Sie sind auf Seite 1von 2

KEBUTUHAN BAHAN

No. URAIAN PEKERJAAN VOL SAT UKURAN HARGA SATUAN TOTAL HARGA

1 2 3 4 5 6 7
PEKERJAAN : Pembangunan Rumah Tinggal 2 (Dua) Lantai 332 M2/420 M2
LOKASI : Kota Jayapura
I. KEBUTUHAN BAHAN BESI
1. PONDASI POER PLAT

@ Pondasi = 24 Buah
Panjang = 0.8 M1
Lebar = 0.8 M1

D13-150
20

Tinggi = 0.2 M1
VOLUME = 3.072 M3

20

80
PEMBESIAN
Panjang1 = 0.80 M1
Panjang2 = 0.80 M1 D13-150

Lebar1 = 0.80 M1
Lebar2 = 0.80 M1
Jarak Besi = 0.15 M1 80

Panjang1 = 6.97 M1 1001.47 Kg


Panjang2 = 6.97 M1 21.00 Zak Semen Rp 95,000.00 Rp 1,995,000.00
Lebar1 = 6.02 M1 HARGA SEMEN Rp 1,995,000.00
Lebar2 = 6.02 M1
= 25.97 M1 1.67 m3
Jumlah = 24 Bh 0.40 Ret Pasir Beton Rp 800,000.00 Rp 320,000.00
Total Panjang Besi = 623.2 M1 HARGA PASIR BETON Rp 320,000.00
Luas Bekisting = 15.36 M2
2.34 m3
0.60 Ret Cipping Rp 1,100,000.00 Rp 660,000.00
HARGA CIPPING Rp 660,000.00

0.77 M3 Papan Kayu Rp 3,000,000.00 Rp 2,304,000.00


HARGA BEKISTING Rp 2,304,000.00

52.00 Batang D 13 x 12 m Rp 135,000.00 Rp 7,020,000.00

HARGA BESI Rp 7,020,000.00


HARGA PEKERJAAN PONDASI TELAPAK Rp 12,299,000.00
2. KOLOM PEDESTAL 20 x 20
Ø8-150

20
8D13

20

BESI D 13 x 12 m Perhitungan Beton Struktur : Luasan Bekisting :


@ Kolom = 24.00 Buah Panjang = 1.50 M1 28.80 M2
Panjang Besi = 1.50 M1 Lebar = 0.20 M1
Besi D 13 = 8.00 Bh Tinggi = 0.20 M1
Jumlah = 24.00 Bh +
Panjang Total = 36.00 M1 Volume = 1.44 M3
Panjang Besi = 288.00 M1
Jumlah Besi = 24.00 Btg 469.44 Kg
Faktor Lose = 2.00 Btg 10.00 Zak Semen Rp 95,000.00 Rp 950,000.00
Beli Besi = 26.00 Btg HARGA SEMEN Rp 950,000.00

BESI Ø 8 x 12 m 0.78 m3
@ Kolom = 24 Buah 0.20 Ret Pasir Beton Rp 800,000.00 Rp 160,000.00
Panjang Kolom = 1.5 M1 HARGA PASIR BETON Rp 160,000.00
Panjang Total = 36 M1
Panjang Sengkang = 0.82 M1 1.10 m3
Jarak Sengkang = 0.15 M1 0.30 Ret Cipping Rp 1,100,000.00 Rp 330,000.00
Jumlah Sengkang = 241 Bh HARGA CIPPING Rp 330,000.00
Panjang Total = 197.62 M1
Jumlah Besi = 16.47 Btg 1.44 M3 Papan Kayu Rp 3,000,000.00 Rp 4,320,000.00
Faktor Lose = 2 Btg HARGA BEKISTING Rp 4,320,000.00
Beli Besi = 19 Btg
26.00 Batang D 13 x 12 m Rp 135,000.00 Rp 3,510,000.00
19.00 Batang Ø 8 x 12 m Rp 65,000.00 Rp 1,235,000.00
HARGA BESI Rp 4,745,000.00
HARGA PEKERJAAN KOLOM PEDESTAL Rp 10,505,000.00
KEBUTUHAN BAHAN
No. URAIAN PEKERJAAN VOL SAT UKURAN HARGA SATUAN TOTAL HARGA

1 2 3 4 5 6 7
3. SLOOF 20 x 30
Ø8-150

30
8Ø12

20

Panjang Vertikal = 81.5 M1 Perhitungan Beton Struktur : Luasan Bekisting :


Panjang Horizontal = 26.98 M1 Panjang = 108.48 M1 65.09 M2
Panjang Total = 108.48 M1 Lebar = 0.20 M1
Tinggi = 0.30 M1
BESI Ø 12 x 12 m Jumlah = 1.00 Bh +
Besi Ø 12 = 8 Bh Volume = 6.51 M3
Panjang Besi = 867.84 M1
Jumlah Besi = 72.32 Btg 2121.87 Kg
Faktor Lose = 2 Btg 43.00 Zak Semen Rp 95,000.00 Rp 4,085,000.00
Beli Besi = 75 Btg HARGA SEMEN Rp 4,085,000.00

BESI Ø 8 x 12 m 3.53 m3
Panjang Sengkang = 0.99 M1 0.80 Ret Pasir Beton Rp 800,000.00 Rp 640,000.00
Jarak Sengkang = 0.13 M1 HARGA PASIR BETON Rp 640,000.00
Jumlah Sengkang = 835.461538461538 Bh
Panjang Total = 827.106923076923 M1 4.96 m3
Jumlah Besi = 68.93 Btg 1.30 Ret Cipping Rp 1,100,000.00 Rp 1,430,000.00
Faktor Lose = 2 Btg HARGA CIPPING Rp 1,430,000.00
Beli Besi = 71 Btg

3.25 M3 Papan Kayu Rp 3,000,000.00 Rp 9,763,200.00


HARGA BEKISTING Rp 9,763,200.00

75.00 Batang Ø 12 x 12 m Rp 119,000.00 Rp 8,925,000.00


71.00 Batang Ø 8 x 12 m Rp 65,000.00 Rp 4,615,000.00
HARGA BESI Rp 13,540,000.00
HARGA PEKERJAAN SLOOF Rp 29,458,200.00

II. KEBUTUHAN PONDASI BATU BELAH


30

VOLUME PONDASI
Panjang Vertikal = 89.50 M1
MUKA TANAH TIMBUNAN

Panjang Horisontal = 42.90 M1 +


Panjang Total = 132.40 M1 PAS. BATU BELAH 1:4

Lebar Atas = 0.30 M1


Lebar Bawah = 0.50 M1
Tinggi Pondasi = 1.5 M1

130
Luasan Pondasi trapesium = 0.6 M2

150
Volume Pondasi = 79.44 M3
Kebutuhan Semen / M3 = 11916 Kg
MUKA TANAH ASLI

Kebutuhan Semen / Zak = 238.32 Zak

20
Kebutuhan Pasir / M3 = 41.3088 M3
50

88.00 M3 Batu Belah


22.00 Ret Batu Belah Rp 800,000.00 Rp 17,600,000.00
HARGA BATU BELAH Rp 17,600,000.00

11916.00 Kg
239.00 Zak Semen Rp 95,000.00 Rp 22,705,000.00
HARGA SEMEN Rp 22,705,000.00

41.31 m3
10.00 Ret Pasir Pasang Rp 800,000.00 Rp 8,000,000.00
HARGA PASIR PASANG Rp 8,000,000.00

HARGA PEKERJAAN PONDASI Rp 48,305,000.00


III. KEBUTUHAN TIMBUNAN KARANG PADAT

VOLUME PONDASI
Panjang = 35.00 M1
Lebar = 12.00 M1
Tinggi = 1.5 M1 x
Volume Timbunan = 630 M3

630.00 M3 Karang
140.00 Ret Karang Rp 300,000.00 Rp 42,000,000.00
HARGA TIMBUNAN Rp 42,000,000.00

HARGA PEKERJAAN TIMBUNAN Rp 42,000,000.00


ESTIMASI KEBUTUHAN BAHAN KONSTRUKSI :
Uraian Pekerjaan Pasir Batu Belah Semen Cipping Besi D 13 Besi Ø 12 Besi Ø 8 Karang Papan Bekisting
Ret Ret Zak Ret Btg Btg Btg Ret M3
1. Pekerjaan Pondasi Telapak 0.40 21.00 0.60 52.00 0.77
2. Pekerjaan Kolom Pedestal 0.20 10.00 0.30 26.00 19.00 1.44
3. Pekerjaan Sloof 0.80 43.00 1.30 75.00 71.00 3.25
4. Pekerjaan Pondasi Batu Belah 10.00 22.00 239.00
5. Pekerjaan Timbunan Karang 140.00

Total Volume Bahan 11.40 22.00 313.00 2.20 78.00 75.00 90.00 140.00 5.46

Total Volume Bahan Rp 9,120,000 Rp 17,600,000 Rp 29,735,000 Rp 2,420,000 Rp 10,530,000 Rp 8,925,000 Rp 5,850,000 Rp 42,000,000 Rp 16,387,200

TOTAL HARGA Rp142,567,200

Das könnte Ihnen auch gefallen