 6. The optimised GEROtherm® VARIO probe
ling emulsion. A calculation of the maxi- pipe reduces hydraulic pressure loss and
• The patent number for this geothermal mum buckling pressure is required here.
probe is EP 2 706 308. thus also the energy consumption of the
• The complete geothermal probe is certi- brine circulation pump, resulting in signi-
fied by the South German Plastics Cen- ficant energy cost savings calculated over
tre (SKZ). the service life of the system.
GEROtherm® VARIO geothermal probes
3.6.1.3. Installation offer improved pressure loss at a depth of
180 to 250 metres compared with a PN 20
3.6.1.1. Internal pressure resistance The geothermal probe is delivered on a geothermal probe
pallet. The probe can be installed using
GEROtherm® VARIO meets the minimum a conventional reel. The geothermal
internal pressure resistance requirements probe is compatible with all installation
of 16 bar. In the lower range, it can wi- aids, such as GEROtherm® PUSH, weights
thstand up to 20 bar depending on the etc.… Transport and coil dimensions are
length. identical to the double-U probe Ø 40 mm.

3.6.1.2. Buckling pressure resistance

Buckling is understood as meaning the de-


formation of the pipe cross-section into a
Pressure losses [mbar]

kidney-shaped form by external over-pres-


sure. Fundamentally, pipes that are laid in
water or soil above the groundwater level
and where the hydrostatic pressure of the
ground water is greater than the internal
03/10/2016 | EWS-2082

Probe length [m]

Table 6: Comparison of the pressure losses of GEROtherm® VARIO and PN 20

12
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

3.6.1.5. Calculation example showing


Wall thickness Internal pressure Buckling pressure
energy savings with GEROtherm® resistance resistance*
VARIO

• Heat carrier: ethylene glycol 20%


• Medium temperature: 12°C
• Volumetric flow per geothermal probe:
1.8 m3/h
• Length of geothermal probe: 200 m
• Design of geothermal probe: double-U
Ø 40 mm
• Brine circulation pump: Grundfos MAG-
NA 80 – 60 F

• Operational hours of the system per


year: 2400 h
• Number of geothermal probes: 10
• Energy saving: 66 kWh / year
• CO2 savings: 38 kg / year
• Energy cost savings: up to 13%
• Pressure loss reduction: 16% less
than with PN 20

* at 20°C / 1 h in compliance with SIA 384/6

300 Figure 7: Wall thickness distribution and pressure resistance of a GEROtherm® FLUX
geothermal probe
250 267
224
Pressure loss [mbar]

200 • Greater safety thanks to internal pres- 3.6.2.2. Installation


sure resistance up to a depth of 320
150
metres. The geothermal probe is delivered on a
100 • Improved buckling pressure resistance pallet. The probe can be installed using
provides benefits with heavier or more a conventional reel. The geothermal pro-
50
conductive compressed material. be is compatible with all installation aids,
0 • Optimum heat transfer such as GEROtherm® PUSH, weight ves-
GEROtherm®PN20 GEROtherm®VARIO
• Fully plastic solution and thus cor- sels, cast weights etc. GEROtherm® PUSH
Table 7: Comparison of pressure losses rosion-resistant with a service life of is an integral part of GEROtherm® FLUX.
GEROtherm® PN 20 / VARIO over 100 years in compliance with SIA
384 / 6.
• GEROtherm® -Vario geothermal probe • The patent number for this geothermal
offers the excellent safety of a PN 20 probe is EP 2 706 308.
geothermal probe, while at the same • The complete geothermal probe is certi-
time increasing efficiency. fied by the South German Plastics Cen-
tre (SKZ).
• Maximum diagonal dimension together
with the GEROtherm® PUSH of 121 mil-
3.6.2. Technical data for GEROtherm® limetres
FLUX • Use of conventional tools.
• SKZ certificate no. A724
The new pressure-resistant GEROtherm®
FLUX geothermal probes are now availa-
ble for drilling depths of up to 320 metres
3.6.2.1. Internal pressure resistance
with difficult geological conditions and
deep boreholes. They combine the posi-
tive properties of many well-known geo- The special design and construction of the
thermal probes. Apart from the normal pipes means that they have an internal
demands placed on GEROtherm® geo- pressure resistance of up to 32 bar, exp-
thermal probes, the following properties laining why geothermal probes can also Figure 8: Dimensions of the probe foot
are also beneficial: be used even in difficult geological con- GEROtherm® FLUX
ditions.
03/10/2016 | EWS-2082

• The hydraulic pressure loss is significant-


ly lower than with a PN 20 geothermal
probe.

13
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

3.6.2.3. Hydraulic pressure loss


Comparison of pressure losses
The optimised GEROtherm FLUX pro- ® 440
be pipe significantly reduces hydraulic 420
400
pressure losses and thus also the ener-
380
gy consumption of the brine circulation
360
pump, enabling considerable cost savings
340
over the service life of the system.

Pressure losses [mbar]


320
300 PN 20 ø40mm
The GEROtherm® FLUX geothermal probe 280
offers the lowest hydraulic pressure loss at 260
a depth of 200 to 320 metres 240 Flux ø43mm
220
200
180
3.6.2.4. Borehole resistance with GE- 160
ROtherm® FLUX 140
120
100
• The borehole resistance of the GERO 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330
therm® FLUX is similar to that of the PN Probe length [m]
20 geothermal probe
Table 8: Pressure loss comparison: GEROtherm® FLUX and PN 20
• Market-standard simulation models can
be used without adjustment to dimensi-
on geothermal probe systems.
Temperature [°C]

Temperature [°C]
Output [W]

Output [W]

Temperature at GTP exit Temperature at GTP exit

Temperature at GTP entry Temperature at GTP entry


Thermal output Thermal output

Time [h] Time [h]

Table 9: TRT GTP Ø 40 mm PN 20 300 m Table 10: TRT GTP FLUX Ø 43 mm 293 m

Results of the standard evaluations, with measurements taken at the same location.

TRT GTP Ø 40 mm PN 20 300 mm TRT GTP FLUX Ø 43 mm 293 mm


Mean probe temperature 13,10 °C Mean probe temperature 13,28 °C
Average thermal borehole resistance 0,098 mK/W Average thermal borehole resistance 0,093 mK/W
(with standard backfilling; water used as a (with standard backfilling; water used as a
probe fluid and flow rate of 2,008 l/h) probe fluid and flow rate of 2,115 l/h)

Table 11: Details of the TRT results


03/10/2016 | EWS-2082

14
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

3.6.2.5. Calculation example showing 3.6.2.6. Thermal Response Test (TRT)


energy savings with GEROtherm®
FLUX The mean thermal conductivity of the soil
along the probe length is needed to calcu-

Pressure loss [mbar]


• Heat carrier: ethylene glycol 20% late the thermal behaviour of geothermal
• Medium temperature: 12°C probes with the introduction or removal
• Volumetric flow per geothermal probe: of heat. A figure can be used for an initial
1.8 m3/h estimation based on an assumed litholo-
• Length of geothermal probe: 320 m gy. According to SIA 384 / 6, this figure
• Design of geothermal probe: Double U must include a safety margin.
Ø 40 /43 mm With larger systems, it is sensible to de-
• Brine circulation pump: Grundfos MAG- termine the thermal conductivity of the
NA 80 – 60 F soil using a Thermal Response Test. With
Table 12: Comparison of pressure loss of
the first geothermal probe in a field, up to
• Operational hours of the system per GEROtherm® PN 20 / FLUX
8 kW of heat output is introduced conti-
year: 2400 h nuously for around 3 days and the tempe-
• Number of geothermal probes: 10 rature of the probe fluid is continuously
• Energy saving: 216 kWh / year measured. The mean thermal conductivity
• CO2 savings: 127 kg / year of the soil and the thermal borehole re-
• Energy cost savings: up to 30% sistance (effect of the U-pipe configura-
• Pressure loss reduction: 36% less tion and backfilling) can be determined
than with PN 20 based on the development of the fluid
• The new development enables energy temperature. (Source: http://www.geo-
to be saved, while at the same time watt.ch)
allowing efficient exploitation of grea-
ter depths. This also increases the sa-
fety and durability of the geothermal
probe
03/10/2016 | EWS-2082

15
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

3.7. Technical data for GEROtherm®


energy piles

The material qualities PE100-RC and PEXc


are ideal for use as energy piles on ac-
count of their outstanding resistance to
stress cracks and point loads. Short probes
are suitable for piles with minimal dimen-
sions, where the dimensions lie below the
minimum bending radii.

Energy pile Energy pile Energy pile Energy pile short


PE100-RC PE-Xc PE100-RT probes PE100-RC
Delivery form Coils Coils Coils Rods

Lengths up to 50 m up to 50 m up to 50 m 10 – 20 m
Dimension dn 25 / dn 32 mm dn 25 / dn 32 mm dn 32 mm dn 25 / dn 32 mm
UV stabilisation Yes Yes Yes Yes
Physical
Density 0,96 g/cm3 0,95 g/cm3 0,94 g/cm3 0,96 g/cm3
Min. bending radius @ 50 x dn 50 x dn 50 x dn 50 x dn
0°C
Min. bending radius @ 35 x dn 35 x dn 35 x dn 35 x dn
10°C
Min. bending radius @ 20 x dn 20 x dn 20 x dn 20 x dn
20°C
Mechanical
FNCT (4.0MPa, 2% >/= 8760 h >/= 8760 h >/= 350 h >/= 8760 h
Arkopal N 100, 80°C)
Joining technique HS, HD, HM HW, pressing / clamping HS, HD, HM HS, HD, HM
Thermal (with piles min. operating temp. of +3°C)
Max. operating temp. + 40 °C + 95 °C + 95 °C + 40 °C
Min. operating temp. – 20 °C – 20 °C – 40 °C – 20 °C
Thermal conductivity 0,4 W/mK 0,4 W/mK 0,41 W/mK 0,4 W/mK

Table 13: Material properties of GEROtherm® energy piles

Take into account the special transport conditions when using short probes in the form of rods.
03/10/2016 | EWS-2082

16
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

3.8. Chemical resistance Heat carrier Density @ 0°C Frost protection


Ethylene glycol 20% 1040kg/m 3
–10.4 °C
HakaGerodur GEROtherm® geothermal
systems are resistant to common heat car- Ethylene glycol 25% 1050 kg/m3 –13.6 °C
riers. The following heat carriers from Ta- Ethylene glycol 30 % 1059 kg/m 3
–17.1 °C
ble 14 can be used: Contact HakaGerodur
Ethylene glycol 33 % 1065 kg/m3 –19.3 °C
Technical Support to clarify the resistance
of the materials to other chemicals. Propylene glycol 25 % 1033 kg/m3 –10.1 °C
Propylene glycol 30 % 1039 kg/m 3
–13.5 °C
Propylene glycol 35 % 1044 kg/m3 –17.5 °C
3.9. Pipe series Water 5 °C 1000 kg/m3 0.0 °C
Water 15 °C 1000 kg/m 3
0.0 °C
Thermoplastic plastic pipes are sub-divi-
ded into pipe series based on their dimen- Ethanol 20 % 969 kg/m3 –10.5 °C
sions (outer diameter and wall thickness) Ethanol 25 % 962 kg/m3 –15.5 °C
in accordance with ISO 4065. Pipes of
Ethanol 30 % 954 kg/m3 –20.5 °C
identical pipe series have the same ratio
of outer pipe diameter to wall thickness. Table 14: Suitable heat carriers Source
They can withstand the same loading, as- SIA 384 / 6:2010, SN 546 384 / 6, issue 2010
suming they are made of the same mate-
rial and have the same classification. This )) Low temperatures impair the efficiency of the entire system. The lifetime of the back-
also applies to the pipe components. filling can be impaired at extremely low temperatures.
Pipe series S is defined by the formula:
belastbar. Dies gilt auch für Rohrleitungsteile.
dn −en
= Die Rohrserie S3.10.
ist definiert
Pressuredurch
stagesdie
2∙en
)) The nominal pressure figure (PN) in-
The term “Nominal pressure“ (PN) is used cludes the ratio of the outer diame-
SDR pipe series number
for water pipes. This expresses the maxi- ter to the wall thickness and material
dn nominal outer diameter
mum operating pressure of plastic pipes strength. This means that the nominal
en nominal wall thickness
with water at 20°C with a mathematically pressure figure alone is insufficient for
calculated minimum operating period of clear determination of a pipe or pipe
Primarily pipes and pipe components in component!
100 years.
series [S8 / SDR 17], [S5 / SDR 11] and
[S3.2 / SDR 7.4] are used for PE100-RC (Source: VKR Underground pressurised
gas and water supply pipes. In European The following gives the relationship bet- pipes)
standards, the term “SDR“ (Standard di- ween the pipe dimensions, permitted cal-
mension ratio) is used to designate pipe culation tension and permitted operating
series. The SDR figure is calculated by the pressure:
formula Betriebsdruck mit Wasser bei 20°C und einer rechnerischen Mindes
Zahl berechnet sich mir der Formel 10∙σs
dn = Der
S
= P permitted zulässigen Betriebsdruck
operating pressure in bar zeigt die folgende Beziehung:
en
s s calculation tension in MPa
(Megapascal)
and the relationship between the pipe se- S pipe series number
ries figure S and SDR is:
The permitted operating pressure (P) cor-
SDR −1 responds to the nominal pressure (PN) for
= bzw.
or =2∙S+1
bzw.
2 20°C and with a calculated tension based
Accordingly the following applies to the on 100 years. Nominal pressures PN 10
other figures: and PN 16 are normal for water supply.
The wall thickness is calculated as follows:
Pipe series S8 S5 S3.2
SDR 17 11 7.4
=
Table 15: Popular pipe series (source VKR
Pipes laid in soil)
( σs
2 10 ∙ P + 1)
en nominal wall thickness in mm
dn nominal outer diameter in mm
03/10/2016 | EWS-2082

s s calculation tension in MPa


(Megapascal)
P permitted operating pressure in bar

17
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

4. Planning and installation of GERO- 4.1.2. General planning information • Do not allow the temperature to fall
therm® geothermal probe systems below a mean minimum heat carrier
II In addition to the planning informati- temperature of –1.5°C (e.g. inlet of the
)) Before designing the geothermal pro- on given in VDI 4640 sheet 2, or SIA geothermal probe –3°C, outlet 0°C) du-
be systems, an overall energy concept 384 / 6: 2010 (SN 546 384 / 6), con- ring operation over the entire service life
first needs to be drawn up for the pro- sider the following points when plan- of the life of the system
perty. In doing so, all the system inter- ning a geothermal probe system:
faces (heat source, heat pump and he- • Geothermal probes are generally sub- II Provide for and install appropriate gas
ating circuits) need to be considered. ject to approval separators in the system in the event
• The dates on which drilling will take pla- of possible gas permeation.
Geothermal energy system must be ce must be notified to the responsible
planned in collaboration with the custo- authorities
mer/project manager. The following • Optimum system efficiency can be
achieved by low flow temperatures 4.1.3. Dimensioning of GEROtherm®
points therefore need to be defined: geothermal probe systems
• Geology of the subsoil • As a rule, a detached house can be
• Number of boreholes supplied by one 150 – 200 metre GE-
• Type of drilling process (dry drilling/ ROtherm® geothermal probe without II Geothermal probe systems must be
wash drilling) the need for additional (monovalent) dimensioned by an approved firm of
• Depth of the boreholes heating consulting engineers or planners. The
• Diameter of the boreholes • The total heating and cooling requi- corresponding applicable standards
• Position of the boreholes rement of the property must be taken and guidelines, as well as the geology
• Pressure loss of the system into account when dimensioning a pro- at the site, must be taken into account
• Specification of the dimensions of the be field at the planning stage.
geothermal probes • Guaranteed optimum coordination of
• Coordination of the position of the the energy flow within the building The nomogram from VDI 4640 can be
energy storage / cooling fields • Geothermal probes for cooling should used as the first point of reference with
• Seasonal energy requirement be planned with a maximum depth of smaller properties to roughly assess the
• Base and peak loads 150 metres, as the geothermal probe design of the geothermal probe system.
would otherwise absorb too high tem- Always check the reading mathematically.
peratures SIA 384 / 6:2010 describes in detail the
)) Before commencing any geothermal • The spacing between two geothermal
probe drilling, obtain the necessary calculation and design of geothermal pro-
probes must be a minimum of 5 metres be systems.
approvals from the responsible autho- (at a depth of 50 metres) or 6 metres (at
rities and pass them onto the drilling a depth of > 50 m); the minimum spa-
contractor, as geothermal probe sys- The length of the GEROtherm® probe can
cing from buildings must be 2 metres
tems are generally subject to approval. be mathematically calculated taking into
• The distance from neighbouring land
consideration the heat requirement and
should be a minimum of 5 metres
the geological soil conditions on site, as
• The brine velocity in the geothermal
clearly shown in the following examp-
4.1. Planning basics probe should preferably lie in the range
le. The extraction capacity of the GERO-
of 0.3– 0.7 m/s, i.e. always within the
therm® geothermal probe corresponds to
turbulent range
4.1.1. Specifications for HakaGerodur the cooling output of the selected heat
• Geological experts‘ reports should be
AG geothermal systems pump. The heat output of the heat pump
obtained, as the physical rock charac-
must correspond to the heat requirement
teristics and thus the specific extraction
All specifications for HakaGerodur AG of the building.
capacity can vary with the geology at a
geothermal systems and individual pro- specific location
ducts can be requested by contacting us. • The climate at the site will have a deci-
sive effect on the extraction and yield
performance of geothermal probes and
therefore also needs to be taken into
account in the planning
• Geothermal probe systems should not
be used to dry out buildings
• The individual circuits of the geothermal
probe system must be hydraulically ba-
lanced (by providing appropriate regula-
ting valves on the distributor / collector)
and one shut-off valve must be provi-
ded per probe circuit
• The mutual interaction of geothermal
probes must be considered at the plan-
03/10/2016 | EWS-2082

ning stage
• The selected heat carrier must be suita-
ble for the selected temperatures

18
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

Besoins en puissance
Besoins en puissance calorifique 9.7 kW
calorifique - 9 . 7 kW −
⇒ Longueur de la sonde = COP = 4.0 = 182m
GEROtherm Puissance de captage 40W / m

Example: Detached house, new building, II The mean brine temperature at the in- rences in the flow resistance can result
floor area approx. 200 m2 let and outlet of the geothermal probe in large pressure losses due to the ba-
Heat requirement: 13.0 kW is crucial for the design. A minimum lancing effect.
brine temperature of –1.5°C (e.g. inlet
Heat pump COP: 4.0 at BO-W35 (COP =
of the geothermal probe –3°C, outlet II It must also be possible to individually
Coefficient of Performance = efficiency)
0 °C) after 50 years is necessary for the shut off individual circuits of soil col-
Cooling output of heat pump: 9.7 kW Ex- extraction of heat. lectors and geothermal probes. This
traction capacity from soil: 40 W/m with
ensures that the system can be vented
2,400 operating hours / year (depending
with ease at any time during commis-
on the geological soil conditions on site)
4.1.4. Design of SAVE collectors / sioning and for any service work nee-
distributors ded. Provide an automatic vent valve,
The entire heat requirement of the deta- if necessary.
ched house, including hot water provisi-
HakaGerodur GEROtherm® collectors /
on, can be provided by a 185 m GERO-
distributors are appropriately dimensioned
therm® geothermal probe.
and therefore only cause minimum flow
resistance.
II Dry soil has a lower extraction capacity
(< 30 W/m), whereas layers of soil
)) The geothermal probes should be
that carry groundwater have an ext-
connected to the collector / distributor
raction capacity of up to 80 W/m.
with flow and return pipes preferably
of the same length. This obviates the
II With systems with three of more GE- need for expensive flow regulation fit-
ROtherm® geothermal probes, select a tings. A differing volumetric flow
lower extraction capacity on account of up to +/– 15% is permitted.
of their mutual influence, as well as
with geothermal probes in moun-
)) With larger systems, we recommend
tainous regions.
siting one of more manholes in the
centre of the geothermal probe field
II Complex systems should be planned to avoid the use of flow regulation
by a design office, and a Thermal Re- fittings here too. However, if they are
sponse Test (TRT) is recommended for unavoidable, we recommend the use
the design of the complete system. of balancing valves or regulating val-
ves. Note, however, that large diffe-

1 All-purpose connector
2 Vent section
3 Wall opening
4 SAVE distributor with ball valves
5 SAVE collector with balancing valves
6 Y-piece / Y-piece kit
7 GEROtherm® geothermal probe
8 Probe foot bypass
9 Weight / weight vessel
10 Brine circulation pump
11 Heat pump
12 Safety valve
13 Pressure gauge
14 Expansion vessel
15 Filling / drain valve

Figure 9: Installation overview of the GE-


03/10/2016 | EWS-2082

ROtherm® SAVE collector / distributor

19
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

GEROtherm® collectors / distributors (flow 4.2. Installation of GEROtherm® geo- In the VDI guidelines, it is stated that the
and return) made of PE 100-RC fulfil the thermal probe systems drilling contractor who carries out the
set requirements and are designed as a work must be certified in accordance with
modular system. Individual sizes are avai- 4.2.1. General installation guidelines DVGW W120. DVGW certification gua-
lable for the connection of geothermal rantees the highest level of quality for the
probes, soil collectors or energy piles. subsequent operator of the system and
Geothermal probe pipes with outer dia- II Geothermal boreholes should gene- guarantees the proper sequence of mea-
meters of Ø 25, Ø 32, Ø 40 and Ø 50 mm rally be produced in accordance with sures. Drilling companies that also hold
can be connected. the state of the art. In the geothermal the quality seal for geothermal probe dril-
energy sector, VDI Guideline 4640 ling will guarantee a high level of quality
“Thermal utilisation of the subsoil“ in the setting-up and use of geothermal
Selection of suitable GEROtherm® col- and SIA 384 / 6:2010 “Geothermal
lectors / distributors for geothermal probe systems.
probes“ are definitive.
probes
The SAVE units should be calculated ba-
sed on the flow volume of the heat pump
(volumetric flow in m³/h). The following is
a rough selection guide:
• up to approx. 300 m: Type SAVE 97
• up to approx. 1400 m: Type SAVE 125 50

• up to approx. 3000 m: Type SAVE 180


• above approx. 3000 m: Type SAVE 250
45

Larger outputs can be achieved by parallel


connection of the SAVE distributor / col- 40
lector or connecting two connectors/ dis-
tributors using a T-piece.
35

SAVE 125, 180 and 250 distributors can


be combined to meet customers‘ specific 30
Number of probes [qty]

requirements. Distributors to run around SAVE 250


corners or for round manholes can also be
produced. Your contact will be happy to 25
advise you.
Customised distributor solutions with hig-
her flow volumes, e.g. SAVE 250, are avai- 20
lable for larger projects, on request. SAVE 180

15

SAVE 125
10

SAVE 97

0
0 50 100 150 200 250 300 350 400
Figure 10: Layout diagram of the SAVE Length of probe [m]
collector / distributor

SAVE 97 SAVE 125 SAVE 180 SAVE 250


Max. flow volumes ≤ 5,4 m³/h ≤ 16,2 m³/h ≤ 35 m³/h ≥ 35 m³/h
Max. heat pump output ≤ 16 kW ≤ 70 kW ≤ 150 kW ≥ 150 kW
Number of connections 2–8 max. 15 Freely selectable Freely selectable
Connection dimension DE 32 / 40 mm DE 40 / 50 DE 40 / 50 DE 40 / 50
03/10/2016 | EWS-2082

Availability Ex-stock Ex-stock Customised order Customised order

Table 16: Overview of collectors / distributors

20
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

Drilling companies with the quality seal 4.2.3. Sinking GEROtherm® geother- geothermal probe with water as soon as
guarantee mal probes it can no longer be inserted because of
• A high number of benefits for custo- buoyancy. Secure the geothermal probe
mers and outstanding advice for the II Note the following points when sin- to prevent the probe from floating up
owner of the building king GEROtherm® geothermal probes: during injection
• Environmentally-friendly installation of • Only permit a certified drilling company • Protect the ends of the pipes of the
the system to install the geothermal probes sunk geothermal probes from damage
• That the boreholes will be sunk in accor- • Ensure that the drilling equipment can on the building site
dance with the state of the art access the drilling site • Tightly seal the geothermal probes with
• The use of technically high-quality pro- • Only use drilling equipment / machines caps and secure the caps with adhesive
be material that are suitable for the soil on the buil- tape before they are connected to the
• Maximum possible safety on the buil- ding site SAVE
ding site • Use the GEROtherm® PUSH protective • The spacing between two geothermal
and impact sleeve if the geothermal probes must be a minimum of 5 met-
probe is to be “pounded“ into the bore- res (at a depth of up to 50 metres) or 6
hole metres (at a depth of more than 50 me-
4.2.2. Transport / storage of GE- • A weight vessel can also be attached to tres), and the minimum distance from
ROtherm® geothermal probes and the GEROtherm® PUSH buildings must be 2 metres
components • Carry out a visual inspection for possible • All drilling work must be chronological-
mechanical damage before sinking the ly recorded by the equipment operator
Active inventory management by HakaGe- geothermal probe, and remove the ma- (refer to Drilling Log temperate in the
rodur and our partner companies ensures nufacturing certificate from its pocket appendix)
the delivery availability and flexibility cal- and file it with the project documenta- • Dispose of any waste water from the
led for. The geothermal probes are protec- tion drilling process in line with the applica-
ted by plastic cling film during transport • Use a coiler to sink the geothermal pro- ble regulations
and storage. be • Remove the pipework without dama-
• Geothermal probes are generally sunk ging the geothermal probe Ý Avoid
with the utmost care to avoid mecha- twisting the geothermal probe
II The following regulations must be ob-
nical damage • Secure the injection pipe on the probe
served when transporting and storing
• During the sinking process, check the foot or in the GEROtherm® PUSH
GEROtherm® geothermal probes:
geothermal probe for possible damage,
• GEROtherm® geothermal probe must
as damaged geothermal probes may 4.2.4. GEOtight® fabric packer
be transported and stored carefully. Do
not be installed (i.e. transport or stora-
not install geothermal probes that have
ge damage) The GEOtight® fabric packer is designed
been damaged during transport or sto-
• The probe foot of the GEROtherm® for the permanent and secure sealing of
rage
geothermal probe is factory-welded and geothermal probe boreholes. Groundwa-
• Always store and transport GERO-
100% inspected. Welding a probe foot ter, water under tension and gas can be-
therm® geothermal probes on the pal-
on site is not permitted. come problematic with geothermal probe
lets available from the factory
• Always sink the GEROtherm® geo- boreholes. The GEOtight® fabric packer is
• Do not remove the plastic cling film
thermal probe with a weight or using the secure and practical solution for per-
from the GEROtherm® geothermal
the GEROtherm® PUSH with / without manent and reliable sealing.
probes during transport / storage; only
weight vessel
remove it just before installation of the
• A maximum weight of 100 kg can be
probes. Carry out a visual inspection be-
attached per U-run when sinking the
fore removing the film!
geothermal probe
• The quality-certified factory-welded GE-
• Make sure that the geothermal probe
ROtherm® probe foot is also protected
is not subjected to high dynamic forces
against damage by a plastic bag
when it is being sunk
• Store GEROtherm® geothermal probes
• Pay attention to the pressure conditions
in a protected location on the building
when installing the geothermal probe –
site
specifically the differential pressure
• Geothermal probes made of PE100-RC
(inner excess-pressure / outer pres-
and PE100-RT can also be stored in sun-
sure). The differential pressure may not
light
exceed 21 bar inner over-pressure (inner
• The recommended maximum storage
to outer) and 8 bar outer over-pressure
period for GEROtherm® geothermal
(outer to inner) during installation and
probes is 5 years after the production
the compression process with PN 16
date.
geothermal probes! When using PN 20
geothermal probes, the differential pres-
sure should be 25 bar inner over-pres-
sure (inner to outer) and 12 bar outer
over-pressure (outer to inner).
03/10/2016 | EWS-2082

• With dry drilling, we recommend filling


the borehole with a good 1/3 of water
before sinking the empty probe. Fill the

21
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

4.2.4.1. Possible applications 4.2.4.2. Description of components • Flushing weighing scales to control the
specific weight
• Shut-off unit, consisting of a PN 40 ball
Position Description valve and 25 bar pressure gauge
1 Upper sealing discs • Transition sections from 25 mm PE ext-
rusion pipe to pumping equipment and
2 Lower sealing discs
shut-off unit (I-joint threaded connec-
3 Filter fabric hose tors etc.)
4 Jubilee clip • 8 mm Allen key for fitting the jubilee
clips
5 Reducing pipe
• GEOtight® (pat.) fabric packer kit (for
Table 17: Description of the components 32 mm and 40 mm probes)
of the fabric packer • Additional injection pipes for packer in-
jection and special backfilling above the
packer

Stages
1) Depending on the required use, be-
fore sinking the double-U probe into
the borehole, either pull the filter fa-
bric hose (diameter 175 mm for mini-
Figure 11: Possible applications GEO- mum borehole diameter 140 mm and
tight® fabric packer maximum diameter 165 mm) over the
standpipe or with filter fabric ho-
ses (150 mm diameter for min. bore-
hole diameter 127 mm and maximum
1) Protection against the penetration of diameter 140 mm), over the probe
contaminated precipitation water (sur- foot and probe and secure it with a
face water, from car parks, roads etc. wire hook on the rotary head, mast or
with a free groundwater level) collection equipment while the probe
2) Sealing of two groundwater levels (hy- is being inserted.
draulic short circuit downwards) with
a free groundwater level and additio- 2) The double-U probe is inserted, as
nal protection against the penetration usual, with the injection hose briefly
of contaminated precipitation water attached over the probe foot and is in-
into the upper groundwater level. terrupted at the position at which the
2a) Sealing of two groundwater levels packer is fitted based on the positional
(hydraulic short circuit upwards) with depth.
lower groundwater level under tensi-
on and additional protection against
3) The probe pipes and the injection pipe
the penetration of contaminated
are positioned in the openings provi-
precipitation water into the upper
ded for this in the upper and lower se-
groundwater level.
aling discs. The length of the filter fa-
3) Sealing of an artesian well bric hose (2.50 m) dictates the spacing
4) Prevention of a hydraulic short circuit between the two sealing discs (1.80-
between two groundwater levels, e.g. Figure 12: Description of the components 2.00 m); make sure that this is always
with a free upper groundwater level of the fabric packer loosely guided into its fitted position.
and an artesian lower groundwater
level under tension, as well as protec-
4) The 25 mm PE packer injection pipe
tion against the penetration of cont-
is positioned in the additional opening
aminated precipitation into the upper
in the upper sealing disc so that the
groundwater level. 4.2.4.3. Installation instructions end of it always reaches to the lower
sealing disc. The 32 mm diameter
Instructions for the proper installation and opening provided in the sealing discs
activation of the GEOtight® (pat.) geother- through which the injection pipe pas-
mal probe fabric packer ses for backfilling the probe below the
packer, must be sealed when using a
Equipment required on the building 25 mm PE compression pipe using lon-
site: gitudinally slotted 32 mm PE reducing
pipes, which are pushed over the 25
03/10/2016 | EWS-2082

• Mixing equipment to produce cement


slurry mm PE pipe in the opening area of the
• Pumping equipment for cement slurry sealing discs.

22
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

5) The filter fabric hose is then pulled 12) The cement must be compressed in 4.2.4.4. Installation examples
over the sealing discs and secured in the packer, taking into consideration
place using the jubilee clips provided. the internal pressure resistance for 25
Two jubilee clips are used to fix in pla- mm PE100 pipes (PN 16), although pa-
ce and seal the filter hose to the upper cker setting depths of up to 100 met-
and lower sealing disc. Make sure that res in water-filled boreholes permit up
the two jubilee clips are attached at to an additional 8 bar of pressure, if
the position provided (flattened curve) the injection hose remains fully filled
on the sealing disc. with cement.

6) The first jubilee clip is positioned and 13) Once the packer has been filled with Installation of the fabric hose at the top
tightened around the filter fabric hose cement and the permitted compres-
simply pulled over the sealing disc at sion pressure has been applied and
the outer end of the sealing disc. maintained for several minutes, seal
the injection hose with the shut-off
unit and then immediately backfill the
7) The ends of the filter fabric hose are
probe above the packer to ground le-
then pulled over the first jubilee clip so
vel using the injection hose additional-
that the second jubilee clip can then
ly provided for this purpose.
be tightened around a double layer
of the fabric hose around the sealing
disc. HakaGerodur cannot accept liability Installation of the fabric hose at the bot-
for incorrectly carried out installation tom
work.
8) Before the double-U probe can be in-
serted further into the borehole with
the packer and packer injection pipe,
the injection hose must be secured to
the probe pipe bundle using fabric ad-
hesive tape to backfill the geothermal
probe above the packer.

9) Once the geothermal probe has been


inserted to the required depth, the
borehole is backfilled from the pro-
be foot to the depth of the packer
through the injection pipe passed th-
rough the packer. Calculate the vo-
lume of this backfilling section with
a 10-20% margin to ensure that the
suspension definitely reaches as far as
the packer or even beyond. Installation of the packer sealing element

10) Before activating the packer, the end


of the probe pipes filled with water
have to be sealed pressure-tightly with
blanking plugs.

11) A minimum of twice the mathematical


volume of the packer and packer in-
jection pipe must be calculated when
inserting the cement slurry to activate
the packer. Mix the cement slurry to a
specific weight of 1.8 kg/litre (mixing
ratio: 50 kg cement - 25 litres water =
42 litres cement slurry), checking this
using flushing scales before pumping
in.
Pushing the packer over the standpipe
03/10/2016 | EWS-2082

Figure 13: Example showing installation


of the fabric packer

23
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

4.2.4.5. More information a pressure of 21 bar is not exceeded )) The pressure test is passed if there is a
along the entire length. maximum pressure drop of less than
An installation certificate can also • The geothermal probe and connecting 0.1 bar between the 1st and 3rd mea-
be produced and printed online at pipes are fully filled with water and ven- surement.
http://www.hakagerodur.ch by entering ted.
the serial number of the GEOtight® fabric Material required: Pressure gauge with a
packer. Implementation: resolution of better than 0.01 bar, pressu-
Check whether the above prerequisites re range as per the test, minimum 12 bar;
The patent issued for this product is EP have been met. 2 sliders, vent valve, venting; pressure
1865 146 B1 (CH, EU) a) 1 hr rest time in an unloaded state for pump; 1-litre measuring cup. All connec-
the pipes to be measured tions are designed to 16 bar.
b) Build up the test pressure (10 – 12 bar Record the results in a report or print out
– depending on the depth – as per SIA as a diagram similar to the above example.
4.2.5. Test procedure after sinking 384/6)
(pressure test / flow test as per
SIA 384 / 6:2010) c) Maintain the test pressure for 10 mi-
nutes d) 1 hr waiting time, during
which the pipe can fully expand
II The tests on the installed geothermal
e) Measure the remaining pressure.
probes must be carried out in accor-
A decrease of 20% from the test
dance with SIA384 / 6 (issue 2010).
pressure is acceptable due to pipe
The acceptance test involves three
expansion. Larger deviations are
tests, for which all measuring results
based on air pockets or leaks. The
are recorded in writing in an acceptan-
test must be restarted at point a).
ce report:
Ý Rapid pressure release of 2 bar by
• Flushing: every geothermal probe must
draining water. Measure the drained
be fully flushed through at least once
volume of water and the new pressu-
• Flow test: the differential pressure bet-
re value. Check the volume of water
ween the flow and return is measured
against the above diagram.
at a constant flow rate and is compa-
red with the theoretical value stated in f) After 10 minutes 1st pressure measu-
the SIA standard. The deviation of both rement.
values may not exceed +/– 15% After another 10 minutes 2nd pressu-
• Leak test: this must be done directly af- re measurement.
ter backfilling and be based on SN EN After a further 10 minutes, 3rd and
805 final pressure measurement

4.2.6. Leak test as per SIA 384/6


(issue: 2010)

Comply with the following prerequisites


for the test:
Horizontal connecting pipes:
• Constant temperature of the pipe wall
throughout the duration of the test
• No direct sunlight on the pipes

Geothermal probes:
• Complete backfilling with the suspen-
sion
• In fissured zones and in permeable areas
where backfilling has not been done
completely, in agreement with the re-
sponsible authorities, the pressure test
must be adapted to the circumstances
to prevent damage to the geothermal
probes. This also applies to backfilling
with other densities.
• Select the test pressure so that the mi-
nimum over-pressure of the pipes at the
03/10/2016 | EWS-2082

foot of the geothermal probe is 0.5 bar


throughout the entire test and the mini-
mum head pressure is 7.5 bar and that Figure 14: Pressure testing of geothermal probes on the basis of SN EN 805

24
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

4.2.7. Backfilling the borehole aled,, chemically and physically stable fied exceptional cases and taking into
insertion of the geothermal probe into account the design of the collector.
Backfilling the borehole fundamentally the surrounding rocks
has three purposes – to create a complete • The injection pipe remains in the bore- )) The system may require approval de-
and permanent seal, ensure stability and hole, fully filled with compressed mate- pending on the regional provisions of
guarantee a high level of thermal conduc- rial the Federal Water Act.
tivity. (SIA 384 / 6) • When using several injection pipes, pay
attention to the backfilling sequence
• Monitor backfilling: II Provide distributors with balancing
II The following rules must be adhered – Monitor backfilling of the geothermal valves with collector circuits of dif-
to when backfilling the borehole: probes after completion of the work ferent lengths to guarantee an even
• During backfilling, the geothermal pro- – A post-injection will be necessary if it flow and thus a consistent heat trans-
be pipes must be fully filled with water, is found that the injection level has fer between the circuits.
sealed pressure-tight at the top and fit- fallen by more than 2 metres With collector circuits of different
ted with a pressure gauge so that the lengths, there is a stronger flow th-
pipes are not pressed together and so rough shorter runs, resulting in a loss
that any possible pressure drop can be 5. Planning / installation regulations of output from the entire geothermal
detected for soil collectors system.
• Note the pressure conditions when
compressing the geothermal probes II A geothermal soil collector system can
– specifically the differential pressu- only be designed and installed in ac-
re (inner over-pressure/outer pressu- cordance with VDI Guideline 4640.
re). The differential pressure may not
exceed 21 bar inner over-pressure (inner The pipes should only be laid by a recog-
to outer) and 8 bar outer over-pressure nised specialist company. Note the design
(outer to inner) during the compression documents and operating instructions is-
process with PN 16 geothermal probes! sued by the heat pump manufacturer.
When using PN 20 geothermal probes,
the differential pressure is 25 bar in-
ner over-pressure (inner to outer) and II Make sure that soil collectors are never
12 bar outer over-pressure (outer to developed or built over and that the
inner). surface is not sealed. It is only possible
• The injection pipes are designed for a to deviate from this principle in justi-
temporary (< 1h) maximum pressure
of 34 bar @20 °C (With higher outsi-
de temperatures, the permissible maxi-
mum pressure is reduced by 40 – 50%!) Collector
• Secure the filling pipe to the geothermal Distributor
probe foot or the GEROtherm® PUSH
and insert it into the borehole when the
geothermal probe is being sunk into the
soil
• Press a suitable suspension (filling ma-
terial) into the borehole from the bot-
tom to the top – do not use the material
from the borehole as filling material!
House wall
• Observe the specifications issued by the Soil
authorities with regard to the backfil-
ling!
• Avoid cavities and air pockets
• The filling suspension must be created
and used in accordance with the manu-
facturer‘s specifications; only a suitable
suspension may be used
• The quantity of the filling suspension
must be registered, recorded in writing
and compared to the theoretically cal-
culated filling quantity Minimum
• Several injection pipes are inserted into bending radius
the borehole depending on the depth
of the borehole and the subsoil condi-
tions Supply and waste pipe
03/10/2016 | EWS-2082

• After curing, the compressed suspensi-


on must guarantee a permanently se-
Figure 15: Laying instructions for soil collectors

25
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

The collector runs preferably come to- II Design condensation. The pipes must be insula-
gether at the wall of the building or in the ted to prevent condensation on the soil,
manhole, generally in the centre of the • Optimum design / dimensioning adap- depending on the circumstances
collector field with larger systems. The soil ted to the geology on site is required, • Maintain the shortest possible distance
collector pipes should be laid at a depth of designing every system separately between the connecting pipes from the
1.2 to 1.5 metres. The spacing between • Design 10% more energy piles than re- energy piles to the distributors. Prefer-
the pipes is usually 0.3 to 0.8 metres, and quired with energy pile systems ably route the pipes using pipes of an
the length of an individual collector circuit • The minimum pipe spacing between the identical length
should not exceed 100 metres. pipes in the energy pile must be 15 cm, • Route flow and return pipes with a spa-
taking into account the statics calcula- cing of approx. 1 metre
II Please note in this respect the corre- tions • Make sure that no groundwater can en-
sponding instructions and information • Any possible impact on the energy pi- ter through openings in the foundation
on your heat pump model. les must be taken into account in the slabs
design, as well as the impact of any • Avoid welding work on the reinforcing
groundwater flows (system simulation) baskets once the heat exchanger pipes
Cold system components must have a have been inserted
minimum distance of 0.7 metres from • Extraction capacity per metre lies bet-
supply and waste lines and heat carrier pi- ween 20 – 75 W/m depending on the
pes must be laid in parallel circuits. If the pile diameter and the geology / hydro-
excavated material exceeds the maximum geology 7. Installation of HakaGerodur SAVE
grain diameter of 20 mm, the PE100-RC • Tichelmann connections should not be collectors / distributors and manholes
collector must be laid into a bed of sand used (problems with venting etc.)
to avoid possible damage or concentra- 7.1. Installation of HakaGerodur SAVE
ted local stress directly on the pipe during collectors / distributors
operation. PE100-RC collectors can be di- II Installation
rectly refilled with the excavated material.
II Observe the following installation ru-
• The heat exchanger pipes must be atta- les:
It is essential that the minimum bending ched onto the inside of the reinforcing • Never use damaged distributors / collec-
radii are observed when laying the soil baskets with cast in-situ concrete piles tors, connecting pipes and connecting
collector pipes to prevent the pipes from • Secure the pipes to the reinforcing iron components
kinking. every 1– 2 metres with cable ties • When connecting GEROtherm® geo-
• Connect the pipe to the reinforcing bas- thermal probes to the SAVE distributor /
)) We recommend the use of soil hooks kets with plastic cable ties. Never use collector, feed the geothermal probes in
(Art. nos. 06.8339 + 06.8340) when binding wire parallel circuits to the distributor
fixing the collector pipes to the soil. • Provide energy piles during installation • Two probe circuits can be connected to
with ball valves and pressure gauges (fil- a distributor outlet using a Y-piece or
ling, venting, pressure build-up) the Y-piece kit
• Energy piles must be pressurised du- • The GEROtherm® geothermal probe
6. Planning / installation regulations ring installation, concreting and joining must be connected to the SAVE collec-
for energy piles work (8 – 10 bar) tor / distributor using approved fittings
• Continuously monitor the pressure con- and tools (certified overall system)
)) Take into account the information ditions • Install the SAVE collector / distributor at
in SIA D 0190 “Use of geothermal • Maintain shut-off valves on the energy the highest point of the system, other-
heat with foundation piles and other pile during the curing phase of the con- wise fit a vent device at the highest
concrete components that come into crete point of the system
contact with concrete“ when desig- • Note the pipe manufacturer‘s bending • Fit individual GEROtherm® geothermal
ning energy piles. Note the following radii at the foot of the pile probes with valves for regulation and
aspects in the design and installation • The pipe ends must project approx. 0.5 shut-off, if no HakaGerodur SAVE col-
of GEROtherm® energy piles. to 1.0 m above the end of the pile lectors / distributors are used
• Visibly protect the outlets of the energy • Install as many components of the geo-
piles from damage (e.g. by fitting a pro- thermal probe system as possible outsi-
tective pipe) de the building to minimise the insulati-
• Do not operate the energy piles with on outlay (condensation water)
anti-freeze. Only use clear water • Make sure that the HakaGerodur AG
• Install an automatic system shut-off fixing set is fitted tightly and free of
when the minimum temperature of 3°C tension and overload.
is reached
• Every energy pile must be capable of Download the mounting instructions for
being shut off individually the collector / distributor with ball valve
• The pipes are brought together in the as a PDF on the HakaGerodur AG home-
foundation slab (the lowest reinforcing page: www.hakagerodur.ch
03/10/2016 | EWS-2082

layer = neutral zone), preferably under-


neath the foundation slab, in order to
prevent negative impacts of dew / or

26
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

7.2. Installation of HakaGerodur 7.2.2. Explications avant le montage 7.2.4. Foundation


manholes
• Record the traffic loads, installation • Provide a flat, solid and load-bearing
II Strictly adhere to the applicable re- conditions and maximum groundwater base on site. The terrain on site may be
gulations, standards and guidelines. level on the HakaGerodur form. The adequate depending on the local situa-
Standard SIA 190 Sewage Ducts and data from the form is urgently required tion (soil conditions, water volume, sea-
the document „In-soil, unpressurised for static design and safe installation. son etc.) or may require gravel or lean
polyethylene (PE), polypropylene (PP) • Eliminate potential damage by roots concrete levelling.
and polyvinyl chloride (PVC-U) pipes“ from existing or planted trees. • The footprint of the excavation site must
issued by the Swiss Plastic Pipes and • Take into consideration the correspon- exceed the dimensions of the manhole
Pipework Association (VKR) apply in ding country-specific guidelines. on each side by a minimum of
this respect.. • Observe all relevant accident prevention • 500 mm; the distance from solid con-
regulations with all work. structions must be a minimum of
• Always keep the manhole closed, except 1000 mm.
when working on the vessel. • Ensure that the subsoil of the excavation
7.2.1. Certificate of conformity site is sufficiently load-bearing and level
(horizontal). Size the depth of the exca-
• HakaGerodur AG manholes are factory vated hole so that round grain gravel or
prefabricated and equipped with built- 7.2.3. Building ground conditions lean concrete levelling can be poured in
in distributor/collector bars and shut-off as a substructure.
and regulating valves. • Ensure that the base of the trench and
• The manhole casing is made of po- the soil surrounding the manhole are
lyethylene (PE), which is environmental- both water-permeable and do not hold 7.2.5. Groundwater / Negative
ly-friendly and can be recycled. any groundwater, strata water or back- buoyancy
• The manholes and collectors / distribu- water, if this has not been taken into
tor bars are factory leak-tested before account in the statics design. • Secure the manhole from buoyancy in
delivery. • On slopes, check the terrain for the risk areas with groundwater, strata water or
• The manholes are specifically desi- of soil slippage and provide a stabilising pressurised water.
gned to enable geothermal probes, support structure if necessary.
soil collectors and energy baskets to be • Do not permit the area to be developed
connected. and/or affected by the foundation loads 7.2.6. Earthwork
• The company accepts no liability for of buildings or similar. Adhere to the
improper use or modifications to the corresponding distances from buildings • Ensure that the pipe connections are
product and the consequential effects or other structures. not under tension and tight during fil-
of this. • Provide adequate drainage of seepage ling and are not damaged during com-
water with water-impermeable soils. pacting.
• Make sure that the distance from exis- • Only use hand tampers for compacting
ting or planned trees is at least the same the area around the pipe connections,
at the diameter of the largest crown of using water if you need to; top up and
the tree. seal the enclosure (round grain gravel
8 / 16) in max. 30 cm layers up to the
Figure 16: Example of round grain gravel upper edge of the vessel
Ý Avoid damage to the manhole.
• You can use graded excavated material
that compacts well. Remove larger bro-
ken rocks to avoid damage to the outer
wall.
• Ensure a perfectly compacted pipe bed /
pipe enclosure without gaps or hollows
for horizontal manholes. Avoid the use
of line supports. You can use grit (max.
grain size 16 mm) up to half the height
of the pipe as the material for the bed /
enclosure.
• The layer thickness of the support is
1/10 of the outer diameter of the pipe,
but should be a minimum of 25 cm.
• In the event of seepage water or water
from the slope penetrating the excava-
tion site, ensure that it is permanently
drained away through a subsoil draina-
03/10/2016 | EWS-2082

ge pipe. This measure prevents uncon-


trollable external forces and the const-
ruction site becoming overloaded.

27
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

7.2.7. Traffic loads 8. Connecting pipes to the collector / even gradient to the geothermal probes
distributor • Ensure the use of approved, tested and
• Ensure that no vehicles drive over small maintained tools
manholes. The following general laying guidelines • Individually label all welded joints with
• Take into account the required load and laying instructions apply to PE100-RC the date, time and signature (proof of
class for traffic loads in the statics cal- and PE100-RT connecting pipes to GERO- the welded joint having been made
culation. In addition, ensure adequate therm® collectors / distributors laid in soil. Ý Complete a welding report)
load distribution by using an appropria- • Fit a venting unit to both the distributor
te design for the transport surface. / collector, or at the highest point of the
II The preparation and laying of connec- system
• If manholes are installed adjacent to ting pipes to collectors / distributors
transport surfaces that carry vehicles .
should only be done by trained speci-
weighing more than 12 tonnes, the alist personnel
minimum distance from these surfaces
must be at least the depth of the exca-
vation site. The following regulations generally apply
• Concrete a 2 x 2 metre support plate when establishing connections.
around the top section if the installation • The corresponding national regulations
is in areas that have no standard road apply when laying connecting pipes:
construction. – EN 12201
• Make sure that there is no direct load – DIN 16963 Part 1– Part 15 (PE pipe Figure 17: Reel with PE pipes
contact between the load distribution components)
– HR 3.26 issued by SKZ Würzburg • When unwinding the pipes from drums
plate and/or the manhole head / man-
– VDI 4640 „Thermal utilisation of the or coils, pay attention to the fact that
hole dome. All traffic loads have to be
subsoil“ the ends of the pipes can lash out when
absorbed in the subsoil.
– SIA 384 / 6:2010 the fastening is removed (risk of acci-
– DVS 2207-1 dent!)
– VKR RL02 „Soil-covered pressurised • When unwinding, make sure that the
7.2.8. General pipes made of polyethylene PE80 and flexibility of the PE pipes is affected by
PE100“; 07/2007 the ambient temperature.
• Check all fittings and joints within the
manhole before commissioning the sys- • Pay attention to the direction of flow in- II Take into account temperature-depen-
tem. Make sure that there are no loose dicated on the geothermal probe to gu- dent temperature elongation when
fittings and joints. arantee correct connection of the pipes shortening and laying the connecting
• Only GEROtherm® manhole types 1-4 • Never use damaged connection compo- pipes. The pipe extends with an in-
are permitted for use in and below the nents (e.g. E-sleeves, T-pieces, brackets. crease in temperature and shortens as
foundation slab. GEROtherm® small PE pipes etc.) the temperature falls, with a 1 metre
manholes are not intended for use in • Never go below the prescribed bending length of PE pipe reducing by 0.2 mm
the foundation slab area. radius of pipes per K!
• The site management is responsible for • Only welded connections are permitted
selecting the excavation site and secu- for connections in the ground! GEROtherm® PE 100-RC connecting pipes
ring it. • A bed of sand is not necessary when can be laid without a bed of sand as they
• Slope stabilisation and other foundati- using material quality PE100-RC have been certified by an independent test
on engineering problems lie within the • Label pipes laid in soil with a warning institute. The pipe trench is backfilled with
remit of the planner or, if need be, a tape material classified as compression classes
specialist. • Only allow trained and qualified specia- V1-V3 in accordance with ZTVA StB 97.
• Inspect the manhole for any damage list personnel (DVS Welding Certificate
before sinking it. or VKE Welder‘s Passport) to produce Heated coil welding (HM) is recommen-
• Smoothly lift the manhole using the welded connections ded for the connection of GEROtherm®
pre-assembled lifting eyes when moving • Dig the pipe trench so that the pre- geothermal probes and energy piles to the
it. Place the manhole gently and wi- scribed minimum coverage of 1.0 to connecting pipes to the distributor / col-
thout impacts into the excavated hole. 1.8 metres can be guaranteed for all lector. High-quality connection elements
• Never use the pipe connections on the connecting pipes, depending on the cli- are available for this
collectors / distributors as carry aids, mate and soil.
handles or fixing points. • Adhere to the applicable safety regu-
• Do not use the pipes and fittings as lations issued by the authorities for all
climbing aids when entering the man- excavation work!
hole. • Dig the base of the trench so that the
• We expressly reserve the right to make pipes lie evenly on it
technical changes and improvements. • In the event of multiple feed/return
runs, ensure that they are thermally se-
Download the mounting instructions for parated from each other within a single
03/10/2016 | EWS-2082

the manholes as a PDF on the HakaGero- trench


dur AG homepage: www.hakagerodur.ch • Make sure that all connection runs are
of the same length and laid with an

28
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

Summary of the work instructions 9. Filling the GEROtherm® geothermal


according to DVS 2207-1 for the hea- system and pressure testing
ted-coil welding of GEROtherm® GTP /
energy piles and connecting pipes, II Refer to the operating instructions for
Y-pieces, distributors/collectors made the heat pump. Only permit qualified
of PE100-RC: specialist personnel to fill the system
1. Create permissible working condi- and perform a pressure test. Hand
tions, e.g. protection from damp, over the test certificate to the owner
wind, temperatures of < 0°C etc. of the building. Note the following im-
2. Connect the welding unit to the pow- portant points when filling:
er source and check that it is working • Only fill GEROtherm® geothermal sys-
properly tems with permitted heat carriers which
3. De-bur the outside of the right-angled do not endanger the water (see table
separated geothermal probe/energy 14; Suitable heat carriers).
pile ends • Never use other liquids.
• Individually flush all connected geother-
4. Where necessary, ensure the round-
mal probes or energy piles before filling
ness of the pipe ends using rounded
to ensure that they are free of air. At all
pressure clamps; permitted non-circu-
costs avoid air pockets.
larity 1.5%
• Fill each probe circuit individually and
5. Machine the pipe surface with a rota- monitor the filling volume per circuit
tion peeler to remove metal (constant • Flush in both directions using sufficient-
metal removal max. 0.2 mm) ly large flushing pumps
6. Remove the electrofusion fittings from • Adjust the concentration of the brine in
their original packaging line with the heat pump manufacturer‘s
7. Clean the machined surface of the GE- instructions and record this in writing.
ROtherm® geothermal probes / energy
piles and the inner surface of the elec- II Make sure that the brine is evenly mi-
trofusion fittings with a cleaning fluid xed before it is filled to prevent the
that is approved for PE surfaces and a glycol clotting in the pipes. Refer to
lint-free, ink-free paper the Material Safety Data Sheets for the
8. Insert the geothermal probe / energy chemicals used.
pile and connecting pipe tension-free
and without force into the electrofu- The following table provides an overview
sion fitting, secure with the integrated of the volume per metre of GEROtherm®
screws and visibly mark the insertion geothermal probe to estimate the volume
depth. CAUTION: Ensure the correct of brine required.
insertion depth!
9. Connect the welding unit cable to the
electrofusion fitting sockets without
any weight strain
10. Where necessary, check the settings
and/or data display on the device dis-
play and enter the welding data (scan
the barcode on the electrofusion fit-
ting)
11. Weld as described in the manufactu-
rer‘s instructions and check the result
12. After completion of the welding, re-
move the cable from the electrofusion
fitting
13. Observe the cooling-down time in ac-
cordance with the manufacturer‘s ins-
tructions
14. If there has been no automatic re-
cording, produce a manual welding
report and visibly label the weld in wri-
ting (date, signature, time and end of
the cooling-down time)
03/10/2016 | EWS-2082

29
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

II Once the system has been fully filled, • All brine circuits need to be vented and
perform a pressure test at 1.5 times filled with the homogeneously mixed
the operating pressure. Note the fol- heat carrier
lowing: • All fittings have to be in the operating
position
• Perform a pressure test on all brine cir-
cuits
• Only use a suitable heat carrier as a 11. Maintenance of GEROtherm® geo-
pressure test liquid thermal systems
• Secure sensitive fittings (e.g. safety
group expansion vessel)
• Monitor the pressure conditions in the GEROtherm® geothermal systems are ge-
geothermal probe/energy piles nerally maintenance-free. The most popu-
Figure 18: Working conditions lar heat pumps are also largely maintenan-
ce-free. Please check the corresponding
Once the pressure test has been comple- maintenance instructions from your heat
ted, put any components that have been pump manufacturer in this respect.
removed back into operation.
)) Check the filling pressure of the geo-
)) Source for a more detailed descrip- thermal probe annually. Record any
tion of the filling of geothermal sys- top-up quantities.
tems: www.wp-systemmodul.ch (Data
sheet: Filling of geothermal systems,
as a PDF)
12. Shutting down geothermal sys-
tems

10. Operation of GEROtherm® geo-


thermal systems When shutting down geothermal probes,
Figure 19: Machining work in the wel- fully flush out the heat carrier and dispose
ding area of it properly in line with the applicable
II Initial commissioning must be done regulations. Then fully compress the geo-
by a specialist company. Refer to the thermal probe with cured material, lea-
instructions and operating instructions ving no gaps. Report the proper shutting
provided by the heat pump manufac- down of the geothermal probe system to
turer! the responsible authorities.

It is essential that you observe the follo-


wing before commissioning the geother-
mal probe system with heat pump:

Figure 20: Cleaning the surface to be


worked on
GEROtherm® Double-U probe
(outer diameter/wall thickness) (2 circuits / 4 pipes)
PN16 Ø 25 mm (25 x 2,3 mm) 1.31 l/m (4 x 0,327 l/m)
PN16 Ø 32 mm (32 x 3,0 mm) 2.14 l/m (4 x 0,535 l/m)
PN16 Ø 40 mm (40 x 3,7 mm) 3.34 l/m (4 x 0,835 l/m)
PN16 Ø 50 mm (50 x 4,6 mm) 5.23 l/m (4 x 1,307 l/m)

PN20 Ø 40 mm (40 x 4,5 mm) 3.02 l/m (4 x 0,755 l/m)


PN20 Ø 50 mm (50 x 5,6 mm) 4.72 l/m (4 x 1,180 l/m)

Vario (ordering length 250 m; arith- 3.25 litres/m (4 x 0.812 litres/m)


metical mean)
03/10/2016 | EWS-2082

Figure 21: Scanning parameters, welding Flux (ordering length 320 m; arithmetical 3.71 litres/m (4 x 0.928 litres/m)
and compliance with cooling-down time mean)

Table 18: Content of geothermal probes

30
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

13. Tables / Diagrams System element Number of Quantity Unit Total


elements
13.1. Calculation of pressure loss in
Geothermal probes 3 4 pipes, each 0.539 l/m 517 litres
the brine circuit
80 metres
long
13.1.1. Definition of the sample
Connecting pipe Ø 3 2 pipes, each 0.835 l/m 30,1 litres
project
40 mm 6m
Brine distributor 2 1.25 l/m 2,5 litres
• Brine heat pump: Cooling output
VL+RL SAVE97
16  kW  / volumetric flow 3900 l/h
(=3.9 m3/h) Connecting pipe Ø 2 3m 1.307 l/m 7,8 litres
• Geothermal probes: 3 no. 80 m doub- 50 mm
le-U, Ø 32 mm Total brine quantity 557,4 litres
• Connecting pipe: Ø 40 mm from geo-
thermal probe to brine distributor = 6 m Table 19: Total brine volume
• Connecting pipe: Ø 50 mm from brine
distributor to heat pump = 3 m
• Medium: Water (Table 19)
Brine distributor SAVE 97: Brine distri- Pressure loss per
Maximum assumed pressure loss for SAVE butor distributor bar
13.1.2. Calculation of brine volume in 97 to SAVE 250:
the system SAVE 97 1.0 mbar
• 2 brine distributors SAVE 97 x 1 mbar
Litre contents per metre were taken from = 2.0 mbar SAVE 125 3.0 mbar
Table 22.
SAVE 180 4.0 mbar
Connecting pipe Ø 50 mm: SAVE 250 5.0 mbar
13.1.3. Calculation of pressure loss in
the system • 3,900 l/h / 3,600 = 1.08 l/s
• As per Table 22 pressure loss at 1.08 l/s Table 20: Assumed pressure loss SAVE
Pressure losses per metre were taken from
Table 22. = 2.39 mbar/m
• 2 pipes VL+RL x 3 m x 2.39 mbar/m
= 14.34 mbar
Geothermal probes Ø 32 mm:
Total volumetric flow for the project: Total pressure loss in the system:
3,900 l/h
Number of geothermal probes: 3 no. II The added pressure loss of 165.94
double-U circuits: 2 no. Conversion factor mbar for the total sample project is
from l/h to l/s: 3600 based on water as a heat carrier. If
• 3,900 l/h / (3 geothermal probes x 2 another heat carrier or mixture is used,
double-U x 3600) = 0.18 l/s an additional factor must be multip-
• As per Table 22 pressure loss at 0.18 l/s lied for the pressure loss.
= 0.86 mbar/m
• Example:
Antifrogen® N heat carrier (Relative
)) The pressure loss should only be calcu- pressure loss diagram table) Mixing ra-
lated once per double-U, as the dou- tio: 20% Antifrogen and 80% water
ble-U geothermal probe is a parallel • Brine temperature: 0°C
connection. • Read factor from table: 1.5
• Total pressure drop including
• 2 pipes x 80 m x 0.86 mbar/m heat carrier: 165.94 mbar x 1.5 =
= 137.6  mbar 248.91 mbar = 0.25 bar

Connecting pipe Ø 40 mm:


• 3,900 l/h / (3 geothermal probes x
3600) = 0.36 l/s
• As per Table 22 pressure loss at 0.36 l/s System element Total
= 1.0 mbar/m
Geothermal probes Ø 32 mm 137.6 mbar
• 2 pipes VL+RL x 6 m x 1.0 mbar/m
= 12.0 mbar Connecting pipe Ø 40 mm 12.0 mbar
Brine distributor VL+RL SAVE 97 2.0 mbar
Connecting pipe Ø 50 mm 14.34 mbar
03/10/2016 | EWS-2082

Total brine quantity 165.94 mbar

Table 21: Total pressure loss in the system

31
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

13.2. Pressure loss tables

13.2.1. Pressurised water pipes PE100-RC, S5, SDR 11, PN 16

de x e 25 x 2.3 mm 32 x 3.0 mm 40 x 3.7 mm


l/m 0.327 0.531 0.835
v Q R Q R Q R
m/s l/s mbar/m l/s mbar/m l/s mbar/m
0.10 0.0327 0.10 0.0531 0.062 0.0835 0.073
0.15 0.0490 0.27 0.0796 0.200 0.1250 0.150
0.20 0.0654 0.44 0.1060 0.320 0.1670 0.240
0.25 0.0817 0.65 0.1330 0.470 0.2090 0.350

0.30 0.0981 0.90 0.1590 0.650 0.2500 0.490


0.35 0.1140 1.18 0.1860 0.860 0.2920 0.640
0.40 0.1310 1.49 0.2120 1.090 0.3340 0.810
0.45 0.1470 1.84 0.2390 1.340 0.3760 1.000
0.50 0.1630 2.22 0.2650 1.620 0.4170 1.210

0.55 0.1800 2.63 0.2920 1.920 0.4590 1.440


0.60 0.1960 3.07 0.3190 2.250 0.5010 1.680
0.65 0.2120 3.55 0.3450 2.600 0.5430 1.950
0.70 0.2290 4.06 0.3720 2.970 0.5840 2.230
0.75 0.2450 4.60 0.3980 3.370 0.6260 2.530

0.80 0.2610 5.17 0.4250 3.790 0.6680 2.840


0.85 0.2780 5.78 0.4510 4.230 0.7090 3.170
0.90 0.2940 6.41 0.4780 4.700 0.7510 3.520
0.95 0.3110 7.08 0.5040 5.190 0.7930 3.890
1.00 0.3270 7.78 0.5310 5.700 0.8350 4.280

de x e 50 x 4.6 mm 63 x 5.8 mm 75 x 6.8 mm


l/m 1.307 2.074 2.960
v Q R Q R Q R
m/s l/s mbar/m l/s mbar/m l/s mbar/m
0.10 0.1310 0.054 0.2070 0.040 0.2940 0.032
0.15 0.1960 0.110 0.3110 0.081 0.4410 0.064
0.20 0.2610 0.180 0.4150 0.130 0.5880 0.110
0.25 0.3270 0.270 0.5190 0.200 0.7350 0.160

0.30 0.3920 0.370 0.6220 0.270 0.8820 0.220


0.35 0.4580 0.480 0.7260 0.360 1.0300 0.290
0.40 0.5230 0.610 0.8300 0.460 1.1770 0.370
0.45 0.5880 0.750 0.9340 0.560 1.3240 0.450
0.50 0.6540 0.910 1.0370 0.680 1.4710 0.550

0.55 0.7190 1.080 1.1410 0.810 1.6180 0.650


0.60 0.7840 1.270 1.2450 0.950 1.7650 0.760
0.65 0.8500 1.460 1.3490 1.090 1.9120 0.880
0.70 0.9150 1.680 1.4520 1.250 2.0590 1.010
0.75 0.9810 1.900 1.5560 1.420 2.2060 1.140

0.80 1.0460 2.140 1.6600 1.600 2.3530 1.280


0.85 1.1110 2.390 1.7640 1.790 2.5000 1.440
0.90 1.1770 2.650 1.8670 1.980 2.6470 1.600
03/10/2016 | EWS-2082

0.95 1.2420 2.930 1.9710 2.190 2.7950 1.760


1.00 1.3070 3.220 2.0750 2.410 2.9420 1.940
Table 22: Pressure loss table of pressurised water pipes PE100-RC, S5, SDR 11, PN 16 Ø 25 – 75 mm

32
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

de x e 90 x 8.2 mm 110 x 10.0 mm 125 x 11.4 mm


l/m 4.252 6.359 8.199
v Q R Q R Q R
m/s l/s mbar/m l/s mbar/m l/s mbar/m
0.10 0.4250 0.0250 0.636 0.0190 0.820 0.016
0.15 0.6380 0.0510 0.954 0.0390 1.231 0.033
0.20 0.8510 0.0840 1.272 0.0650 1.641 0.056
0.25 1.0640 0.1300 1.590 0.0970 2.051 0.083

0.30 1.2760 0.1700 1.909 0.130 2.461 0.110


0.35 1.4890 0.2300 2.227 0.180 2.871 0.150
0.40 1.7020 0.2900 2.545 0.230 3.281 0.190
0.45 1.9150 0.3600 2.863 0.280 3.692 0.240
0.50 2.1270 0.4300 3.181 0.340 4.102 0.290

0.55 2.3400 0.5100 3.499 0.400 4.512 0.340


0.60 2.5530 0.6000 3.817 0.470 4.922 0.400
0.65 2.7650 0.7300 4.135 0.540 5.332 0.460
0.70 2.9780 0.8000 4.453 0.620 5.742 0.530
0.75 3.1910 0.9100 4.771 0.710 6.153 0.600

0.80 3.4040 1.0200 5.089 0.800 6.563 0.680


0.85 3.6160 1.1400 5.407 0.890 6.973 0.760
0.90 3.8290 1.2700 5.726 0.990 7.383 0.840
0.95 4.0420 1.4000 6.044 1.090 7.793 0.930
1.00 4.2540 1.5400 6.362 1.200 8.203 1.030

de x e 140 x 12.7 mm 160 x 14.6 mm


l/m 10.310 13.430
v Q R Q R
m/s l/s mbar/m l/s mbar/m
0.10 1.028 0.014 1.344 0.012
0.15 1.542 0.029 2.016 0.025
0.20 2.056 0.048 2.687 0.041
0.25 2.570 0.072 3.359 0.061

0.30 3.084 0.099 4.031 0.084


0.35 3.598 0.130 4.703 0.110
0.40 4.112 0.170 5.375 0.140
0.45 4.625 0.210 6.047 0.170
0.50 5.139 0.250 6.719 0.210

0.55 5.653 0.300 7.390 0.250


0.60 6.167 0.350 8.062 0.300
0.65 6.681 0.400 8.734 0.340
0.70 7.195 0.460 9.406 0.390
0.75 7.709 0.520 10.078 0.450

0.80 8.223 0.590 10.750 0.500


0.85 8.737 0.660 11.422 0.560
0.90 9.251 0.730 12.093 0.620
0.95 9.765 0.810 12.765 0.690
1.00 10.279 0.890 13.437 0.760
Table 23: Pressure loss table of pressurised water pipes PE100-RC, S5, SDR 11, PN 16 Ø 90 – 160 mm
03/10/2016 | EWS-2082

33
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

13.2.2. Pressurised water pipes PE100-RC, S4, SDR 9, PN 20

PN20 PN20
de x e 40 x 4.5 mm 50 x 5.6 mm
l/m 0.755 1.18
v Q R Q R
m/s l/s mbar/m l/s mbar/m
0.10 0.0755 0.077 0.1180 0.057
0.15 0.1133 0.153 0.1770 0.114
0.20 0.1510 0.252 0.2360 0.188
0.25 0.1888 0.371 0.2950 0.277

0.30 0.2265 0.510 0.3540 0.381


0.35 0.2643 0.668 0.4130 0.499
0.40 0.3020 0.845 0.4720 0.632
0.45 0.3398 1.041 0.5310 0.779
0.50 0.3775 1.254 0.5900 0.939

0.55 0.4153 1.486 0.6490 1.114


0.60 0.4530 1.735 0.7080 1.301
0.65 0.4908 2.003 0.7670 1.502
0.70 0.5285 2.287 0.8260 1.716
0.75 0.5663 2.589 0.8850 1.943

0.80 0.6040 2.908 0.9440 2.183


0.85 0.6418 3.244 1.0030 2.435
0.90 0.6795 3.597 1.0620 2.701
0.95 0.7173 3.967 1.1210 2.980
1.00 0.7550 4.354 1.1800 3.271

Table 24: Pressure loss table of pressurised water pipes PE100-RC, S4, SDR 9, PN 20 Ø 40 – 50 mm

03/10/2016 | EWS-2082

34
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

13.3. Long-period internal pressure diagram PE100

Reference characteristic lines of the long-period internal pressure resistance (minimum curves) of pipes made of PE 100 in accordance
with DIN 8075: 1999-08 and made of PE 100-RT in accordance with DIN 16833: 2009-9
03/10/2016 | EWS-2082

Figure 22: Long-period internal pressure diagram PE100

35
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

13.4. Diagram of relative pressure loss

of Antifrogen® N-water mixture compared with water (t = +10°C) with turbulent flow
Source: Clariant Produkte Deutschland GmbH, D-65840 Sulzbach

Figure 23: Diagram of relative pressure loss

13.5. Diagram of frost-proofness

of Antifrogen® N-water mixtures (crystallisation point in accordance with ASTM D 1177)


Source: Clariant Produkte Deutschland GmbH, D-65840 Sulzbach

03/10/2016 | EWS-2082

Figure 24: Diagram of frost-proofness

36
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

13.6. Diagram of conductivity

of Antifrogen® N –water mixtures of different concentrations


Source: Clariant Produkte Deutschland GmbH, D-65840 Sulzbach

Figure 25: Diagram of conductivity


03/10/2016 | EWS-2082

37
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

13.7. Coil dimensions of roll packages

13.7.1. Coil dimensions of geothermal probes PN 16

Dimension Length ID AD Height (H) Weight Qty / Pal. Pallet


mm m mm mm mm kg cm
32 x 3.0 50 670 970 590 55 3 80 x 80
32 x 3.0 60 650 1000 600 66 3 80 x 80
32 x 3.0 70 770 1125 590 77 3 100 x 100
32 x 3.0 80 680 1030 710 88 2 80 x 80
32 x 3.0 90 640 980 845 97 2 80 x 80
32 x 3.0 100 725 1080 860 110 2 100 x 100
32 x 3.0 112 660 1070 865 123 2 100 x 100
32 x 3.0 125 760 1170 860 137 2 100 x 100
32 x 3.0 137 690 1160 885 150 2 100 x 100
32 x 3.0 150 782 1240 880 164 2 100 x 100
32 x 3.0 162 710 1240 880 177 2 100 x 100

40 x 3.7 50 680 970 870 87 2 100 x 100


40 x 3.7 60 880 1195 850 104 2 100 x 100
40 x 3.7 70 770 1125 865 121 2 100 x 100
40 x 3.7 80 690 1120 910 139 2 100 x 100
40 x 3.7 90 770 1190 900 156 2 100 x 100
40 x 3.7 102 725 1190 900 177 2 100 x 100
40 x 3.7 112 835 1260 900 194 2 120 x 120
40 x 3.7 127 860 1235 1360 220 1 100 x 100

40 x 3.7 140 765 1190 1400 242 1 120 x 120


40 x 3.7 152 830 1250 1400 263 1 120 x 120
40 x 3.7 165 830 1360 1220 282 1 120 x 120
40 x 3.7 175 925 1440 1220 303 1 120 x 120
40 x 3.7 185 835 1335 1370 317 1 120 x 120
40 x 3.7 200 870 1425 1220 341 1 120 x 120
40 x 3.7 215 830 1380 1370 372 1 120 x 120
40 x 3.7 225 850 1480 1220 385 1 120 x 120
40 x 3.7 240 910 1540 1220 410 1 120 x 120
40 x 3.7 250 800 1500 1220 427 1 120 x 120
40 x 3.7 265 875 1510 1370 458 1 150 x 150
40 x 3.7 275 905 1530 1370 476 1 150 x 150
40 x 3.7 290 805 1510 1370 500 1 150 x 150
40 x 3.7 300 865 1575 1370 519 1 150 x 150

Table 25: Coil dimensions of geothermal probes PN 16

Tolerances:
ID+AD = + / – 50 mm
H = + / – 50 mm
03/10/2016 | EWS-2082

)) Date: 27/07/2016. We reserve the right to amend products and dimensions

38
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

13.7.2. Coil dimensions of geothermal probes PN 20

Dimension Length ID AD Height (H) Weight Qty / Pal. Pallet


mm m mm mm mm kg cm
40 x 4.5 200 880 1415 1220 400 1 120 x 120
40 x 4.5 215 800 1365 1390 430 1 120 x 120
40 x 4.5 225 835 1495 1230 450 1 120 x 120
40 x 4.5 240 905 1540 1230 480 1 120 x 120
40 x 4.5 250 805 1510 1230 500 1 120 x 120
40 x 4.5 265 900 1500 1390 530 1 150 x 150
40 x 4.5 275 900 1500 1390 550 1 150 x 150
40 x 4.5 290 825 1505 1390 580 1 150 x 150
40 x 4.5 300 895 1575 1390 600 1 150 x 150

Table 26: Coil dimensions of geothermal probes PN 20

Tolerances:
ID+AD = + / – 50 mm
H = + / – 50 mm

)) Date: 27/07/2016. We reserve the right to amend products and dimensions.

13.7.3. Coil dimensions of geothermal probes VARIO

Dimension Length ID AD Height (H) Weight Qty / Pal. Pallet


mm m mm mm mm kg cm
40 x 3.7– 4.1 180 835 1335 1380 315 1 120 x 120
40 x 3.7– 4.3 190 870 1370 1380 334 1 120 x 120
40 x 3.7– 4.5 200 870 1425 1220 352 1 120 x 120
40 x 3.7– 4.5 215 830 1380 1390 426 1 120 x 120
40 x 3.7– 4.5 225 850 1480 1230 446 1 120 x 120
40 x 3.7– 4.5 240 910 1540 1240 476 1 120 x 120
40 x 3.7– 4.5 250 800 1500 1240 495 1 120 x 120

Table 27: Coil dimensions of Vario geothermal probes

Tolerances :
ID+AD = + / – 50 mm
H = + / – 50 mm

)) Date: 27/07/2016. We reserve the right to amend products and dimensions.


03/10/2016 | EWS-2082

39
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

13.7.4. Coil dimensions of geothermal probes FLUX

Dimension Length ID AD Height (H) Weight Qty / Pal. Pallet


mm m mm mm mm kg cm
43 x 3.5 – 6.5 200 870 1490 1290 380 1 150 x 200
43 x 3.5 – 6.5 215 960 1570 1290 410 1 150 x 200
43 x 3.5 – 6.5 225 1020 1630 1290 430 1 150 x 200
43 x 3.5 – 6.5 240 910 1600 1290 470 1 150 x 200
43 x 3.5 – 6.5 250 910 1600 1290 500 1 150 x 200
43 x 3.5 – 6.5 265 860 1550 1460 540 1 150 x 200
43 x 3.5 – 6.5 275 910 1600 1460 570 1 150 x 200
43 x 3.5 – 6.5 290 970 1660 1460 600 1 150 x 200
43 x 3.5 – 6.5 300 1020 1710 1460 630 1 150 x 200
43 x 3.5 – 6.5 320 940 1710 1640 690 1 150 x 200

Table 28: Coil dimensions of geothermal probes FLUX

Tolerances :
ID+AD = + / – 50 mm
H = + / – 50 mm

)) Date: 27/07/2016. We reserve the right to amend products and dimensions.

03/10/2016 | EWS-2082

40
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

13.7.5. Coil dimensions of injection pipes

Dimension Length ID AD Height (H) Weight Qty / Pal. Pallet


mm m mm mm mm kg cm
25 x 2.3 52 740 955 120 9.0 10 80 x 80
25 x 2.3 62 725 990 140 10.7 10 80 x 80
25 x 2.3 72 660 915 150 12.4 10 80 x 80
25 x 2.3 82 620 930 150 14.1 10 80 x 80
25 x 2.3 92 700 995 150 15.8 10 100 x 100
25 x 2.3 102 650 995 150 17.6 10 100 x 100
25 x 2.3 114 735 1030 175 19.6 10 100 x 100
25 x 2.3 129 730 1070 150 22.2 10 100 x 100
25 x 2.3 142 705 1140 150 24.4 10 100 x 100
25 x 2.3 154 722 1100 175 26.5 10 100 x 100
25 x 2.3 167 680 1105 175 28.7 10 100 x 100
25 x 2.3 177 710 1060 210 30.1 8 100 x 100
25 x 2.3 187 760 1155 210 32.0 8 100 x 100
25 x 2.3 202 710 1140 210 34.8 8 100 x 100
25 x 2.3 227 710 1200 210 39.1 8 100 x 100
25 x 2.3 252 705 1230 210 43.4 8 100 x 100
25 x 2.3 277 700 1260 210 47.7 8 120 x 120
25 x 2.3 302 685 1255 210 52.0 8 120 x 120

32 x 3.0 104 830 1100 255 28.5 8 100 x 100


32 x 3.0 114 710 1050 255 31.3 8 100 x 100
32 x 3.0 129 825 1150 255 35.4 8 100 x 100
32 x 3.0 142 730 1170 255 38.9 8 100 x 100
32 x 3.0 154 815 1205 255 42.2 8 120 x 120
32 x 3.0 167 730 1190 255 45.8 8 120 x 120
32 x 3.0 177 790 1250 255 48.5 8 120 x 120
32 x 3.0 187 850 1295 255 51.2 8 120 x 120
32 x 3.0 202 780 1275 255 55.4 8 120 x 120
32 x 3.0 227 800 1245 325 62.2 5 120 x 120
32 x 3.0 252 750 1245 325 69.1 5 120 x 120
32 x 3.0 277 840 1355 325 75.9 5 120 x 120
32 x 3.0 302 720 1255 360 82.8 5 120 x 120

Table 29: Coil dimensions of injection pipes

The PE-HD injection pipe temporarily withstands en injection pressure up to 32 bar @ 20°C.

)) Date: 27/07/2016. We reserve the right to amend products and dimensions


03/10/2016 | EWS-2082

41
42
22
Drilling report/Lager description
© FWS (Mustervorlage SIA/BAFU)

Approval No.: ..................................................................... dated: ........................................................................... Order No.: ......................................................................................................................


Technical Manual

Drill Master: ........................................................................ Object: .......................................................................... Location/Municipality: .....................................................................................................


Technical Handbook

Drilling start : ................. end: ......................... Coordinates: ................................................. Height: ............ ( estimated,  measured) Borehole No. ........ of ................. Borehole acc. to location sketch
13.8. Drilling log template

Water content Drill Wet / Incidents relevant to


Depth Description of the material drilled / layer description Remarks

Figure 26: Drilling log template


type Dry water protection
to Type, Properties Colour S / H drilled Observations WZ SV IV K G Depth

wet
damp
dry
    
    
    
    
    
    
    
    
    
    

……….. Final depth (drill depth)     

Drill unit: Piping, Æ


9.7. Sample Drilling Report (according to SIA 384/6:2010 ©FWS Mustervorlage rev. SIA)

Sampling: all .............................

Drill elevation: ........................ +“/- 0.0m drill elevation to depth in m


Samples:collected
Drill bit (Model, Æ):  taken
 Inclined bore: Direction: ................ Angle: ...................... (SM: step bit, RM: roller bit, IH:
 deposited
Giessenstrasse

Down-the-hole hammer, EX:


CH-8717 Benken

Date: Eccentric)
 where.................
CH-8717 3Benken
Fax

S = Flush boring
H = Hammer drilling
~ = wet drilled
- = dry drilled
Water entry
Injection losses
Caverns
Suspicion of gas

Flushing losses

Signature Drill master


Telefon

Source: SIA 384/6:2010


Fax+41 (0)55
HakaGerodur

Source: SIA 384/6:2010)


+41 (0)55
+41 (0)55 293 25 99
293 25293
25 25 99
Giessenstrasse 3 Telefon+41 (0)55 293 25 25

03/2010 | EWS-2078

03/10/2016 | EWS-2082
Technical Manual
HakaGerodur
Giessenstrasse 3 Telefon+41 (0)55 293 25 25
Technical Handbook Giessenstrasse
CH-8717 3 Benken
Telefon Fax
+41 (0)55
+41293 25 25
(0)55 293 25 99
CH-8717 Benken Fax +41 (0)55 293 25 99

13.9. Sample test and acceptance report


9.8. Sample Test and Acceptance Report (according to SIA 384/6:2010)

Object: Order No. :


Geothermal probes No.

Factory Identification Number ID:

Roll pair number (e.g. 0040) No.

Length (integrated probe) m

External diameter / Wall thickness mm / / /


Flow check Test date
KL1/KL2 KL1 KL2 KL1/KL2 KL1 KL2 KL1/KL2 KL1 KL2
Water flow volume l / min
Pressure during flow bar
Condition met? Yes / No
Leakage test Test date
acc. to SIA 384/6 (based on SN EN 805) Set value Actual value Set value Actual value Set value Actual value
Read-out accuracy 0.01 bar KL1/KL2 KL 1 KL2 KL1/KL2 KL1 KL2 KL1/KL2 KL1 KL2

Sequence Test pressure procedure for: bar


in minutes (Dependent on the length of the EWS and the
density of the back-filling; see SIA 384/2 Appendix
B2 Tab. 4)
Filling probe with water
0 Apply test pressure bar
10 Pressure at end of pressure bar
maintenance
60 End of static pressure drop bar
(perm. pressure drop acc. to manufacturer)
Pressure after pressure
reduction bar
(Reduction 10% of the test pressure, min.
1 bar)
Quantity of drained water l
(acc. to SIA 384/6, Appendix B2, Tab. 5)

65 Pressure read out bar


75 Pressure read out bar
90 Pressure at end of main test bar
Condition met: Yes / No
Back-filling Standard: 100 kg Bentonit, 200 kg
cement, 900 l water Date
Bentonit Cement Water Bentonit Cement Water Bentonit Cement Water
Quantity in kg Bentonit, cement, water
or ready-mix: manufacturer, water/100 kg
Total quantity of back-filling in kg / spec. gravity in
kg/m3
yes/no Metre UK Terrain yes/no Metre UK Terrain yes/no Metre UK Terrain
Until UKT met, Yes, if NI up to Metre UKT
Acceptance SIA Norm 118 Polish:
Place and date: Construction manager:
03/2010 | EWS-2078
03/10/2016 | EWS-2082

Figure 27:SIA
Source: Sample test and acceptance report, (Source: SIA 384 / 6:2010)
384/6:2010
23

43
Welding and laying of pipelines from PE laid end-to-end

44
24
Figure
VKR 7. Heated –coil welding

Welding Report

for electrofusion (heated –coil welding)


Technical Manual

PE 100 �
Technical Handbook

Company carrying out *Construction site


Building owner the work Welding unit *Weather protection

sunny 1 None 1

dry 2 Screen 2
Object Welder Manufacture
rain 3 Tent 3

Heated 4
*Construction
Volt (sec. Cooling Mains
No. Date Pipe Ø Series/SDR Ohm Ω Resistance Welding time Temperature *Weather site Generator Signature fitter
voltage) time operation
protection

28: Sample record for the heated coil welding of pipes


9.9. Sample report for the heated-coil welding of pipelines
13.10. Sample record for the heated coil welding of pipes

Copyright by VKR, Verband Kunststoff-Rohre and –Rohrleitungsteile (11.09) A 7.2


Giessenstrasse 3
CH-8717 Benken

Source: VKR, Verband Kunststoff-Rohre and Rohrleitungsteile (Association for Plastic Pipes and Plastic Pipe Components, 5000 Aarau, Switzerland
Fax
CH-8717 Benken Fax
HakaGerodur
+41 (0)55 293 25 99
Telefon +41 (0)55 293 25 25
+41 (0)55 293 25 99
Giessenstrasse 3 Telefon+41 (0)55 293 25 25

03/2010 | EWS-2078

03/10/2016 | EWS-2082
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

14. Certificates for GEROtherm® geothermal systems

14.1. SKZ
03/10/2016 | EWS-2082

Figure 29: SKZ certificate

45
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

14.2. Kiwa – Komo

KOMO®
technical approval-with-product certificate
Number K84660/01 Replaces -

Issued 2014-09-09 Dated -

Valid until Indefinite Page 1 of 3

Plastics piping systems intended for geothermal heat exchange

GEROTHERM® Geothermal Systems


STATEMENT BY KIWA
This technical approval-with-product certificate is issued by Kiwa on the basis of BRL 5219
"Plastics piping systems intended for geothermal heat exchange in closed loops’" issued on
8 November 2013 by Kiwa, in accordance with the Kiwa regulations for product certification.

Kiwa declares that legitimate confidence exists that:


- the by the producer manufactured products comply with the technical specifications as laid
down in this technical approval-with-product certificate provided that they have been marked
®
with the KOMO -mark in the manner as indicated in this technical approval-with-product
certificate;
- the with certified products composed Gerotherm® system provides the performances as
described in the technical approval-with-product certificate, provided that:
- the manufacturing of the Gerotherm® system intended for heating systems takes place
according to the processing methods as laid down in this technical approval-with-
product certificate;
- the application conditions as described in this approval-with-product certificate are met.

Within the framework of this technical approval-with-product certificate Kiwa does not impose any
inspections with regard to the production of other parts of the Gerotherm® system, nor the
manufacturing of the Gerotherm® system itself.

Bouke Meekma
Kiwa

The certificate is listed in the overview on the website of Stichting KOMO: www.komo.nl.
Advice: consult www.kiwa.nl in order to ensure that this certificate is still valid.

Kiwa Nederland B.V. HakaGerodur AG


Sir Winston Churchilllaan 273 Giessenstrasse 3
Postbus 70 8717 Benken
2280 AB RIJSWIJK Switzerland
The Netherlands T +41 (0)55 293 25 25
Tel. +31 70 414 44 00 F +41 (0)55 293 25 99
Fax +31 70 414 44 20 E secretariat@hakagerodur.h
info@kiwa.nl I www.hakagerodur.ch
www.kiwa.nl

Evaluated is:
Quality system
Product in application
Periodic inspection

Figure 30: Kiwa – Komo certificate


03/10/2016 | EWS-2082

46
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

14.3. ISO 9001:2008


03/10/2016 | EWS-2082

Figure 31: ISO 9001:2008 certificate

47
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

15. Appendix

15.1. Table of figures

Figure 1: Overview of geothermal energy..................................................................................................................................................................3


Figure 2: Energy balance of near-surface geothermal energy................................................................................................................................4
Figure 3: Overview of GEROtherm® systems..............................................................................................................................................................5
Figure 4: GEROtherm® manufacturing certificate for geothermal probes............................................................................................................6
Figure 5: Total greenhouse gas emissions in the manufacture, transport and disposal of different materials ...........................................10
Figure 6: Wall thickness distribution with internal pressure and buckling pressure resistance of a GEROtherm® Vario............................12
Figure 7: Wall thickness distribution and pressure resistance of a GEROtherm® FLUX geothermal probe...................................................13
Figure 8: Dimensions of the probe foot GEROtherm® FLUX.................................................................................................................................13
Figure 9: Installation overview of the GEROtherm® SAVE collector / distributor...............................................................................................19
Figure 10: Layout diagram of the SAVE collector / distributor..............................................................................................................................20
Figure 11: Possible applications GEOtight® fabric packer......................................................................................................................................22
Figure 12: Description of the components of the fabric packer...........................................................................................................................22
Figure 13: Example showing installation of the fabric packer..............................................................................................................................23
Figure 14: Pressure testing of geothermal probes on the basis of SN EN 805...................................................................................................24
Figure 15: Laying instructions for soil collectors......................................................................................................................................................25
Figure 16: Example of round grain gravel................................................................................................................................................................27
Figure 17: Reel with PE pipes.....................................................................................................................................................................................28
Figure 18: Working conditions...................................................................................................................................................................................30
Figure 19: Machining work in the welding area.....................................................................................................................................................30
Figure 20: Cleaning the surface to be worked on..................................................................................................................................................30
Figure 21: Scanning parameters, welding and compliance with cooling-down time.......................................................................................30
Figure 22: Long-period internal pressure diagram PE100.....................................................................................................................................35
Figure 23: Diagram of relative pressure loss............................................................................................................................................................36
Figure 24: Diagram of frost-proofness......................................................................................................................................................................36
Figure 25: Diagram of conductivity...........................................................................................................................................................................37
Figure 26: Drilling log template.................................................................................................................................................................................42
Figure 27: Sample test and acceptance report, (Source: SIA 384 / 6:2010).......................................................................................................43
Figure 28: Sample record for the heated coil welding of pipes............................................................................................................................44
Figure 29: SKZ certificate............................................................................................................................................................................................45
Figure 30: Kiwa – Komo certificate...........................................................................................................................................................................46
Figure 31: ISO 9001:2008 certificate........................................................................................................................................................................47
03/10/2016 | EWS-2082

48
Technical Manual Giessenstrasse 3 Telefon+41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

15.2. List of tables

Table 1: Near-surface geothermal energy systems...................................................................................................................................................5


Table 2: Possible extraction capacity of soil collectors.............................................................................................................................................6
Table 3: Overview of GEROtherm® small manholes.................................................................................................................................................8
Table 4: Overview of GEROtherm® manhole types 1 / 2 / 3 / 4..............................................................................................................................9
Table 5: Material properties of GEROtherm® geothermal probes........................................................................................................................11
Table 6: Comparison of the pressure losses of GEROtherm® VARIO and PN 20...............................................................................................12
Table 7: Comparison of pressure losses GEROtherm® PN 20 / VARIO................................................................................................................13
Table 8: Pressure loss comparison: GEROtherm® FLUX and PN 20......................................................................................................................14
Table 9: TRT GTP Ø 40 mm PN 20 300 m................................................................................................................................................................14
Table 10: TRT GTP FLUX Ø 43 mm 293 m...............................................................................................................................................................14
Table 12: Comparison of pressure loss of GEROtherm® PN 20 / FLUX................................................................................................................15
Table 14: Suitable heat carriers Source SIA 384 / 6:2010, SN 546 384 / 6, issue 2010...................................................................................17
Table 15: Popular pipe series (Source VKR Pipes laid in soil).................................................................................................................................17
Table 16: Overview of collectors / distributors........................................................................................................................................................20
Table 17: Description of the components of the fabric packer............................................................................................................................22
Table 18: Content of geothermal probes.................................................................................................................................................................30
Table 19: Total brine volume......................................................................................................................................................................................31
Table 20: Assumed pressure loss SAVE....................................................................................................................................................................31
Table 21: Total pressure loss in the system..............................................................................................................................................................31
Table 22: Pressure loss table of pressurised water pipes PE100-RC, S5, SDR 11, PN 16 Ø 25 – 75 mm......................................................32
Table 23: Pressure loss table of pressurised water pipes PE100-RC, S5, SDR 11, PN 16 Ø 90 – 160mm.....................................................33
Table 24: Pressure loss table of pressurised water pipes PE100-RC, S4, SDR 9, PN 20 Ø 40 – 50 mm.........................................................34
Table 25: Coil dimensions of geothermal probes PN 16.......................................................................................................................................38
Table 26: Coil dimensions of geothermal probes PN 20.......................................................................................................................................39
Table 27: Coil dimensions of Vario geothermal probes.........................................................................................................................................39
Table 28: Coil dimensions of geothermal probes FLUX.........................................................................................................................................40
Table 29: Coil dimensions of injection pipes...........................................................................................................................................................41
03/10/2016 | EWS-2082

49
Technisches Handbuch
Giessenstrasse 3 Telefon +41 (0)55 293 25 25
CH-8717 Benken Fax +41 (0)55 293 25 99

Standorte HakaGerodur
16. HakaGerodur AG sites AG

Gossau Benken Neustadt in Sachsen

HakaGerodur AG HakaGerodur AG GERODUR MPM


Mooswiesstrasse 67 Giessenstrasse 3 Kunststoffverarbeitung GmbH & & Co.
Co. KG
KG
Postfach CH-8717 Benken SG SG Andreas-Schubert-Strasse 6
CH-9201 Gossau SG
CH-9200 Telefon +41 (0)55
Telefon +41 (0)55 293
293 25 25 D-01844 Neustadt inin Sachsen
Sachsen
Telefon +41
Telefon +41 (0)71
(0)71 388
388 94
94 94
94 Fax
Fax +41 (0)55
+41 (0)55 293
293 25 99 Telefon +49 (03596)
Telefon +49 (03596) 58
58 33-0
Fax
Fax +41 (0)71
+41 (0)71 388
388 94
94 80
80 sekretariat@hakagerodur.ch Fax
Fax +49 (03596)
+49 (03596) 60
60 24 04
sekretariat@hakagerodur.ch www.hakagerodur.ch info@gerodur.de
www.hakagerodur.ch www.gerodur.de

Gesamtverkaufsprogramm
Total Sales Range
Heating & Plumbing
Geschäftsbereich Division,
Heizung Gossau/Benken/
+ Sanitär,
Neustadt
Gossau / Neustadt
•• Fussbodenheizungsrohre
Underfloor heating pipesaus made of PE 100-RT, PB
and
PE PE-X PB und PE-X
100-RT,
•• Mehrschicht-Verbundrohre
Multi-layered composite pipes aus made of plastic/
Kunststoff/Metall
metal
• Sanitärrohre
• Sanitary pipes
• Spezialrohre, z.B. für Deckenkühlung
• Special pipes, e.g. for chilled ceilings or oil product
oder Ölprodukteleitungen
pipes

Geschäftsbereich
Pipe Systems Division, Rohrsysteme,
Benken/Neustadt
Benken/Neustadt
• Pressurised PE pipes for
•• PE-Druckrohre für
Gas / Water / Waste water
• Gas / Wasser
GEROfit ® / Abwasser
protective pipe sleeve
GEROfit®-Schutzmantelrohr
•• GEROfit ®
REX – Impermeable protective pipe sleeve
•• Kanalisations-
Sewage and seepage pipes
und Sickerrohre
•• Kabelschutz
Cable protection
rohre pipes
•• Hausentwässerungsrohre
Residential drainage pipes
•• Rohre
Pipes für
for Industrieanwendungen
industrial applications (liquids / gas
transport)
(Flüssigkeiten- / Gastransport)
•• Konfektionierte
Assembled plastic components
Kunststoffteile
Geothermal Probe Division, Benken
Geschäftsbereich Erdwärmesonden, Benken
• Pipe systems for using near-surface geothermal
• Rohrsysteme
energy for airzur Nutzung der
conditioning (cooling and heating)
oberflächennahen
of buildings geothermischen Energie zum
Klimatisieren (Kühlen und Heizen)
• Comprehensive range of accessories von Gebäuden
• Umfassendes Zubehör-Programm
Profiles Division, Gossau
Geschäftsbereich
• Profiles made of Profile, Gossau
polyolefins / technical plastics for
mechanical
• Profile engineering,
aus Polyolefinen environmental
/ techn. enginee-
Kunststoffen für
ring, lighting, construction,
Maschinenindustrie, furnitureBeleuchtung,
Umwelttechnik, etc.
• Bau,
In-house
Möbel design
u.a. (CAD) with tool making
• Eigene Konstruktion (CAD) mit Werkzeugbau
03/10/2016 | EWS-2082

Das könnte Ihnen auch gefallen