URAIAN PEKERJAAN VOLUME SAT. (Rp.) (Rp.) 1 2 3 4 5 6 D PEKERJAAN STRUKTUR BETON 1 Pekerjaan Kolom 20/70 Beton K-225 (site mix) 0.56 m3 Rp 1,557,131.51 Rp 871,993.65 Besi beton 90.56 kg Rp 22,012.63 Rp 1,993,398.81 Bekisting 2 kali pakai 7.20 m2 Rp 183,239.16 Rp 1,319,321.95 2 Pekerjaan Balok 20/50 Rp - Beton K-225 (site mix) 0.60 m3 Rp 1,557,131.51 Rp 934,278.91 Besi beton 120.05 kg Rp 22,012.63 Rp 2,642,664.87 Bekisting 2 kali pakai 7.20 m2 Rp 199,957.67 Rp 1,439,695.22 SUB JUMLAH Rp 9,201,353.41 TOTAL Rp 9,201,353.41 PPN 11% Rp 1,012,148.88 SUBTOTAL Rp 10,213,502.29 PEMBULATAN Rp 10,210,000.00 TERBILANG : SEPULUH JUTA DUA RATUS SEPULUH RIBU RUPIAH 6.5 1 M³ MEMBUAT BETON MUTU Fc = 19,3 Mpa (K 225), Slump (12±2)Cmw/c=0,58 6.5.1 Bahan 371.000 Kg Semen @ Rp 1,440.00 Rp 469,440.00 0.698 m3 Pasir @ Rp 247,500.00 Rp 172,755.00 1.047 m3 Kerikil @ Rp 385,000.00 Rp 403,095.00 215.000 Liter Air @ Rp - Rp - Jumlah (1) Rp 1,045,290.00 Tenaga - - 1.650 oh Pekerja @ Rp 143,200.00 Rp 236,280.00 0.275 oh Tukang Batu @ Rp 179,000.00 Rp 49,225.00 0.028 oh Kepala Tukang @ Rp 193,000.00 Rp 5,404.00 0.083 oh Mandor @ Rp 214,800.00 Rp 17,828.40 Jumlah (2) Rp 308,737.40 D. JUMLAH HARGA TENAGA DAN BAHAN Jumlah Rp 1,354,027.40 E. OVERHEAD + PROFIT ( Maksimum 15 % ) 10 % x D Rp 203,104.11 F. HARGA SATUAN PEKERJAAN PER- M³( D + E ) Rp 1,557,131.51
6.17 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR
6.17.1 Bahan 10.500 Kg Besi Beton ( Polos / Ulir) @ Rp 15,500.00 162,750.00 0.150 Kg Kawat Beton @ Rp 26,000.00 Rp 3,900.00 Jumlah (1) Rp 166,650.00 Tenaga 0.070 oh Pekerja @ Rp 143,200.00 Rp 10,024.00 0.070 oh Tukang Batu @ Rp 179,000.00 Rp 12,530.00 0.007 oh Kepala Tukang @ Rp 193,000.00 Rp 1,351.00 0.004 oh Mandor @ Rp 214,800.00 Rp 859.20 Jumlah (2) Rp 24,764.20 D. JUMLAH HARGA TENAGA DAN BAHAN Jumlah Rp 191,414.20 E. OVERHEAD + PROFIT ( Maksimum 15 % ) 10 % x D Rp 28,712.13 F. HARGA SATUAN PEKERJAAN PER- KG( D + E ) Rp 220,126.33 Jadi 1 Kg Rp 22,012.63
6.22 1 M² MEMBUAT BEKESTING UNTUK KOLOM
6.22.1 Bahan 0.040 m³ Kayu Kelas III @ Rp 2,254,000.00 Rp 90,160.00 0.400 Kg Paku 5 Cm - 10 Cm @ Rp 23,400.00 Rp 9,360.00 0.200 Liter Minyak Bekesting @ Rp - Rp - 0.015 m³ Balok Kayu Kelas II @ Rp 3,150,000.00 Rp 0.350 Lbr Plywood Tebal 6 mm @ Rp 90,000.00 Rp 31,500.00 2.000 Btg Dolken Kayu Galamø (8 -10 Cm) @ Rp 4,400.00 Rp 8,800.00 Jumlah (1) Rp 187,070.00 Tenaga 0.520 oh Pekerja @ Rp 143,200.00 Rp 74,464.00 0.260 oh Tukang Batu @ Rp 179,000.00 Rp 46,540.00 0.026 oh Kepala Tukang @ Rp 193,000.00 Rp 5,018.00 0.026 oh Mandor @ Rp 214,800.00 Rp 5,584.80 Jumlah (2) Rp 131,606.80 D. JUMLAH HARGA TENAGA DAN BAHAN Jumlah Rp 318,676.80
E. OVERHEAD + PROFIT ( Maksimum 15 % ) 10 % x D Rp 47,801.52
F. HARGA SATUAN PEKERJAAN PER- M²( D + E ) Rp 366,478.32 2x pakai Rp 183,239.16 Pekerjaan Kolom 20/70 Beton panjang LEBAR TINGGI VOLUME (M3) 4 0.2 0.7 0.56
Pekerjaan Kolom 20/70
Besi Tulangan Pokok panjang Jumlah besi diameter besi koefisien besi volume (kg) 4 4 14 1.208413614 19.33 4 12 12 0.887814084 42.62 Besi Begel 1.74 26.6666667 10 0.616537558 28.61
Total 90.56
Pekerjaan Kolom 20/70
BEKISTING panjang LEBAR TINGGI VOLUME (M2) 4 0.4 1.4 7.2
Pekerjaan Balok 20/50
Beton panjang LEBAR TINGGI VOLUME (M3) 6 0.2 0.5 0.6 Pekerjaan Balok 20/50 Besi Tulangan Pokok panjang Jumlah besi diameter besi koefisien besi volume (kg) 6 4 14 1.208413614 29.00 6 8 14 1.208413614 58.00 Besi Begel 1.34 40 10 0.616537558 33.05
Total 120.05
Pekerjaan Balok 20/50
BEKISTING panjang LEBAR TINGGI VOLUME (M2) 6 0.2 1 7.2