A.

KONVERSI BESI BOREPILE


▪ Desain Awal

- Tulangan Utama : 18D16


- Tulangan Spiral : D13-100

▪ Desain Perubahan

- Tulangan Utama : 13D19


- Tulangan Spiral : D13-100

25-10-2023

Novan
Desain awal ( Tulangan Utama 18D16 , Spiral D13-100 ) menjadi Desain Perubahan (
Tulangan utama 13D19 , Spiral D13-100 ) Masih memenuhi syarat.

B. KONVERSI BESI PILECAP


Desain Awal
Tulangan Atas Pilecap : D25-100
Tulangan Bawah Pilecap : D25-100

Perubahan Desain ( By Project )


Tulangan Atas Pilecap : D22-70
Tulangan Bawah Pilecap : D22-70

Perubahan Desain ( Rekomendasi Eng )


Tulangan Atas Pilecap : D22-100
Tulangan Bawah Pilecap : D22-100

25-10-2023

Novan
PERHITUNGAN GESER 1 ARAH DAN 2 ARAH ( PONDS PONDASI)

d Rerata = Tebal Pondasi - Tebal Selimut - 1 Diamater Tulangan


= 1,7 - 0,1 - 0,022
= 1,578 m
= 1578 mm

Tegangan Ultimate Akibat Beban Terfaktor (Pu) = P/Luas Pondasi

p = 402,7188 Ton
= 4027,188 Kn

Luas Tapak Pondasi = 31,36 m²

Pu = 128,4179847 Kn/m²

A. GESER 1 ARAH

Vu 1 = P ult x Area Efektif

Bentang efektif = 1/2Lebar ( Bentang terpanjang ) - 1/2Lebar Kolom - d


= 2,8 - 1,175 - 0,8125
= 0,8125 m
= 812,5 mm

Luas Area Efektif = Bentang efektif x Lebar Pndasi


= 0,8125 x 5,6
= 4,55 m²

Vu 1 = 584,3018304 Kn

ØVn = Ø(0.17*ƛ Fc'*bo*d


= 0,1275 x 5,477225575 x 8836800
= 6171,146238 Kn

ØVn > Vu 1

6171,146238 > 584,3018304 (Kn) ok!!!! Checking 1 Arah

25-10-2023

Novan
b.Geser 2 Arah

Vu 2 = Pult x Area Efektf


Area Efektif = ( Lebar Kolom / Bentang Panjang )² - ( C+D)²
Area Efektif = 31,36 - 10,00140625
= 21,35859375 m²
=

Vu 2 = 128,4179847 x Luas Area Efektif


= 128,4179847 x 21,35859375
= 2742,827565 Kn

Nilai Kuat Geser Ponds 2 arah ditentukan dari nilai terkecil

Vc 1 = 0.17 (1+2/ɞ)*ƛ fc'b0.d

= 0,51 X 5,477225575 x 19961700


= 55760714,22 N

Vc 2 = 0.083((αs*d)/bo + 2)ƛ fc'*bo*d

= 0,083 x 740,8126852 x 1 x 5,477225575 x 19961700


= 6722714289 N

Vc 3 = 0.33ƛ Fc'*bo*d
= 0,33 x 5,477225575 x 19961700
= 36080462,14 N

diambil nilai Vc terkecil = 36080462,14 N


= 36080,46214 Kn

ØVn = 27060,34661 Kn
Vu 2 = 2742,827565 Kn

Syarat:
ØVn > Vu 2

27060,34661 > 2742,827565 ok!!!!! Checking Geser 2 Arah

25-10-2023

Novan
PENULANGAN PILECAP

Mu = ( Pnetto x B x l²) / 2

Mu = 1039,158332 Kn.m

Rn = Mu
Øbd²

= 1039158332
12550023360
= 0,082801307

p perlu = 0.85 fc' x ( 1- 1-(2Rn/0.85fc'))


fy
(2Rn/0.85fc') = 0,00649422
1-(2rRn/0.85fc') = 0,99350578

p perlu = 0,060714286 x 1 - 0,996747601


= 0,000197467

As Perlu = P perlu x B X d
= 0,000197467 x 5600 x 1578
= 1744,977172 mm²

As min = P min x B X d

P min = 0.85 fc' x ( 1- 1-(2Rn/0.85fc'))


fy
Rn min = Mu
Øbd²
= 1039158332
14565600000
= 0,071343325

25-10-2023

Novan
(2Rn/0.85fc') = 0,005595555
1-(2rRn/0.85fc') = 0,994404445

P min = 0,060714286 X 1 - 0,997198298


= 0,000170103

As min = 1619,383879 mm²

Diambil Nilai As pelu = 1744,977172 mm²

TULANGAN YANG DIPAKAI


Rencana
Ø 22 = 22 mm
Luas Tulangan = 379,94 mm²
As Perlu = 1744,977172

Maka dibutuhkan jarak Tulangan = 217 mm


= D25 - 100

Desain awal Tul. Pilecap D25-100 menjadi Desain Perubahan D22-100 Masih memenuhi syarat.