TOTAL I. - V. 895,075,945
RENCANA ANGGARAN BIAYA
PEKERJAAN PERKERASAN PAVING JALAN LINGKUNGAN
AURORA VALLEY
BUKIT SEMARANG BARU
Total 1,812,867,452
RENCANA ANGGARAN BIAYA
PEKERJAAN INFRASTRUKTUR
AURORA VALLEY
BUKIT SEMARANG BARU
Total 2,707,943,397
contigency 5 % 135,397,170
TOTAL 2,843,340,567
Dibulatkan 2,843,000,000
6. Drain hole pipa PVC 1.5" (pipa + ijuk) 611.65 m' 150,000 91,748,170
Total 659,547,670
contigency 5 % 32,977,384
TOTAL 692,525,054
Dibulatkan 693,000,000
Apabila disetujui kami merekomendasikan untuk diadakan tender dengan peserta sbb :
• CV. Sumber Waluyo Sejati
• CV. Brillyan Putra Mandiri
• CV. Graha Prima
• CV. MJMS
•
TOTAL I. - V. 524,877,091
RENCANA ANGGARAN BIAYA
PEKERJAAN SALURAN
SALURAN DRAENASE AURORA VALLEY
BUKIT SEMARANG BARU
contigency 5 % 26,243,855
Dibulatkan 551,000,000
Semarang, Semarang, 02 Januari 2019
PT. HIJAU CIPTA HARMONI
NOTE :
• Pipa beton R dan NR ex. Lokal
Apabila disetujui kami merekomendasikan untuk diadakan tender dengan peserta sbb :
• CV. Bangun Indah Perkasa
• CV. Brillyan Putra Mandiri
• CV. Sumber Waluyo Sejati
Adapun untuk pelaksanaan hari dan tanggal sebagai berikut :
• Undangan tender 11 Januari 2019
• Pengambilan dokumen & aanwijzing 15 Januari 2019
• Penawaran 22 Januari 2019
• Klarifikasi 25 Januari 2019
• Pengumuman pemenang 28 Januari 2019
pipa suling
plesteran
beraben
dimensi
galian
pasir
(H1 + h2 ) x b2 x p
NO
N – (H + I)
n*p x ps
0.05
p h1 h2 b1 b2 0.05 n 3 ps
m m m m m m3 m3 m3 bh bh m m m3 m3 m2
1 a 105.00 0.65 0.50 0.30 0.50 0.02 31.50 2.63 1 36.00 0.38 13.68 53.55 -24.68 71.41 68.25
2 b 221.00 0.70 0.50 0.30 0.50 0.02 66.30 5.53 1 74.67 0.38 28.37 117.13 -56.36 160.89 154.70
3 c 76.00 0.75 0.50 0.30 0.50 0.02 22.80 1.90 1 26.33 0.38 10.01 41.80 -20.90 58.99 57.00
4 d 37.35 0.80 0.50 0.30 0.50 0.02 11.21 0.93 1 13.45 0.38 5.11 21.29 -11.02 30.80 29.88
5 e 8.00 0.90 0.50 0.30 0.50 0.02 2.40 0.20 1 3.67 0.38 1.39 4.88 -2.68 7.38 7.20
6 f 8.00 0.95 0.50 0.30 0.50 0.02 2.40 0.20 1 3.67 0.38 1.39 5.04 -2.84 7.77 7.60
7 g 48.75 1.00 0.60 0.30 0.60 0.03 20.48 1.46 2 34.50 0.89 30.71 39.49 -20.48 50.90 48.75
8 h 43.93 1.10 0.60 0.30 0.60 0.03 18.45 1.32 2 31.29 0.89 27.85 37.56 -20.43 50.09 48.32
9 i 8.00 1.15 0.60 0.30 0.60 0.03 3.36 0.24 2 7.33 0.89 6.53 7.02 -3.90 9.51 9.20
10 j 24.00 1.20 0.60 0.30 0.60 0.04 10.08 0.72 2 18.00 0.89 16.02 21.60 -12.24 29.69 28.80
11 k 8.00 1.25 0.60 0.30 0.60 0.04 3.36 0.24 2 7.33 0.89 6.53 7.38 -4.26 10.28 10.00
12 l 8.00 1.30 0.60 0.30 0.60 0.04 3.36 0.24 2 7.33 0.89 6.53 7.56 -4.44 10.67 10.40
13 m 8.00 1.40 0.60 0.30 0.60 0.04 3.36 0.24 2 7.33 0.89 6.53 7.92 -4.80 11.45 11.20
14 n 8.00 1.45 0.60 0.30 0.60 0.04 3.36 0.24 2 7.33 0.89 6.53 8.10 -4.98 11.85 11.60
15 o 8.00 1.55 0.70 0.30 0.70 0.05 4.48 0.28 2 7.33 0.89 6.53 10.12 -5.92 12.81 12.40
16 p 4.00 1.75 0.70 0.30 0.70 0.06 2.24 0.14 2 4.67 0.89 4.15 5.46 -3.36 7.18 7.00
17 q 4.00 1.90 0.70 0.30 0.70 0.07 2.24 0.14 2 4.67 0.89 4.15 5.76 -3.66 7.77 7.60
18 r 32.00 2.00 0.80 0.30 0.80 0.08 23.04 1.28 3 35.00 1.54 53.90 55.68 -33.92 65.97 64.00
19 s 12.00 2.05 0.80 0.30 0.80 0.08 8.64 0.48 3 15.00 1.54 23.10 21.21 -13.05 25.32 24.60
20 t 16.00 2.10 0.80 0.30 0.80 0.08 11.52 0.64 3 19.00 1.54 29.26 28.72 -17.84 34.54 33.60
21 u 28.00 2.15 0.80 0.30 0.80 0.09 20.16 1.12 3 31.00 1.54 47.74 51.03 -31.99 61.81 60.20
22 v 32.00 2.20 0.80 0.30 0.80 0.09 23.04 1.28 3 35.00 1.54 53.90 59.20 -37.44 72.20 70.40
23 w 28.00 2.30 0.80 0.30 0.80 0.09 20.16 1.12 3 31.00 1.54 47.74 53.34 -34.30 65.90 64.40
24 x 4.00 2.40 0.80 0.30 0.80 0.10 2.88 0.16 3 7.00 1.54 10.78 7.84 -5.12 9.81 9.60
25 y 4.00 2.45 0.80 0.30 0.80 0.10 2.88 0.16 3 7.00 1.54 10.78 7.95 -5.23 10.00 9.80
26 z 32.00 2.50 0.90 0.30 1.00 0.13 32.00 1.60 3 35.00 1.54 53.90 80.80 -50.40 83.08 80.00
27 a' 24.00 2.55 0.90 0.30 1.00 0.13 24.00 1.20 3 27.00 1.54 41.58 61.38 -38.58 63.46 61.20
28 b' 12.00 2.65 0.90 0.30 1.00 0.13 12.00 0.60 3 15.00 1.54 23.10 31.47 -20.07 32.89 31.80
29 c' 4.00 2.85 0.90 0.30 1.00 0.14 4.00 0.20 3 7.00 1.54 10.78 11.01 -7.21 11.74 11.40
30 d' 12.00 2.90 0.90 0.30 1.00 0.15 12.00 0.60 3 15.00 1.54 23.10 33.42 -22.02 35.80 34.80
868.03 50.90 20.80 9.00 21.30 1.97 407.69 27.08 67.00 573.90 32.09 611.65 904.71 -524.10 1,121.94 1,085.70
ABSENSI TENDER PEKERJAAN RETAINING WALL
#REF!
TYPE NR HARGA
diameter tebal diameter luar dia. Luar soket I R W panjang efk. berat KODE btg
30 5.0 40.0 47.0 9.5 10.5 13.1 125 192 kg 218,500 1,138
40 5.5 51.0 60.4 9.5 10.5 17.5 125 281 kg 301,500 1,073
50 6.5 63.0 73.8 9.5 10.5 20.15 125 411 kg 504,000 1,226
60 7.0 74.0 84.4 11 12 19.4 125 519 kg -
60 7.0 74.0 84.4 11 12 19.4 250 965 kg 1,240,000 1,285
70 8.0 86.0 98.8 11 12 23.9 250 1289 kg 1,485,000 1,152
80 8.4 96.8 112.8 11 12 29.8 250 1690 kg 1,946,974 1,152
90 10.2 110.4 128.2 12.6 13.6 33.2 250 2159 kg
100 10.8 121.6 141.0 12.6 13.6 36.2 250 2638 kg
HARGA
m
220,800
318,200
459,700
-
562,800
760,300 16
1,008,000
-
-
-
-
-
-
HARGA
m
189,200
261,000
436,400
-
518,800
621,300
814,600
-
-
lama baru
1. Pengukuran & bouwplank 5.000 5.000
2. Galian tanah saluran ± buang 1000m 35,000 35,000
3. Pasir bawah saluran 10 cm 286,000 250,000
4. Pas. Batu kali dudukan buis beton 1 : 8 (jarak 1 m) 457,000 500,000
5. Pasang cincin beton sambungan pipa 700,000 575,000
6. Urugan tanah dipadatkan 20,000 20,000
1. manhole