S.No.

# DIV/RLY SECTION STATION XOVER LINE LR OR RR KM FROM MET FROM


1 UMB/NR MRND-DULPR SL LR 74 850.95
2 UMB/NR MRND-DULPR SL LR 74 857.1
3 UMB/NR MRND-DULPR SL LR 74 863.1
4 UMB/NR MRND-DULPR SL LR 75 62.9
5 UMB/NR MRND-DULPR SL LR 75 69
6 UMB/NR MRND-DULPR SL LR 76 285
7 UMB/NR MRND-DULPR SL LR 76 291
8 UMB/NR MRND-DULPR SL LR 76 378
9 UMB/NR MRND-DULPR SL LR 76 384.5
10 UMB/NR MRND-DULPR SL LR 77 315
11 UMB/NR MRND-DULPR SL LR 77 321.75
12 UMB/NR MRND-DULPR SL LR 78 25.1
13 UMB/NR MRND-DULPR SL LR 78 31.1
14 UMB/NR MRND-DULPR SL LR 79 461
15 UMB/NR MRND-DULPR SL LR 79 467.35
16 UMB/NR MRND-DULPR SL LR 79 555.9
17 UMB/NR MRND-DULPR SL LR 79 561.9
18 UMB/NR MRND-DULPR SL LR 104 896
19 UMB/NR MRND-DULPR SL LR 104 902
20 UMB/NR MRND-DULPR SL RR 74 786.3
21 UMB/NR MRND-DULPR SL RR 74 792.3
22 UMB/NR MRND-DULPR SL RR 74 857
23 UMB/NR MRND-DULPR SL RR 74 863.1
24 UMB/NR MRND-DULPR SL RR 75 62.9
25 UMB/NR MRND-DULPR SL RR 75 69
26 UMB/NR MRND-DULPR SL RR 76 285
27 UMB/NR MRND-DULPR SL RR 76 291
28 UMB/NR MRND-DULPR SL RR 77 678.9
29 UMB/NR MRND-DULPR SL RR 77 685.4
30 UMB/NR MRND-DULPR SL RR 79 289.4
31 UMB/NR MRND-DULPR SL RR 79 296.65
32 UMB/NR MRND-DULPR SL RR 79 379.45
33 UMB/NR MRND-DULPR SL RR 79 385.7
34 UMB/NR MRND-DULPR SL RR 79 527
35 UMB/NR MRND-DULPR SL RR 79 533
36 UMB/NR MRND-DULPR SL RR 79 900
37 UMB/NR MRND-DULPR SL RR 79 906
38 UMB/NR MRND-DULPR SL RR 79 976.44
39 UMB/NR MRND-DULPR SL RR 79 983.9
40 UMB/NR MRND-DULPR SL RR 145 108.25
41 UMB/NR MRND-DULPR SL RR 145 114.75
42 UMB/NR BARJ Loop Line No3 LR 66 507
43 UMB/NR BARJ Loop Line No3 LR 66 547.4
44 UMB/NR BARJ Loop Line No3 LR 66 553.5
45 UMB/NR BARJ Loop Line No3 LR 66 584.5
46 UMB/NR BARJ Loop Line No3 LR 66 591
47 UMB/NR BARJ Loop Line No3 LR 66 725.5
48 UMB/NR BARJ Loop Line No3 LR 66 732
49 UMB/NR BARJ Loop Line No3 LR 66 829
50 UMB/NR BARJ Loop Line No3 LR 66 835
51 UMB/NR BARJ Loop Line No3 RR 66 507
52 UMB/NR BARJ Loop Line No3 RR 66 548
53 UMB/NR BARJ Loop Line No3 RR 66 555.5
54 UMB/NR BARJ Loop Line No3 RR 66 585
55 UMB/NR BARJ Loop Line No3 RR 66 591
56 UMB/NR BARJ Loop Line No3 RR 66 726
57 UMB/NR BARJ Loop Line No3 RR 66 732
58 UMB/NR BARJ Loop Line No3 RR 66 829
59 UMB/NR BARJ Loop Line No3 RR 66 835.8
60 UMB/NR DLPC Line no 1 LR 162 981.7
61 UMB/NR DLPC Line no 1 LR 163 625.77
62 UMB/NR DLPC Line no 1 RR 162 981.7
63 UMB/NR DLPC Line no 1 RR 163 625.77
64 UMB/NR KART Line No3 Goods Siding LR 75 555
65 UMB/NR KART Line No3 Goods Siding LR 75 561.5
66 UMB/NR KART Line No3 Goods Siding RR 75 555
67 UMB/NR KART Line No3 Goods Siding RR 75 561.5
68 UMB/NR KART Loop Line no1 LR 75 522
69 UMB/NR KART Loop Line no1 LR 75 528.5
70 UMB/NR KART Loop Line no1 LR 75 938.1
71 UMB/NR KART Loop Line no1 LR 75 944.6
72 UMB/NR KART Loop Line no1 LR 76 320
73 UMB/NR KART Loop Line no1 LR 76 326.5
74 UMB/NR KART Loop Line no1 RR 75 522
75 UMB/NR KART Loop Line no1 RR 75 528.5
76 UMB/NR KART Loop Line no1 RR 76 320
77 UMB/NR KART Loop Line no1 RR 76 326.5
Reporting Date: 18/01/2023 10:05:27  
S.No. # DIV/RLY SECTION STATION XOVER LINE LR OR RR KM FROM MET FROM
WELD TYPE
DATE OF WELDING
WELDING GAP
WELDER NAME
SUPERVISOR NAME
PORTION AGENCY
PORTION DATE
BATCHOF
NOFINISH GRINDING
DONE ON
PLANT/AGENCY NAME
Thermit Weld (AT Weld)
11/3/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 200198 11/3/2022 ON TRACK
Thermit Weld (AT Weld)
11/3/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22080135 11/3/2022 ON TRACK
Thermit Weld (AT Weld)
11/3/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22080135 11/3/2022 ON TRACK
Thermit Weld (AT Weld)
11/4/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22080135 11/4/2022 ON TRACK
Thermit Weld (AT Weld)
11/4/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22080135 11/4/2022 ON TRACK
Thermit Weld (AT Weld)
11/8/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 210007 11/8/2022 ON TRACK
Thermit Weld (AT Weld)
11/8/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 210007 11/8/2022 ON TRACK
Thermit Weld (AT Weld)
12/5/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22100166 12/5/2022 ON TRACK
Thermit Weld (AT Weld)
12/5/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22100166 12/5/2022 ON TRACK
Thermit Weld (AT Weld)
12/10/2022 25 mm
GURVINDER SINGH
Baban
(UMB)
Yadav (UMB)
TPP Lucknow 22050085 12/10/2022 ON TRACK
Thermit Weld (AT Weld)
12/10/2022 25 mm
GURVINDER SINGH
Baban
(UMB)
Yadav (UMB)
TPP Lucknow 22060102 12/10/2022 ON TRACK
Thermit Weld (AT Weld)
12/13/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22100166 12/13/2022 ON TRACK
Thermit Weld (AT Weld)
12/13/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22100166 12/13/2022 ON TRACK
Thermit Weld (AT Weld)
11/29/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 22080138 11/29/2022 ON TRACK
Thermit Weld (AT Weld)
11/29/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 22060102 11/29/2022 ON TRACK
Thermit Weld (AT Weld)
12/1/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22100166 12/1/2022 ON TRACK
Thermit Weld (AT Weld)
12/1/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22100166 12/1/2022 ON TRACK
Thermit Weld (AT Weld)
12/27/2022 25 mm
GURVINDER SINGH
Baban
(UMB)
Yadav (UMB)
TPP Lucknow 210007 12/27/2022 ON TRACK
Thermit Weld (AT Weld)
12/27/2022 25 mm
GURVINDER SINGH
Baban
(UMB)
Yadav (UMB)
TPP Lucknow 210007 12/27/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/10/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 200198 11/10/2022 ON TRACK
Thermit Weld (AT Weld)
11/10/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 200042 11/10/2022 ON TRACK
Thermit Weld (AT Weld)
11/1/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22080135 11/1/2022 ON TRACK
Thermit Weld (AT Weld)
11/1/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22010005 11/1/2022 ON TRACK
Thermit Weld (AT Weld)
11/2/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22080135 11/2/2022 ON TRACK
Thermit Weld (AT Weld)
11/2/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22080135 11/2/2022 ON TRACK
Thermit Weld (AT Weld)
11/5/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 810007 11/5/2022 ON TRACK
Thermit Weld (AT Weld)
11/5/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 200198 11/5/2022 ON TRACK
Thermit Weld (AT Weld)
12/31/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22100166 12/31/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/31/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22100166 12/31/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/2/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22100166 12/2/2022 ON TRACK
Thermit Weld (AT Weld)
12/2/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22100166 12/2/2022 ON TRACK
Thermit Weld (AT Weld)
11/30/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22050085 11/30/2022 ON TRACK
Thermit Weld (AT Weld)
11/30/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22080138 11/30/2022 ON TRACK
Thermit Weld (AT Weld)
11/28/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 22080138 11/28/2022 ON TRACK
Thermit Weld (AT Weld)
11/28/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 22060102 11/28/2022 ON TRACK
Thermit Weld (AT Weld)
11/24/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22070113 11/24/2022 ON TRACK
Thermit Weld (AT Weld)
11/24/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22070113 11/24/2022 ON TRACK
Thermit Weld (AT Weld)
11/25/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22070113 11/25/2022 ON TRACK
Thermit Weld (AT Weld)
11/25/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22060102 11/25/2022 ON TRACK
Thermit Weld (AT Weld)
11/26/2022 25 mm
GURVINDER SINGH
Raju Kumar
(UMB)Sharma TPP
(UMB)
Lucknow 22070111 11/26/2022 ON TRACK
Thermit Weld (AT Weld)
11/26/2022 25 mm
GURVINDER SINGH
Raju Kumar
(UMB)Sharma TPP
(UMB)
Lucknow 22070111 11/26/2022 ON TRACK
Thermit Weld (AT Weld)
12/14/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22070111 12/14/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/17/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 22070111 12/17/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/17/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 22070111 12/17/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/20/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22070111 12/20/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/20/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22070111 12/20/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/21/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22070111 12/21/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/21/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22070111 12/21/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/26/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 22090163 12/26/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/26/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 22090163 12/26/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/14/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22070111 12/14/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/16/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 21100149 12/16/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/16/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22070111 12/16/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/19/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 210007 12/19/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/19/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 22070111 12/19/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/23/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22070111 12/23/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/23/2022 25 mm
GURVINDER SINGH
Hoshiar
(UMB)Singh (UMB)
TPP Lucknow 22070111 12/23/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/30/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 22070111 12/30/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
12/30/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 21060100 12/30/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/19/2022 25 mm
GURVINDER sanjeev
SINGH (UMB)
kumar vermaTPP
(UMB)
Lucknow 210007 11/19/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/21/2022 25 mm
GURVINDER sanjeev
SINGH (UMB)
kumar vermaTPP
(UMB)
Lucknow 190154 11/21/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/19/2022 25 mm
GURVINDER sanjeev
SINGH (UMB)
kumar vermaTPP
(UMB)
Lucknow 210007 11/19/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/21/2022 25 mm
GURVINDER sanjeev
SINGH (UMB)
kumar vermaTPP
(UMB)
Lucknow 59767 11/21/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/12/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22080138 11/12/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/12/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22080138 11/12/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/15/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 22080138 11/15/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/15/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 22080138 11/15/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/22/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 22080138 11/22/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/22/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 22070113 11/22/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/7/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22070113 11/7/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/7/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22060102 11/7/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/11/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22070113 11/11/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/11/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22050085 11/11/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/18/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 22080138 11/18/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/18/2022 25 mm
GURVINDER SINGH
DILWAR
(UMB)
SINGH (UMB)
TPP Lucknow 22080138 11/18/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/9/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22060102 11/9/2022 ON TRACK New Untested Weld
Thermit Weld (AT Weld)
11/9/2022 25 mm
GURVINDER SINGH
KISHAN
(UMB)
CHAND (UMB)
TPP Lucknow 22070113 11/9/2022 ON TRACK New Untested Weld

WELD TYPE
DATE OF WELDING
WELDING GAP
WELDER NAME
SUPERVISOR NAME
PORTION AGENCY
PORTION DATE
BATCHOF
NOFINISH GRINDING
DONE ON
PLANT/AGENCY NAME
LAST USFD
LAST INSP.
USFD RESULT
TESTING
LAST DATE(RAIL/WELD)
USFD TESTING DATE(WELD)
GMT CARRIED
GW 11/30/2022 11/30/2022 6.324
GW 11/30/2022 11/30/2022 6.324
GW 11/30/2022 11/30/2022 6.324
GW 11/25/2022 11/25/2022 6.24
GW 11/25/2022 11/25/2022 6.24
GW 11/25/2022 11/25/2022 5.908
GW 11/25/2022 11/25/2022 5.908
GW 12/31/2022 12/31/2022 3.661
GW 12/31/2022 12/31/2022 3.661
GW 12/31/2022 12/31/2022 3.245
GW 12/31/2022 12/31/2022 3.245
GW 12/31/2022 12/31/2022 2.995
GW 12/31/2022 12/31/2022 2.995
GW 12/20/2022 12/2/2022 4.16
GW 12/20/2022 12/2/2022 4.16
GW 12/20/2022 12/2/2022 3.994
GW 12/20/2022 12/2/2022 3.994
GW 12/31/2022 12/31/2022 0.592
New Untested Weld 0.592
GW 11/30/2022 11/30/2022 5.741
GW 11/30/2022 11/30/2022 5.741
GW 11/30/2022 11/30/2022 6.49
GW 11/30/2022 11/30/2022 6.49
GW 11/25/2022 11/25/2022 6.407
GW 11/25/2022 11/25/2022 6.407
GW 11/25/2022 11/25/2022 6.157
GW 11/25/2022 11/25/2022 6.157
New Untested Weld 1.498
New Untested Weld 1.498
GW 12/31/2022 12/31/2022 3.911
GW 12/31/2022 12/31/2022 3.911
GW 12/20/2022 12/2/2022 4.077
GW 12/20/2022 12/2/2022 4.077
GW 12/20/2022 12/2/2022 4.243
GW 12/20/2022 12/2/2022 4.243
GW 12/20/2022 12/2/2022 4.576
GW 12/20/2022 12/2/2022 4.576
GW 12/20/2022 12/2/2022 4.493
GW 12/20/2022 12/2/2022 4.493
GW 12/30/2022 12/30/2022 1.205
GW 12/30/2022 12/30/2022 1.205
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld
New Untested Weld

LAST USFD
LAST INSP.
USFD RESULT
TESTING
LAST DATE(RAIL/WELD)
USFD TESTING DATE(WELD)
GMT CARRIED
S.No. DIV/RLY SECTION LINE LR OR RR KM FROM MET FROM WELD TYPE
22 UMB/NR MRND-DULPR SL RR 74 857 Thermit Weld (AT Weld)
23 UMB/NR MRND-DULPR SL RR 74 863.1 Thermit Weld (AT Weld)
24 UMB/NR MRND-DULPR SL RR 75 62.9 Thermit Weld (AT Weld)
25 UMB/NR MRND-DULPR SL RR 75 69 Thermit Weld (AT Weld)
1 UMB/NR MRND-DULPR SL LR 74 850.95 Thermit Weld (AT Weld)
2 UMB/NR MRND-DULPR SL LR 74 857.1 Thermit Weld (AT Weld)
3 UMB/NR MRND-DULPR SL LR 74 863.1 Thermit Weld (AT Weld)
4 UMB/NR MRND-DULPR SL LR 75 62.9 Thermit Weld (AT Weld)
5 UMB/NR MRND-DULPR SL LR 75 69 Thermit Weld (AT Weld)
26 UMB/NR MRND-DULPR SL RR 76 285 Thermit Weld (AT Weld)
27 UMB/NR MRND-DULPR SL RR 76 291 Thermit Weld (AT Weld)
70 UMB/NR KART Loop Line no1 LR 75 938.1 Thermit Weld (AT Weld)
71 UMB/NR KART Loop Line no1 LR 75 944.6 Thermit Weld (AT Weld)
6 UMB/NR MRND-DULPR SL LR 76 285 Thermit Weld (AT Weld)
7 UMB/NR MRND-DULPR SL LR 76 291 Thermit Weld (AT Weld)
76 UMB/NR KART Loop Line no1 RR 76 320 Thermit Weld (AT Weld)
77 UMB/NR KART Loop Line no1 RR 76 326.5 Thermit Weld (AT Weld)
20 UMB/NR MRND-DULPR SL RR 74 786.3 Thermit Weld (AT Weld)
21 UMB/NR MRND-DULPR SL RR 74 792.3 Thermit Weld (AT Weld)
72 UMB/NR KART Loop Line no1 LR 76 320 Thermit Weld (AT Weld)
73 UMB/NR KART Loop Line no1 LR 76 326.5 Thermit Weld (AT Weld)
64 UMB/NR KART Line No3 Goods Siding LR 75 555 Thermit Weld (AT Weld)
65 UMB/NR KART Line No3 Goods Siding LR 75 561.5 Thermit Weld (AT Weld)
66 UMB/NR KART Line No3 Goods Siding RR 75 555 Thermit Weld (AT Weld)
67 UMB/NR KART Line No3 Goods Siding RR 75 561.5 Thermit Weld (AT Weld)
74 UMB/NR KART Loop Line no1 RR 75 522 Thermit Weld (AT Weld)
75 UMB/NR KART Loop Line no1 RR 75 528.5 Thermit Weld (AT Weld)
60 UMB/NR DLPC Line no 1 LR 162 981.7 Thermit Weld (AT Weld)
62 UMB/NR DLPC Line no 1 RR 162 981.7 Thermit Weld (AT Weld)
61 UMB/NR DLPC Line no 1 LR 163 625.77 Thermit Weld (AT Weld)
63 UMB/NR DLPC Line no 1 RR 163 625.77 Thermit Weld (AT Weld)
68 UMB/NR KART Loop Line no1 LR 75 522 Thermit Weld (AT Weld)
69 UMB/NR KART Loop Line no1 LR 75 528.5 Thermit Weld (AT Weld)
36 UMB/NR MRND-DULPR SL RR 79 900 Thermit Weld (AT Weld)
37 UMB/NR MRND-DULPR SL RR 79 906 Thermit Weld (AT Weld)
38 UMB/NR MRND-DULPR SL RR 79 976.44 Thermit Weld (AT Weld)
39 UMB/NR MRND-DULPR SL RR 79 983.9 Thermit Weld (AT Weld)
40 UMB/NR MRND-DULPR SL RR 145 108.25 Thermit Weld (AT Weld)
41 UMB/NR MRND-DULPR SL RR 145 114.75 Thermit Weld (AT Weld)
34 UMB/NR MRND-DULPR SL RR 79 527 Thermit Weld (AT Weld)
35 UMB/NR MRND-DULPR SL RR 79 533 Thermit Weld (AT Weld)
14 UMB/NR MRND-DULPR SL LR 79 461 Thermit Weld (AT Weld)
15 UMB/NR MRND-DULPR SL LR 79 467.35 Thermit Weld (AT Weld)
32 UMB/NR MRND-DULPR SL RR 79 379.45 Thermit Weld (AT Weld)
33 UMB/NR MRND-DULPR SL RR 79 385.7 Thermit Weld (AT Weld)
16 UMB/NR MRND-DULPR SL LR 79 555.9 Thermit Weld (AT Weld)
17 UMB/NR MRND-DULPR SL LR 79 561.9 Thermit Weld (AT Weld)
30 UMB/NR MRND-DULPR SL RR 79 289.4 Thermit Weld (AT Weld)
31 UMB/NR MRND-DULPR SL RR 79 296.65 Thermit Weld (AT Weld)
8 UMB/NR MRND-DULPR SL LR 76 378 Thermit Weld (AT Weld)
9 UMB/NR MRND-DULPR SL LR 76 384.5 Thermit Weld (AT Weld)
10 UMB/NR MRND-DULPR SL LR 77 315 Thermit Weld (AT Weld)
11 UMB/NR MRND-DULPR SL LR 77 321.75 Thermit Weld (AT Weld)
12 UMB/NR MRND-DULPR SL LR 78 25.1 Thermit Weld (AT Weld)
13 UMB/NR MRND-DULPR SL LR 78 31.1 Thermit Weld (AT Weld)
42 UMB/NR BARJ Loop Line No3 LR 66 507 Thermit Weld (AT Weld)
51 UMB/NR BARJ Loop Line No3 RR 66 507 Thermit Weld (AT Weld)
52 UMB/NR BARJ Loop Line No3 RR 66 548 Thermit Weld (AT Weld)
53 UMB/NR BARJ Loop Line No3 RR 66 555.5 Thermit Weld (AT Weld)
43 UMB/NR BARJ Loop Line No3 LR 66 547.4 Thermit Weld (AT Weld)
44 UMB/NR BARJ Loop Line No3 LR 66 553.5 Thermit Weld (AT Weld)
54 UMB/NR BARJ Loop Line No3 RR 66 585 Thermit Weld (AT Weld)
55 UMB/NR BARJ Loop Line No3 RR 66 591 Thermit Weld (AT Weld)
45 UMB/NR BARJ Loop Line No3 LR 66 584.5 Thermit Weld (AT Weld)
46 UMB/NR BARJ Loop Line No3 LR 66 591 Thermit Weld (AT Weld)
47 UMB/NR BARJ Loop Line No3 LR 66 725.5 Thermit Weld (AT Weld)
48 UMB/NR BARJ Loop Line No3 LR 66 732 Thermit Weld (AT Weld)
56 UMB/NR BARJ Loop Line No3 RR 66 726 Thermit Weld (AT Weld)
57 UMB/NR BARJ Loop Line No3 RR 66 732 Thermit Weld (AT Weld)
49 UMB/NR BARJ Loop Line No3 LR 66 829 Thermit Weld (AT Weld)
50 UMB/NR BARJ Loop Line No3 LR 66 835 Thermit Weld (AT Weld)
18 UMB/NR MRND-DULPR SL LR 104 896 Thermit Weld (AT Weld)
19 UMB/NR MRND-DULPR SL LR 104 902 Thermit Weld (AT Weld)
58 UMB/NR BARJ Loop Line No3 RR 66 829 Thermit Weld (AT Weld)
59 UMB/NR BARJ Loop Line No3 RR 66 835.8 Thermit Weld (AT Weld)
28 UMB/NR MRND-DULPR SL RR 77 678.9 Thermit Weld (AT Weld)
29 UMB/NR MRND-DULPR SL RR 77 685.4 Thermit Weld (AT Weld)
DATE OF WELDING WELDING GAP WELDER NAME SUPERVISOR NAME PORTION AGENCY
11/1/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/1/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/2/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/2/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/3/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/3/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
11/3/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
11/4/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/4/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/5/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/5/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/7/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/7/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/8/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/8/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/9/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/9/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/10/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/10/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/11/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/11/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/12/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/12/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/15/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
11/15/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
11/18/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
11/18/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
11/19/2022 25 mm GURVINDER SINGH (UMB) sanjeev kumar verma (UMB) TPP Lucknow
11/19/2022 25 mm GURVINDER SINGH (UMB) sanjeev kumar verma (UMB) TPP Lucknow
11/21/2022 25 mm GURVINDER SINGH (UMB) sanjeev kumar verma (UMB) TPP Lucknow
11/21/2022 25 mm GURVINDER SINGH (UMB) sanjeev kumar verma (UMB) TPP Lucknow
11/22/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
11/22/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
11/24/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
11/24/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
11/25/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
11/25/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
11/26/2022 25 mm GURVINDER SINGH (UMB) Raju Kumar Sharma (UMB) TPP Lucknow
11/26/2022 25 mm GURVINDER SINGH (UMB) Raju Kumar Sharma (UMB) TPP Lucknow
11/28/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
11/28/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
11/29/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
11/29/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
11/30/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
11/30/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
12/1/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
12/1/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
12/2/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
12/2/2022 25 mm GURVINDER SINGH (UMB) KISHAN CHAND (UMB) TPP Lucknow
12/5/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
12/5/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
12/10/2022 25 mm GURVINDER SINGH (UMB) Baban Yadav (UMB) TPP Lucknow
12/10/2022 25 mm GURVINDER SINGH (UMB) Baban Yadav (UMB) TPP Lucknow
12/13/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
12/13/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
12/14/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
12/14/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
12/16/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
12/16/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
12/17/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
12/17/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
12/19/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
12/19/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
12/20/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
12/20/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
12/21/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
12/21/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
12/23/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
12/23/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
12/26/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
12/26/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
12/27/2022 25 mm GURVINDER SINGH (UMB) Baban Yadav (UMB) TPP Lucknow
12/27/2022 25 mm GURVINDER SINGH (UMB) Baban Yadav (UMB) TPP Lucknow
12/30/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
12/30/2022 25 mm GURVINDER SINGH (UMB) DILWAR SINGH (UMB) TPP Lucknow
12/31/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
12/31/2022 25 mm GURVINDER SINGH (UMB) Hoshiar Singh (UMB) TPP Lucknow
PORTION BATCH NO DATE OF FINISH GRINDING
22080135 11/1/2022
22010005 11/1/2022
22080135 11/2/2022
22080135 11/2/2022
200198 11/3/2022
22080135 11/3/2022
22080135 11/3/2022
22080135 11/4/2022
22080135 11/4/2022
810007 11/5/2022
200198 11/5/2022
22070113 11/7/2022
22060102 11/7/2022
210007 11/8/2022
210007 11/8/2022
22060102 11/9/2022
22070113 11/9/2022
200198 11/10/2022
200042 11/10/2022
22070113 11/11/2022
22050085 11/11/2022
22080138 11/12/2022
22080138 11/12/2022
22080138 11/15/2022
22080138 11/15/2022
22080138 11/18/2022
22080138 11/18/2022
210007 11/19/2022
210007 11/19/2022
190154 11/21/2022
59767 11/21/2022
22080138 11/22/2022
22070113 11/22/2022
22070113 11/24/2022
22070113 11/24/2022
22070113 11/25/2022
22060102 11/25/2022
22070111 11/26/2022
22070111 11/26/2022
22080138 11/28/2022
22060102 11/28/2022
22080138 11/29/2022
22060102 11/29/2022
22050085 11/30/2022
22080138 11/30/2022
22100166 12/1/2022
22100166 12/1/2022
22100166 12/2/2022
22100166 12/2/2022
22100166 12/5/2022
22100166 12/5/2022
22050085 12/10/2022
22060102 12/10/2022
22100166 12/13/2022
22100166 12/13/2022
22070111 12/14/2022
22070111 12/14/2022
21100149 12/16/2022
22070111 12/16/2022
22070111 12/17/2022
22070111 12/17/2022
210007 12/19/2022
22070111 12/19/2022
22070111 12/20/2022
22070111 12/20/2022
22070111 12/21/2022
22070111 12/21/2022
22070111 12/23/2022
22070111 12/23/2022
22090163 12/26/2022
22090163 12/26/2022
210007 12/27/2022
210007 12/27/2022
22070111 12/30/2022
21060100 12/30/2022
22100166 12/31/2022
22100166 12/31/2022