G HARDA TEMAGAON PROJECT

Shoulde Zebra Arrow Bar Stop Stop Chevro Checure


Date Center Median q block
Working Chainage r Marking Marking Marking Line Mark n
Type Of +Traingl Total Qty
Date Site Length Median Length Nos. Nos. Nos. Nos. Nos.
Mark Size of Nos.of in Sqm.
Date From To Mark Patte 0.100 0.150 0.150 - - -

9/Sep/23 7540 7324 Ramp 3X3 36 108 10.800


9/Sep/23 7595 7540 Sr.Road 6X3 6 36 3.600
9/Sep/23 7430 7325 Sr.Road 6X3 12 72 7.200
9/Sep/23 7420 7325 Sr.Road 6X3 10 60 6.000
9/Sep/23 28700 LHS JN 6X3 10 60 6.000
9/Sep/23 28700 LHS JN 385 57.750
9/Sep/23 28700 LHS JN 385 57.750
9/Sep/23 28700 RHS JN 380 57.000
9/Sep/23 28700 RHS JN 385 57.750
9/Sep/23 30000 LHSEnd merging 105 15.750
9/Sep/23 30000 RHSEnd merging 105 15.750
9/Sep/23 30000 LHSEnd merging 45 6.750
9/Sep/23 30000 RHSEnd merging 45 6.750
9/Sep/23 30000 LHSEnd mergin 3 X 3 7 21 3.150
9/Sep/23 2450 RHS JN 3 1 1 1 24.800
9/Sep/23 2450 LHS JN 3 2 1 1 37.400
9/Sep/23 200 LHSBus Shelter 1 28.000
9/Sep/23 0 LHS JN 1 1 19.250
9/Sep/23 0 LHS JN 1 5.310
9/Sep/23 1150 LHS JN 6 15 464.26
9/Sep/23 1250 LHS JN 9 22.5